Subject: Approve the construction contract award of the N. Peytonville
Avenue storm drain and sidewalk improvements to HQS
Construction, LLC in an amount not to exceed $952,269.
Action
Requested: Approve the construction contract award of the N. Peytonville
Avenue storm drain and sidewalk improvements to HQS
Construction, LLC in an amount not to exceed $952,269.
Background
Information: Inadequate drainage has been a notable concern at the intersection
of N. Peytonville and Raven Bend Court. The intersection
experiences drainage issues during major rain events, causing runoff
to surface flow across the intersection. The storm runoff can quickly
overwhelm existing drainage facilities, with water reaching several
inches deep and posing a safety concern for the traveling public . In
FY 2020, design began for drainage improvements at this
intersection with the scope expanded to include improvements
upstream at Raven Bend Court to intercept excess surface runoff,
and downstream to accommodate the influx of stormwater. Some of
the improvements added to the scope include the addition of an
underground system for stormwater management, a concrete-lined
ditch to convey stormwater, waterline relocation and upsizing, and
pedestrian improvements, including a sidewalk to close an existing
gap.
Solicitation of bids for this project began on January 9, 2022, and
sealed bids were received and opened on February 11, 2022. The
three bids received for this project are shown in the bid tabulation
below:
Bidder Bid Amount
HQS Construction, LLC $ 867,268.18
Fort Worth Civil Construction, LLC $ 1,128,225.00
Joe Funk Construction, LLC $ 1,367,894.06
City staff and Halff Associates, Inc. have reviewed and scored three
bids using best value criteria as described in the project manual. The
Item 9A
Page 2 of 3
evaluation criteria for this bid was the purchase price (50%); the
reputation of the bidder including key personnel (15%); the
reputation and quality of the bidder’s goods or services (15%); the
bidder’s past relationship with the City (10%); and the bidder’s
responsiveness (10%). The evaluation of the proposals,
qualifications, and references led to the recommendation of HQS
Construction, LLC for this project.
The approved budget for this CIP project is $750,000.
Preconstruction expenses of $197,000 (design, materials testing,
and drainage easement acquisition) leave the available balance for
construction at $553,000. Scope changes to the original project, as
well as inflation increases, resulted in increased construction costs.
HQS was deemed to be the most responsive and responsible bidder
with a bid in an amount of $867,269, with the addition of $85,000 of
project contingency the total authorized amount for this agreement is
$952,369. With the approval of this agreement, the anticipated start
date is May 2022.
Financial
Considerations: The original project funding of $750,000 was approved as part of the
FY 2018 Capital Improvement Program. The scope additions of
$400,000 is available to be funded from residual stormwater funds.
The approval of this agreement will amend the total project budget
from the original $750,000 to a new total of $1,150,000.
Strategic Link: This item links to the City’s Strategy Map strategic focus areas of
Safety & Security, Mobility, and Infrastructure. It specifically relates
to the City’s Corporate Objectives, C1: Achieve The Highest
Standards Of Safety & Security, and F2: Invest To Provide &
Maintain High Quality Public Assets. The Critical Business Outcome
is, CBO5: Improve Quality Of Life Through Progressive
Implementation Of Southlake’s Comprehensive Plan
Recommendations.
Citizen Input/
Board Review: None
Legal Review: This is the standard construction services contract that has been
previously reviewed by the City Attorney.
Alternatives: The City Council may approve or deny the contract.
Supporting
Documents: Attachment A: Bid Tabulation
Staff
Item 9A
Page 3 of 3
Recommendation: Approve the construction contract award of the N. Peytonville
Avenue storm drain and sidewalk improvements to HQS
Construction, LLC in an amount not to exceed $952,269.
Staff Contact: Rob Cohen, Director of Public Works
CLIENT:City of Southlake
PROJECT:N Peytonville Ave Storm Drain and Sidewalk Improvements
Bid Tabulation
Denotes low bidder
Denotes mathematical errors in contractor provided proposal.
