Loading...
Items Receivedx CITY OF SOUTHLAKE MEMORANDUM January 31, 2003 TO: Honorable Mayor and Members of the City Council FROM: Bruce Payne, AICP, Planning Director SUBJECT: Revised FY 2002-03 to FY 2006-07 Capital Improvements Program ACTION REQUESTED: In accordance with the Texas Local Government Code and the Charter of the City of Southlake, the proposed Fiscal Year (FY) 2002-03 to FY 2006-07 Capital Improvements Program (CIP) is submitted for City Council consideration. BACKGROUND: The CIP establishes a five (5) year funding schedule for the purchase, construction or replacement of physical assets of the City. Capital improvements typically have a useful life of over ten (10) years and value greater than $10,000. The first year (FY 2002-03) of the Capital Improvements Program is called the Capital Budget, and is appropriated in the same manner as the annual operating budget. Funds for projects are appropriated on an annual basis. Projects approved for subsequent years (FY 2003-04 through FY 2006-07) are approved for planning purposes only and do not receive expenditure authority until they are part of the Capital Budget. The proposed CIP was developed by the staff technical committee. CIP SPREADSHEETS ATTACHED TO THIS MEMORANDUM: Attached are three (3) CIP spreadsheets. Attachment A (dated February 4, 2003) is a spreadsheet which summarizes all CIP projects being recommended for funding between FY 2002-03 through FY 2006-07 by fund type (i.e. General, Utility, Sewer Impact, Water Impact, TIF, Crime Control, and SPDC). The spreadsheet also includes a list of projects that were submitted by the various City departments but can not be funded over the next five (5) years due to fiscal limitations. Attachment B (dated February 4, 2003) is a summary of all CIP projects being recommended for funding between FY 2002-03 through FY 2006-07 by project type (i.e. drainage, traffic management bond, street, water and sewer, public safety and community services). This spreadsheet also includes a list of projects that were submitted by the various City departments but can not be funded over the next five (S) years due to fiscal limitations. On both of these spreadsheets (Attachments A & B), projects recommended to be funded over the next five (5) year period (FY 2002-03 to FY 2006-07) are shaded in yellow. Projects not recommended for funding over the next five years are not shaded. On both spreadsheets, the total dollar cost of the projects not recommended for funding are shown in a column shaded = and titled "FY 2007 and Beyond". Federally mandated projects are indicated in "red " lettering and projects in which the city has committed funding over the next five (S) years are indicated in "green" lettering. Also, a column has been added to the spreadsheets entitled "Residual Funds". This is due to some CIP projects that will be funded using residual funds carried over from previously approved CIP projects. Finally, a number a CIP projects that have been revised in terms of project scope and dollar amount since City Council's initial meeting on the CIP on December 3, 2002. All CIP projects revisions are summarized later in this memo. Attachment C (dated December 3, 2002) is a copy of the initially proposed FY 2002-03 to FY 2006-07 CIP which was reviewed by City Council at its first meeting in December, 2002. OVERVIEW OF REQUESTED CIP DOLLAR AMOUNTS: The technical committee has recommended that thirty-one (31) projects totaling $21,239,698 be funded next fiscal year (FY2002-03) and that forty-six (46) projects totaling $60,880,698 be funded over the next five years (FY 2002-03) through (FY 2006-07). Thirty-one(31) submitted CIP project requests totaling $57,650,000 are not recommended to be funded over the next five (S) fiscal years (FY 2002-03 to FY 2006-07). The table below summarizes the CIP funding request amounts (Table A). TABLE A YEAR # OF PROJECTS $ AMOUNT FY 2002-03* 31 $21,239,698 FY 2002-03 TO FY 2006-07 47 $60,880,698 BEYOND FY 2007 31 $57,650,000 * Includes residual funds from previously approved CIP projects. The following table on the next page is a breakdown of FY 2002-03 and FY 2002-03 to FY 2006-07 expenditures by fund category (TABLE B-See Page 3). Honorable Mayor and City Council 2 January 31, 2003 TABLE B FUND TYPE FY 2002-03 FY 2002-03 to FY 2006-07 GENERAL FUND $7,903,000 $19,665,000 UTILITY FUND $4,516,000* $15,689,000 SEWER IMPACT FEE FUND $236,000 $436,000 WATER IMPACT FEE FUND $150,000 $350,000 TIF FUND $3,925,000 $3,925,000 CRIME CONTROL FUND $1,300,000 15,046,000 SPDC FUND $3,209,698 5,769,698 TOTAL 21,239,698 60,880,698 * Includes residual funds from previously approved CIP projects. DECEMBER 3, 2002 CITY COUNCIL MEETING: The proposed FY 2002-03 to FY 2006-07 CIP was initially presented to City Council at its December 3, 2002 meeting (ATTACHMENT C). At that meeting, three (3) primary issues were discussed. A summary of these issues were as follows: 1) The basis for staff including several projects for funding in the CIP that already had been initiated or had been completed. These were the following Public Works projects: a) Storm Water Phase II -Drainage Master Plan; b) Johnson Road Sewer; c) Pavement Management System; and d) the Traffic Signal at FM 1709/S.Nolen Drive. 2) The possibility of cost savings realized if the S. Kimball Avenue ultimate road construction from Heritage Business Park to FM 1709 (including the S. Kimball Avenue S-7 sewer line) was constructed under a one single contract versus completing this project in phases over a six year time period as being proposed. 3) The need to fund the Union Church/Pearson Roads reconstruction and drainage project in this fiscal year due to the current road conditions and persistent drainage concerns. STAFF RESPONSE TO ISSUES RAISED AT THE DECEMBER 3, 2002 MEETING: Issue #I-Proiects that had initiated construction or were completed but were still listed for CIP funding. Storm Water Phase II- Drainage Master Plan This project was approved by City Council for CIP funding in FY 2001-2002. This is a federally mandated project with a deadline of March 10, 2003. Lack of compliance would have exposed the City Honorable Mayor and City Council January 31, 2003 to regulatory fines of $10,000425,000 per day. As a result, if staff had not began this project, it was very likely that the March 10, 2003 federal deadline would have not been met. The City Council, during both the 2001 and 2002 Council Retreats directed staff to complete the project on time. The fund amount indicated in the CIP in FY 2002-03 ($527, 000) is the amount needed to complete the project and includes prior spending of $120,000 (See Attachments A & B). The $120,000 was transferred from the CIP FY 2000-01 "Miscellaneous Drainage Fund" project. Johnson Road Sewer The Johnson Road rehabilitation project was approved in FY 1999-2000 and did not include the sewer line. In late 2001, a large number of property owners living along Johnson Road appeared before the City Council and requested that the extension of sewer service be included within the scope of the Johnson Road rehabilitation road project. Council agreed and directed the staff to include sewer service as a part of the project. Due to limited right-of-way and a number of large trees along Johnson Road, the sewer had to be placed under the roadway. Therefore, it was necessary to construct the sewer line prior to road construction. In order to fund the sewer line (additional $230, 000), a CIP project request was approved by City Council last year anticipating available funding due to bond sales. As a result of the economy, bonds were not issued and money was not available to cover the cost of the sewer. However, the road project including the sewer line was started. The dollar amount indicated in the CIP dated December 3, 2002 ($230, 000) was the amount needed to pay for the sewer line only (Road construction was funded in an earlier approved CIP (FY2000-01) (See Attachment C). Since the December 3, 2002 City Council meeting, a review of the Utility Fund by staff has indicated that there are residual funds available to pay for the sewer project. As a result, the Johnson Road sewer project is indicated in