SB Item 5 - PlansAddress
Approval / Date
Sheet
0629161AR9
IH
6/10/21
#
1450 Plaza Pl,
Southlake, TX
Acct. Rep.
Coordinator
DEBBIE MOLTZ
LAUREN STACKHOUSE
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
2301 River Road
Suite 201
Louisville, KY 40206
(502) 897-9800 Cell (502) 554-2575
14201 Sovereign Road #101
Fort Worth, TX 76155
R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations.
- Delete F.
- On front elevation - see architect notes about angling the "E" light bars, and adding some around the
corners.
- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.
- Change sign C to open channel with exposed white LED stroke(s) in the letters
- Change sign B2 to an EVO Entertainment sign instead of play button
R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the
details of what's inside.
R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art
so that we can send it to the engineer.
- Add a separate item ID for the support bars behind sign A3 as well for the engineer.
7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white
Contour LED on the face of each as shown on the latest renderings in Downloads.
- Correct the item IDs on the floor plan- they seem to be labeled as G instead of F.
R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign
R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided
by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the
horizontal trellis is in our scope and will need to match that same finish.
(9/7/21)JGZ: Add electrical details.
R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5
(change to R6).
Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1
trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint
finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis
pieces we are building.
R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can
add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be
supplied by GC & note to reference stamped engineering for attachment details.
We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension
from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign
can be fully above the T-Bar ceiling dimension.
C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with
a survey note for location of power supplies.
Sign D will also need to be pre-wired.
B- We need to provide amp draw per each tower rather than a total for all since they are all around the
building and likely will not all be tied together to the same.
E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in
PT Art References folder dated 10/15 so you can also update power requirements.
R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical
277v.
**The art will be posted this week for us to release the job so we need to clean it up and remove as
many survey notes as possible on this revision.
A - Color temperature of LEDs is confirmed 6500k white for these signs.
Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of
the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD
note?
Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the
survey & information about location of leads per survey. Power supplies will be located behind wall.
Delete TBD note.
B - Change color temperature to 6500k white rather than warm white.
C - Add notes for location of power supplies/leads per survey. 6500k white LED
D - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.
E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from
survey re: j-boxes and no prewiring needed.
R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See
Art References folder for new location. Update attachment method- should be like A2 now.
1 of 9
S C A L E 1/32" = 1 '-0"
A2
C
E1
E1
B5B6
B1
B2
B4
B3
E2
A3
A1
E2
E3
Address
Approval / Date
Sheet
0629161AR9
IH
6/10/21
#
1450 Plaza Pl,
Southlake, TX
Acct. Rep.
Coordinator
DEBBIE MOLTZ
LAUREN STACKHOUSE
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
2301 River Road
Suite 201
Louisville, KY 40206
(502) 897-9800 Cell (502) 554-2575
14201 Sovereign Road #101
Fort Worth, TX 76155
R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations.
- Delete F.
- On front elevation - see architect notes about angling the "E" light bars, and adding some around the
corners.
- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.
- Change sign C to open channel with exposed white LED stroke(s) in the letters
- Change sign B2 to an EVO Entertainment sign instead of play button
R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the
details of what's inside.
R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art
so that we can send it to the engineer.
- Add a separate item ID for the support bars behind sign A3 as well for the engineer.
7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white
Contour LED on the face of each as shown on the latest renderings in Downloads.
- Correct the item IDs on the floor plan- they seem to be labeled as G instead of F.
R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign
R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided
by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the
horizontal trellis is in our scope and will need to match that same finish.
(9/7/21)JGZ: Add electrical details.
R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5
(change to R6).
Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1
trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint
finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis
pieces we are building.
R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can
add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be
supplied by GC & note to reference stamped engineering for attachment details.
We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension
from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign
can be fully above the T-Bar ceiling dimension.
C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with
a survey note for location of power supplies.
Sign D will also need to be pre-wired.
B- We need to provide amp draw per each tower rather than a total for all since they are all around the
building and likely will not all be tied together to the same.
E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in
PT Art References folder dated 10/15 so you can also update power requirements.
R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical
277v.
**The art will be posted this week for us to release the job so we need to clean it up and remove as
many survey notes as possible on this revision.