Item No.Description Total Quanity Unit
Unit Price ($) Total ($) Unit Price ($) Total ($) Unit Price ($) Total ($)
1 Mobilization (Bonds, Insurance, Move-In, Sanitary Facilities)
Note: This Item may not exceed 5% of the Grand Total Bid Amount
1 LS $37,500.00 $37,500.00 $80,600.00 $80,600.00 $41,000.00 $41,000.00
2 General Site Preparation 1 LS $50,312.50 $50,312.50 $48,350.00 $48,350.00 $25,000.00 $25,000.00
3 Barricades, Warning and Detour Signs 1 LS $20,625.00 $20,625.00 $24,150.00 $24,150.00 $45,000.00 $45,000.00
4 Remove Asphalt Pavement 8046 SF $10.14 $81,586.44 $3.25 $26,149.50 $2.76 $22,206.96
5 Remove Concrete Pavement and Flatwork 3492 SF $11.39 $39,773.88 $3.00 $10,476.00 $2.76 $9,637.92
6 Remove Concrete Curb and Gutter 227 LF $12.50 $2,837.50 $33.50 $7,604.50 $20.00 $4,540.00
7 Remove Concrete Ribbon Curb 122 LF $15.00 $1,830.00 $12.00 $1,464.00 $20.00 $2,440.00
8 Remove Headwall for Dual Box Culvert 2 EA $8,125.00 $16,250.00 $3,080.00 $6,160.00 $2,500.00 $5,000.00
9 Remove 5-ft by 2-ft Concrete Box Culvert 75 LF $93.75 $7,031.25 $113.00 $8,475.00 $50.00 $3,750.00
10 Remove Fence (Various Sizes and Materials)199 LF $22.50 $4,477.50 $5.00 $995.00 $6.00 $1,194.00
11 Remove Existing Water Line 67 LF $37.50 $2,512.50 $60.00 $4,020.00 $20.00 $1,340.00
12 Remove Existing Water Valve 1 EA $625.00 $625.00 $775.00 $775.00 $800.00 $800.00
13 Erosion Control 1 LS $35,937.50 $35,937.50 $9,530.00 $9,530.00 $7,500.00 $7,500.00
14 4-in Topsoil and Block Sod 2241 SY $15.00 $33,615.00 $14.00 $31,374.00 $15.00 $33,615.00
15 Asphalt Pavement Repair 894 SY $75.00 $67,050.00 $82.50 $73,755.00 $65.00 $58,110.00
16 6-in Thick Concrete Valley Gutter 50 SY $93.75 $4,687.50 $120.00 $6,000.00 $10.00 $500.00
17 5-in Thick Concrete Sidewalk 1415 SF $7.50 $10,612.50 $13.70 $19,385.50 $7.22 $10,216.30
18 6-in Thick Concrete Ribbon Curb 122 LF $18.75 $2,287.50 $46.00 $5,612.00 $10.00 $1,220.00
19 Concrete Curb and Gutter 359 LF $37.50 $13,462.50 $70.50 $25,309.50 $35.00 $12,565.00
20 Pedestrian Ramp (Type 7 Mod)1 EA $1,562.50 $1,562.50 $4,030.00 $4,030.00 $2,500.00 $2,500.00
21 Pedestrian Railing 80 LF $168.75 $13,500.00 $218.00 $17,440.00 $275.00 $22,000.00
22 Install 4-ft Wooden Fence 148 LF $50.00 $7,400.00 $54.00 $7,992.00 $100.00 $14,800.00
23 Install 8-ft Wooden Fence 47 LF $81.25 $3,818.75 $67.00 $3,149.00 $150.00 $7,050.00
24 Trench Safety for Storm Drains 912 LF $5.00 $4,560.00 $13.00 $11,856.00 $2.00 $1,824.00
25 24-in Class IV Reinforced Concrete Pipe 157 LF $192.64 $30,244.48 $189.00 $29,673.00 $85.00 $13,345.00
26 30-in Class IV Reinforced Concrete Pipe 167 LF $255.14 $42,608.38 $210.00 $35,070.00 $100.00 $16,700.00
27 36-in Class IV Reinforced Concrete Pipe 396 LF $317.64 $125,785.44 $226.00 $89,496.00 $140.00 $55,440.00
