Loading...
Item 4E - MemoCITY OF SOUTHLAKE MEMORANDUM (June 21, 2022) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Item 4E Subject: Authorize expenditures with Road Master Striping, LLC for pavement marking services in an amount not to exceed $100,000. Action Requested: Authorize expenditures with Road Master Striping, LLC for pavement marking services in an amount not to exceed $100,000. Background Information: Southlake Public Works utilizes the services of a pavement marking contractor for the installation of new pavement markings on paving projects. The City also uses the services of this contractor to refresh worn pavement lane markings, replace reflective buttons, and refresh crosswalk markings throughout the City, as part of the annual maintenance program. Clean and bright pavement markings are critical to ensuring visibility, and the safety of motorists and pedestrians. For FY 2022, the department will contract Road Master Striping for projects related to the pavement management assessment (PMA) program, crosswalk striping, and any refresh of the long -line striping that is needed. Under the PMA program, there are currently 6 roadway segments that will be restriped after resurfacing is completed. Financial Considerations: The City's purchasing policy for this service is met through an ILA with the City of Allen. On February 2, 2021, the City of Allen awarded its contract for pavement marking services to Road Maser Striping, LLC, contract no. 2021-10-5. This contract comes with a one year initial and up to two additional renewal options. Page 1 of 3 Item 4E Below are services performed by Road Master Striping, LLC in FY 2022: Pavement Marking Services Cost Blessed Way — SH114 to Kirkwood Blvd $ 7,955 Kimball Ave — SH114 to FM1709 $ 6,837 SLTS — Various intersections $ 14,116 TW King RD — Plaza Dr to W Bob Jones Rd $ 6,874 Nolen Dr — E Southlake Blvd to Crooked Ln $ 7,242 SLTS E & W Grand Ave $ 1,898 SLTS Grand Ave — SH114 to Division St $ 1,771 Expenses -to -date $ 46,693 PMA — Briarwood Dr $ 105 PMA — White Chapel Ct $ 105 PMA — Cherry Ln $ 105 PMA — Shady Ln $ 14,806 PMA — Raintree Dr $ 5,964 PMA — Pine Dr $ 7,803 N White Chapel — FM1709 to Emerald Blvd $ 7,314 Total expected expenditures $ 82,895 Staff is requesting authorization up to $100,000 for the remainder of the year should additional requests be submitted to be completed. Funding for these services are available in the General Fund via the Streets & Drainage and Traffic Operating budgets, and part of the Capital Improvement Program budget. Expenditures will not exceed available funds. Strategic Link: This item links to the City's Strategy Map strategic focus areas of Safety & Security and Mobility. It specifically relates to the City's Corporate Objectives, Cl: Achieve The Highest Standards Of Safety & Security, C2: Provide Travel Convenience Within City & Region, and B2: Collaborate With Select Partners To Implement Service Solutions. The Critical Business Outcome is, CBO2: Enhance Mobility Through Aggressive Traffic Management Initiatives And Capital Project Implementation. Citizen Input/ Board Review: None. Legal Review: None. Page 2of3 Item 4E Alternatives: The City Council may approve or deny the request. Staff Recommendation: Authorize expenditures with Road Master Striping, LLC for pavement marking services in an amount not to exceed $100,000. Supporting Documents: Attachment A: City of Allen Contract No. 2021-10-5 Staff Contact: Rob Cohen, Director of Public Works Jack Thompson, Deputy Director of Public Works — Operations Page 3of3 Attachment A CITY OF ALLEN February 8, 2021 Mr. Dino Vasquez, President Road Master Striping, LLC 1301 SE McKinney Rice, TX 75155 SUBJECT. Notice to Proceed, Pavement Markings Services Invitation for Bid #2021-10-S Dear Mr. Vasquez, Please allow this letter to serve as a notice to proceed for the above -mentioned agreement for Pavement Markings Services. This first term agreement will be in effect through February 28. 2022. Effective Dates Year One - 2/2/2021 - 2/2812022 Year Two - 3/1/2022 - 2/28/2023 Year Three - 3/1/2022 - 2/23/2023 This agreement will automatically renew annually through the final expiration date, except for either party exercising the termination conditions in Article I of the contract. All invoices must also be e-mailed to accountspayable(acityofalien_org.. The invoices must reference a Purchase Order number. Orders will be issued on as as -needed basis by the City of Allen department for which work will be performed. If you have any questions concerning this award, please contact me at 214-509-4632. Thank you for your service/support to the City of Allen. Please acknowledge receipt and acceptance of this notice by signing below and faxing to 214-509-4675 or email to eataie dcityofallen.org. Signature Title Date Sincerely, Ellen Ataie, CPPB Contract Administrator STATE OF TEXAS § AGREEMENT FOR PAVEMENT MARKINGS SERVICES COUNTY OF COLLIN This Agreement for Annual Services ("Agreement") is made by and between the City of Allen, Texas ("City,"') and Road Master Striping, LLC, a Texas Limited Liability Company ("Contractor") (each a "Party" and collectively the "Parties"), acting by and through their authorized representatives. Recitals: WHEREAS, the City desires to obtain Pavement Markings Services from Company in accordance with the bid specifications attached hereto as -Exhibit. "A" ("Specifications"); and WHEREAS, Company desires to provide services to City in accordance with its response to Specifications attached hereto as Exhibit "A"; NOW THEREFORE; in exchange for the mutual covenants set forth herein and other valuable consideration, the sufficiency and receipt of which are hereby acknowledged, the parties agree as follows: Article 1 Term The term of this Agreement shall begin on February 2, 2021 (the "Effective Date") 'and continue until the last day of February 2022, unless earlier terminated as provided herein (the "Initial Term"). City maintains the right to automatically renew this Agreement for up to two additional renewal terms ofoneyeareach attheCity'ssole discretion, the first renewal term beginning on March 1, 2022. Article 11 Contract Documents Every provision of the documents below is incorporated into this Agreement by reference. The documents referenced below are in descending order of precedence. Any conflict between or among any of the documents shall be resolved in favor of the document with higher precedence. A. This Agreement; B. City's Invitation for Bid No. 2021-10-5 ("Specifications"); and C. Road Master Striping, LLC's Response to City's Invitation for Bid No.2021- 10-5 ("Response"). :1CREENENTFOR PAVEMENTM4RWNCSSERVICES- PACE 1 43198 Article Ill Scope of Services Contractor shall provide the Services specifically set forth in the Specifications, including those requirements in the sample contract to the extentthey do not conflict with this Agreement, as contained in Exhibit "A," which is attached hereto and made a part of this Agreement for all purposes. Article IV Schedule of Work Contractor agrees to commence Services upon the Effective Date of this Agreement and to complete the required Services in accordance with the schedules and at the times and locations provided by the City as set forth in Exhibit "A;" including the Requirements in the' sample contract to the extent they do not conflict with this Agreement. Article V Commpensation and Method of Payment S.1 Charges. CI labor, materials, equipr compensation to Contrz and no/100/cents) d u ri nc Contractor shall provide the work and Services pE compensate Contractor being net 30 days after completed. Contractor shall without a written Notic incurred by Contractor from City shall be entire incurred after Contracts eligiblefor reimbursem( task order. City shall have tl determines in its sole ty shall compensate Contractor for the Services, including all lent and supplies as provided in Exhibit "A." The total actor shall not exceed $80,000.00 (eighty thousand dollars I the Initial Term or any renewal term under this Agreement. the City with written invoices on a monthly basis describing �rformed as provided in Exhibit "A." Upon approval, City shall 3s provided herein and in Exhibit "A" with the payment term the date the City is delivered a written invoice for Services Article VI Notice to Proceed of proceed with any work required under this Agreement e to Proceed from City. Any work performed or expenses prior to Contractor's receipt of a- written Notice to Proceed �ly at Contractor's own risk. Work performed and expenses �r has received a written Notice to Proceed from City will be nt under the terms of this Agreement, subject to an approved Article VII Suspension of Work right to immediately suspend work by Contractor if City iscretion that Contractor has, or will fail to perform, in AGREEMENT FOR PAVEMENT MARKINGS SERVICES - PAGE 2 43198 accordance with this Agreement. In such event, any payments due Contractor shall be suspended until Contractor has taken satisfactory corrective action. Article Vlll of Time; Personnel; and Equipment 8.1 The Contractor shall devote such time as reasonably necessary for the satisfactory performance of the work under this Agreement. Should the City require additional services not included under this Agreement, the Contractor shall make reasonable effort to provide such additional services at mutually agreed charges or rates, and within the time schedule prescribed by the City; and without decreasing the effectiveness of the performance of services required under this Agreement. 8.2 To the extent reasonablynecessary for the Contractor to perform the services under this Agreement, the Contractor shall be authorized to engage the services of any agents, assistants, persons, or corporations that the Contractor may deem proper to aid or assist in the performance of the services under this Agreement. The cost of such personnel and assistanc6sshall be borne exclusively by the Contractor. 8.3 The Contractor shall furnish the facilities, equipment, telephones, facsimile machines, email facilities, and personnel necessary to perform the services required under this Agreement unless otherwise provided herein. 8.4 Time is and shall be of the essence in the performance of this Agreement as written. Article IX Availability of Funds If monies are not appropriated or otherwise made available to support continuation of perfor ance in a subsequent fiscal period, this Agreement shall be canceled and Contractor mayonly be reimbursed for the reasonable value of any non- recurring costs incurred but not amortized inthe price of services delivered underthis Agreement or which are otherwise not recoverable. The cost of cancellation may be paid from any appropriations for such purposes. Article X Termination This Agreement I ay be terminated by: (a) by mutual written agreement of the parties; (b) immediately by City, if Contractor defaults or breaches any of the terms or conditions of this Agreement; (c) by either party, upon thirty (30) days prior to written notice. Should Contractor terminatethis Agreement under this provision, ACREE!NE.IVT FOR PAVENTENT .M.a RVJNCS SERVICES— PACE 3 43198 Contractor shall further state the reason(s) for termination in its written notice; (d) by City, if Company suffers an Event of Bankruptcy or Insolvency, or "Event of Bankruptcy" shall mean the dissolution or termination (other than a dissolution or termination by reason of Company merging with an affiliate of Company) of Company's existence as a going business, insolvency, appointment of receiver for any part of Company's property and such appointment is not terminated ,within ninety (90) business days after such appointment is initially made, any general assignment for the benefit of creditors, or the commencement of any proceeding under any bankruptcy or insolvency laws by or against Company and in the event such proceeding is not voluntarily commenced by the Company, such proceeding is not dismissed within ninety (90) business days after the filing thereof; (e) by City, if City fails to budget and appropriate funds.for payment of the obligations here.bnder for -the then ensuing fiscal year; or Article XI Insurance (a) For coverage requirements, please refer to the table on the following page. All insurance shall beendorsedto provide the following provisions: (1) name the City, its officers, and employees as additional insureds as to all applicable coverage with the exception of Workers Compensation Insurance and Professional Liability; (2) provide for a waiver of subrogation against the City for injuries, including death, property damage, or, any other loss to the extent the same is covered by the proceeds of insurance, except for Professional Liability Insurance. A specific endorsement needs to be added to all policies, with a copy of the endorsement provided to the City that indicates the insurance company will provide to the City at least a thirty (30) day prior written notice for cancellation, non -renewal, and/or material changes of the policy. In the event the companies providing the required insurance are prohibited by law to provide any such specific endorsements, the Contractor shall provide at Feast thirty (30) days prior written notice to the City of