A - Color temperature of LEDs is confirmed 6500k white for these signs.
Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of
the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD
note?
Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the
survey & information about location of leads per survey. Power supplies will be located behind wall.
Delete TBD note.
B - Change color temperature to 6500k white rather than warm white.
C - Add notes for location of power supplies/leads per survey. 6500k white LED
D - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.
E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from
survey re: j-boxes and no prewiring needed.
R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See
Art References folder for new location. Update attachment method- should be like A2 now.
2 of 9
3'-0"7'-0"406'-4"53'-8"406'-4"
222'-10"222'-9"
32'-0"
32'-0"
S C A L E 1 /3 2 " = 1 '-0 "
76'-0"38’-0”27'-4"3'-10"38'-2"2’-6 3/8”30’-8”LED SHOWN IN RED FOR VISUAL PURPOSES ONLY
19’-4”
A2
A1
A3
D
C
E2
E1
E3
B1
B1 B3
B3
B3
B6
B6
B5
B5
B2
B2 B4
B4
5’-0”
+5 FT AROUND
LEFT CORNER+5 FT AROUND
LEFT CORNER
2 1/4”
30’-8”
30’-8”
30’-8”
30’-8”
43’-8”43’-8”43'-8"8'-0"T- BAR CEILING INSIDE
20'-2"2'-11"22'-3"22'-1"PRE-WIRING REQUIRED FOR SIGN D.24'-4"E1
CENTER SIGN BETWEEN DOWN SPOUTS
5'-0"RELOCATED LAMP
Address
Approval / Date
Sheet
0629161AR9
IH
6/10/21
#
1450 Plaza Pl,
Southlake, TX
Acct. Rep.
Coordinator
DEBBIE MOLTZ
LAUREN STACKHOUSE
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
2301 River Road
Suite 201
Louisville, KY 40206
(502) 897-9800 Cell (502) 554-2575
14201 Sovereign Road #101
Fort Worth, TX 76155
R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations.
- Delete F.
- On front elevation - see architect notes about angling the "E" light bars, and adding some around the
corners.
- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.
- Change sign C to open channel with exposed white LED stroke(s) in the letters
- Change sign B2 to an EVO Entertainment sign instead of play button
R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the
details of what's inside.
R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art
so that we can send it to the engineer.
- Add a separate item ID for the support bars behind sign A3 as well for the engineer.
7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white
Contour LED on the face of each as shown on the latest renderings in Downloads.
- Correct the item IDs on the floor plan- they seem to be labeled as G instead of F.
R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign
R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided
by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the
horizontal trellis is in our scope and will need to match that same finish.
(9/7/21)JGZ: Add electrical details.
R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5
(change to R6).
Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1
trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint
finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis
pieces we are building.
R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can
add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be
supplied by GC & note to reference stamped engineering for attachment details.
We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension
from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign
can be fully above the T-Bar ceiling dimension.
C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with
a survey note for location of power supplies.
Sign D will also need to be pre-wired.
B- We need to provide amp draw per each tower rather than a total for all since they are all around the
building and likely will not all be tied together to the same.
E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in
PT Art References folder dated 10/15 so you can also update power requirements.
R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical
277v.
**The art will be posted this week for us to release the job so we need to clean it up and remove as
many survey notes as possible on this revision.
A - Color temperature of LEDs is confirmed 6500k white for these signs.
Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of
the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD
note?
Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the
survey & information about location of leads per survey. Power supplies will be located behind wall.
Delete TBD note.
B - Change color temperature to 6500k white rather than warm white.
C - Add notes for location of power supplies/leads per survey. 6500k white LED
D - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.
E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from
survey re: j-boxes and no prewiring needed.
R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See
Art References folder for new location. Update attachment method- should be like A2 now.
3 of 9
5" DEEP ALUM. OPEN LETTERS TO BE LIT WITH GE CONTOUR 6500K WHITE L.E.D.’S.
RETURNS ON THE OUTSIDE P.T.M. SW 7674 PEPPERCORN.
RETURNS IN THE INSIDE AND BACKS TO BE PAINTED WHITE.
LOCATION OF POWER SUPPLIES T.B.D.
WHITE ACRYLIC FACE WITH DIGITALLY
PRINTED GRAPHICS APPLIED ON 1ST
SURFACE. INT. LIT WITH WHITE L.E.D.