the residual fund column in the "Utility Fund" (See Attachment A) and "Water and Sewer Projects (See Attachment B) sections. Traffic Signal at FM 1709 and S. Nolen Drive This project was approved by the City Council for CIP funding in FY 2001-2002. South Nolen Drive was completed in late 2001 and was ready for acceptance by the City. However, a traffic warrant study conducted in late 2001 indicated that the Nolen Drive/FM 1709 intersection would be dangerous if a traffic signal was not installed. Anticipating available project funding due to a bond issuance, City Council directed staff to complete the project to ensure the safety of the public. Due to the state of the economy there were no bonds issued in FY 2001-2002 and funds earmarked for the Dove Creek Drainage improvements had to be used to pay for the traffic signal. The traffic signal project was initially placed into the CIP dated December 3, 2002 to replace the Dove Creek Drainage funds (See Attachment C)• After the December 3, 2002 CIP discussion, staff determined that there were positive balances on previously completed CIP projects. These funds will be used to pay for the traffic signal. As such, this project has been removed from the revised CIP dated February 4, 2003 (See Attachments A & B). Honorable Mayor and City Council 4 January 31, 2003 Pavement Management Svstem This project was approved by the City Council for CIP funding in FY 2001-2002. Due to the increasing deterioration of City streets and the financial savings that would be realized through implementing the Pavement Management System program, the City Council, during its June 2001 retreat, directed staff to complete this project. Staff started the project with the anticipation that bonds would be issued to fund the project. When no bonds were issued in FY 2001-2002, funds were transferred from the Pavement Slurry Seal project in order to start this project. The project was initially placed into the CIP dated December 3, 2002 to replace those Slurry Seal funds (See Attachment Q. After the December 3,2002 CIP discussion, staff determined that there were positive balances on previously completed CIP projects. These funds can be used to pay for the Pavement Management System project. As such, this project has been removed from the revised CIP dated February 4, 2003 (See Attachments A & B). Issue #2- S. Kimball Avenue (Ultimate Project) At the December 3, 2002 meeting, City Council requested that staff determine if a cost savings would be realized by consolidating the S. Kimball Avenue from FM 1709 to Heritage Business Park; including the installation of the Kimball/S-7 sewer line from 1200' south of Crooked Lane to 1400' north of Crooked Lane into one (1) construction project. Also, Council requested that if a cost savings was indeed realized that staff revised CIP to indicate the funding of the ultimate South Kimball Avenue road construction project (including the S-7 sewer line) in the upcoming Capital Budget Year (FY 2002-03). On December 12, 2002, the Public Works Department completed a cost estimate for the ultimate S. Kimball Avenue project. The cost estimate indicated that as much as a 10% cost savings would be realized if the S. Kimball project was completed under one (1) contract (See Attachment D-Memo from Pedram Farahnak to Billy Campbell dated December 12, 2002). As a result of the potential cost savings, the City staff revised the proposed CIP to indicate the funding of the ultimate South Kimball Avenue road construction project (General Fund), including the S-7 sewer line (Utility Fund) in the upcoming fiscal year (FY2002-03-See Attachment A & B). Issue #3- Union Church/Pearson Roads and Drainage Rehabilitation* City Council discussed the need to fund the Union Church/Pearson Roads and Drainage Rehabilitation project due to the poor condition of these roads and the persistent drainage problems. Staff initially believed that the funding of both the ultimate S. Kimball Avenue project and the Union Church/Pearson Road project in FY 2002-03 could not be achieved due to fiscal constraints. However, since the December 3, 2002 meeting, the Public Works Department has been involved in conversations with Tarrant County about possibly performing the construction work on Union Church/Pearson Roads, including all the drainage construction at no cost to the City Tarrant County has agreed to consider the construction project if the City of Southlake provides all necessary materials. As such, funding for this project has remained in FY 2002-03 (Materials Only -See Attachments A & B). The City will need to enter into an inter -local agreement with the County prior to �- Honorable Mayor and City Council 5 January 31, 2003 construction. By allowing the County to conduct the construction work, the City will save approximately $1.0 million. (*Note: The 12" water line was eliminated from the original project. The 12" water line will be resubmitted in next year's CIP as an individual project and ranked accordingly. It is likely that new development in the area may ultimately contribute toward the funding of the construction of the water line). SUMMARY OF CHANGES TO THE CIP PROJECTS SUBMITTED DECEMBER 3, 2002: Below is a summary of the changes that were made to the CIP project requests (FY2002-03 to FY 2006- 07- See Attachments A & B) since the December 3, 2002 City Council meeting. Also, some modifications have been made to the spread sheet format. TABLE C PROJECT CHANGES FROM THE DECEMBER 3, 2002 CIP 1. STORM WATER PHASE II Changed fund amount in FY 2002-03 from $647,000 to $527,000. The $527,000 is the amount needed to complete the project. Approximately $120,000 of the original $647,000 has been spent. This $120,000 is now indicated as a prior expenditure. Storm water Phase II is now indicated as a mandated project (Red lettering). 2. FM 1938 RIGHT-OF-WAY Indicated as a project in which the City has committed funding (Green lettering). Tarrant County will purchase the right-of-way and the City will reimburse the County for the cost. 3. DOVE ROAD REIMBURSEMENT Indicated as a project in which the City has committed funding (Green lettering). This project is near completion. Funds will be used to reimburse Verizon for constructing the road. 4. TMB PROPOSITION TWO (SH 114 Indicated as a project in which the City has committed funding (Green lettering). URBAN DESIGN) Project provides urban design and landscaping along SH 114. The City is obligated to repay TXDOT for the enhancement improvements that are currently being provided in conjunction with SH 114 construction. Honorable Mayor and City Council 6 January 31, 2003 5. TMB PROPOSITION ONE The project was moved into the five (5) year CIP due to cost savings realized from the (PEARSON INTERSECTION ONLY) Kimball Avenue and Union Church/Pearson Road projects. The TMB Proposition One project was ranked #1 in General Fund category in FY 01-02 CIP; however, many of the planned TMB # 1 projects will now be constructed using State funds instead of City funds. For example, the intersection of Randol Mill Avenue and FM 1709 will now be likely constructed by TXDOT in conjunction with the FM 1938 extension project. Also, the State Regional Transportation Commission (RTC) recently approved the City's application to be included in the 2002 Strategic Program Funding Initiative. This program allows the City to use Transportation Improvement Program (TIP) funds instead of City funds to construct all 16 deceleration lanes at minor intersections along FM 1709 from Jellico to Bank Street. As a result, the only TMB project remaining is the Pearson Lane intersection improvements. 6. UNION CHURCH ROAD The project cost was reduced from $2.4 million to $543,000 due to construction of this project now likely to be performed by Tarrant County (City provides all necessary materials). The City of Keller is expected to participate in the rehabilitation of Union Church and Pearson. The $543,000 indicated in FY 2002-03 includes a City of Keller Contribution of $130,000 for costs associated with materials (one-half of cost for cement and asphalt materials). The City of Keller will not participate in the drainage improvements portion of this project. Southlake will need to enter into an inter -local agreement with the County prior to construction. 