any cancellation' non -renewal and/or material changes to any of the policies of insurance. (b) All insurance companies providing the required insurance shall be authorized to transact business in Texas and rated at least "A" by AM Best or other equivalent rating service. All policies must be written on a primary basis, non-contributory with any other insurance coverage and/or self-insurance maintained by the City. (c) A certificate of insurance and copies of policy endorsements evidencing the required insurance shall be submitted to the City prior to AGREEMENT FOR PAVEMENT MARKINGS SERVICES - PAGE 4 43198 commencement of services. On every date of renewal of the required insurance policies, the Contractor shall cause a certificate of insurance and policy endorsements to be issued evidencing the required insurance herein and delivered to the City. In addition, the Contractor shall within ten (10) business days after written request provide the City with certificates of insurance and policy endorsements for the insurance required herein. The delivery of the certificates of insurance and policy endorsements to the City is a condition precedent to the payment,of any amounts due to Contractor by the City. The failure to .provide valid certificates of insurance and .policy endorsements shall be deemed a default and/or breach of this Agreement. in the Amount of $0-$100,000 Type of Insurance Amount of Insurance Provisions 1. Corrimercial General $500,000 each occurrence, City to be listed as .(Public) Liability to $1,000,000 general additional insured and include coverage for: aggregate; provided 30-day notice of a) Premises/Operations cancellation or material b) Products/Completed or change in coverage. Operations c) Independent $1,000,000 combined City prefers that insurer be Contractors single limits rated A or higher by A.M. d) Personal Liability Best or equivalent. e) Contractual Liability Waiver of Subrogation to apply 2. Business Auto Liability T $500,000 combined single Owned, non -owned, and _ _ limit _ hired vehicles 3. Workers' Comp & _ _ Statutory Limits _ Waiver of subrogation Employers' Liability $1,000,000 each accident ll 4. a) Professional Liability 1,000,000 per occurrence If Applicable b) E & 0 coverage Contracts in the Amount of $100,000-$1,000,000 Type of Insurance Amount of Insurance Provisions 1. Commercial General $1,000,000 each City to be listed as (Public) Liability to occurrence additional insured and include coverage for: provided 30-day notice of f) Premises/Operations $2,000,000 general cancellation or material g) Products/Completed aggregate change in coverage. Operations h) Independent $2,000,000 Umbrella/ City requires that insurer Contractors -Excess Liability be rated A or higher by i) Personal Liability A.M. Best or equivalent. j) Contractual Liability 71Waiver of subrogation 2. Business Auto Liability $1,000,000 per City to be named as a occurrence additional insured AGREEMENT FOR PAVEMENT PACE 5 43198 • $1,000,000 aggregate or; • $1,000,000 combined single limits 3. Workers' Comp & I Statutory Limits Waiver of subrogation Employers' Liability $1,000,000 each accident 4. Builders Risk Policy 100% of construction total If Applicable 5.a) Professional Liability 1,000,000 per occurrence If Applicable b) E & O coverage Contracts in the Amount of $l.000_000-$8_000_000 Type of Insurance Amount of Insurance Provisions 1. Broad Form $2,000,000 each occurrence, City to be listed as Commercial General $4,000,000 general additional insured and Liabilityto aggregate; provided 30-day notice of include coverage for: $4,000,000 umbrella cancellation or material k) Premises/Operatio change in coverage. ns 1) Products/Complete City requires that insurer d Operations be rated A or higher by m) Independent A.M. Best or equivalent. Contractors Waiver of Subrogation n) Personal Liability o) Contractual Liability 2. Business Auto Liability • $1,000,000 per City to be named as occurrence additional insured • $2,000,000 aggregate or; • $2,000,000 combined single limits 3. Workers' Comp & Statutory Limits City to be provided a Employers' Liability $1,000,000 each accident waiver of subrogation 4. Builders Risk Policy 100% of construction total If Applicable S. a) Professional Liability 1,000,000 per occurrence If Applicable b) E & O coverage i All Contracts over $8,000I000 must contact Risk Management for insurance specifications. All Certificates of in comments section. AGREEMENT FOR PAVEMENT MARKINGS SERVICES - Insurance need to reference job or contract number PAGE 43198 Article XII Miscellaneous 12.1 Entire Agreement. This Agreement constitutes the sole and only agreement between the parties and supersedes any prior understandings written or oral agreements between the parties with respect to this subject matter. 12.2 Assignment. Contractor may not assign this Agreement in whole or in part without the prior written consent of City. In the event of an assignment by Contractor to which City1has consented, the assignee shall agree in writing with City to personally assume, perform, and be bound by all the covenants, and obligations contained in this Agreement. 12.3 Successors � and Assigns. Subject to the provisions regarding assignment, this Agreement shall be binding on and inuretothe benefit ofthe parties to it and their respective heirs, executors, administrators, legal representatives, successors and assigns. I 12.4 Governina Law. The laws of the State of Texas shall govern this Agreement; and venue for any action concerning this Agreement shall be in Collin County, Texas. The parties agree to submit to the personal and subject matter jurisdiction of said Court. 12.5 Amendments. This Agreement maybe amended by the mutual written agreement of the parties.; 12.6 Severability.1 In the event any one or more of the provisions contained in this Agreement shall for any reason be held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality or unenforceability shall not effect any other provisions, and the Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained in it. 12.7 Independent Contractor. It is understood and agreed by and between the parties that Contractor, in satisfying the conditions of this Agreement, is acting independently, and that City assumes no responsibility or liabilities to any third party in connection with these actions. All services to be performed by Contractor pursuant to this Agreement shall be in the capacity of an independent Contractor, and not as an agent or employee of City. Contractor shall supervise the performance of its services and shall be entitled to control the manner and means by which its services are to be performed, subject to the terms of this Agreement. 