TRIMCAP TO MATCH AS CLOSE AS
POSSIBLE TO SW 7674 PEPPERCORN
GE 6500K TETRA CONTOUR SYSTEM
N O TE TO E LEC TR ICAL
C O NT RAC TO R
DENOTES APPROX. LOCATION OF
J-BOX(ES) PROVIDED and INSTALLED
BY ELECTRICAL CONTRACTOR
120v ELECTRICAL REQUIRED
ELECTRICAL CONTRACTOR TO PROVIDE
PRIMARY ELECTRICAL AND TO PROVIDE
FINAL ELECTRICAL HOOK-UP
3M VINYL
LIME GREEN
3630-136
(PMS 368)
3M VINYL
ORANGE
3630-44
(PMS 1655)
3M VINYL
TEAL GREEN
3630-246
(PMS 322)
MATCH
PMS 7405
MATCH
PMS 3285
MATCH
PMS 326
3M VINYL
OLYMPIC BLUE
3630-57
(MATCH PMS 298)
NEW COLORS UTILIZING
PMS MATCH AND VINYL COLORS
COLOR CALLOUT SHOWN FOR PRODUCTION
477.68 SQ FT
5" DEEP ALUM. OPEN LETTERS TO BE LIT WITH GE CONTOUR 6500K WHITE L.E.D.’S.
RETURNS ON THE OUTSIDE P.T.M. SW 7674 PEPPERCORN.
RETURNS IN THE INSIDE AND BACKS TO BE PAINTED WHITE.
POWER SUPPLIES WILL BE LOCATED IN TRANSFORMER BOXES ON THE BACK SIDE OF THE LETTERS CONCEALED ON THE FRAME WITH ALL CONDUIT/BOXES PAINTED SILVER
OCL “EVO” / PLEX CHANNEL LOGO
ONE (1) REQUIRED - MANUFACTURE & INSTALL
SCALE: 3/16" = 1' - 0"A1
OCL “ENTERTAINMENT” LETTERS
ONE (1) REQUIRED - MANUFACTURE & INSTALL
SCALE: 3/16" = 1' - 0"
32'-0"
9’-0 3/4”11’-6 1/4”11’-4 5/8”5’-3 5/8”11’-3”2’-7 3/4”14'-11"4 1/2”1’-11”5'-7 1/2"5'-7 1/2"U.L. LABELS REQUIRED
LABELS TO BE ATTACHED IN VISIBLE
AREA, DIRECTLY BELOW ON/OFF SWITCH
APPROX. AMP DRAW: 11.1 AMPS PER SIGN
REQ'D FOR EACH SET OF CHANNEL LETTERS
GE CONTOUR - TOTAL FEET 511’-0”
24v TETRAMAX - 29 TOTAL MODULES - 20FT TOTAL
NOTE: THE STEEL TUBE STRUCTURE WILL BE SUPPLIED BY GC.
REFERENCE STAMPED ENGINEERING FOR ATTACHMENT DETAILS.
PRIMARY ELECTRICAL 277V.
Address
Approval / Date
Sheet
0629161AR9
IH
6/10/21
#
1450 Plaza Pl,
Southlake, TX
Acct. Rep.
Coordinator
DEBBIE MOLTZ
LAUREN STACKHOUSE
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
2301 River Road
Suite 201
Louisville, KY 40206
(502) 897-9800 Cell (502) 554-2575
14201 Sovereign Road #101
Fort Worth, TX 76155
R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations.
- Delete F.
- On front elevation - see architect notes about angling the "E" light bars, and adding some around the
corners.
- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.
- Change sign C to open channel with exposed white LED stroke(s) in the letters
- Change sign B2 to an EVO Entertainment sign instead of play button
R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the
details of what's inside.
R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art
so that we can send it to the engineer.
- Add a separate item ID for the support bars behind sign A3 as well for the engineer.
7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white
Contour LED on the face of each as shown on the latest renderings in Downloads.
- Correct the item IDs on the floor plan- they seem to be labeled as G instead of F.
R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign
R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided
by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the
horizontal trellis is in our scope and will need to match that same finish.
(9/7/21)JGZ: Add electrical details.