7. N. WHITE CHAPEL Initial construction funds moved back from FY 2003-04 to FY 2004-05. 8. DOVE CREEK DRAINAGE Construction funds moved back from FY 2003-04 to FY 2004-05. 9. LOCALIZED DRAINAGE Construction funds increased $250,000 for FY 2002-03. Funds eliminated in FY 2003-04 and FY 2005-06. 10. S. KIMBALL AVENUE Amended the Kimball Avenue project description to include the ultimate pavement (4- lanes) of the roadway from FM 1709 to Heritage Business Park. As a result project cost increased from $1.35 million to $3.80 million. Project was combined under one contract in order to realize a cost savings versus constructing the project in two (2) phases over time as originally proposed. S-7 sewer will be constructed in conjunction with this project (See S-7 project in the Utility Fund section). 11. TRAFFIC SIGNAL AT FM 1709 Removed from the CIP. AND NOLEN. 12. PAVEMENT MANAGEMENT Removed from the CIP. SYSTEM Honorable Mayor and City Council January 31, 2003 13. OAK LANE DRAINAGE Added to the five (5) year CIP in FY 2003-04. City Council has committed to funding this project. Indicated as a project in which the City has committed funding (Green lettering). 14. RANDOL MILL AVENUE This is a newly added project. This project was added to take advantage of Tarrant REHABILITATION County's willingness to perform the construction work in a manner similar to the Union Church/Pearson Road projects. The City will need provides all necessary materials for construction. 15. 12" WATER LINE ALONG N. Originally listed in the General Fund as part of the Carroll Avenue widening project. CARROLL Project now listed in the Utility Fund as a separate project. 16. S-7 ALONG KIMBALL AVENUE. Project cost was reduced from $387,000 to $250,000 as a result of cost savings associated with completing the project in conjunction with the road project. The S-7 sewer line must be installed in conjunction with the Kimball Avenue Road project (FY 2002-03) in order to realize cost savings. All available FY 2002-03 Utility Fund dollars are allocated towards the Redundant Water Supply project and no funds are available for other projects. However, a review of the Utility Fund by staff has indicated that residual funds from previous CIP projects are available to fund this request. Therefore, $250,000 is indicated in the residual fund column. 17. JOHNSON ROAD SEWER The Johnson Road Rehabilitation project was approved in FY 2000-01 and did not include a sewer line. In late 2001, residents living along the roadway requested that City Council include a sewer line within the scope of the road project. Council agreed and directed staff to include sewer as part of the road project. Due to limited right-of- way and a large number of trees along Johnson Road, the sewer had to be placed under the roadway. Therefore, it was necessary to construct the sewer line before the road reconstruction. In order to fund the sewer line, a CIP request was approved by City Council last year anticipating available funding due to the bond sale. As a result of the economy, bonds were not issued and money was not available to cover the cost of the sewer. However, the road project (including the sewer line installation) was started. All available FY 2002-03 Utility Fund dollars are allocated towards the Redundant Water Supply project and no funds are available for other projects. A review of the Utility Fund by staff has indicated that residual funds from previous CIP projects are available to fund the sewer project request. Therefore, $230,000 is indicated in the residual fund column. The cost of the Johnson Road reconstruction (not including sewer) is approximately $1.2 million. 18. 12" WATER LINE ON SH 114 Increased funding in FY 2004-05 from $45,000 t0 $245,000. Eliminated $200,000 (KIMBALL TO BRAIRWOOD) from FY 2005-06. 19. DEVELOPER Placed in both the sewer and water impact fee fund. Projects that the City has REIMBURSEMENTS FOR committed funds to are broken out separately (Green lettering). These projects are as OVERSIZING UTILITIES follows: 1) N-1 Sewer; 2) Loch Meadows; 3) Sienna; 4) Clariden Ranch III, and 5) Triple C Ranch. Honorable Mayor and City Council January 31, 2003 20. TOWN SQUARE REIMBURSEMENT FOR OVER SIZING UTILITIES TIF Developer reimbursement for public infrastructure costs. 21. CISD AQUATIC CENTER Indicated as a project in which the City has committed funding (Green lettering). 22. MATCHING FUND GRANT Indicated as a project in which the City has committed funding (Green lettering). 23. JOINT -USE PROJECTS Indicated as a project in which the City has committed funding (Careen lettering). ATTACHMENTS (4) Honorable Mayor and City Council January 31, 2003 ATTACHMENT A TECHNICAL COMMITTEE'S PROPOSED FY 2002- 0E TO FY 2006-07 CAPITAL IMPROVEMENTS PROGRAM BY FUND TYPE The following spreadsheet is the Technical Committee's proposed FY 2002-03 to FY 2006-07 Capital Improvements Program by fund type (i.e. General, Utility, Water Impact Fee, Sewer Impact Fee, TIF, CCPD, SPDC). The CIP establishes a five (5) year funding schedule for the purchase, construction or replacement of physical assets of the city. The first year the CIP (FY 2002-03) is called the Capital Budget year, and is appropriated in the same manner as the operating budget. Projects approved for subsequent years are approved for planning purposes only and do not receive expenditure authority until they are part of the Capital Budget. The spreadsheet indicates all CIP projects recommended to be funded within the five (5) year funding schedule (FY 2002-03 to FY 2006-07). These projects are indicated in yellow. Revised Technical Committee's Proposed FY 2002-03 To FY 2006-07 Capital Improvements Program by Fund Type ATTACHMENT A February 4, 2003 FY 2002-03 TO FY 2006-07 PROJECTS RECOMMENDED TO BE FUNDED SHADED IN YELLOW Score SECTION I -GENERAL FUND EXPENDITURES FY 2002-03 TO FY 2006-07 PRIOR RESIDUAL FY 2002-03 FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07 FY 2007 and TOTAL ExpENDIruRE FUNDS Beyond NOTES * Project is mandated by the Federal Clean Water Act. Project involves developing "best management practices" in areas of operation and capital STORM WATER PHASE 11 -DRAINAGE MASTER PLAN (ON -GOING FEDERALLY MANDATED improvement project construction that result in the protection of the quality of storm water runoff. The fund amount indicated ($527,000) is the PROJECT -FUNDS NEEDED TO COMPLETE PROJECT) amount needed to complete the entire scope of the project and includes a prior expenditure of $120,000. The project was initiated by staff last fiscal 96.71 $120 000 $627,000 $647,000 year to meet the Federal mandate deadline of March 10, 2003. ** Acquire 16' of additional right-of-way above and beyond what is needed for actual roadway construction, necessary to locate utilities, trails, FM 1938 RIGHT-OF-WAY ACQUISITION -FM 1709 TO CITY LIMITS (REIMBURSEMENT TO landscaping and other features. Tarrant County will purchase the right-of-way and the City will reimburse the County for the cost. TARRANT COUNTY FOR THE PURCHASE OF ROW ON THE EAST SIDE OF RANDOL AVE. Not FROM FM 1709 NORTH TO THE CITY LIMITS) Rankedl $330 000 $330 000 ** Widen Dove Street from SH 114 to Kirkwood Blvd. This project is near completion. Funds will be used to reimburse Verizon for constructing the DOVE STREET WIDENING SH 114 TO KIRKWOOD (DEVELOPER REIMBURSEMENT- road. VERIZOWCOMMITTED FUNDING) 75.71 $466,000 $465,000 ** Project provides urban design and landscaping along SH 114. The City is obligated to repay TXDOT for the enhancement improvements that are TMB PROPOSITION TWO (SH 114 URBAN DESIGN CONSTRUCTION -COMMITTED currently being provided in conjunction with SH 114 construction. 59.57 FUNDING) $1,550,000 $600,000 $2,150,000 N. CARROLL AVENUE (FEDERAL WAY TO SH 114) ULTIMATE ROADWAY ($347,000 FOR Designing and constructing ultimate 4-lane section from SH 114 to FM 1709. 12" water line along Carroll Avenue is a companion project (See Utility ENGINEERING COSTS) Fund). 