Loading...
Item 6B9 CASE NO: ZA22-0008 SOUTHLAKE PLANNING & DEVELOPMENT SERVICES STAFF REPORT February 22, 2022 PROJECT: Development Plan and Site Plan for Verizon Expansion EXECUTIVE SUMMARY: On behalf of Verizon Wireless, Halff Associates is requesting approval of a Development Plan/Site Plan for Verizon Expansion on property described as Tracts 1 ClA, 1 C1 B, 1 C2 and 1 F, James B. Martin Survey, Abstract No. 1134, City of Southlake, Tarrant County, Texas, and located at 747 W. S.H. 114, Southlake, Texas. SPIN Neighborhood #1. DETAILS: The property is located approximately 850 feet north of the intersection of W. SH 114 and W. Dove Road and extends to W. Kirkwood Blvd. to the east. The purpose of this request is to consider approval of a development plan and Site Plan for a Verizon data center on approximately 25.15 acres. The proposed facility will be a multi -phase development a total of six buildings (pods) totaling 210,700 square feet. The buildings will include 5 data center pods and an operational building. The first phase will consist of 3 buildings (one operational center 1-story building and two 1-story data center pods) and a later phase of three 1-story data center pods. The pods will be constructed perpendicular to W. SH 114 to reduce the site view impact of delivery trucks from the street. Employees for the data center that will access the operations building from the W. Dove Road entrance (no access from W. Kirkwood Blvd.) There will be 200 feet of existing undisturbed tree buffer and two existing ponds that will between the data center complex and W. Kirkwood Blvd. to buffer the adjacent neighborhood. Case No. ZA22-0008 Site Data Summary Phase I (2022) Future Phases Total TBD Existing Zoning NR-PUD Land Use Designation Mixed Use Gross/Net Acreage 1,060,860 sf 24.35 acres No. of Lots 1 Site Coverage % 8.86% 11.00% 19.86% Area of Impervious 309,422 sf 188,258 sf 497,680 sf Coverage sf (%) (29.17%) (17.75%) (46.92%) Area of Open Space sf (%) 751,438 sf 563,180 sf 563,180 sf 70.83% 53.09% 53.09% Total Building/Floor Area sf 94,000 sf 116,700 sf 210,700 sf Building Use 94,000 sf: 116,700 sf 210,700 sf data center data center data center Number of Stories 1 1 1 Building Ht. 24 ft. 24 ft. Total Parking Required/ Total 122 spaces/126 spaces Parking Provided HC: 5 spa es/ 7 spaces Required Loading Spaces/ 1/4 3/0 4/4 Provided Loading Spaces Area of Outside Storage/ 63,329 sf/ 5.97% 79,503 sf/ 7.49% 142,832 sf/ 13.46% Percentage of Outside Storage VARIANCES REQUESTED: 1) Bufferyard Plantings and Irrigation on the west, north and east bufferyards to allow preservation of natural vegetation and trees. 2) 8' Multi -use Trail along the west (SH 114) and the north (flood plan/channel) 3) Allow Tri-County electric switch box adjacent to Kirkwood Blvd. with screening wall. 4) Allow articulation as shown on the architectural elevations. 5) Corridor Overlay Masonry Standards allowing masonry with concrete tilt wall as shown. Exterior elevations comply with the Masonry Ordinance No. 557, as amended 6) Tree Preservation Ordinance requires a minimum of 40% preservation of existing tree cover. Applicant proposes preservation of approximately 38% of existing tree cover. The applicant proposes mitigation plantings of a minimum of 120 canopy trees. ACTION NEEDED: 1) Conduct a public hearing 2) Consider approval of a Development / Site Plan ATTACHMENTS: (A) Background Information (B) Vicinity Map (C) Development/Site Plan Review Summary No. 2, February 22, 2022 (D) Surrounding Property Owners Map and Responses Full Size Plans (for Commission and Council members only) PowerPoint Presentation Case No. ZA22-0008 Narrative Combined Plans Verizon Color Landscape Rendering SPIN Meeting Report Corridor Planning Committee Report Traffic Impact Study STAFF CONTACT: Ken Baker (817) 748-8067 Dennis Killough (817) 748-8072 Case No. ZA22-0008 BACKGROUND INFORMATION OWNER: Verizon Wireless APPLICANT: Halff Associates PROPERTY SITUATION: 747 W. SH 114 generally located approximately 850 feet north of the W. Dove Road/ W. SH 114 intersection. LEGAL DESCRIPTION: Tracts 1 C1A, 1 C1 B, 1 C2 and 1 F, James B. Martin Survey, Abstract No. 1134, Southlake, Texas LAND USE CATEGORY: Mixed Use CURRENT ZONING: "NR-PUD" — Non -Residential Planned Unit Development District including "C-3" General Commercial District, "0-2" Office District, "HC" Hotel District, and "CS" Community Service