R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5
(change to R6).
Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1
trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint
finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis
pieces we are building.
R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can
add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be
supplied by GC & note to reference stamped engineering for attachment details.
We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension
from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign
can be fully above the T-Bar ceiling dimension.
C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with
a survey note for location of power supplies.
Sign D will also need to be pre-wired.
B- We need to provide amp draw per each tower rather than a total for all since they are all around the
building and likely will not all be tied together to the same.
E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in
PT Art References folder dated 10/15 so you can also update power requirements.
R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical
277v.
**The art will be posted this week for us to release the job so we need to clean it up and remove as
many survey notes as possible on this revision.
A - Color temperature of LEDs is confirmed 6500k white for these signs.
Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of
the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD
note?
Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the
survey & information about location of leads per survey. Power supplies will be located behind wall.
Delete TBD note.
B - Change color temperature to 6500k white rather than warm white.
C - Add notes for location of power supplies/leads per survey. 6500k white LED
D - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.
E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from
survey re: j-boxes and no prewiring needed.
R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See
Art References folder for new location. Update attachment method- should be like A2 now.
4 of 9
5" DEEP ALUM. OPEN LETTERS TO BE LIT WITH GE CONTOUR 6500K WHITE L.E.D.’S.
RETURNS ON THE OUTSIDE P.T.M. SW 7674 PEPPERCORN.
RETURNS IN THE INSIDE AND BACKS TO BE PAINTED WHITE.
LOCATION OF POWER SUPPLIES T.B.D.
WHITE ACRYLIC FACE WITH DIGITALLY
PRINTED GRAPHICS APPLIED ON 1ST
SURFACE. INT. LIT WITH WHITE L.E.D.
TRIMCAP TO MATCH AS CLOSE AS
POSSIBLE TO SW 7674 PEPPERCORN
GE 6500K TETRA CONTOUR SYSTEM
N O TE TO E LEC TR ICAL
C O NT RAC TO R
DENOTES APPROX. LOCATION OF
J-BOX(ES) PROVIDED and INSTALLED
BY ELECTRICAL CONTRACTOR
120v ELECTRICAL REQUIRED
ELECTRICAL CONTRACTOR TO PROVIDE
PRIMARY ELECTRICAL AND TO PROVIDE
FINAL ELECTRICAL HOOK-UP
3M VINYL
LIME GREEN
3630-136
(PMS 368)
3M VINYL
ORANGE
3630-44
(PMS 1655)
3M VINYL
TEAL GREEN
3630-246
(PMS 322)
MATCH
PMS 7405
MATCH
PMS 3285
MATCH
PMS 326
3M VINYL
OLYMPIC BLUE
3630-57
(MATCH PMS 298)
NEW COLORS UTILIZING
PMS MATCH AND VINYL COLORS
COLOR CALLOUT SHOWN FOR PRODUCTION
477.68 SQ FT
5" DEEP ALUM. OPEN LETTERS TO BE LIT WITH GE CONTOUR 6500K WHITE L.E.D.’S.
RETURNS ON THE OUTSIDE P.T.M. SW 7674 PEPPERCORN.
RETURNS IN THE INSIDE AND BACKS TO BE PAINTED WHITE.
REMOTE POWER SUPPLIES WILL BE LOCATED BEHIND WALL
OCL “EVO” / PLEX CHANNEL LOGO
TWO (2) REQUIRED - MANUFACTURE & INSTALL
SCALE: 3/16" = 1' - 0"A3A2
OCL “ENTERTAINMENT” LETTERS
ONE (1) REQUIRED - MANUFACTURE & INSTALL
SCALE: 3/16" = 1' - 0"
32'-0"
9’-0 3/4”11’-6 1/4”11’-4 5/8”5’-3 5/8”11’-3”2’-7 3/4”14'-11"4 1/2”1’-11”5'-7 1/2"5'-7 1/2"U.L. LABELS REQUIRED
LABELS TO BE ATTACHED IN VISIBLE
AREA, DIRECTLY BELOW ON/OFF SWITCH
APPROX. AMP DRAW: 11.1 AMPS PER SIGN
REQ'D FOR EACH SET OF CHANNEL LETTERS
GE CONTOUR - TOTAL FEET 511’-0”
24v TETRAMAX - 29 TOTAL MODULES - 20FT TOTAL
PRIMARY ELECTRICAL 277V.