87.13 $347,000 $2,172,000 $2.519,000 TMB PROPOSITION ONE (PEARSON INTERSECTION IMPROVEMENTS ONLY -DOES NOT The TMB Proposition 1 project was ranked #1 in General Fund category in FY 01-02 CIP ; however, many of the planned TMB # 1 projects will now INCLUDE RANDOL MILL AVENUE INTERSECTION AND DECEL LANES ALONG MINOR be constructed using State funds instead of City funds. For example, the intersection of Randol Mill Avenue and FM 1709 will now be likely INTERSECTIONS) constructed by TXDOT in conjunction with the FM 1938 extension project. Also, the State Regional Transportation Commission (RTC) recently approved the City's application to be included in the 2002 Strategic Program Funding Initiative. This program allows the City to use Transportation Improvement Program (TIP) funds instead of City funds to construct all 16 deceleration lanes at minor intersections along FM 1709 from Jellico to 78.00 $10,181,000 $1,850,000 $12,031,000 Bank Street. As a result, the only TMB project remaining is the Pearson Lane intersection improvements. UNION CHURCH ROAD/S. PEARSON RECONSTRUCTION AND DRAINAGE (MATERIAL COST The construction of this project will likely be performed by Tarrant County provided that the City provides all necessary materials. The City of ONLY-INTERLOCAL AGREEMENT WITH THE COUNTY FOR CONSTRUCTION) Keller is expected to participate in the rehabilitation of Union Church and Pearson. The $543,000 indicated in FY 2002-03 includes a City of Keller Contribution of $130,000 for costs associated with materials (one-half of cost for cement and asphalt materials). The City of Keller will not participate in the drainage improvements portion of this project. Southlake will need to enter into an inter -local agreement with the County prior to 72.00 $89,0001 $543 000 $632,000 construction. N. WHITE CHAPEL (EMERALD STREET TO SH 114) Designing and constructing ultimate 5-lane section from SH 114 to FM 1709. An additional 1.99 million beyond FY 2006-07 is needed to complete 71.88 1 1 $135,000 $600,0001 $3,150,000 $1,990,000 $5,875.000 this project. The $135,000 in FY 2002-03 is for preliminary engineering. DOVE CREEK DRAINAGE IMPROVEMENTS Project includes channel widening, culvert crossing improvements, and/or detention ponds along Dove Creek. $100 000 $750 000 $850,000 LOCALIZED DRAINAGE PROJECTS -MULTIPLE PROJECTS Includes projects such as curb and gutter replacement, localized pavement replacement, and culvert and drainage system improvements in various 69.71 $750,000 $500,000 $500,000 $1,750.000 locations as these needs arise. Projects include Dove Road, Scenic Drive, and Union Church Road. S. KIMBALL AVE. (ULTIMATE ROADWAY FROM FM 1709 TO HERITAGE BUSINESS PARK) Ultimate pavement (4-lanes) on Kimball Ave. from FM 1709 to Heritage Business Park. Project was combined under one contract in order to realize a cost savings versus constructing the project in phases over time as originally proposed. S-7 sewer will be constructed in conjunction with this 69.50 $3,800,000 $3 800 000 project (See S-7 project in the Utility Fund section). N. WHITE CHAPEL WIDENING (SH 114 TO SWEET STREET) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 69.00 $4,435,000 $4 35.000 BRUMLOW WIDENING (CONTINENTAL TO SH 26) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006.07) due to fiscal constraints. 60.17 $2,576,000 $2,576.000 OUTDOOR COMMUNITY WARNING SYSTEM Not recommended for funding in the five year CIP (FY2002-03 to FY 2006.07) due to fiscal constraints. 60.17 $450,000 $450.000 TMB PROPOSITION THREE (HIKE/BIKE TRAILS) Not recommended for funding in the five year CIP (FY2002-03 to FY 200"7) due to fiscal constraints. 57.00 2,730,000 $1 996 000 $4 726 000 S. WHITE CHAPEL (FM 1709 TO CONTINENTAL) (ULTIMATE ROADWAY) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 55.50 $3.641,000 $3,641000 SOUTH KIRKWOOD BRANCH CHANNEL IMPROVEMENTS Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 53.71 $360,000 $360,000 T. W. KING REHABILITATION (SH 114 TO SOUTH OF BOB JONES) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 53.50 $550 000 $550,000 MISCELLANEOUS PAVEMENT REHABILITATION This project is intended to provide funds to rehabilitate various roads, particularly concrete streets with localized pavement failures. This project was moved into the 5 YEAR CIP despite the score due to the urgent need to rehabilitate streets in the following subdivisions: Mission Hills Subdivision, Southridge Lakes, Timarron, and Cross Timber Hills. Also roadways such as Highland Ave. and Dominion Dr. may be rehabilitated 53.38 $2,450,000 $2.450,000 using these funds. SIDEWALK ALONG VARIOUS ROADWAYS Not recommended for funding in the five year CIP (FY2002-03 to FY 2006.07) due to fiscal constraints. 52.43 $660.000 $660 000 W. BOB JONES REHAB (N.WHITE'S CHAPEL TO TW KING) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 50.83 $570,000 $670,000 S. CARROLL AVE. (FM 1709 TO BREEZE WAY) (ULTIMATE ROADWAY) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 50.63 $2,427 000 $2 427 000 DURHAM SCHOOL ROAD CONSTRUCTION (WHITE CHAPEL TO SHADY OAKS) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 50.29 $1,570,000 $1,570,000 N. PEARSON LN. REHAB (1709 TO FLORENCE) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006.07) due to fiscal constraints. $874 000 $874,000 r9O SILVERWOOD CIRCLE RECONSTRUCTION Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. $245,000 $245,000 SHADY OAKS (FM 1709 TO DURHAM JR HIGH) Not recommended for funding in the five year CIP (FY2002.03 to FY 2006-07) due to fiscal constraints. $641,000 $641,000 FEDERALLY MANDATED PROJECT (SHOWN IN RED) PROJECTS WHICH THE CITY HAS COMMITTED FUNDING (SHOWN IN GREEN) Revised Technical Committee's Proposed FY 2002-03 To FY 2006-07 Capital Improvements Program by Fund Type ATTACHMENT A February 4, 2003 EXPENDITURES FY 2002.03 TO FY 2006-07 FY 2002-03 TO FY 2006-07 PROJECTS RECOMMENDED TO BE FUNDED SHADED IN PRIOR RESIDUAL FY 2007 and TOTAL YELLOW EXPENDITURE FUNDS FY 2002-03 FY 2003.04 FY 2004-05 FY 2005-06 FY 2006-07 Beyond NOTES E. CONTINENTAL BLVD. (BRUMLOW TO CROOKED) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 47.29 $845,000 $645,000 CROOKED LANE (S. KIMBALL TO NOLEN DR) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 45.43 $894,000 $894,000 SADDLE RIDGE RD., SAM BASS RIDGE, SODA RIDGE, SHUMAKER, SUNSHINE, SWEET Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 45.38 STREET REHAB $2 115,000 $2.115,000 E. HIGHLAND REHAB (SH 114 TO WHITE CHAPEL) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 45.13 $1.013,0001 $1,013,000 OAK LANE PAVING AND DRAINAGE PROJECT City Council has committed to finding this project. 44.88 $250,000 $250,000 FLORENCE ROAD REHABILITATION Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 43.75 $987,000 $987,000 E. BOB JONES REHABILITATION (N WHITE'S CHAPEL TO 4200 FT EAST) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 41.43 $728,000 $728,000 E. CONTINENTAL BLVD. (S. CARROLL TO BYRON NELSON) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006.07) due to fiscal constraints. 41.29 $978,000 $978,000 T. W. KING REHAB (BOB JONES TO LAKE GRAPEVINE) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006.07) due to fiscal constraints. 41.25 $987,000 $987,000 PUBLIC WORKS CENTER IMPROVEMENT Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 41.14 $1 050,000 $1,050 000 FIRE SERVICE APPARATUS Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 39.00 $1,920,000 $7,920,000 CROSS TIMBER HILLS ROAD REHABILITATION Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 33.71 $1,320,000 $1,320,000 VERSAILLES CHANNEL (INSTALL 2-7' X 3' CULVERTS) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 33.14 $547,000 $547,000 BREWER ROAD Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 32.43 $202,000 $202,000 CARLISLE RECONSTRUCTION (CARROLL AVENUE TO RAINBOW STREET) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 24.14 $600,000 $600,000 Not RANDOL MILL AVENUE REHABILITATION The construction of this project will be performed by Tarrant County provided that the City provides all necessary materials. lRankedl 1 $406,0001 $406,000 SUBTOTAL $14,770,000 $0 $7,903,000 $3,172,000 $2,950,000 $3,150,000 $2,490,000 $37,631,000 $72,066,000 REDUNDANT WATER SUPPLY (THROUGH KELLER ALONG FLORENCE TO PUMP STATION Redundant water supply from Fort Worth to Southlake. 