District uses. HISTORY: October 17, 1995; City Council approved a Rezoning and Concept Plan for Solana (Non-residential) to "NR-PUD" Non -Residential Planned Unit Development with "C-3" General Commercial District, "0-2" Office District, "HC" Hotel District, and "CS" Community Service District uses. Case No. ZA22-0008 June 14, 2001; City Council approved a site plan. (ZA01-056) June 14, 2001; City Council approved a preliminary plat for Lots 1 and 2, Block 1, Solana Addition. (ZA01-058) June 14, 2001; City Council approved a final plat for Lot 1, Block 1, Solana Addition. (ZA01-059) November 15, 2011; City Council approved a site plan to add an approximately 56,529 square foot two-story expansion to the existing Verizon Wireless facility for increased network space and area for infrastructure and a service yard surrounded by a twenty (20) foot wall adjacent to the expansion. Construction is underway on this expansion. (ZA11-050) December 4, 2012; City Council approved a site plan to add a two-phase, two-story expansion with approximately 5,800 square feet of floor area on each floor and an approximately 6,500 square foot service yard. (ZA12- 096) March 2012; Building permits were issued by right as a permitted accessory use for a temporary construction facility at the northwest corner of W. Dove Rd. and Kirkwood Blvd. for a period not to exceed two years. March 4, 2014; City Council approved a Specific Use Permit to keep the temporary construction facility at the northwest corner of W. Dove Road and Kirkwood Blvd. past the two-year period allowed by right was approved by City Council with an expiration date to be the earlier of sixty (60) days Attachment A Page 1 after the Certificate of Occupancy was issued or November 15, 2014. The requested variances for the building not to be skirted, the landscaping requirement not being met, and the paved parking spaces not being provided were granted with approval of the SUP. The construction trailer was recently removed from the property. (ZA14-013) May 5, 2015; Approved (6-0) a specific use permit for two construction trailers subject to Staff Report dated April 28, 2015, noting that Verizon will work with the staff and HOA on placement of the plantings along Dove Road and Kirkwood Boulevard to shield the cars in the parking lot and including the enhanced landscape plan as presented granting the variance on the landscaping for the two temporary facilities. (ZA15-009) September 20, 2016; City Council approved 2 electric vehicle charging spaces for 4 parking spaces near the main entrance to the building subject to Staff Report dated September 13, 2016 and noting the following: • Approved four parking spaces as indicated site plan and presented as electric vehicle charging parking spaces; and, • Also approved the location of the two dual electric charging stations, signage and parking control devices as presented and provided as an exhibit in the staff report, specifically requiring the bollards located in front of the charging stations to be painted grey. (ZA16-068) February 21, 2017; City Council approved a site plan and elevations for Verizon Wireless Dock expansion; requiring the installation of an approximate 200 linear foot screen of landscape materials running parallel to the building and east of the dock area and an approximate 80 linear foot dock screening wall matching the building brick and trim and located north of the dock area as indicated on the site plan, and the extent of the wall will not exceed the limits shown on the site plan; approving variances to Ordinance No. 480 in association with the dock expansion for Corridor Overlay Zone, Section 43.9.c.2(c), for loading and service area, Residential Adjacency Standards, Section 43.13a(6),for loading and service area, Corridor Overlay Zone, Section 43.9.c.1.c, for screening of mechanical equipment, Residential Adjacency Standards, Section 43.13.A.3, for screening of mechanical equipment; noting as part of this approval, Council is directing staff to have administrative approval authority over the design and implementation of the 200 linear foot area of landscape materials and noting a minimum installation of eight foot plant materials and noting that Council recognizes that due to seasonal changes, the impact on plant life may change and vary throughout the year and Council is noting that the applicant is fully compliant with the screening requirement