A2 SIGN WALL NOTE: GC IS TO REMOVE EXISTING LIGHT
AND RELOCATE 2 FT UNDER NEW SIGN.
Address
Approval / Date
Sheet
0629161AR9
IH
6/10/21
#
1450 Plaza Pl,
Southlake, TX
Acct. Rep.
Coordinator
DEBBIE MOLTZ
LAUREN STACKHOUSE
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
2301 River Road
Suite 201
Louisville, KY 40206
(502) 897-9800 Cell (502) 554-2575
14201 Sovereign Road #101
Fort Worth, TX 76155
R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations.
- Delete F.
- On front elevation - see architect notes about angling the "E" light bars, and adding some around the
corners.
- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.
- Change sign C to open channel with exposed white LED stroke(s) in the letters
- Change sign B2 to an EVO Entertainment sign instead of play button
R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the
details of what's inside.
R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art
so that we can send it to the engineer.
- Add a separate item ID for the support bars behind sign A3 as well for the engineer.
7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white
Contour LED on the face of each as shown on the latest renderings in Downloads.
- Correct the item IDs on the floor plan- they seem to be labeled as G instead of F.
R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign
R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided
by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the
horizontal trellis is in our scope and will need to match that same finish.
(9/7/21)JGZ: Add electrical details.
R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5
(change to R6).
Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1
trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint
finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis
pieces we are building.
R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can
add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be
supplied by GC & note to reference stamped engineering for attachment details.
We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension
from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign
can be fully above the T-Bar ceiling dimension.
C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with
a survey note for location of power supplies.
Sign D will also need to be pre-wired.
B- We need to provide amp draw per each tower rather than a total for all since they are all around the
building and likely will not all be tied together to the same.
E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in
PT Art References folder dated 10/15 so you can also update power requirements.
R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical
277v.
**The art will be posted this week for us to release the job so we need to clean it up and remove as
many survey notes as possible on this revision.
A - Color temperature of LEDs is confirmed 6500k white for these signs.
Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of
the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD
note?
Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the
survey & information about location of leads per survey. Power supplies will be located behind wall.
Delete TBD note.
B - Change color temperature to 6500k white rather than warm white.
C - Add notes for location of power supplies/leads per survey. 6500k white LED
D - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.
E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from
survey re: j-boxes and no prewiring needed.
R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See
Art References folder for new location. Update attachment method- should be like A2 now.
5 of 9
Address
Approval / Date
Sheet
0629161AR9
IH
6/10/21
#
1450 Plaza Pl,
Southlake, TX
Acct. Rep.
Coordinator
DEBBIE MOLTZ
LAUREN STACKHOUSE
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
2301 River Road
Suite 201
Louisville, KY 40206
(502) 897-9800 Cell (502) 554-2575
14201 Sovereign Road #101
Fort Worth, TX 76155
R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations.
- Delete F.
- On front elevation - see architect notes about angling the "E" light bars, and adding some around the
corners.
- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.
- Change sign C to open channel with exposed white LED stroke(s) in the letters
- Change sign B2 to an EVO Entertainment sign instead of play button
R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the
details of what's inside.
R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art
so that we can send it to the engineer.
- Add a separate item ID for the support bars behind sign A3 as well for the engineer.
7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white
Contour LED on the face of each as shown on the latest renderings in Downloads.
- Correct the item IDs on the floor plan- they seem to be labeled as G instead of F.
R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign
R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided
by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the
horizontal trellis is in our scope and will need to match that same finish.
(9/7/21)JGZ: Add electrical details.
R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5
(change to R6).
Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1
trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint
finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis
pieces we are building.
R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can
add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be
supplied by GC & note to reference stamped engineering for attachment details.
We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension
from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign
can be fully above the T-Bar ceiling dimension.
C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with
a survey note for location of power supplies.
Sign D will also need to be pre-wired.
B- We need to provide amp draw per each tower rather than a total for all since they are all around the
building and likely will not all be tied together to the same.
E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in
PT Art References folder dated 10/15 so you can also update power requirements.
R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical
277v.