42" line from Caylor tank to Pump Station #1. 30" line from Pearson to SH 114; 24" line on #2) SH 114 to T.W. King; and associated pumping equipment. The city will not be able to meet 2004 water demand if the project is not completed. 100.67 $2 567,417 $4 036,000 $2,268,000 $1,249,000 $0 $0 $10,120,417 NORTH CARROLL 12" WATER LINE (IN CONJUNCTION WITH N. CARROLL WIDENING) Project in conjunction with the widening of N. Carroll Avenue from FM 1709 to SH 114. 87.13 $200,000 $200 000 This project is in conjunction with the widening of FM 1938 (Randol Mill Avenue). The City is purchasing additional right-of-way along the west 82.50 12" WATER LINE ALONG RANDOL MILL (FM1709 TO RANDOLL MILL BEND) $54,000 $876,000 $930 000 side of Randol Mill Avenue in order to accommodate the water line. N-2 SEWER INTERCEPTOR N-2 Interceptor is essential for the development of the DIPS North facility. 76.83 $83,750 $581,000 $664,750 The S-7 sewer line must be installed in conjunction with the Kimball Avenue Road project (FY 2002-03) in order to realize cost savings. All available AVENUE SEWER LINE FY 2002-03 Utility Fund dollars are allocated towards the Redundant Water Supply project and no funds are available for other projects. However, �S-7/KIMBALL a review of the Utility Fund by staff has indicated that residual funds from previous CIP projects are available to fund this request. Therefore, 69.67 $250,000 $250,000 $250,000 is indicated in the residual fund column. JOHNSON ROAD SEWER LINE (SEWER LINE BEING INSTALLED IN CONJUNCTION WITH The Johnson Road Rehabilitation project was approved in FY 2000-01 and did not include a sewer line. In late 2001, residents living along the JOHNSON ROAD REHABILITATION WHICH IS CURRENTLY BEING COMPLETED) roadway requested that City Council include a sewer line within the scope of the road project. Council agreed and directed staff to include sewer as part of the road project. Due to limited right-of-way and a large number of trees along Johnson Road, the sewer had to be placed under the roadway. Therefore, it was necessary to construct the sewer line before the road reconstruction. In order to fund the sewer line, a CIP request was approved by City Council last year anticipating available funding due to the bond sale. As a result of the economy, bonds were not issued and money was not available to cover the cost of the sewer. However, the road project (including the sewer line installation) was started. A review of the Utility Fund by staff has indicated that residual funds from previous CIP projects are available to fund the sewer project request. Therefore, $230,000 is indicated in the residual fund column. The cost of the Johnson Road reconstruction (not including sewer) is approximately $1.2 69.13 $230,000 $230,000 million. 12" WATER LINE ON SH 114 (KIMBALL TO BRIARWOOD) Replace an undersized 6" water line with a 12" line. 66.50 $245,000 $245 000 12" WATER LINE ON N. CARROLL AVE (DOVE TO PRIMROSE) Replace an undersized 6" water line with a 12" line. 65.17 $50,000 $250,000 $300.000 12" WATER LINE ON SHADY OAKS (HIGHLAND TOW. DOVE) Replace an undersized 6" water line with a 12" line. 64.83 $111,000 $553,000 $664,000 12" WATER LINE ON FM 1709 (PARKWOOD TO WHITE CHAPEL) Replace an undersized 6" water line with a 12" line. 64.00 $165,000 $165,000 20" WATER LINE ON SH 114 (TOWN SQUARE TO N. WHITE CHAPEL) Extend the existing 20" water line (9,000 ft.) through Town Square to connect with an existing 20" water line on White Chapel Blvd. 63.8E $74,000 $1,100,000 $1,174 000 GARDEN ADD., HEATHERWOOD, HERSHAW, ROYAL OAKS, TWIN CREEKS, ETC. SANITARY Provide sanitary sewer to the listed neighborhoods. Design work is completed. 6+ ^7 SEWER $203,000 $1,074,000 $632,000 $1,909,000 12" WATER LINE ON EAST HIGHLAND (N. CARROLL TO KIMBALL) Replace an undersized 6" water line with a 12" line. An additional $600,000 beyond FY 2006-07 is needed to complete this project. y, ,, $92,000 $600,000 $692,000 FEDERALLY MANDATED PROJECT (SHOWN IN RED) PROJECTS WHICH THE CITY HAS COMMITTED FUNDING (SHOWN IN GREEN) Revised Technical Committee's Proposed FY 2002-03 To FY 2006-07 Capital Improvements Program by Fund Type February 4, 2003 ATTACHMENT A EXPENDITURES FY 2002-03 TO FY 2006-07 FY 2002-03 TO FY 2006-07 PROJECTS RECOMMENDED TO BE FUNDED SHADED IN PRIOR RESIDUAL FY 2007 and YELLOW EXPENDITURE FUNDS FY 2002-03 FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07 Beyond TOTAL NOTES 12" WATER LINE ON E. DOVE FROM N. CARROLL TO N. KIMBALL Replace undersized 8" water line with a 12" line. An additional $674,00 beyond FY 2006-07 is needed to complete the project. 59.83 $117,000 $674,000 $791,000 N. PEYTONVILLE 8" WATER LINE (LOW PRESSURE PLANE) Install 7,000 linear feet from FM 1709 to Woodbrook. 59.67 $682,000 $682,000 SHADY OAKS SEWER FROM THE BASIN LINE TO FM 1709 Install 3,000 linear feet along Shady Oaks and 1,000 linear feet along FM 1709. 58.67 $468,000 $468,000 8" WATER LINE ON HIGHLAND (WHITE CHAPEL AND SHADY OAKS) Replace an under sized 6" water line with a 8" line. 58.33 $297,000 $297,000 12" WATER LINE ON E. CONTINENTAL FROM 800 BLOCK TO 1100 BLOCK Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 58.33 $132.000 $132,000 CASEY COURT (OAKS ADDITION) SEWER Provide sanitary sewer to the Oaks Addition. 57.00 $109,000 $109,000 FLORENCE 1.5 MG ELEVATED WATER TANK Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 57.00 $2,860,000 $2,860,000 QUAIL CREEK ESTATES, WOODLAND HEIGHTS SEWER Not recommended for funding in the five year CIP (FY2002-03 to FY 2006.07) due to fiscal constraints. 55.67 $1244,000 $1,244,000 12" WATER LINE FROM BICENTENNIAL PARK WATER TOWER TO W. HIGHLAND AVE. Not recommended for funding in the five year CIP (FY2002-03 to FY 2006.07) due to fiscal constraints. 55.50 $132,000 $132,000 SHADY OAKS SEWER FROM THE BASIN LINE TO FM 1709 Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 54.00 $315,000 $315,000 8" WATER LINE CONNECTING EXISTING LINES AT LINES AT LAKES DR./BURNEY LN. Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 52.33 $90,000 $90,000 REHABILITATION TO THE BANK STREET LIFT STATION Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 51.50 $30,000 $30,000 W. BOB JONES 12" WATER LINE (N.WHITE'S CHAPEL TO TW KING) Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. Project in conjunction with Bob Jones 50.83 1 1 1 1 1 1 1 1 1 $341,0001 $341,000 rehabilitation (N. Whire Chapel to T.W. King). JUBIUTAL $2 928 167 $480,000 $4,036,000 $3,103,000 $2,420,000 $2,700,000 $2,950,000 $6,748,000 $25,365,167 CF(`TIr)M IIL CFWFD IMDArT FFF FI Rdn ** Reimbursement to Southlake-Coventry, Ltd. for the oversizing of the N-1 sewer line associated with providing service to Coventry Manor. N-1 SEWER DEVELOPER REIMBURSEMENT (OVERSIZING SEWER LINE TO 73.71 CONVENTRY MANOR -COMMITTED FUNDING) $61,000 $61 000 ** Reimbursement to Corps Property Holding, Inc. for oversizing sewer line associated with providing service to Loch Meadows. LOCK MEADOWS DEVELOPER REIMBURSEMENT (OVERSIZING SEWER LINE- i. . COMMITTED FUNDING) $95,000 $95 000 ** Reimbursement to Ashton Dallas Residential, LLC for oversizing sewer line associated with providing service to Sienna. SIENNA DEVELOPER REIMBURSEMENT (OVERSIZING SEWER LINE -COMMITTED 73.71 FUNDING) $30,000 $30,000 FUTURE DEVELOPER REIMBURSEMENT FOR OVERSIZING SEWER UTILITIES Funds for future Developer Reimbursements. Similar project in the Utility Fund. 73.71 1 $50,0001 $50,0001 $50,OOOL $50,000 $50,0001 $250,000 JUB I IAL $0 $0 $236,000 $50,000 $50,000 $50,000 $50,000 $0 $436,000 CFr:TIMI IV- WATER IMPACT FFF FI Wn ** Reimbursement to Terra Land Company for oversizing sewer line associated with providing service to Clariden Ranch III. 73.71 CLARIDEN RANCH III DEVELOPER REIMBURSEMENT (OVERSIZING WATER LINE- $10,000 $10,000 ** Reimbursement to Pulte Homes for oversizing sewer line associated with providing service to Triple C Ranch. 