12.8 Under the Authority of the Clean Water Act, the Environmental Protection Agency (EPA), the City of Allen has endeavored to reduce / improve storm water quality per direction of the Texas Commission of Environmental Quality (TCEQ). The City of Allen has developed standard operating procedures (SOP's) for our Storm Water Management Proglram (SWMP). By signing this contract all vendors accept to follow our SOP's of our SWMP. Follow the link for our SOP's Otto://www.citvofal len_ord/933/Storm-Water-Manaaement AGREEb1ENT FOR PAVEMENT MARFUNGS SERVICES — PAGE 7 43198 12.9 Notice. Any be sent by first class mail, address specified below, designate in writing, and forth herein: If inter Eric Ell City M; 31 floo 305 Ce Allen, I notice required or permitted to be delivered hereunder may overnight courier or by confirmed telefax or facsimile to the or to such other party or address as either party may shall be deemed received three (3) days after delivery set led for City: with copy to: vanger Peter G. Smith nager Nichols, Jackson, Dillard, Hager City Hail & Smith, L.LP. itury Parkway 500 N. Akard, 1800 Lincoln ?xas 75013 Plaza Facsimile: 214-509-4118 . Te l e p h one: 214-50 9 -4110 If intended for Contractor Road Master Striping, LLC 1301 SE McKinney Rice, TX175155 Dallas, Texas 75201 Facsimile: 214-965-0010 12.10 Counteraarts. This Agreement may be executed bythe parties hereto in separate counterparts, each of which when so executed and delivered shall be an original, but all such counterparts shall together constitute one and the same instrument. Each counterpart may consist of any number of copies hereof each signed by less than all, but together signed by all of the parties hereto. 12.11 Exhibits andlRecitals. The exhibits attached hereto and the Recitals are incorporated herein and made a part hereof for all purposes. 12.12 Indemnification. Contractor shall release, defend, indemnify and hold harmless City and its officers, agents and employees from and against all damages, injuries (including death) claims, property damages, (including loss of use), losses, demands, suits, judgments and costs, including reasonable attorney's fees and expenses, in any way arising out of, related to, or resulting from the performance of the work or caused by theIl negligent act or omission of Contractor, its officers,. agents, employees, subcontractors, licensees, invitees or any other third parties for whom Contractor is legally responsible (hereinafter "Claims"). Contractor is expressly required to defend City against all such Claims. In its sole discretion, City shall have the right to select or to approve defense counsel to be retained by Contractor in fulfilling its obligation hereunder to defend and indemnify City, unless such right is expressly waived by City in writing. City reserves the right to provide a portion or all of its own defense; however, City is under no obligation to do so. Any such action by City is not to be construed as a waiver of Company's obligation to I defend City or as a waiver of Contractor's obligation to ACREEMENTFORPAVEMENT MARUNCSSERWCES- PACES 43198 indemnify City pursuant to this Contract. Contractor shall retain City . approved defense counsel within seven (7) business days of City's written notice that City is invoking its right to indemnification under this Contract. If Contractor fails to retain Counsel within such time period, City shall have the right to retain defense counsel on its own behalf, and Contractor shall be liable for all costs incurred by City. 12.13 Audits and Records. Contractor agrees that during the term hereof, City and its representatives may, during normal business hours and as often as deemed necessary, inspect, audit,) examine and reproduce any and all of the Contractor's records relating to the services provided pursuant to this Agreement for a period of oneyear following the date of completion of services as determined by City or date of termination if sooner. 12.14 Conflicts of (Interests. The Contractor represents that no official or employee of City has any direct or indirect pecuniary interest in this Agreement. 12.15 Warranty. The Contractor warrants to the City that all labor furnished to perform the work under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that the workwill be performed in a good and workmanlike manner and at least in accordance with industry standards, and that the work will be of good quality, free from faults and defects and in strict conformance with this contract. All work not conforming to these requirements may be considered defective. 12.16 Uniforms. Contractor shall provide and require its employees to wear a uniform that bears the company name, logo, and the employee's name. Uniforms are not to be dirty, stained, o eltorn. Uniforms shall be worn at all times while on the job. Contractor shall provide and ensure the wearing of protective clothing, masks, eye protection, etc., as required by laws, regulation, ordinances, and/or manufacturer's instruction for material and equipment. All employees of Contractor working on right-of-ways or medians must utilize personal protective equipment such as safety vests to insure their visibility to drivers. 12.17 Warning Devices and Barricades. The Contractor shall furnish and maintain such warning devices, barricades, lights, signs, and other devices as may be necessaryor appropriate or required bythe Cityto protect persons or property in, near or adjacent to the jobsite. The contractor shall comply with all applicable Federal, State, and Local Laws regarding occupational safety and health as well as providing protection of the environment. This shall include but not be limited to compliance with U.S. Department of Labor -Occupational Safety and Health Administration (OSHA), and U.S. Environmental Protection Agency (EPA) guidelines and regulations. No separate compensation shall be paid to the Contractor for such measures. 