**The art will be posted this week for us to release the job so we need to clean it up and remove as
many survey notes as possible on this revision.
A - Color temperature of LEDs is confirmed 6500k white for these signs.
Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of
the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD
note?
Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the
survey & information about location of leads per survey. Power supplies will be located behind wall.
Delete TBD note.
B - Change color temperature to 6500k white rather than warm white.
C - Add notes for location of power supplies/leads per survey. 6500k white LED
D - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.
E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from
survey re: j-boxes and no prewiring needed.
R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See
Art References folder for new location. Update attachment method- should be like A2 now.
6 of 9
EXTERIOR PERIMETER L.E.D
PROVIDE & INSTALLB
B
2811
25
18
25
6
7 44
9
15
18
2438
Light Guide
End CapLight Guide
Mounting Clip
Light Guide
Connector
Light Guide
18
25
2438
28
Tetra Contour Complete System
All dim. in MM
13
13
Light Engine
MountingClip
10
11
Light Engine
Light Engine,
Light Guide &
Mounting Clip
EXTERIOR PERIMETER WHITE LED 6500k GE CONTOUR LS STRIP LIGHTING
SURVEY REQUIRED TO VERIFY DIMENSIONS
210 +/- LINEAR FOOTAGE TO BE DETERMINED
10 POWER SUPPLIES GE GEPS24-100 REQUIRED
PRIMARY ELECTRICAL 277V.
Address
Approval / Date
Sheet
0629161AR9
IH
6/10/21
#
1450 Plaza Pl,
Southlake, TX
Acct. Rep.
Coordinator
DEBBIE MOLTZ
LAUREN STACKHOUSE
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
2301 River Road
Suite 201
Louisville, KY 40206
(502) 897-9800 Cell (502) 554-2575
14201 Sovereign Road #101
Fort Worth, TX 76155
R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations.
- Delete F.
- On front elevation - see architect notes about angling the "E" light bars, and adding some around the
corners.
- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.
- Change sign C to open channel with exposed white LED stroke(s) in the letters
- Change sign B2 to an EVO Entertainment sign instead of play button
R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the
details of what's inside.
R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art
so that we can send it to the engineer.
- Add a separate item ID for the support bars behind sign A3 as well for the engineer.
7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white
Contour LED on the face of each as shown on the latest renderings in Downloads.
- Correct the item IDs on the floor plan- they seem to be labeled as G instead of F.
R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign
R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided
by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the
horizontal trellis is in our scope and will need to match that same finish.
(9/7/21)JGZ: Add electrical details.
R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5
(change to R6).
Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1
trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint
finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis
pieces we are building.
R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can
add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be
supplied by GC & note to reference stamped engineering for attachment details.
We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension
from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign
can be fully above the T-Bar ceiling dimension.
C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with
a survey note for location of power supplies.
Sign D will also need to be pre-wired.
B- We need to provide amp draw per each tower rather than a total for all since they are all around the
building and likely will not all be tied together to the same.
E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in
PT Art References folder dated 10/15 so you can also update power requirements.
R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical
277v.
**The art will be posted this week for us to release the job so we need to clean it up and remove as
many survey notes as possible on this revision.
A - Color temperature of LEDs is confirmed 6500k white for these signs.
Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of
the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD
note?
Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the
survey & information about location of leads per survey. Power supplies will be located behind wall.
Delete TBD note.
B - Change color temperature to 6500k white rather than warm white.
C - Add notes for location of power supplies/leads per survey. 6500k white LED
D - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.
E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from
survey re: j-boxes and no prewiring needed.
R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See
Art References folder for new location. Update attachment method- should be like A2 now.
7 of 9
PRIMARY ELECTRICAL AND BLOCKING BY OTHERS (NOT INCLUDED BY CSI).
3M VINYL
TEAL GREEN 3630-246
3M VINYL
TEAL GREEN 3630-246
3M VINYL
LIME GREEN 3630-136
3M VINYL
LIME GREEN 3630-136
3M VINYL
ORANGE 3630-44
3M VINYL
ORANGE 3630-44
FACE-LIT CHANNEL LETTERS
ONE (1) REQUIRED - MANUFACTURE & INSTALL
SCALE: 3/16" = 1' - 0"D
D
C
38’-3”2’-4 5/8”19’-4”3’-7”6 3/4”6 1/4"
2 1/4”
1 5/8”2 1/2"16’-3 3/4” 5/8”91.38 SQ FT
315.35 SQ FT
3" DEEP ALUM. OPEN LETTERS TO BE LIT WITH GE CONTOUR 6500K WHITE L.E.D.’S.
