Item 9BXM CITY OF SOUTH LAKE MEMORANDUM June 14, 2022 To: Shana Yelverton, City Manager From: Chris Tribble, Director of Community Services Subject: Approve contract with Wildstone Construction, LLC for the purchase and installation of an 8" waterline and fire hydrant associated with the new nature center barn in amount not to exceed $150,000. Action Requested: City Council approval of the contract with Wildstone Construction, LLC for the purchase and installation of an 8" waterline and fire hydrant to serve the existing nature center building and new barn. Background Information: The purpose of this item is to approve the purchase and installation of an 8" waterline and fire hydrant to serve the existing nature center building and new barn at the Bob Jones Nature Center & Preserve. A new fire hydrant located within 300 feet of the building structures, fed by an 8" waterline, is required to meet the International Fire Code standards for hydrant spacing and hydrant availability to structures. The current hydrant is 1,200 feet from the current building. Financial Considerations: Funding in the amount of $150,000 is being reallocated within the FY 2022 Community Services Department General Fund and SPDC operating budgets for this project Strategic Link: This item is linked to the City's Strategy Map related to the focus area of Infrastructure and meets the corporate objective to Invest to provide and maintain high quality public assets. Citizen Input/ Board Review: SPDC to consider on June 21, 2022 City Council to consider on June 21, 2022 Legal Review: N/A Alternatives: 1) Approval as presented City of Southlake Values. - Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Shana Yelverton, City Manager Meeting Date — June 21, 2022 Page 2 of 2 2) Approval with modifications 3) Decision not to approve Supporting Documents: Copy of proposal from Wildstone Staff Recommendation: City Council approval of the contract with Wildstone Construction, LLC for the purchase and installation of an 8" waterline and fire hydrant to serve the existing nature center building and new barn. City of Southlake Values. - Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Wildstone Construction, LLC 12850 Hwy 287 Fort Worth, Texas 76052 Phone: 817-847-8660 Fax: 817-847-8019 Quote To: City of Southlake 1950 E. Continental Blvd. Southlake, Texas 76092 Phone: 817-748-8200 Fax: - Project: Bob Jones Nature Center Southlake, TX CONS STIO , LLC Date: 6/7/2022 Attn: Jack Thompson Item No. Quantity Unit Water Description Unit Price Extension 1 980 LF 8" DR-18 PVC $94.00 $92,120.00 2 280 LF 6" DR-18 PVC $88.00 $24,640.00 3 1 EA 8"X8" Tapping Sleeve & Valve $7,866.00 $7,866.00 4 1 EA Fire Hydrant $8,697.00 $8,697.00 5 1 EA 8" Gate Valve & Box $3,192.00 $3,192.00 6 1 EA 6" Gate Valve & Box $2,349.00 $2,349.00 7 1 LS Ductile Iron Fittings $3,675.00 $3,675.00 8 1260 LF Water Testing $1.00 $1,260.00 9 1260 LF Trench Safety $1.00 $1,260.00 Item No. Quantity Unit Miscellaneous Items Description Sub Total- Unit Price $145,059.00 Extension 1 1 LS PP&M Bonds $4,941.00 $4,941.00 Sub Total- $4,941.00 TOTAL QUOTE: $150,000.00 NOTES: 1. We are a licensed " Fire Protection Sprinkler System- Underground Fire Main Contractor" No. SCR-U-1897567. 2. We have included Sales Tax on the private materials, but not on the public materials. A tax exempt certificated will be req. 3. All underground conflicts to be relocated by others. 4. Inlet Protection is NOT Included. All erosion control not listed above, all maintenance & removal by others. 5. Barricades are excluded for our scope of work. If needed, shall be provided by others. 6. Topsoil or seeding/hydro-mulch is NOT included in our pricing. 7. SWPPP and Erosion control are to be by others. 8. We will set all manholes, cleanout, fire hydrants, valve boxes and inlet tops to final grades provided by plans. 9. All final adjustments of manholes, cleanouts, valve boxes in paving are by others. 10. All landscaping, hardscaping and sprinklers systems are excluded. Removal, repairs or replacement by others. 11. Payment and Performance Bonds are not included. 12. Material testing is excluded. 13. Excess ditch excavation is to be left onsite and spread out along waterline. 14. Plumbing and Fire Line permits are included in unit prices. 15. Layout is included in this proposal. 16. This proposal is based on One (1) mobilization. Additional mobilizations will be $4,500.00 each. 17. 10 working days required to substantially complete. 18. This quote is based on "new layout" plans dated on 4-29-2022 and received 0 addendum. 19. All utilities to end 5' outside face of building with exception of fire riser 1' AFF. 20. All site clearing & demolition, except itemized above is to be by others. 21. Pollution insurance is excluded and shall be by others if needed. 22. Rock Excavation is NOT Included in This Proposal. No Geo Report provided. 23. This Proposal is valid for 10 days from date shown above. Bob Jones Nature Center(New Layout 8IN)Revl Page 1 of 2 24. Once project is awarded, final pricing on materials will be calculated from shipment date. 25. Proposal and/or line items are subject to be voided/cancelled due to availability of materials. 26. Tree removal, trimming, protection or haul off to be by others. 27. All asphalt and concrete removal & replacement by others. 28. All obstacles & obstructions to be removed & replaced by others. Additional Items Exclude: Inspection Fees, Impact Fees, Meter Fees, Tap Fees, Conduits, Auto Flush Device, Water Services and Water Meters. Respectfully Submitted, 7m am F ac&lwd William Blackwood Wildstone Construction, LLC Office (817) 847-8660 Cell (817) 821-5209 Bob Jones Nature Center(New Layout 8IN)Revl Page 2 of 2