12.18 Protection of Utilities. The Contractor shall use best efforts to leave undisturbed and uninterrupted all irrigation systems, utilities, and utility services provided to the job site or which presently exist at, above, or beneath the location where the work is to be performed. In the event that any irrigation system, utility, or utility service is disturbed or damaged during the progress of the work, the Contractor AGREEMENT FOR PAVEIIENT'MARKINCSSERVICES - PACE9 43198 I A shall forthwith repair, remed, Contractor is responsible for site to ensure that no damag If damage is noted or if pr responsibility to notify the Cit action to correct and docum replacement of all irrigation F approved by the City of Allen 12.19 PROHIBITION O Boycott Israel, and agrees the as that term is defined amended. Effective Septemk sole proprietor, a non-profit e Vendor has ten (10) or more $100,000.00 or more to be pa AGREEMENT FOR PAVEMENT MARKINGS or restore the utility at Contractor's sole expense. The in inspection of the site prior to commencing work on is existing or will not occur when maintenance begins. ibable damage will occur then it is the contractor's of Allen representative so that the City of Allen can take nt the problem(s). The contractor is responsible for the ?ads that are damaged by mowing with like equipment BOYCOTT ISRAEL. Company verifies that it does not during the term of this Contract will not Boycott Israel in Texas Government Code Section 808.001, as ar 1, 2019, this section does not apply if the Vendor is a itity or a governmental entity; and only applies if: (i) the ulltime employees and (ii) this Contract has a value of J under the terms of this Contract. - PACE 10 page to follow) 43198 EXECUTED this ATTEST EXECUTED this CITY OF ALLEN By: A'�e Eric Ellwanger, qy Manag r 305 Century Parkway Allen, Texas 75013 ry of FEBRUARY 2021. Road Master Striping, LLC By: Signature ofAut ri Officer Print Name Title: &� 1301 SE McKinney Rice, TX 75155 AGREEMENT FOR PAVEMENT MARKINGS SERVICES - PACE 11 43198 EXHIBIT'W SPECIFICATIONS AND RESPONSE 1. City's Invitation for Bid #2021710-5. 2. Road Master Striping, LLC's Response to City's Invitation for Bid #2021- 10-5. Exhibit "A^ Agreement for Pavement Marldngs TERM CONTRACT FOR PAVEMENT MARKINGS BID# 2021-10-5 TABULATION, OPENING 1/21/21 3:30 PM ROAD MASTER STRIPING LLC ELITE STRIPING LLC THERMOPLASTIC PAVEMENT MARKINGS (Surface preparation does not include removal of existing striping) ITEM EST UNIT DESCRIPTION AND PRICE IN WORDS UNIT PRICE IN EXTENDED UNIT PRICE IN EXTENDED NO. QNTY FIGURES AMOUNT FIGURES AMOUNT Furnish and Install Solid White or Yellow Traffic Paint (4") including surface preparation, complete and in place, for the 1 5,000 LF sum of Dollars & $0.30 $1,500.00 $0.25 $1,250.00 Cents Per Linear Foot Furnish and Install Solid White or Yellow Traffic Paint (6") including surface preparation, complete and in place, for the 2 5,000 LF sum of Dollars & $0.40 $2,000.00 $0.35 $1,750.00 Cents Per Linear Foot Furnish and Install Solid White or Yellow Traffic Paint (8") including surface preparation, complete and in place, for the 3 3,000 LF sum of Dollars & $0.60 $1,800.00 $0.50 $1,500.00 Cents Per Linear Foot Furnish and Install Solid White or Yellow Traffic Paint (12") including surface preparation, complete and in place, 4 1,000 LF for the sum of Dollars & $0.90 $900.00 $0.75 $750.00 Cents Per Linear Foot Furnish and Install Solid White or Yellow Traffic Paint (24") including surface preparation, complete and in place, 5 500 LF for the sum of Dollars & $1.80 $900.00 $2.00 $1,000.00 Cents Per Linear Foot Furnish and Install Solid White Traffic Paint (Word) "ONLY" including surface preparation, complete and in 6 10 EA place, for the sum of Dollars & $35.00 $350.00 $65.00 $650.00 Cents per Each Furnish and Install Solid White Traffic Paint (Arrow) (Right, Left, U-Turn, or Straight) including surface 7 15 EA preparation, complete and in place, for the sum of Dollars & $50.00 $750.00 $50.00 $750.00 Cents per Each Furnish and Install Hot Applied Thermoplastic Solid White Pavement Markings (4") including surface preparation, 8 2,500 LF complete and in place, for the sum of Dollars & $0.75 $1,875.00 $1.00 $2,500.00 Cents Per Linear Foot ITEM EST UNIT DESCRIPTION AND PRICE IN WORDS UNIT PRICE IN EXTENDED UNIT PRICE IN EXTENDED NO. I QNTY I FIGURES AMOUNT FIGURES AMOUNT Furnish and Install Hot Applied Thermoplastic Solid White Pavement Markings (6") including surface preparation, 9 2,500 LF complete and in place, for the sum of Dollars & $1.10 $2,750.00 $1.20 $3,000.00 Cents Per Linear Foot Furnish and Install Hot Applied Thermoplastic Solid White Pavement Markings (8") including surface preparation, 10 1,000 LF complete and in place, for the sum of Dollars & $1.50 $1,500.00 $1.60 $1,600.00 Cents Per Linear Foot 35 TERM CONTRACT FOR PAVEMENT MARKINGS BID# 2021-10-5 TABULATION, OPENING 1/21/21 3:30 PM Furnish and Install Hot Applied Thermoplastic Solid White Pavement Markings (12") including surface preparation, 11 500 LF complete and in place, for the sum of Dollars & $3.75 $1,875.00 $2.75 $1,375.00 Cents Per Linear Foot Furnish and Install Hot Applied Thermoplastic Solid White Pavement Markings (24") including surface preparation, 12 500 LF complete and in place, for the sum of Dollars & $7.50 $3,750.00 $5.75 $2,875.00 Cents Per Linear Foot Furnish and Install Hot Applied Thermoplastic Solid Yellow Pavement Markings (4") including surface preparation, 13 500 LF complete and in place, for the sum of Dollars & $0.75 $375.00 $1.00 $500.00 Cents Per Linear Foot Furnish and Install Hot Applied Thermoplastic Solid Yellow Pavement Markings (12" x 18" Yield Line) including 14 50 LF surface preparation, complete and in place, for the sum of Dollars & $6.00 $300.00 $4.00 $200.00 Cents Per Linear Foot Furnish and Install Hot Applied Thermoplastic Solid Yellow Pavement Markings (24" x 36" Yield Line) including 15 50 LF surface preparation, complete and in place, for the sum of Dollars & $12.00 $600.00 $8.00 $400.00 Cents Per Linear Foot Furnish and Install Hot Applied Thermoplastic Solid White Pavement Markings (Word) "ONLY" including surface 16 15 EA preparation, complete and in place, for the sum of Dollars & $125.00 $1,875.00 S 150.00 $2,250.00 Cents per Each ITEM EST UNIT 1p DESCRIPTION AND PRICE IN WORDS UNIT PRICE IN EXTENDED UNIT PRICE IN EXTENDED NO. I QNTY I FIGURES AMOUNT FIGURES AMOUNT Furnish and Install Hot Applied Thermoplastic Solid White Pavement Markings (Arrow) (Right, Left, U-Turn, or Straight) including surface preparation, complete and in 17 15 EA place, for the sum of $175.00 $2,625.00 $125.00 $1,875.00 Dollars & Cents per Each Furnish and Install Hot Applied Thermoplastic Solid White Pavement Markings (Double Arrow) including surface 18 5 EA preparation, complete and in place, for the sum of Dollars & $225.00 $1,125.00 $225.00 $1,125.00 Cents per Each Furnish and Install Hot Applied Thermoplastic Solid White Pavement Markings (Sharks Teeth / Yield Triangles) including surface preparation, complete and in place, for the 19 50 EA sum of $35.00 $1,750.00 $40.00 $2,000.00 Dollars & Cents per Each Remove Traffic Paint (4") (this is not surface preparation for other items), complete and in place, for the sum