28 5-ft by 3-ft Reinforced Concrete Box 147 LF $1,098.89 $161,536.83 $512.00 $75,264.00 $535.00 $78,645.00
29 10-ft by 4-ft Reinforced Concrete Box (CIP) (Mod w/ False Bottom) 45 LF $2,000.00 $90,000.00 $2,573.00 $115,785.00 $1,100.00 $49,500.00
30 Parallel Wingwall for 10-ft by 4-ft Concrete Box Culvert 2 EA $28,125.00 $56,250.00 $14,825.00 $29,650.00 $16,500.00 $33,000.00
31 5-in Thick Concrete Riprap 143 SY $156.25 $22,343.75 $160.00 $22,880.00 $55.00 $7,865.00
32 4-inch Thick Concrete Pilot Channel 336 SY $231.25 $77,700.00 $85.50 $28,728.00 $110.00 $36,960.00
33 15-ft Curb Inlet 6 EA $18,437.50 $110,625.00 $10,343.00 $62,058.00 $13,500.00 $81,000.00
34 4-ft by 4-ft Drop Inlet 2 EA $5,625.00 $11,250.00 $6,925.00 $13,850.00 $6,500.00 $13,000.00
35 5-ft by 5-ft Junction Box 1 EA $7,062.50 $7,062.50 $10,430.00 $10,430.00 $8,500.00 $8,500.00
36 7-ft by 7-ft Junction Box 1 EA $9,687.50 $9,687.50 $13,460.00 $13,460.00 $12,500.00 $12,500.00
37 Trench Safety for Water Lines 499 LF $5.00 $2,495.00 $5.00 $2,495.00 $2.00 $998.00
38 6-in Water Line (By Open Cut)98 LF $61.39 $6,016.22 $101.00 $9,898.00 $68.00 $6,664.00
39 8-in Water Line (By Open Cut)112 LF $86.39 $9,675.68 $135.00 $15,120.00 $75.00 $8,400.00
40 12-in Water Line (By Open Cut)289 LF $141.39 $40,861.71 $176.00 $50,864.00 $83.00 $23,987.00
41 6-in by 6-in Tapping Sleeve and Valve 1 EA $5,312.50 $5,312.50 $6,000.00 $6,000.00 $3,200.00 $3,200.00
42 12-in by 12-in Tapping Sleeve and Valve 1 EA $9,375.00 $9,375.00 $9,680.00 $9,680.00 $7,500.00 $7,500.00
43 8-inch Water Valve 1 EA $2,437.50 $2,437.50 $2,100.00 $2,100.00 $3,200.00 $3,200.00
44 12-inch Water Valve 3 EA $3,750.00 $11,250.00 $5,780.00 $17,340.00 $4,400.00 $13,200.00
45 2-inch Blow Off Valve 1 EA $6,000.00 $6,000.00 $6,500.00 $6,500.00 $3,600.00 $3,600.00
46 Fire Hydrant Assembly 1 EA $7,437.50 $7,437.50 $6,960.00 $6,960.00 $7,250.00 $7,250.00
47 Connection to Water Line 2 EA $2,656.25 $5,312.50 $6,333.00 $12,666.00 $2,500.00 $5,000.00
48 Concrete Easement 12 LF $231.25 $2,775.00 $107.00 $1,284.00 $500.00 $6,000.00
49 Water Line Lowering 1 EA $32,187.50 $32,187.50 $15,300.00 $15,300.00 $17,500.00 $17,500.00
50 Post-Construction Television Inspection 912 LF $7.50 $6,840.00 $2.25 $2,052.00 $15.00 $13,680.00
51 Unclassified Excavation 195 CY $56.25 $10,968.75 $46.00 $8,970.00 $35.00 $6,825.00
$1,367,894.06 $1,128,225.00 $867,268.18
$1,367,894.06 $1,128,225.00 $867,268.18
HALFF ASSOCIATES, Inc.
4000 Fossil Creek Boulevard
Fort Worth, Texas 76137
TOTAL:
Company
Joe Funk Construction
TOTAL:
Company
HQS Construction, LLC
Company
Fort Worth Civil Construction, LLC
I:\34000s\34096\001\ConstrAdmin\Bid Tabs\N Peytonville Ave Storm Drain and Sidewalk Improvements Bid Tab 3/4/20228:45 AM