73.71 TRIPLE C RANCH DEVELOPER REIMBURSEMENT (OVERSIZING WATER LINE- $60 000 $60 000 ** Reimbursement to Ashton Dallas Residential, LLC for oversizing sewer line associated with providing service to Sienna. SIENNA DEVELOPER REIMBURSEMENT (OVERSIZING WATER LINE -COMMITTED 73.71 FUNDING) $30.000 $30,000 FUTURE DEVELOPER REIMBURSEMENT FOR OVERSIZING WATER UTILITIES Funds for future Developer Reimbursements. Similar project in the Utility Fund. 73.71 $50,000 $50,000 $50,000 $50,000 $50,000 $250,000 SUBTOTAL $0 $0 $150,000 $50,000 $50,000 $50,000 $50,000 $0 $350.000 SECTION V- TIF FUND Not ** TIF Developer reimbursement for public infrastructure costs. Ranked TOWN SQUARE REIMBURSEMENT FOR PUBLIC UTILITIES $3,925,000 1 1 1 1 1 $3 925,000 SUBTOTAL $0 $0 $3,925,000 $0 $0 $0 $0 $0 $3,925,000 SECTION VI - CCPD FUND NORTH DPS FACILITY Design and construction of DPS North Facility at the corner of White Chapel Blvd. and Dove St. 75.00 $300,000 $300,000 $12,400,000 $13.000,000 EAST DPS FACILITY Land acquisition, design and construction of East DPS Facility. 72.00 $1, 046, 000 $1.046, 000 Not RADIO INFRASTRUCTURE Strategic Plan outlining the methods and equipment necessary towards improving the field and mobile radio equipment in the City of Southlake. Ranked $1,000,000 $1,000,000 SUBTOTAL $0 $0 $1,300,000 $300.000 $13,446,000 $0 $0 $0 $15,046,000 ' FEDERALLY MANDATED PROJECT (SHOWN IN RED) PROJECTS WHICH THE CITY HAS COMMITTED FUNDING (SHOWN IN GREEN) Revised Technical Committee's Proposed FY 2002-03 To FY 2006-07 Capital Improvements Program by Fund Type February 4, 2003 EXPENDITURES FY 2002-03 TO FY 2006-07 FY 2002-03 TO FY 2006-07 PROJECTS RECOMMENDED TO BE FUNDED SHADED IN PRIOR RESIDUAL FY 2007 and YELLOW EXPENDITURE FUNDS FY 2002-03 FY 2003-04 FY 2004-05 FY 2005-06 FY 20116-07 Beyond TOTAL NOTES SECTION VII - SPDC ATTACHMENT A Not ** City's last remaining contractual contribution to the CISD Aquatics Center joint -use facility. Ranked CISD AQUATICS CENTER -CONTRIBUTION TO JOINT USE FACILITY $1,000,000 $250,000 $1,250 000 Not ** Annual funding set aside as matching funds for groups who propose projects and are able to match the city's funding share with their own funds. Ranked MATCHING FUNDS (GRANT) $91,799 $200,000 $200,000 $200,000 $200,000 $200,000 $1,091,799 Not ** Funding earmarked for reimbursement to other entities (i.e. churches, CISD) for joint -use project development or use of facilities. Ranked JOINT USE PROJECTS $1 100 $20,000 $20,000 $20,000 $61,100 JOINT USESOUTHLAKE GRAPEVINE CONSTRUCTION IN MEADOWMERE PARK Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. Not Ranked $500,000 $500,000 RECREATION CENTER Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 61.00 $7,000 $8,650.000 $8,657.000 BOB JONES DEVELOPMENT Substantial completion of Bob Jones Recreation Area. 60.00 $449,057 $1,115 967 $1.565,024 BICENTENNIAL PARK IMPROVEMENTS Not recommended for funding in the five year CIP (FY2002-03 to FY 2006.07) due to fiscal constraints. 53.00 $30,000 $2 530 000 $2 560.000 GIRLS SOFTBALL COMPLEX Construct Girl's softball complex. 51.00 $15,840 $1.399 400 $1,415,240 NEIGHBORHOOD PARK DEVELOPMENT On -going funding for neighborhood parks. Typical park improvements include trails, parking, benches, picnic areas, landscaping, etc. 48.00 $62.787 1 $123.331 $500,000 $686,118 ON -GOING TRAIL IMPROVEMENTS Trail system implementation in key, high -use areas to compliment existing trails, make critical connections, or construction as part of other capital 48.00 $58,000 $41,000 $150,000 $249,000 projects. LAND ACQUISITION -COMMUNITY PARK Funds to acquire new land for parks. This request is for the purchase of 40 acres for alighted sports complex. 40.00 $662,675 $900,000 $1,562 675 NATURE CENTER IMPROVEMENTS Construct Nature Center in Bob Jones Park. 38.00 $10,000 $10,000 SKATE PARK Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 33.00 $171,000 $171,000 JUNIOR IN -LINE HOCKEY RINK Not recommended for funding in the five year CIP (FY2002-03 to FY 2006-07) due to fiscal constraints. 30.00 $720.000 $720,000 Not SPECIAL PROJECTS Funding earmarked for unexpected opportunities that may not have been identified in advance. Ranked 1 $25,8151 1 $50,0001 $35,0001 $35,0001 $50,0001 $50,0001 $245,815 SUBU IAL 62,41J4,U/J 4iU :Ii3,aeu0Jt5 1S2Jb,000 ZliZ3b,000 4i1.S2U,000 4i2/U,000 4i13,2/1,000 4iZ1,444,//1 TOTALS $20,102,240 $480,000 $20,759,698 $6,910,000 $19,151,000 $7,770,000 $5,810,000 $57,650,000 $138,63$938 ' FEDERALLY MANDATED PROJECT (SHOWN IN RED) PROJECTS WHICH THE CITY HAS COMMITTED FUNDING (SHOWN IN GREEN) ATTACHMENT B TECHNICAL COMMITTEE'S PROPOSED FY 2002- 03 TO FY 2006-07 CAPITAL IMPROVEMENTS PROGRAM BY PROJECT TYPE The following spreadsheet is the Technical Committee's proposed FY 2002-03 to FY 2006-07 Capital Improvements Program by project type (i.e. Drainage, Traffic management Bond, Streets, Water and Sewer, Public Safety, Community Services). The CIP establishes a five (5) year funding schedule for the purchase, construction or replacement of physical assets of the city. The first year the CIP (FY 2002-03) is called the Capital Budget year, and is appropriated in the same manner as the operating budget. Projects approved for subsequent years are approved for planning purposes only and do not receive expenditure authority until they are part of the Capital Budget. The spreadsheet indicates all CIP projects recommended to be funded within the five (5) year funding schedule (FY 2002-03 to FY 2006-07). These projects are indicated in yellow. Revised Technical Committee's Proposed FY 2002-03 To FY 2006-07 Capital Improvements Program by Project Type February 4, 2003 �FY 2002-03 TO FY 2006-07 FUNDED PROJECTS CIP PROJECT REQUEST SUBMITTED BUT NOT RECOMMENDED FOR FUNDING DUE TO NF- FINANCIAL CONSTRAINTS Paae# SECTION I - DRAINAGE PROJECTS EXPENDITURES FY 2002-03 TO FY 2006-07 Residual FY 2007 and Prior Expenditure Funds FY 2002-03 FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07 Beyond TOTAL 1-1 �s STORM WATER PHASE 11 -DRAINAGE MASTER PLAN (ON -GOING PROJECT) $120,000 $S27,0:) $647,000 1-2 LOCALIZED DRAINAGE PROJECTS -MULTIPLE PROJECTS $750,000 $500,000 $500,000 $1,750.000 1-3 DOVE CREEK DRAINAGE IMPROVEMENTS $100,000 $750,000 $850,000 NF SOUTH KIRKWOOD BRANCH CHANNEL IMPROVEMENTS $360,000 $360,000 LIVERSAILLES CHANNEL (INSTALL 2-7' X 3' CULVERTS) 547,000 $547,000 SUBTOTAL $220.000 $0 $1,277,000 $750,000 $500,000 $0 $500,000 $907,000 $4,154,000 Pan" SECTION 11 - MISCELLANEOUS PROJECTS N-1 SEWER DEVELOPER REIMBURSEMENT (OVERSIZING LINE TO CONVENTRY 2-1 MANOR -COMMITTED FUNDING) $61,000 $61,000 LOCK MEADOWS DEVELOPER REIMBURSEMENT (OVERSIZING SEWER LINE- 2-2 COMMITTED FUNDING) $95,000 $95,000 TRIPLE C RANCH DEVELOPER REIMBURSEMENT (OVERSIZING WATER LINE- 2-3 COMMITTED FUNDING) $60,000 $60,000 CLARIDEN RANCH III DEVELOPER REIMBURSEMENT (OVERSIZING WATER LINE- 2-4 COMMITTED FUNDING) $10,000 $10,000 SIENNA DEVELOPER REIMBURSEMENT (OVERSIZING WATER & SEWER LINE- 2-5 COMMITTED FUNDING) $60,000 $60,000 TOWN SQUARE REIMBURSEMENT FOR PUBLIC UTILITIES $3,925,000 $3,925,000 FUTURE DEVELOPER'S REIMBBURSEMENTS FOR OVER SIZING UTILITIES (GENERAL AND 2-7 UTILITY FUND) $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 NF PUBLIC WORKS CENTER IMPROVEMENT $1,050,000 $1,050,000 NF SIDEWALK ALONG VARIOUS ROADWAYS $660,002L $660,000 SUBTOTAL $0 $0 $4,311,000 $100,000 $100,000 $100,000 $100,000 $1,710,000 $6,421,000 Paae# SECTION III - TRAFFIC MANAGEMENT BOND PROGRAM 3-1 �t TMB PROPOSITION TWO (SH 114 URBAN DESIGN CONSTRUCTION) $1,550,000 $600.000 $2,150,000 NF TMB PROPOSITION ONE INTERSECTION IMPROVEMENTS $10,181,000 $1,850,000 $12,031,000 NF TMB PROPOSITION THREE HIKE/BIKE TRAILS 2,730,000 1,996,000 $4,726,000 SUBTOTAL $14,461,000 $0 $600,000 $0 $1,850,000 $0 $0 $1,996,000 $18,907,000 Paae# SECTION IV - STREET PROJECTS 4-1 FM 1938 RIGHT-OF-WAY ACQUISITION -FM 1709 TO CITY LIMITS $330,000 $330,000 4-2 S. KIMBALL AVENUE (ULTIMATE ROADWAY FROM FM 1709 TO HEITAGE BUSINESS PARK) $3,800,000 $3,800,000 4-3 N. CARROLL AVENUE (FEDERAL WAY TO SH 114) ULTIMATE ROADWAY $347,000 $2,172,000 $2,519,000 4-4 IN. WHITE CHAPEL (EMERALD TO SH 114)' $135,000 $600,000 $3,150,000 $1,990,000 $5,875,000 4-5 DOVE ROAD WIDENING SH 114 TO KIRKWOOD (DEVELOPER REIMBURSEMENT TO VERIZON) $465,000 $465,000 4-6 UNION CHURCH ROAD/S. PEARSON RECONSTRUCTION (MATERIALS ONLY) $89,000 $543,000 $632,000 'FEDERALLY MANDATED PROJECT (SHOWN IN RED) PROJECTS WHICH THE CITY HAS COMMITTED FUNDING (SHOWN IN GREEN) ATTACHMENT B FY 2002-03 EXPENDITURES BY FUND CATEGORY