of 20 2,500 LF Dollars & $0.15 $375.00 $0.50 $1,250.00 Cents Per Linear Foot Remove Traffic Paint (6") (this is not surface preparation for other items), complete and in place, for the sum of cnn r � en �n ccnn nn en �n m i cnn nn 36 TERM CONTRACT FOR PAVEMENT MARKINGS BID# 2021-10-5 TABULATION, OPENING 1/21/21 3:30 PM �. Dollars & Cents Per Linear Foot Remove Solid Traffic Paint (8") (this is not surface preparation for other items), complete and in place, for the 22 1,000 LF sum of Dollars & $0.30 $300.00 $1.00 $1,000.00 Cents Per Linear Foot Remove Solid Traffic Paint (12") (this is not surface preparation for other items), complete and in place, for the 23 1,000 LF sum of Dollars & $0.50 $500.00 $1.20 $1,200.00 Cents Per Linear Foot Remove Solid Traffic Paint (24") (this is not surface preparation for other items), complete and in place, for the 24 500 LF sum of Dollars & $1.00 $500.00 $2.50 $1,250.00 Cents Per Linear Foot Remove Solid White Traffic Paint (Word) "ONLY" (this is not surface preparation for other items), complete and in 25 10 EA place, for the sum of Dollars & $10.00 $100.00 $50.00 $500.00 Cents per Each ITEM EST UNIT DESCRIPTION AND PRICE IN WORDS UNIT PRICE IN EXTENDED UNIT PRICE IN EXTENDED NO. I QNTY I FIGURES AMOUNT FIGURES AMOUNT Remove Solid White Traffic Paint (Arrow) (Right, Left, U- Turn, or Straight) (this is not surface preparation for other 26 10 EA items), complete and in place, for the sum of Dollars & $15.00 $150.00 $50.00 $500.00 Cents per Each Remove Hot Applied Thermoplastic Solid Pavement Markings (4") (this is not surface preparation for other 27 500 LF items), complete and in place, for the sum of Dollars & $0.50 $250.00 $0.50 $250.00 Cents Per Linear Foot Remove Hot Applied Thermoplastic Solid Pavement Markings (6") (this is not surface preparation for other 28 500 LF items), complete and in place, for the sum of Dollars & $0.75 $375.00 $0.60 $300.00 Cents Per Linear Foot Remove Hot Applied Thermoplastic Solid Pavement Markings (8") (this is not surface preparation for other 29 500 LF items), complete and in place, for the sum of Dollars & $1.00 $500.00 $1.00 $500.00 Cents Per Linear Foot Remove Hot Applied Thermoplastic Solid Pavement Markings (12") (this is not surface preparation for other 30 300 LF items), complete and in place, for the sum of Dollars & $1.50 $450.00 $1.25 $375.00 Cents Per Linear Foot Remove Hot Applied Thermoplastic Solid Pavement Markings (24") (this is not surface preparation for other 31 200 LF items), complete and in place, for the sum of Dollars & $3.00 $600.00 $2.50 $500.00 Cents Per Linear Foot 37 TERM CONTRACT FOR PAVEMENT MARKINGS BID# 2021-10-5 TABULATION, OPENING 1/21/21 3:30 PM Remove Hot Applied Thermoplastic Pavement Markings (12" x 18" Yield Line) (this is not surface preparation for other items), complete and in place, for the sum of 32 5 LF $4.00 $20.00 $15.00 $75.00 Dollars & Cents Per Linear Foot Remove Hot Applied Thermoplastic Pavement Markings (24" x 36" Yield Line) (this is not surface preparation for other items), complete and in place, for the sum of 33 5 LF $6.00 $30.00 $3.50 $17.50 Dollars & Cents Per Linear Foot ITEM EST UNIT DESCRIPTION AND PRICE IN WORDS UNIT PRICE IN EXTENDED UNIT PRICE IN EXTENDED NO. I QNTY I FIGURES AMOUNT FIGURES AMOUNT Remove Hot Applied Thermoplastic Pavement Markings (Word) (this is not surface preparation for other items), 34 5 EA complete and in place, for the sum of $25.00 $125.00 $60.00 $300.00 Dollars & Cents per Each Remove Hot Applied Thermoplastic Pavement Markings (Arrow) (Right, Left, U-Turn, or Straight) (this is not surface preparation for other items), complete and in place, for the 35 5 EA sum of $45.00 $225.00 $50.00 $250.00 Dollars & Cents per Each Remove Hot Applied Thermoplastic Pavement Markings (Double Arrow) (this is not surface preparation for other 36 5 EA items), complete and in place, for the sum of $55.00 $275.00 $75.00 $375.00 Dollars & Cents per Each Remove Hot Applied Thermoplastic Pavement Markings (Sharks Teeth / Yield Triangles) (this is not surface preparation for other items), complete and in place, for the 37 50 EA sum of $15.00 $750.00 $15.00 $750.00 Dollars & Cents per Each Furnish and Install Solid Red Fire Lane Traffic Paint (6") With "FIRE LANE" (4") And/Or "NO PARKING" (4") Alternating Every Fifty (50) Feet On Curb -Face Or Pavement, As Directed By The Engineer, Including surface 38 1,500 LF preparation, complete and in place, for the sum of $0.45 $675.00 $0.75 $1,125.00 Dollars & Cents Per Linear Foot Furnish and Install Solid White Traffic Paint (6") With "VISITOR" (4") And/Or Other Text (4") to be determined by the Engineer Every Ten (10) Feet On Curb -Face Or Pavement, As Directed By The Engineer, Including surface 39 1,500 LF preparation, complete and in place, for the sum of $1.00 $1,500.00 $1.00 $1,500.00 Dollars & Cents Per Linear Foot Furnish and Install Sharrow Street Marking (Shared -Lane Marking), complete and in place, for the sum of 40 1 EA $300.00 $300.00 $225.00 $225.00 Dollars & Cents per Each TOTAL THERMOPLASTIC PAVEMENT MARKINGS: $37,100.00 $41,092.50 38 TERM CONTRACT FOR PAVEMENT MARKINGS BID# 2021-10-5 TABULATION, OPENING 1/21/21 3:30 PM RAISED PAVEMENT MARKINGS (Surface preperation shall include removal of extraneous material (i.e. glue, oil, existing buttons, etc. ) and to clean solid concrete or asphal ITEM EST UNIT DESCRIPTION AND PRICE IN WORDS UNIT PRICE IN EXTENDED UNIT PRICE IN EXTENDED NO. QNTY FIGURES AMOUNT FIGURES AMOUNT Furnish and Install with Epoxy Raised Acrylic Pavement Markers (Type I -A Reflectorized Marker) including surface 1 1,000 EA preparation, complete and in place, for the sum of Dollars & $3.25 $3,250.00 $3.75 $3,750.00 Cents per Each Furnish and Install with Epoxy Raised Acrylic Pavement Markers (Type I-C Reflectorized Marker) including surface 2 1,000 EA preparation, complete and in place, for the sum of Dollars & $3.25 $3,250.00 $3.75 $3,750.00 Cents per Each Furnish and Install with Epoxy Raised Acrylic Pavement Markers (Type II -A -A Reflectorized Marker) including 3 1,000 EA surface preparation, complete and in place, for the sum of Dollars & $3.25 $3,250.00 $3.75 $3,750.00 Cents per Each Furnish and Install with Epoxy Raised Acrylic Pavement Markers (Type II-A-R Reflectorized Marker) including 4 1,000 EA surface preparation, complete and in place, for the sum of Dollars & $3.25 $3,250.00 $3.75 $3,750.00 Cents per Each ITEM EST UNIT DESCRIPTION AND PRICE IN WORDS UNIT PRICE IN EXTENDED UNIT PRICE IN EXTENDED NO. I QNTY I FIGURES AMOUNT FIGURES AMOUNT Furnish and Install with Epoxy Raised Acrylic Pavement Markers (Type II-C-C