based upon tonight's approval regardless of seasonal changes; and noting that the 200 linear foot landscape materials are to be staggered plantings of eastern red cedars, a minimum of eight foot tall, four foot spread at planting and six foot on center. (ZA16-100) March 6, 2018; City Council approved the extension of the expiration date for the Specific Use Permit for temporary construction facilities for Verizon Case No. Attachment A ZA22-0008 Page 2 Wireless; granting to this specific use permit requirements to provide foundation landscape planting consisting of one (1) five -gallon shrub per four (4) linear feet around skirting (excluding entrances); noting that they approved, once construction begins, if it indeed is an external building expansion, that City Council approved moving the temporary trailers east or west slightly and be overseen by staff's approval in order to allow construction on the footprint itself; and also noting that if the applicant completes this project prior to expiration of this specific use permit that the trailers are to be removed immediately; and approving this specific use permit to July 1, 2019. December 4, 2018; City Council approved a Specific Use Permit/Site Plan for an accessory structure (guard house) and site improvements including 8- foot wrought iron perimeter security fencing, 5-foot concrete walkways with bollard lighting, benches, outdoor pavilion (24 ft. by 24 ft.) with picnic tables for employees, and landscaping. granting the following variance requests: 1) Section 45 Specific Use Permits, Section 45.15 (a) requiring the structure to be in the rear yard and Section 45.15 (f) Specific Requirements for Accessory Structures: No accessory building shall be located forward of the principle building on the lot. This variance allows the accessory building (guard house) to be in the front yard at the W. Dove Road entry and forward of the principal building as shown on the site plan presented this evening; 2) Variance to the Driveway Ordinance No. 634, Section 5.2 (2) to allow a 99.6 ft. stacking depth at the W. Dove Road entry drive where a 150 ft. stacking depth is required for driveways with properties with over 200 parking spaces; also noting the applicant's agreement to vertically articulate the fence along W. Kirkwood Blvd. (ZA18- 0046) September 21, 2021; City Council approved a specific use permit for a guard house at the W. Dove Road entrance subject to the Staff Report dated September 14, 2021 and the Specific Use Permit Review Summary No. 2, dated September 3, 2021. (ZA21-0067) SOUTH LAKE 2035 PLAN: Consolidated Future Land Use Plan The 2035 Future Land Use designation for the site is "Mixed Use" and Optional Land Use Designation is Campus Office Overlay. Case No. ZA22-0008 Mobility & Master Thoroughfare Plan The Master Thoroughfare Plan shows W. S.H. 114 to be a variable width freeway with 300' — 500' of right of way. W. Dove Rd. is shown as a four - lane divided arterial with 88' of right of way and Kirkwood Blvd. is shown as a four -lane divided arterial with 100' of right of way. No changes to the existing roadways are required or proposed with this project. Pathways Master Plan & Sidewalk Plan Southlake's Pathway System Master Plan shows a planned eight (8) foot or greater multiuse trail adjacent to the S.H. 114 frontage and along the northern boundary adjacent to the channel, between W. SH 114 and W. Kirkwood Blvd. There is an existing five (5) foot sidewalk that was constructed with the Kirkwood Blvd. Attachment A Page 3 TRANSPORTATION ASSESSMENT: Traffic Impact A previous presented Traffic Impact Study under ZA21-0046, was conducted for the Verizon entrance on W. Dove Road and the W. Kirkwood Blvd. entrance. The following list of finding and recommendations has been based on the results of the analyses presented in the report: • Conversion of the secondary drive on Kirkwood Boulevard to exit only will have negligible impact on site operations. The secondary drive serves less than 10 percent of the overall inbound traffic. • Truck traffic represents approximately three (3) percent of the total traffic. • For card reader operations at the main drive, the average queue is projected to be less the one (1) vehicle and the maximum queue will be no more than four (4) vehicles during either the peak 15-minute period, or the peak hour. • Projected truck queues (both average and maximum) will be no