ROADWAY IMPACT FEE WATER IMPACT FEE SEWER IMPACT FEE GENERAL FUNDS UTILITY FUNDS TIF DISTRICT CRIME CONTROL SPDC FUNDS $527,000 $750,000 $0 $0 $0 $1,277,000 $0 $0 $0 $0 $61,000 $95,000 $60,000 $10,000, $30,000 $30,000 $3,925,000 $50,000 $50,000 $0 $150,000 $236,000 $0 $0 $3,925,000 $0 $0 $600,000 $0 $0 $0 $600,000 $0 $0 $0 $0 $330,000 3,800,000 Revised Technical Committee's Proposed FY 2002-03 To FY 2006-07 Capital Improvements Program by Project Type February 4, 2003 FY 2002-03 TO FY 2006-07 FUNDED PROJECTS EXPENDITURES FY 2002-03 TO FY 2006-07 CIP PROJECT REQUEST SUBMITTED BUT NOT RECOMMENDED FOR FUNDING DUE TO Residual FY 4-7 RANDOL MILL AVENUE REHABILITATION $406,000 $406,000 4-8 OAK LANE PAVING AND DRAINAGE PROJECT S250,000 $250,000 NF E. CONTINENTAL BLVD. (S. CARROLL TO BYRON NELSON) $978,000 $978,000 NF E. HIGHLAND REHAB (SH 114 TO WHITE CHAPEL) $1.013,000 $1,013,000 NF FLORENCE ROAD REHAB (PEARSON TO RANDOL MILL) $987,000 $987,000 NF IN. PEARSON LN. REHAB (1709 TO FLORENCE) $874,000 $874,000 NF N. WHITE CHAPEL WIDENING SH 114 TO SWEET STREET $4,435,000 $4,435,000 4-7 MISCELLANEOUS PAVEMENT REHABILITATION $2,450,000 $2,450,000 NF SADDLE RIDGE RD., SAM BASS RIDGE, SODA RIDGE, SHUMAKER, SUNSHINE, SWEET STREET REHAB $2,115,000 $2,115,000 NF I SHADY OAKS (FM 1709 TO DURHAM JR HIGH) $641,000 $641,000 NF SILVERWOOD CIRCLE RECONSTRUCTION $245,000 $245,000 NF S. CARROLL AVE. (FM 1709 TO BREEZE WAY) (ULTIMATE ROADWAY) $2,427,000 $2,427,000 NF S. WHITE CHAPEL (FM 1709 TO CONTINENTAL) (ULTIMATE ROADWAY) $3,641,000 $3,641,000 NF IT. W. KING REHAB (BOB JONES TO LAKE GRAPEVINE) $987,000 $987,000 NF T. W. KING REHABILITATION (SH 114 TO SOUTH OF BOB JONES) $550,000 $550,000 NF W. BOB JONES REHABILITATION (N.WHITE-S CHAPEL TO TW KING) $570,000 $570,000 SUBTOTAL $89,000 $0 $6,026,000 $2,422,000 $600,000 $3,150,000 $1,990,000 $30,648,000 $44,925.000 Pape# SECTION V - WATER AND SEWER PROJECTS 5-1 REDUNDANT WATER SUPPLY (THROUGH KELLER ALONG FLORENCE TO P. S. #2) $2,567,417 $4,036,000 $2,268,000 $1,249,000 $10,120,417 5-2 JOHNSON ROAD REHABILITATION AND SEWER (PEARSON TO RANDOL MILL) $230,000 $230.000 5-3 S. KIMBALL S-7 SEWER LINE $250,000 $250,000 5-4 12" WATER LINE ALONG RANDOL MILL $54,000 $876,0001 $930,000 5-5 1 N-2 SEWER INTERCEPTOR $83,750 $581,000 $664,750 5-6 NORTH CARROLL 12" WATER LINE (IN CONJUNCTION W/ N. CARROLL WIDENING $200,000 $200,000 5-7 12" WATER LINE ON SH 114 (KIMBALL TO BRIARWOOD) E$245,0 00 $245,000 5-8 12" WATER LINE ON N. CARROLL AVE (DOVE TO PRIMROSE) $50,000 $250,000 $300,000 5-9 12" WATER LINE ON SHADY OAKS (HIGHLAND TO W. DOVE) $111,000 $553,000 $664,000 5-10 12" WATER LINE ON FM 1709 (PARKWOOD TO WHITE CHAPEL) $165,000 $165,000 5-11 20" WATER LINE ON SH 114 (TOWN SQUARE TO N. WHITE CHAPEL) $74,000 $1,100,000 $1.174.000 5-12 GARDEN ADD., HEATHERWOOD, HERSHAW, LOMA VISTA, ETC. SANITARY SEWER $203,000 $1,074,000 $632,000 $1,909,000 5-13 12" WATER LINE ON EAST HIGHLAND (N. CARROLL TO KIMBALL) $92.000 $600,000 $692,000 5-14 N. PEYTONVILLE 8" WATER LINE (LOW PRESSURE PLANE) $682,000 $682,000 NF T. W. KING (SH 114 TO SOUTH OF BOB JONES), 12" WATER LINE (P.S. #2 TO WEST BOB JONES) $330,000 NF W. BOB JONES 12" WATER LINE (N.WHITE-S CHAPEL TO TW KING) $341,000 ,F FLORENCE 1.5 MG ELEVATED WATER TANK $2,860,000 $2,860,000 SUBTOTAL $2,928,167 $480,000 $4,036,000 $3,103,000 $2,420,000 $2,700,000 $2,950,000 $6,748,000 $24,694,167 `FEDERALLY MANDATED PROJECT (SHOWN IN RED) " PROJECTS WHICH THE CITY HAS COMMITTED FUNDING (SHOWN IN GREEN) ATTACHMENT B FY 2002-03 EXPENDITURES BY FUND CATEGORY ROADWAY IMPACT FEE i WATER IMPACT FEE SEWER IMPACT FEE GENERAL FUNDS UTILITY FUNDS TIF DISTRICT CRIME CONTROL SPDC FUNDS $406,000 $0 $0 $0 $6,026,000 $0 $0 $0 $0 000 000 000 $0 $0 $0 $0 $4,516,000 $0 $0 $0 Revised Technical Committee's Proposed FY 2002-03 To FY 2006-07 Capital Improvements Program by Project Type February 4, 2003 r�FY 2002-03 TO FY 2006-07 FUNDED PROJECTS CIP PROJECT REQUEST SUBMITTED BUT NOT RECOMMENDED FOR FUNDING DUE TO NF- FINANCIAL CONSTRAINTS Pnnptt SFCTIAN VI - PI IRI IC SAFFTY EXPENDITURES FY 2002-03 TO FY 2006-07 Residual FY 2007 and Prior Expenditure Funds FY 2002-03 FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07 Beyond TOTAL 6-1 NORTH DPS FACILITY $300,000 $300,000 $12,400,000 $13,000,000 6-2 RADIO INFRASTRUCTURE $1,000,000 $1,000,000 6-3 EAST DPS FACILITY $1,046,000 $1,046,000 NF JOUTDOOR COMMUNITY WARNING SYSTEM $450,000 $450,000 NF I FIRE SERVICE APPARATUS $1,920,000 $1,920.000 SUBTOTAL $0 $1,300,000 $300,000 $13,446,000 $0 $0 $2,370,000 $17,416,0 Paae# SECTION VII - COMMUNITY SERVICES 7-1 CISD AQUATICS CENTER -CONTRIBUTION TO JOINT USE FACILITY $1,000,000 $250,000 $1,250,000 7-2 MATCHING FUNDS (GRANT) $91,799 $200,000 $200,000 $200,000 $200,000 $200,000 $1,091,799 7-3 JOINT USE $1,100 $20,000 $20,000 $20,000 $61,100 7-4 BOB JONES DEVELOPMENT $449.057 $1,115,967 $1,565,024 7-5 GIRLS SOFTBALL COMPLEX $15,840 $1,399,400 $1,415,240 6 NEIGHBORHOOD PARK DEVELOPMENT $62,787 $123,331 $500,000 $686,118 -7 NATURE CENTER IMPROVEMENTS $10,000 $10,000 7-8 SPECIAL PROJECTS $25,815 $50,000 $35,000 $35,000 $50,000 $50,000 $245,815 7-9 ON -GOING TRAIL IMPROVEMENTS $58,000 $41,000 $150,000 $249,000 7-10 LAND ACQUISITION $662,675 $900,000 $1,562,675 NF RECREATION CENTER $7,000 $8,650,000 $8,650,000 NF JOINT USE-SOUTHLAKE GRAPEVINE CONSTRUCTION IN MEADOWMERE PARK $500,000 $500,000 NF PARK MAINTENANCE FACILITY $500,000 $500,000 NF BICENTENNIAL PARK IMPROVEMENTS $30,000 $2,530,000 $2,530,000 NF JUNIOR IN -LINE HOCKEY RINK $720,000 $720,000 NF SKATE PARK $171,000 $171,000 NF ITOWN SQUARE PARK HILL TRAILS AND AMENITIES $200,000 $200,000 'FEDERALLY MANDATED PROJECT (SHOWN IN RED) " PROJECTS WHICH THE CITY HAS COMMITTED FUNDING (SHOWN IN GREEN) ATTACHMENT B FY 2002-03 EXPENDITURES BY FUND CATEGORY ROADWAY IMPACT FEE WATER IMPACT FEE SEWER IMPACT FEE GENERAL FUNDS UTILITY FUNDS TIF 1 DISTRICT CRIME CONTROL SPDC FUNDS Ex $0 $0 $0 $0 $0 $0 $1,300,000 $0 $250,000 $200,000 $20,000 1,115,967 1,399,400 $123,331 $41.0001 SUBTOTAL $2,404,073 $0 $3,209,698 $235,000 $235,000 $1,820,000 $270,000 $13,271,000 $21,444,771 $0 $0 $0 $0 $0 $0 $0 $3,209,698 TOTALS $20,102,240 $480,000 $20,759,698 $6,910,000 $19,151,000 $7,770,000 $5,810,000 $57,650,000 $138,632,938 $0 $150,000 $236,000 $7,903,000 $4,516,000 $3,925,000 $1,300,000 $3,209,698 Total FY 02/03: $21,239,698 Technical Committee's Proposed FY 2002-03 To FY 2006-07 Capital Improvements Program by Fund Type December 3, 2002 r FY 2002-03 TO FY 2006-07 RECOMMENDED FUNDED PROJECTS CIP PROJECT REQUEST SUBMITTED BUT NOT RECOMMENDED FOR FUNDING DUE TO FINANCIAL CONSTRAINTS Score SECTION I - GENERAL FUND EXPENDITURES FY 2002-03 TO FY 2006-07 PRIOR EXPENDITURE 1 1 FY 2002-03 FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07 TOTAL 96.71 STORM WATER PHASE II -DRAINAGE MASTER PLAN $647,000 $647,000 87.13 N. CARROLL AVENUE (FEDERAL WAY TO SH 114) ULTIMATE ROADWAY AND 12" WATER LINE $347,000 $2,172,000 $2,519,000 81.00 TRAFFIC SIGNAL AT FM 1709 AND NOLEN $165,000 $165,000 78.00 TMB PROPOSITION ONE INTERSECTION IMPROVEMENTS) 76.63 PAVEMENT MANAGEMENT $150,000 $150,000 75.71 IDOVE ROAD WIDENING SH 114 TO KIRKWOOD $465,000 $465,000 73.71 DEVELOPER REIMBURSEMENT FOR OVERSIZING UTILITIES (General Fund) $142,000 $100,000 $50,000 $50,000 $50,000 $392,000 72.00 UNION CHURCH ROAD/S. PEARSON RECONSTRUCTION-12" WATER LINE $89,000 $2,438,000 $2,527,000 71.88 N. WHITE CHAPEL (EMERALD TO SH 114)" $135,000 $228,000 $450,000 $1,950,000 $1,122,000 $3,885,000 71.00 DOVE CREEK DRAINAGE IMPROVEMENTS $100,000 $800,000 $900,000 69.71 LOCALIZED DRAINAGE PROJECTS -MULTIPLE PROJECTS $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000 69.50 S. KIMBALL AVE. (CROOKED TO CONTINENTAL) (HALF OF ULTIMATE ROADWAY) $1,305,000 $1,305,000 69.00 N. WHITE CHAPEL WIDENING (SH 114 TO SWEET STREET) 60.71 BRUMLOW WIDENING (CONTINENTAL TO SH 26) 60.00 OUTDOOR COMMUNITY WARNING SYSTEM 59.57 TMB PROPOSITION TWO (SH 114 URBAN DESIGN CONSTRUCTION) $600,000 $600,000 57.25 S. KIMBALL FROM FM 1709 TO HERITAGE BUSINESS PARK/E. CONTINENTAL FROM CROOKED TO S. KIMBALL 57.00 TMB PROPOSITION THREE (HIKE/BIKE TRAILS) 55.50 S. WHITE CHAPEL (FM 1709 TO CONTINENTAL) (ULTIMATE ROADWAY) 53.71 SOUTH KIRKWOOD