Item 4D - SPIN ReportJUSOUTHLAKE
SPIN MEETING REPORT
SPIN Item Number: SPIN2022-02
City Case Number: ZA22-0008
Project Name: Verizon Southlake Expansion
SPIN Neighborhood:
Meeting Date: January 25, 2022
Meeting Location: 1400 Main Street, Southlake, TX
City Council Chambers
Total Attendance: 2
Hosts: Vandana Tanneru, member of the Southlake Community
Engagement Committee; Eric Wang, member of the Southlake
Community Engagement Committee
Applicant Presenting: Mason Griffin, phone: 214-420-1535, email:
mgriffin(a-)griffinharris.com
City Staff Present: Madeline Oujesky, Assistant to the Director
Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthiake.com and clicking on "I Want to" and "View"
"Video on Demand" — forums are listed under SPIN by meeting date.
FORUM SUMMARY:
Property Situation:
The property is located at 747 W. SH 114
Development Details:
The applicant is proposing the development and construction of the approximately 210,700
square foot Verizon data center and operations center on 747 W. SH 114 (between W. Kirkwood
Blvd. and W. SH 114, north of the existing Verizon Wireless campus at 500 W. Dove Road,
Southlake). There will be 5 data center pods (buildings), one operations building, and an enclosed
access spine (between the data center pods) for the proposed complex. Only two pods and the
operation center will be constructed initially. The pods will be constructed perpendicular to W. SH
114 to reduce the site view impact of delivery trucks from the street. Employees for the data center
that will access the operations building from the W. Dove Road entrance (no access from W.
Kirkwood Blvd.) There will be 200 feet of existing undisturbed tree buffer and two existing ponds
that will between the data center complex and W. Kirkwood Blvd. to buffer the adjacent
neighborhood. The facility will be constructed in 2 phases- the 1 It phase will include the operations
center and 2 data center pods. The second phase will include the remaining 3 data center pods.
The goal of the development was to screen the facility from the neighborhood.
Presentation:
MASTERPLAN: SITE PLAN
HKS
W
OVERALL:
HKS ae
EXTERIOR MATERIALS: POD
I
slLL�c
—
k--— ——— "
HKS
MASTERPLAN: MASSING
l 4
ti Ii
HKS , oz
OVERALL:
f�
2
SIGHTLINE',
1 WN
HKS
EXTERIOR MATERIAL5', SPINE
HKS :6 - 13
EXTERIOR MATEROLS: OPERATION
v 4
HKS 14
Questions and Concerns:
rs;
.rx -
!IIIIIII
1. What is the timetable for Phases 1 and 2? Phase 1 will be constructed as soon as possible
after City approval in the Spring 2022. There is no specified time for Phase 2 construction.
2. How long will the construction take for Phase 1? Will need to check on the construction
time for Phase 1.
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official
meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and
the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are
strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council.
Southlake Connect Results for the January 25, 2022 SPIN Town Hall Forum
rJl)Yfl, 1AS PM .re- .- -..ars
-idge Sui[e -pert �o iwi�ebni�l
o�Gnie urlrme welemRvv fmra-.s xsms ry I`un
am,ra, a.a� xen�d,e.wm, m�xTa.�x.n retim-J.r..,y
Detailed Notification Analysis
B-m xwl PieVte
rry.
•YNI¢msllmnge]-
■1crh.]ax�weix%a-
■>� [iamnlecl
�givoxi oue
a
ui �
mreu� ene:r
wxvr.ee
stivuyyy
—pb o�
ss cneYY�w
secmaery eeeexe
anene n
t0.TttlTm OMa
�yypyx
'Mr etap
"`° Yee1ea
re�rp »evF error eeerrps enen a enerArt erenPl Ye�rgr rcma
n�:n�rr.dgere-.emaa,f.�eu�rry�n�e�
Egerh ,- Reports
A]�1vey� Del'i��Y Aoempe Amnpl lxxm 3 Anrfrp; Aiteriys 41ieri 6 Ai•.snyT A'k'iri ei Al:lrlyl T �
SYmi
�l'41e
vnonx e u o 0 0 0 0 x .:
Ikl e
gMe o a o 0 0
9 fi g o g o 0 0 0
gicm
TTY!
o 0 0
z�
Og2]95 2NH 0 0 0 0 0 0 0 52fi1
sw
Jen
2�
a0T2 Ri"� 4 0 0 0 0 4 0 4 0 0
Og
S�eex
dry O 0 0 0 0 0 0 0 0 0
!i6
1 0 0 6]0 0 0 0 0 0 0 .1
Ferei
hYW
, O 0 gaa gal o O 0 O 0 10xs
�l•41e
eeeY 0 0 96 1]1 0 0 0 0 0 aeg
swan
eery o o se ]x o 0 0 0 0 leg
euea.
�""° o o fi1 eo 0 0 0 0 0 150
vnale
Erarb W-Re -
am"p ati"p --e -111 AIII —,q -111 urge -111 an"ye reins
mr
25,
raer�
2�
2❑TI
1a1a:
plmer O 0 ❑ 0 e O 0 e 0 ❑
rsrns
4 inn
esy ❑ o u ❑ o 0 0 0 o v
e.y o ❑ u ❑ ma o 0 0 o ma
e.y o o u ❑ 1so 0 0 0 o rs
xcm.
vnnne o 0 0 o x o 0 0 o a
Ererhrige - Reports
Amm t Ml—y ArAn1p1 Al W A pi Anm t AVm L A pr Aae❑pr A[[nrpi Aaempr Toralf
Trne Wffi d 1 2 a A 5 6 ] 8 9
YI
TT❑ 0 0 0 0 16 0 0 0 0 16
�erlec
Jen
25,
2m
iM& 0 ❑ R ❑ 655 0 0 0 ❑ d59
OB
CSf
51L
rnen
J'
21
2' Pilmm 0 0 0 0 0 0 0 0 0 ❑
10.�9. 1.....
OB
CST
d n
eery
o
0
0
0
0
0
0
❑
o 0
vor
y
F rah
o
0
0
0
0
0
0
0
0 0
y sn.
y
�e1eu
o
0
0
0
0
0
0
0
❑ o
d m
eery
En1ev
o
❑
o
❑
o
o
❑
o
❑ o
smn
ea,r,
❑
o
o
❑
0
161
❑
o
❑ 162
Mabik
Ncerrr:
vr�
0
0
0
0
0
w
41
0
0 ]9
vr�
❑
o
o
❑
o
a
4
0
❑ 7
n
ems ne
o
❑
o
❑
0
13
17
o
o ao
mi
Tr❑
o
0
0
❑
0
9
2
0
0 11
Oerlee
Ta 2]95 2q1 1515 B2] 455 m W 1E a Ba2e
Meet uwp senip IlMepe 111nipt xtlnrp neunPe uronW �eemp ievie
Jen
R;
R;
C n
eery o 0 0 0 0 0 0 0 0 0
Hlme�
ery O 0 0 0 O 0 0 O 0 �
eery O o 0 0 0 0 o O o 0
Len
R[
IITI