Reflectorized Marker) including 5 I,000 EA surface preparation, complete and in place, for the sum of Dollars & $3.25 $3,250.00 $3.75 $3,750.00 Cents per Each Furnish and Install with Epoxy Raised Acrylic Pavement Markers (Type II-C-R Reflectorized Marker) including 1,000 EA surface preparation, complete and in place, for the sum of Dollars & $3.25 $3,250.00 $3.75 $3,750.00 Cents per Each Furnish and Install with Epoxy Raised Acrylic Pavement Markers (Type W) including surface preparation, complete 7 1,000 EA and in place, for the sum of Dollars & $3.00 $3,000.00 $3.50 $3,500.00 Cents per Each Furnish and Install with Epoxy Raised Acrylic Pavement Markers (Type Y) including surface preparation, complete 8 1,000 EA and in place, for the sum of Dollars& $3.00 $3,000.00 $3.50 $3,500.00 Cents per Each Furnish and Install with Epoxy Raised Acrylic Pavement Markers (Type II-B-B Reflectorized Marker) including 9 50 EA surface preparation, complete and in place, for the sum of Dollars & $3.25 $162.50 $7.50 $375.00 Cents per Each Furnish and Install with Epoxy Raised Channelizing Traffic Buttons IV) including surface preparation, complete and in 10 200 EA place, for the sum of Dollars & $15.00 $3,000.00 $15.00 S3,000.00 Cents per Each 39 TERM CONTRACT FOR PAVEMENT MARKINGS BID# 2021-10-5 TABULATION, OPENING 1/21/21 3:30 PM Furnish and Install with Epoxy Raised Channelizing Traffic Buttons (8") including surface preparation, complete and in 11 200 EA place, for the sum of Dollars & $25.00 $5,000.00 $35.00 $7,000.00 Cents per Each Furnish and Install with Epoxy 6" Raised Acrylic Jiggle Bar Tile (Type I -A Reflectorized) including surface preparation, 12 100 EA complete and in place, for the sum of Dollars & $12.50 $1,250.00 $15.00 $1,500.00 Cents per Each ITEM EST UNIT DESCRIPTION AND PRICE IN WORDS UNIT PRICE IN EXTENDED UNIT PRICE IN EXTENDED NO. I QNTY I FIGURES AMOUNT FIGURES AMOUNT Furnish and Install with Epoxy 6" Raised Acrylic Jiggle Bar Tile (Type I-C Reflectorized) including surface preparation, 13 100 EA complete and in place, for the sum of Dollars & $12.50 $1,250.00 $15.00 $1,500.00 Cents per Each Fumish and Install with Epoxy 6" Raised Acrylic Jiggle Bar Tile (Type W Nonreflectorized) including surface 14 50 EA preparation, complete and in place, for the sum of Dollars & $12.00 $600.00 $15.00 $750.00 Cents per Each Fumish and Install with Epoxy 6" Raised Acrylic Jiggle Bar Tile (Type Y Nonreflectorized) including surface 15 50 EA preparation, complete and in place, for the sum of Dollars & $12.00 $600.00 $15.00 $750.00 Cents per Each Remove Raised Pavement Markers or Buttons Including glue to existing pavement, complete and in place, for the 16 2,000 EA sum of Dollars & $1.00 $2,000.00 $0.50 $1,000.00 Cents per Each Remove Raised Jiggle Bar Tile including glue to existing pavement, complete and in place, for the sum of 17 100 EA Dollars & $5.00 $500.00 $1.00 $100.00 Cents per Each TOTAL RAISED PAVEMENT MARKINGS: $39,862.50 $45,475.00 PROPOSAL SUMMARY TOTAL THERMOPLASTIC PAVEMENT MARKINGS: $37,100.00 $41,092.50 $39,862.50 $45,475.00 TOTAL RAISED PAVEMENT MARKINGS: TOTAL BID $76,962.50 $86,567.50 40 Road Master Striping, LLC 1301 SE McKinney St Rice, TX 75155 Proposal Date Proposal # 1 /25/2021 21-23 Name / Address Location CITY OF ALLEN TERM CONTRACT FOR PAVEMENT MARKINGS 305 CENTURY PARKWAY BID# 2021-10-5 ALLEN, TEXAS 75013 P.O. 10847 DBE#-HMDB64808N0322 Bid Date 2/24/2021 Bid Item # Description Qty U/M Cost Total THERMOPLASTIC PAVEMENT MARKINGS 1 FURNISH AND INSTALL SOLID WHITE OR YELLOW TRAFFIC PAINT (411) 5,000 LF 0.30 1,500.00 INCLUDING SURFACE PREPARATION 2 FURNISH AND INSTALL SOLID WHITE OR YELLOW TRAFFIC PAINT (611) 5,000 LF 0.40 2,000.00 INCLUDING SURFACE PREPARATION 3 FURNISH AND INSTALL SOLID WHITE OR YELLOW TRAFFIC PAINT (8") 3,000 LF 0.60 1,800.00 INCLUDING SURFACE PREPARATION 4 FURNISH AND INSTALL SOLID WHITE OR YELLOW TRAFFIC PAINT 1,000 LF 0.90 900.00 (1211) INCLUDING SURFACE PREPARATION 5 FURNISH AND INSTALL SOLID WHITE OR YELLOW TRAFFIC PAINT 500 LF 1.80 900.00 (2411) INCLUDING SURFACE PREPARATION 6 FURNISH AND INSTALL SOLID WHITE TRAFFIC PAINT (WORD) "ONLY " 10 EA 35.00 350.00 INCLUDING SURFACE PREPARATION 7 FURNISH AND INSTALL SOLID WHITE TRAFFIC PAINT (ARROW) 15 EA 50.00 750.00 (RIGHT, LEFT, U-TURN, OR STRAIGHT) INCLUDING SURFACE PREPARATION 8 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID WHITE 2,500 LF 0.75 1,875.00 PAVEMENT MARKINGS (411) INCLUDING SURFACE PREPARATION 9 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID WHITE 2,500 LF 1.10 2,750.00 PAVEMENT MARKINGS (61) INCLUDING SURFACE PREPARATION 10 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID WHITE 1,000 LF 1.50 1,500.00 PAVEMENT MARKINGS (8") INCLUDING SURFACE PREPARATION 1 1 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID WHITE 500 LF 3.75 1,875.00 PAVEMENT MARKINGS (1211) INCLUDING SURFACE PREPARATION 12 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID WHITE 500 LF 7.50 3,750.00 PAVEMENT MARKINGS (2411) INCLUDING SURFACE PREPARATION 13 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID 500 LF 0.75 375.00 YELLOW PAVEMENT MARKINGS (411) INCLUDING SURFACE PREPARATION Estimator miguel.loeza@roadmasterstriping.com Subtotal Sales Tax (0.0%) Total Page 1 Road Master Striping, LLC 1301 SE McKinney St Rice, TX 75155 Proposal Date Proposal # 1 /25/2021 21-23 Name / Address Location CITY OF ALLEN TERM CONTRACT FOR PAVEMENT MARKINGS 305 CENTURY PARKWAY BID# 2021-10-5 ALLEN, TEXAS 75013 P.O. 10847 DBE#-HMDB64808N0322 Bid Date 2/24/2021 Bid Item # Description Qty U/M Cost Total 14 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID 50 LF 6.00 300.00 YELLOW PAVEMENT MARKINGS (12" X 18" YIELD LINE) INCLUDING SURFACE PREPARATION 15 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID 50 LF 12.00 600.00 YELLOW PAVEMENT MARKINGS (24" X 36" YIELD LINE) INCLUDING SURFACE PREPARATION 16 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID WHITE 15 EA 125.00 1,875.00 (WORD) ' ONLY " INCLUDING SURFACE PREPARATION 17 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID WHITE 15 EA 175.00 2,625.00 PAVEMENT MARKINGS (ARROW) (RIGHT, LEFT, U-TURN, OR STRAIGHT) INCLUDING SURFACE PREPARATION 18 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID WHITE 5 EA 225.00 1,125.00 PAVEMENT MARKINGS (DOUBLE ARROW) INCLUDING SURFACE PREPARATION 19 FURNISH AND INSTALL HOT APPLIED THERMOPLASTIC SOLID WHITE 50 EA 35.00 1,750.00 PAVEMENT MARKINGS(SHARKS TEETH / YIELD TRIANGLES) (2406) INCLUDING SURFACE PREPARATION 20 REMOVE TRAFFIC PAINT (411)( THIS IS NOT SURFACE PREPARATION 2,500 LF 0.15 375.00 FOR OTHER ITEMS) 21 REMOVE TRAFFIC PAINT (61')( THIS