BRANCH CHANNEL IMPROVEMENTS 53.50 T. W. KING REHAB. (SH 114 TO SOUTH OF BOB JONES), 12" WATER LINE (P.S. #2 TO WEST BOB JONES) 53.38 MISCELLANEOUS PAVEMENT REHABILITATION 43 SIDEWALK ALONG VARIOUS ROADWAYS 33 W. BOB JONES REHAB & 12" WATER LINE (N.WHITE'S CHAPEL TO TW KING) 50.63 S. CARROLL AVE. (FM 1709 TO BREEZE WAY) (ULTIMATE ROADWAY) 50.29 DURHAM SCHOOL ROAD CONSTRUCTION (WHITE CHAPEL TO SHADY OAKS) 49.00 N. PEARSON LN. REHAB (1709 TO FLORENCE) 49.00 SILVERWOOD CIRCLE RECONSTRUCTION 47.50 SHADY OAKS (FM 1709 TO DURHAM JR HIGH) 47.29 E. CONTINENTAL BLVD. (S. CARROLL TO CROOKED) 45.43 CROOKED LANE (S. KIMBALL TO NOLEN DR) 45.38 SADDLE RIDGE RD., SAM BASS RIDGE, SODA RIDGE, SHUMAKER, SUNSHINE, SWEET STREET REHAB 45.13 E. HIGHLAND REHAB (SH 114 TO WHITE CHAPEL) 44.88 OAK LANE PAVING AND DRAINAGE PROJECT 43.75 FLORENCE ROAD REHAB (PEARSON TO RANDOL MILL) 41.43 E. BOB JONES REHABILITATION (N WHITE'S CHAPEL TO 4200 FT EAST) 41.29 E. CONTINENTAL BLVD. (S. CARROLL TO BYRON NELSON) 41.25 T. W. KING REHAB (BOB JONES TO LAKE GRAPEVINE) 41.14 PUBLIC WORKS CENTER IMPROVEMENT 39.00 FIRE SERVICE APPARATUS 33.71 CROSS TIMBER HILLS ROAD REHABILITATION 33.14 VERSAILLES CHANNEL (INSTALL 2-TX 3' CULVERTS) 32.43 BREWER ROAD 24.14 CARLISLE RECONSTRUCTION (CARROLL AVENUE TO RAINBOW STREET) NR# FM 1938 RIGHT-OF-WAY ACQUISITION -FM 1709 TO CITY LIMIT $330,0001 1 1 1 1 $330,000 5UBTUTAL $189,000 $8,U24,000 $3,000,000 $1,000,000 $2,50U,000 $1.672.000 $16,385,000 An additional $1.99 million will be needed to complete this project # Project not ranked by CIP Technical Committee Score SECTION II - UTILITY FUND 100.67 REDUNDANT WATER SUPPLY (THROUGH KELLER ALONG FLORENCE TO P. S. #2) $2,567.417 $4,036,000 $2,268,000 $1,249,000 $0 $0 $10,120,417 82.50 12" WATER LINE ALONG RANDOL MILL (FM1709 to Randol Mill Bend) $54,000 $876,000 $930,000 76.83 N-2 SEWER INTERCEPTOR $581,000 $581,000 -1.71 DEVELOPER REIMBURSEMENT FOR OVERSIZING UTILITIES (Utility Fund) $142,000 $100,000 $50,000 $292,000 S7 S. KIMBALL S-7 SEWER LINE $387,000 $387,000 69.13 JOHNSON ROAD REHABILITATION AND SEWER (PEARSON TO RANDOL MILL) $230,000 $230,000 66.50 12" WATER LINE ON SH 114 (KIMBALL TO BRIARWOOD) $45,0001 $200,000 $245,000 65.17 12" WATER LINE ON N. CARROLL AVE (DOVE TO PRIMROSE) 1 $50,0001 $250,0001 $300,000 64.83 12" WATER LINE ON SHADY OAKS (HIGHLAND TO W. DOVE) 1 1 $111,0001 $553,000 $664,000 ATTACHMENT C FY 2002-03 EXPENDITURES BY FUND CATEGORY ROADWAY IMPACT FEE WATER IMPACT FEE SEWER IMPACT FEE GENERAL FUNDS UTILITY FUNDS TIF DISTRICT CRIME CONTROL SPDC FUNDS $647,000 $347,000 $165,000 $150,000 $465,000 $142,000 $2,438,000 $135,000 $800,000 $500,000 $1,305,000 $600,000 $330,000 $0 $0 $0 $8,024,000 $0 $0 $0 $0 Technical Committee's Proposed FY 2002-03 To FY 2006-07 Capital Improvements Program by Fund Type December 3, 2002 FY 2002-03 TO FY 2006-07 RECOMMENDED FUNDED PROJECTS CIP PROJECT REQUEST SUBMITTED BUT NOT RECOMMENDED FOR FUNDING DUE TO FINANCIAL CONSTRAINTS EXPENDITURES FY 2002-03 TO FY 2006-07 PRIOR E%PENDITURE FY 2002-03 FY 2003-04 FY 2004-05 FY 2005-06 FY 2006-07 TOTAL 64.00 12" WATER LINE ON FM 1709 (PARKWOOD TO WHITE CHAPEL) $165,000 $165,000 63.88 20" WATER LINE ON SH 114 (TOWN SQUARE TO N. WHITE CHAPEL) $74,000 $1,100,000 $1,174,000 61.67 GARDEN ADD., HEATHERWOOD, HERSHAW, LOMA VISTA, ETC. SANITARY SEWER $203,000 $1,074,000 $632,000 $1,909,000 60.33 12" WATER LINE ON EAST HIGHLAND (N. CARROLL TO KIMBALL)** $92,000 $92,000 59.83 12" WATER LINE ON E. DOVE FROM N. CARROLL TO N. KIMBALL $117,000 $117,000 59.67 N. PEYTONVILLE 8" WATER LINE (LOW PRESSURE PLANE) $682,000 $682,000 58.67 SHADY OAKS SEWER FROM THE BASIN LINE to FM 1709 $468,000 $468,000 58.33 8" WATER LINE ON HIGHLAND (WHITE CHAPEL AND SHADY OAKS) $297,000 $297,000 58.33 12" WATER LINE ON E. CONTINENTAL FROM 800 BLOCK TO 1100 BLOCK 57.00 CASEY COURT (OAKS ADDITION) SEWER $109,000 $109,000 57.00 FLORENCE 1.5 MG ELEVATED WATER TANK 55.67 QUAIL CREEK ESTATES, WOODLAND HEIGHTS SEWER 55.50 12" WATER LINE FROM BICENTENNIAL PARK WATER TOWER TO W. HIGHLAND AVE. 54.00 SHADY OAKS SEWER FROM THE BASIN LINE to FM 1709 52.33 8" WATER LINE CONNECTING EXISTING LINES AT LINES AT LAKES DR./BURNEY LN. 51.50 1 REHABILITATION TO THE BANK STREET LIFT STATION **An additional $.60 million will be needed to complete this project SCORE SECTION III - CCPD FUND ATTACHMENT C FY 00EXPENDITURES CATEGORY W -SEW TIF DISTRICT CRIME CONTROL SUbIW AL A2,644,411 $4,U6b,000 $2,WJ,000 $2,VtU,000 $J,000,UUU W,UUU,000 ZI$1b,/bZ,41/ W W Z�U Z�U z�4,UJb,UUU yU yV yu 75 INORTH DPS FACILITY 1 1 $300,0001 $300,0001 $12,400,0001 1 1 $13,000,000 72 JEAST DPS FACILITY I 1 1 $1,046,0001 1 1 $1,046,000 NR# IRADIO INFRASTRUCTURE 1 $1,000,000 $1,000,000 SUBTOTAL $0 $1,300,000 $300,000 $13,446,000 $0 $0 $15,046,000 SCORE SECTION IV - SPDC 61 RECREATION CENTER BOB JONES DEVELOPMENT $449,057 $1,115,967 $1,565,024 BICENTENNIAL PARK IMPROVEMENTS 51 GIRLS SOFTBALL COMPLEX $15,840 $1,399,400 $1,415,240 48 NEIGHBORHOOD PARK DEVELOPMENT $62,787 $123,331 $500,000 $686,118 48 TRAIL IMPROVEMENTS $0 $41,000 $150,000 $191,000 46 TOWN SQUARE PARK HILL TRAILS AND AMENITIES 43 PARK MAINTENANCE FACILITY 40 LAND ACQUISITION $662,675 $900,000 $1,562,675 40 JOINT USE-SOUTHLAKE GRAPEVINE CONSTRUCTION IN MEADOWMERE PARK 38 NATURE CENTER IMPROVEMENTS $0 $10,000 $10,000 33 SKATE PARK 30 JUNIOR IN -LINE HOCKEY RINK NR# CISD AQUATICS CENTER -CONTRIBUTION TO JOINT USE FACILITY $500,000 $250,000 $750,000 NR# MATCHING FUNDS (GRANT) $91,799 $200,000 $200,000 $200,000 $200,000 $200,000 $1,091,799 NR# JOINT USE $1,100 $20,000 $20,000 $20,000 $61,100 NR# SPECIAL PROJECTS 1 $25,8151 $50,000 $35,0001 $35 000 $50 000 $50 000 $245,815 $1, 399,400 $123,331 $41,000 200,000 $20,000 $50,000 SUBTOTAL $1,809,073 $3,209,698 $235,000 $235,000 $1,820,000 $270,000 $7,578,771 $0 $0 $0 $0 $0 $0 $0 $3,209,698 # Project not ranked by CIP Technical Committee TOTALS $4,842,490 $16,569,698 $6,438,000 $17,660,000 $7,320,000 $4,942,000 $57,772,188 $0 $0 $0 $8,024,000 $4,036,000 $0 $1,300,000 $3,209,698 Total FY 02/03: $16,569,698 r ATTACHMENT C TECHNICAL COMMITTEE'S PROPOSED FY 2002- 03 TO FY 2006-07 CAPITAL IMPROVEMENTS PROGRAM PRESENTED TO CITY COUNCIL ON DECEMBER 3, 2002. The following spreadsheet is a copy of the proposed FY 2002-03 to FY 2006-07 CIP which was reviewed by City Council at its meeting in December, 2002. Based on the comments of the City Council at this meeting, a number of changes have been made to this spreadsheet and are reflected in Attachments A & B. City of Southlake, Texas ATTACHMENT D MEMORANDUM December 12, 2002 To: Billy Campbell, City Manager From: Pedram Farahnak, P.E., Director of Public Works Subject: 2002/2003 CIP At the last City Council meeting, the Council requested that staff prepare cost estimates on completing the ultimate pavement on S. Kimball Avenue from FM 1709 to Heritage Park. The staff also took another look at the cost estimate for completing the S-7 sewer on S. Kimball Avenue that extends north of Crooked Lane. Since the last estimate was prepared, a developer has constructed a portion of the sewer line near Continental Boulevard and the original estimate was not prepared for constructing the sewer line in a large street improvement project but as a stand alone project. Project Description S. Kimball from Continental Blvd. to Crooked Lane (Northbound lanes including intersection at Crooked Lane) S. Kimball from Crooked Lane to FM 1709 (Northbound lanes) S. Kimball from Crooked Lane to Continental Blvd. (Southbound lanes) S. Kimball from Continental Blvd. to Heritage Park (Eastbound lanes) E. Continental from Crooked Lane to S. Kimball Ave. (Eastbound lanes) Total cost of completing remainder of ultimate section of S. Kimball from FM 1709 to Heritage Park and E. Continental from Crooked Lane to S. Kimball Ave. S-7 Sewer from 1200' South of Crooked Lane to 1400' North of Crooked Lane Grand Total: Total Cost $1,600,000 $1,200,000 $350,000 $330,000 $320,000 $3,800,000 $250,000 $4,050,000 There is an opportunity to realize a cost savings by doing all phases of the S. Kimball Avenue constriction and S-7 sewer line in one contract, possibly, as much as 10%. Without actual bid prices, this is only an estimation. South Kimball Avenue �1