greater than one truck. • The existing main entry drive has sufficient storage length for the projected maximum queue. • Halff recommends that the existing driveway remain in its current location, but that the driveway be widened to accommodate an additional inbound traffic lane. It is recommended that the additional lane be approximately 50 feet in length, which will allow employees to bypass any queue at the guard house lane, minimizing the potential blocking of the employee entrance. • Impacts to on -site circulation, as a result of the proposed changes, will be minimal and should not affect traffic operations on the site. • The proposed change in operation has no discernable impact on the operation of the signalized intersection at Dove Road at Kirkwood Boulevard. TREE PRESERVATION: Since the property already has an approved Concept Plan, it is regulated by the Tree Preservation Ordinance 585-B. The requirements for tree preservation and removal are stated in Section 6.7c of the Tree Preservation Ordinance 585-B. The applicant may choose that the development be regulated by the Tree Preservation Ordinance 585-E. CITIZEN INPUT: A SPIN meeting was held for this request on January 25, 2022. PLANNING AND ZONING COMMISSION: February 17, 2022; Approved (6-0) subject to the Staff Report dated February 17, 2022 and the Development Plan/ Site Plan Review Summary No. 1 dated February 17, 2022; granting the 6 variances as requested; encouraging the applicant to provide as much information and photographs on the bufferyards to support the variance request; providing perspectives on the sightlines along SH114 similarto what was provided along Kirkwood Blvd. and creating a visual layout of the property and the surrounding area, as is possible; and noting specifically, the access from SH114 and potentially access, and limiting it from the SH114 access road to egress only. Case No. Attachment A ZA22-0008 Page 4 STAFF COMMENTS: Attached is the Review Summary No. 2, dated February 22, 2022 WCommunity DevelopmenhMEMO12022 Cases10008 - DPSP - Verizon Expansion Case No. ZA22-0008 Attachment A Page 5 Case No. Attachment B ZA22-0008 Page 1 SITE PLAN REVIEW SUMMARY Case No.: ZA22-0008 Review No.: Two Date of Review: 2122/22 Project Name: Development Plan/Site Plan — Verizon Southlake Expansion APPLICANT: Halff Associates Kaylie Flynn 1201 N. Browser Rd. Richardson, TX 75081 Phone: 214-937-3923 Email: Iflynn@half.com OWNER: Dallas MTA Gregory Delmotte 145 Chubb Way Branchburg, NJ 08876 Phone: 908-878-8668 Email: Gregory.delmotte@verizonwireless.com CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 2/21/2022 AND WE OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF SITE PLAN APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED FURTHER CLARIFICATION, PLEASE CONTACT THE APPROPRIATE STAFF MEMBER. Planning Review Patty Moos Planner I Phone: (817) 748-8269 Email: pmoos _ci.southlake.tx.us Show and label the width and type of bufferyards along all boundaries in accordance with Ord. 480, Section 42 and 43. See Landscape Administrator's comments below. Show the bufferyard with dashed lines and shading or cross -hatch. Properties within Corridor Overlay Zone see Ord. 480-S § 43.9.c.3. and Exhibits 43-B and 43-C (Variance Requested, to allow preservation of natural growth and trees) 2. The curb return radii adjacent to the fire lanes must be a minimum of 30 ft. Label the radii of all fire lane curves and adjacent curb returns. 3. An 8 ft. wide or greater multi -use trail is required along the W. SH 114 frontage road and along the northerly boundary of the site, adjacent to the channel. (Variance Requested) 4. Show and label type and height of screening for ground equipment and utilities. The switch gear facility in the southwest corner adjacent to W. Kirkwood should be in a rear easement, if possible, and completely screened of view from the right-of-way. Show any intended maintenance access drive if needed. (Variance, allow electric switch box adjacent to Kirkwood Blvd, with screening) 5. The SH 114 driveway access gate needs to be located such that it does not impede the minimum needed stacking depth. Label the stacking depth at this driveway. 