IS NOT SURFACE PREPARATION 2,500 LF 0.20 500.00 FOR OTHER ITEMS) 22 REMOVE SOLID TRAFFIC PAINT (811)( THIS IS NOT SURFACE 1,000 LF 0.30 300.00 PREPARATION FOR OTHER ITEMS) 23 REMOVE SOLID TRAFFIC PAINT (1211)( THIS IS NOT SURFACE 1,000 LF 0.50 500.00 PREPARATION FOR OTHER ITEMS) 24 REMOVE SOLID TRAFFIC PAINT (2411)( THIS IS NOT SURFACE 500 LF 1.00 500.00 PREPARATION FOR OTHER ITEMS) 25 REMOVE SOLID TRAFFIC PAINT (WORD) " ONLY" ( THIS IS NOT 10 EA 10.00 100.00 SURFACE PREPARATION FOR OTHER ITEMS) Estimator miguel.loeza@roadmasterstriping.com Subtotal Sales Tax (0.0%) Total Page 2 Road Master Striping, LLC 1301 SE McKinney St Rice, TX 75155 Proposal Date Proposal # 1 /25/2021 21-23 Name / Address Location CITY OF ALLEN TERM CONTRACT FOR PAVEMENT MARKINGS 305 CENTURY PARKWAY BID# 2021-10-5 ALLEN, TEXAS 75013 P.O. 10847 DBE#-HMDB64808N0322 Bid Date 2/24/2021 Bid Item # Description Qty U/M Cost Total 26 REMOVE SOLID TRAFFIC PAINT (ARROW (RIGHT, LEFT, U-TURN OR 10 EA 15.00 150.00 STRAIGHT)( THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 27 REMOVE HOT APPLIED THERMOPLASTIC SOLID WHITE PAVEMENT 500 LF 0.50 250.00 MARKINGS (411)( THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 28 REMOVE HOT APPLIED THERMOPLASTIC SOLID WHITE PAVEMENT 500 LF 0.75 375.00 MARKINGS (6")(THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 29 REMOVE HOT APPLIED THERMOPLASTIC SOLID WHITE PAVEMENT 500 LF 1.00 500.00 MARKINGS (8")(THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 30 REMOVE HOT APPLIED THERMOPLASTIC SOLID WHITE PAVEMENT 300 LF 1.50 450.00 MARKINGS (1211)( THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 31 REMOVE HOT APPLIED THERMOPLASTIC SOLID WHITE PAVEMENT 200 LF 3.00 600.00 MARKINGS (24")(THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 32 REMOVE HOT APPLIED THERMOPLASTIC PAVEMENT MARKINGS (12" 5 LF 4.00 20.00 X 18" YIELD LINE)(THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 33 REMOVE HOT APPLIED THERMOPLASTIC PAVEMENT MARKINGS (24" 5 LF 6.00 30.00 X 36" YIELD LINE)( THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 34 REMOVE HOT APPLIED THERMOPLASTIC PAVEMENT MARKINGS 5 EA 25.00 125.00 (WORD) ( THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 35 REMOVE HOT APPLIED THERMOPLASTIC PAVEMENT MARKINGS 5 EA 45.00 225.00 (ARROW) ( RIGHT, LEFT, U-TURN, OR STRAIGHT)(THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) Estimator miguel.loeza@roadmasterstriping.com Subtotal Sales Tax (0.0%) Total Page 3 Road Master Striping, LLC 1301 SE McKinney St Rice, TX 75155 Proposal Date Proposal # 1 /25/2021 21-23 Name / Address Location CITY OF ALLEN TERM CONTRACT FOR PAVEMENT MARKINGS 305 CENTURY PARKWAY BID# 2021-10-5 ALLEN, TEXAS 75013 P.O. 10847 DBE#-HMDB64808N0322 Bid Date 2/24/2021 Bid Item # Description Qty U/M Cost Total 36 REMOVE HOT APPLIED THERMOPLASTIC PAVEMENT MARKINGS ( 5 EA 55.00 275.00 DOUBLE ARROW) ( THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 37 REMOVE HOT APPLIED THERMOPLASTIC PAVEMENT MARKINGS 50 EA 15.00 750.00 (SHARKS TEETH / YIELD TRIANGLES 36x24) ( THIS IS NOT SURFACE PREPARATION FOR OTHER ITEMS) 38 FURNISH AND INSTALL SOLID RED FIRE LANE TRAFFIC PAINT (61') 1,500 LF 0.45 675.00 WITH "FIRE LANE" (411) AND/OR " NO PARKING " (411) ALTERNATING EVERY FIFTY (50) FEET ON CURB -FACE OR PAVEMENT, AS DIRECTED BY THE ENGINEER, INCLUDING SURFACE PREPARATION 39 FURNISH AND INSTALL SOLID WHITE TRAFFIC PAINT (61) WITH 1,500 LF 1.00 1,500.00 "VISITOR" (411) AND/OR OTHER TEXT (411) TO BE DETERMINED BY THE ENGINEER EVERY TEN (10) FEET ON CURB -FACE OR PAVEMENT, AS DIRECTED BY THE ENGINEER, INCLUDING SURFACE PREPARATION 40 FURNISH AND INSTALL SHARROW STREET MARKING ( SHARED - 1 EA 300.00 300.00 LANE MARKING) RAISED PAVEMENT MARKINGS 1 FURNISH AND INSTALL WITH EPDXY RAISED ACRYLIC PAVEMENT 1,000 EA 3.25 3,250.00 MARKERS (TYPE I -A REFLECTORIZED MARKER) INCLUDING SURFACE PREPARATION 2 FURNISH AND INSTALL WITH EPDXY RAISED ACRYLIC PAVEMENT 1,000 EA 3.25 3,250.00 MARKERS (TYPE I-C REFLECTORIZED MARKER) INCLUDING SURFACE PREPARATION 3 FURNISH AND INSTALL WITH EPDXY RAISED ACRYLIC PAVEMENT 1,000 EA 3.25 3,250.00 MARKERS (TYPE II -A -A REFLECTORIZED MARKER) INCLUDING SURFACE PREPARATION 4 FURNISH AND INSTALL WITH EPDXY RAISED ACRYLIC PAVEMENT 1,000 EA 3.25 3,250.00 MARKERS (TYPE II-A-R REFLECTORIZED MARKER) INCLUDING SURFACE PREPARATION Estimator miguel.loeza@roadmasterstriping.com Subtotal Sales Tax (0.0%) Total Page 4 Road Master Striping, LLC 1301 SE McKinney St Rice, TX 75155 Proposal Date Proposal # 1 /25/2021 21-23 Name / Address Location CITY OF ALLEN TERM CONTRACT FOR PAVEMENT MARKINGS 305 CENTURY PARKWAY BID# 2021-10-5 ALLEN, TEXAS 75013 P.O. 10847 DBE#-HMDB64808N0322 Bid Date 2/24/2021 Bid Item # Description Qty U/M Cost Total 5 FURNISH AND INSTALL WITH EPDXY RAISED ACRYLIC PAVEMENT 1,000 EA 3.25 3,250.00 MARKERS (TYPE II-C-C REFLECTORIZED MARKER) INCLUDING SURFACE PREPARATION 6 FURNISH AND INSTALL WITH EPDXY RAISED ACRYLIC PAVEMENT 1,000 EA 3.25 3,250.00 MARKERS (TYPE II-C-R REFLECTORIZED MARKER) INCLUDING SURFACE PREPARATION 7 FURNISH AND INSTALL WITH EPDXY RAISED ACRYLIC PAVEMENT 1,000 EA 3.00 3,000.00 MARKERS (TYPE W) INCLUDING SURFACE PREPARATION 8 FURNISH AND INSTALL WITH EPDXY RAISED ACRYLIC PAVEMENT 1,000 EA 3.00 3,000.00 MARKERS (TYPE Y) INCLUDING SURFACE PREPARATION 9 FURNISH AND INSTALL WITH EPDXY RAISED ACRYLIC PAVEMENT 50 EA 3.25 162.50 MARKERS (TYPE II-B-B) INCLUDING SURFACE PREPARATION 10 FURNISH AND INSTALL WITH EPDXY RAISED CHANNELIZING 200 EA 15.00 3,000.00 TRAFFIC BUTTONS (611) INCLUDING SURFACE PREPARATION 11 FURNISH AND INSTALL WITH EPDXY RAISED CHANNELIZING 200 EA 25.00 5,000.00 TRAFFIC BUTTONS (811) INCLUDING SURFACE PREPARATION 12 FURNISH AND INSTALL WITH EPDXY 6" RAISED ACRYLIC JIGGLE BAR 100 EA 12.50 1,250.00 TILE (TYPE I -A REFLECTORIZED) INCLUDING SURFACE PREPARATION 13 FURNISH AND INSTALL WITH EPDXY 6" RAISED ACRYLIC JIGGLE BAR 100 EA 12.50 1,250.00 TILE (TYPE I-C RELFECTORIZED) INCLUDING SURFACE PREPARATION 14 FURNISH AND INSTALL WITH EPDXY 6" RAISED ACRYLIC JIGGLE BAR 50 EA 12.00 600.00 TILE (TYPE W NONREFLECTORIZED) INCLUDING SURFACE PREPARATION 15 FURNISH AND INSTALL WITH EPDXY 6" RAISED ACRYLIC JIGGLE BAR 50 EA 12.00 600.00 TILE (TYPE Y NONREFLECTORIZED) INCLUDING SURFACE PREPARATION 16 REMOVE RAISED PAVEMENT MARKERS OR BUTTONS INCLUDING 2,000 EA 1.00 2,000.00 GLUE TO EXISTING PAVEMENT 17 REMOVE RAISED JIGGLE BAR TILE INCLUDING GLUE TO EXISTING 100 EA 5.00 500.00 PAVEMENT Estimator miguel.loeza@roadmasterstriping.com Subtotal $76,962.50 PROPOSAL VALID FOR 30 DAYS Sales Tax (0.0%) $0.00 PHONE # - 903-326-4530 FAX# - 903-326-4671 Total $76,962.50 Page 5