6. Provide clarification on the parking ratios used for calculating the required parking. Parking spaces shall be provided in accordance with Section 35 of the Zoning Case No. Attachment C ZA22-0008 Page 1 Ordinance No. 480, as amended. Parking is determined by the uses within the building and typically calculated as a ratio of a minimum number of spaces per square feet of "floor area" in of the building. See definition of "Floor Area" Section4 of the Zoning Ordinance. 7. The following items are required by the Corridor Overlay Zone per Ord. 480, Section 43.3 as amended: a. Provide vertical architectural elevations with the outline of the corresponding horizontal building footprint below the elevation with dimensions for building wall heights, wall lengths and off -sets to demonstrate compliance horizontal and vertical articulation requirements of 43.9.c.1(d) on all fagade visible from W. SH114 and W. Kirkwood Blvd. The elevations do not appear to meet the vertical or horizontal articulation. (Variance Requested, allow as articulation as shown) b. Label all architectural elevations with each material type. Provide a sample/cut- sheet of proposed exterior materials. Ord. 480, Section 43.9.c.1(a) requires the following masonry standards: Masonry Requirements: These standards shall apply to facades which are visible from the following roadways and their respective rights -of -way: SH 114, Carroll Avenue between SH 114 and FM 1709, FM 1709, FM 1938, and roadways designated as having sixty -foot (60') or greater rights -of - way in the Thoroughfare Plan. All facades of the applicable buildings shall be constructed with the same material and all buildings shall meet the masonry requirements as set out in Ordinance No 557, as amended. However, such masonry requirements shall exclude the use of cement, concrete tilt wall and other masonry materials of similar characteristics. In addition, the use of standard concrete block shall be limited to 10% of any facade visible from adjacent public ROW. Stucco or plaster shall only be allowed when applied using a 3-step process over diamond metal lath mesh to a 7/8th inch thickness or by other processes producing comparable stucco finish with equal or greater strength and durability specifications. The use of synthetic products (e.g., EIFS — exterior insulation and finish systems, hardy plank, or other materials) shall not be considered as masonry material. (Variance to Corridor Overlay Standards allowing masonry, with some concrete tilt wall as shown. Exterior elevations comply with the Masonry Ordinance No. 557, as amended) Tree Conservation/Landscape Review Keith Martin Landscape Administrator Phone: (817) 748-8229 Case No. Attachment C ZA22-0008 Page 2 E-mail: kmartin ci.southlake.tx.us TREE CONSERVATION COMMENTS: * Since the property already has an approved Concept Plan, it was regulated by the Tree Preservation Ordinance 585-B. The applicant has requested that the development be regulated by the Tree Preservation Ordinance 585-E. * Under traditional zoning the proposed preservation of existing tree cover would not comply with the Existing Tree Cover Preservation Requirements of the Tree Preservation Ordinance 585-E. There is 70% of existing tree cover and a minimum of 40% of the existing tree cover is required to be preserved. A maximum amount of 38% of existing tree cover is proposed to be preserved. To mitigate the removal of trees off -site and removal below the minimum amount of existing tree cover required to be preserved, the applicant is proposing to plant 120 additional canopy trees, and 24 additional accent trees. Approximately seventeen (17) of the provided canopy trees, and two (2) provided accent trees would be required anyways for the required parking landscaping. Except as provided by subsection 7.2.b. of the Tree Preservation Ordinance, a Tree Conservation Analysis or Tree Conservation Plan shall be approved if it will preserve existing tree cover in accordance with the percentage requirements established by Table 2.0. If the property has previously received a tree permit related to development, the percentage of existing tree cover at the time the first such permit was issued shall be used to calculate the minimum existing tree cover that must be preserved under this section. Table 2.0 — Existing Tree Cover Preservation Requirements Percentage of existing tree cover on the entire site Minimum percentage of the existing tree cover to be preserved* 0% — 20% 70% 20.1 —40% 60% 40.1 % - 60% 50% 60.1 % - 80% 40% 80.1 % - 100% 30% *The minimum percentage of existing tree cover to be preserved shall exclude any area in public rights -of -way as approved by City Council. For property sought to be zoned for the Downtown zoning district or a planned development zoning district, including an S-P-1 Site Plan, S-P-2 Site Plan, Transition, Rural Conservation, Planned Unit Development, or Employment Center zoning district, the City Council shall consider the application for a Conservation Analysis or Plan in conjunction with the corresponding development application (as established in Table 1.0). The Planning and Zoning Commission shall review the application and make a recommendation to the City Council regarding the application. The City Council shall Case No. Attachment C ZA22-0008 Page 3 approve the Plan or Analysis if the Council finds that the Plan or Analysis provides for the: placement of building pads, parking areas, driveways, streets, and utility easements so as to maximize the preservation of environmental features of the property including mature tree stands, natural creeks and ponds, and significant grades; maximizes the preservation of tree cover preservation areas indicated on the Environmental Resource Protection Map; iii. maximizes the preservation of existing tree stands with the potential to buffer residential areas from the noise, glare, and visual effects of nonresidential uses; iv. maximizes the preservation of existing trees, if any, adjoining a natural or man- made drainage creek; V. maximizes the preservation of existing protected trees along rural roadways and other streets as identified and prioritized in the Street Typology designation; and vi. mitigation of altered trees through proposed tree replacement procedures pursuant to this Ordinance. Please be aware that all existing trees shown to be preserved on the City Council approved Tree Conservation Plan must be preserved and protected during all phases and construction of the development. Alteration or removal of any of the existing trees shown to be preserved on the approved Tree Conservation Plan is a violation of the Tree Preservation Ordinance and the zoning as approved by the Southlake City Council. Please ensure that the layout of all structures, easements, utilities, structures grading, and any other structure proposed to be constructed do not conflict with existing trees intended to be preserved. LANDSCAPE COMMENTS: On the Landscape plan please correct the labeling for the east bufferyard. It is labeled as a 20' bufferyard and is shown as a 10' bufferyard in the Bufferyards Summary Chart. 2. The minimum required number of shrubs are not being provided within the interior landscape area. Please provide at least the minimum number of required shrubs within the interior landscape. Existing tree credits are proposed to be taken for all required interior landscape canopy trees and accent trees. The required plant material is being provided within the parking lot landscape islands, which do count towards required interior landscape plant material. The applicant is requesting a variance to the bufferyards requirements and proposing to take existing tree and natural vegetation credits for all canopy trees accent trees, and shrubs required within the bufferyards. Case No. Attachment C ZA22-0008 Page 4 The south access drive is located within the south bufferyard. The applicant is requesting a variance to allow the access drive as shown because of future property platting. Indicates informational comment. # Indicates required items comment. Public Works/Engineering Review Sandy Endy, P.E., Civil Engineer Phone: (817) 748-8033 E-mail: sendy aQci.southlake.tx.us DRAINAGE COMMENTS: 1. Please provide an existing drainage area map and associated calculations. 2. Proposed Drainage Area Map: a. The Q100 values listed for each subarea in plan view doesn't match what is listed in the table. b. The infiltration values for subareas A-1 b through A-7 vary significantly. Please revise the values to be consistent. c. The infiltration values are based on the previous iSWM tables. Please update the values to match the updated iSWM tables. 3. If detention is not being proposed for the increase in runoff, then documentation supporting and certifying that detention is not necessary will be required prior to approval of construction plans. The memorandum shall be signed and sealed by a registered PE. Discharge of post development runoff must have no adverse impact on downstream properties and shall meet the provisions of Ordinance No. 605. 4. Please be aware that a drainage easement sized for the 1 % (100-year) storm event plus 1-foot of freeboard will be required to be dedicated for the existing creek. Fire Department Review Kelly Clements Fire Marshal Phone: (817) 748-8223 E-mail: kclementsC�ci.southlake.tx.us GENERAL COMMENTS: Provide 30 ft. radii on all fire lane access between buildings. Case No. Attachment C ZA22-0008 Page 5 General Informational Comments No review of proposed signs is intended with this site plan. A separate building permit is required prior to construction of any signs. Mechanical Equipment Screening: All buildings must be designed such that no mechanical equipment (HVAC, etc.) or satellite dishes shall be visible from SH 114, Carroll Avenue between SH 114 and FM 1709, FM 1709, and FM 1938 and any adjacent public ROW. This shall include equipment on the roof, on the ground or otherwise attached to the building or located on the site. The applicant has indicated that no roof mounted equipment is proposed. All other equipment will be screened. All lighting must comply with the Lighting Ordinance No. 693, as amended. All development must comply with the Drainage Ordinance No. 605 and the Erosion and Sediment Control Ordinance No. 946, as amended. It appears that a portion of this property lies within the 65 LDN D/FW Regional Airport Overlay Zone and will require construction standards that meet requirements of the Airport Compatible Land Use Zoning Ordinance No. 479. Development must comply with all requirements in Zoning Ordinance No. 480, Section 43, Overlay Zones. The applicant should be aware that prior to issuance of a building permit a Plat must be processed and filed in the County Plat Records, a fully corrected site plan, landscape plan, irrigation plan, and building plans, must be submitted for approval and all required fees must be paid. This may include but not be limited to the following fees: Park Fee, Perimeter Street Fee, Water & Sewer Impact and Tap Fees, and related Permit Fees. Denotes Informational Comment Case No. Attachment C ZA22-0008 Page 6 SURROUNDING PROPERTY OWNERS MAP SPO# 1. Owner Name POGUE, BILLINGSLEY GARNER Zoning RPUD Physical Address 2815 TYLER ST Acreage 0.68 Response NR 2• KIRKWOOD HOLLOW HO ASSOC RPUD 2819 TYLER ST 1.17 NR 3• PARKER, THANE D RPUD 2813 TYLER ST 0.65 NR 4. BURTNETT, MICHAEL RPUD 2811 TYLER ST 0.66 NR 5. BARKER, MATTHEW RPUD 2809 TYLER ST 0.60 NR 6. RAYNER, FRED RPUD 2807 TYLER ST 0.54 NR 7• SALT-E LIVING TRUST RPUD 2805 TYLER ST 0.56 NR 8. NAEEN, MUHAMMAD RPUD 2803 TYLER ST 0.56 NR 9• MESENBRINK, DANIELS RPUD 2801 TYLER ST 0.67 NR 10. COTTINGHAM, BRENT A RPUD 2802 TYLER ST 0.71 NR 11. KIRKWOOD HOLLOW HO ASSOC RPUD 2800 TYLER ST 0.70 NR 12. KIRKWOOD HOLLOW HO ASSOC RPUD 2798 TYLER ST 0.09 NR 13. KIRKWOOD HOLLOW HO ASSOC RPUD 416 ORCHARD HILL DR 0.46 NR 14. KIRKWOOD HOLLOW HO ASSOC RPUD 420 ORCHARD HILL DR 0.14 NR 15. VERIZON WIRELESS TEXAS LLC NRPUD 500 W DOVE RD 24.86 NR 16. KIRKWOOD HOLLOW HO ASSOC RPUD 2818 TYLER ST 0.10 NR 17. WILKS SOUTH LAKE DEVELOPMENT L NRPUD 1001 W KIRKWOOD BLVD 11.26 F 18. DALLAS MTA LP NRPUD 747 W STATE HWY 114 19.99 NR 19• DALLAS MTA LP NRPUD 747 W STATE HWY 114 0.24 NR 20. DALLAS MTA LP NRPUD 747 W STATE HWY 114 4.39 NR 21. DALLAS MTA LP NRPUD 747 W STATE HWY 114 0.08 NR 22• SOUTHLAKE CITY NRPUD 1050 W KIRKWOOD BI 4.39 NR 23. NAIR, RAJ EEV RPUD 504 ROUND HOLLOW LN 0.69 NR 24. BADYLAK, JOHN RPUD 500 ROUND HOLLOW LN 0.58 NR 25. TD AMERITRADE SERVICES COMPANY NRPUD 1051 W KIRKWOOD BLVD 78.39 NR Case No. Attachment E ZA12-0067 Page 1 26• SOUTHLAKE MEADOWS RESIDENTIAL RPUD 2413 AMELIA ISLAND PATH 13.00 NR 27• Superintendent of Carroll ISD NR 28. Supt of Grapevine Colleyville ISD NR 29• Superintendent of Keller ISD NR 30. Superintendent of Northwest ISD NR Responses: F: In Favor O: Opposed To Notices Sent: Twenty-one (21) Responses: In Favor: 1 Opposed: 0 Case No. ZA12-0067 U: Undecided NR: No Response Undecided: 0 No Response: 20 Attachment E Page 2 SURROUNDING PROPERTY OWNERS' RESPONSES Prom; K•rle'Xil,s Sent: Thursday, February 17, W22 5:12 PM To: MadeIineOujesky<mauieskyDri.southlake.tx.us> Cc: Lori Weeks Subject; 7-A22-0" Madeline, I own property at the comer of State Hwy114 and Kirkwood and I am in favor ofZA22-t OM, Thanks, KYLE WILKS PRESIDENT 9& 0;- I C;- lijazaiM kyl e. wi I ks 0wi Iksdewe loamenx. corn 17019 IH 20, Cisco,TX 7ti437 Case No. ZA12-0067 Attachment E Page 3