RETURNS ON THE OUTSIDE P.T.M. SW 7674 PEPPERCORN.
RETURNS IN THE INSIDE AND BACKS PTM VINYL COLORS.
REMOTE POWER SUPPLIES BEHIND WALL
FLUSH MOUNT TO WALL.
4 3/4”
7”2 1/4”APPROX. AMP DRAW: 3.3 AMPS PER SIGN
REQ'D FOR EACH SET OF CHANNEL LETTERS
APPROX. AMP DRAW: 3.3 AMPS PER SIGN
REQ'D FOR EACH SET OF CHANNEL LETTERS
ALL ACCESS FOR INSTALL AND PER SURVEY
SERVICE INSIDE THEATER ABOVE T-BAR CIELING
PRE-WIRING REQUIRED FOR SIGN D.
TO DETERMINESURVEY REQUIRED
LOCATION OF POWER SUPPLIES
PRIMARY ELECTRICAL 277V.
ELECTRICAL AT BOTTOM
ELECTRICAL IN MIDDLE
ELECTRICAL AT TOP
FACE-LIT CHANNEL LETTERS
ONE (1) REQUIRED - MANUFACTURE & INSTALL
SCALE: 3/16" = 1' - 0"C
Address
Approval / Date
Sheet
0629161AR9
IH
6/10/21
#
1450 Plaza Pl,
Southlake, TX
Acct. Rep.
Coordinator
DEBBIE MOLTZ
LAUREN STACKHOUSE
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
2301 River Road
Suite 201
Louisville, KY 40206
(502) 897-9800 Cell (502) 554-2575
14201 Sovereign Road #101
Fort Worth, TX 76155
R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations.
- Delete F.
- On front elevation - see architect notes about angling the "E" light bars, and adding some around the
corners.
- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.
- Change sign C to open channel with exposed white LED stroke(s) in the letters
- Change sign B2 to an EVO Entertainment sign instead of play button
R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the
details of what's inside.
R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art
so that we can send it to the engineer.
- Add a separate item ID for the support bars behind sign A3 as well for the engineer.
7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white
Contour LED on the face of each as shown on the latest renderings in Downloads.
- Correct the item IDs on the floor plan- they seem to be labeled as G instead of F.
R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign
R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided
by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the
horizontal trellis is in our scope and will need to match that same finish.
(9/7/21)JGZ: Add electrical details.
R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5
(change to R6).
Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1
trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint
finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis
pieces we are building.
R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can
add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be
supplied by GC & note to reference stamped engineering for attachment details.
We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension
from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign
can be fully above the T-Bar ceiling dimension.
C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with
a survey note for location of power supplies.
Sign D will also need to be pre-wired.
B- We need to provide amp draw per each tower rather than a total for all since they are all around the
building and likely will not all be tied together to the same.
E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in
PT Art References folder dated 10/15 so you can also update power requirements.
R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical
277v.
**The art will be posted this week for us to release the job so we need to clean it up and remove as
many survey notes as possible on this revision.
A - Color temperature of LEDs is confirmed 6500k white for these signs.
Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of
the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD
note?
Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the
survey & information about location of leads per survey. Power supplies will be located behind wall.
Delete TBD note.
B - Change color temperature to 6500k white rather than warm white.
C - Add notes for location of power supplies/leads per survey. 6500k white LED
D - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.
E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from
survey re: j-boxes and no prewiring needed.
R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See
Art References folder for new location. Update attachment method- should be like A2 now.
8 of 9
D
C
Address
Approval / Date
Sheet
0629161AR9
IH
6/10/21
#
1450 Plaza Pl,
Southlake, TX
Acct. Rep.
Coordinator
DEBBIE MOLTZ
LAUREN STACKHOUSE
FINAL ELECTRICAL
CONNECTION BY
CUSTOMER
2301 River Road
Suite 201
Louisville, KY 40206
(502) 897-9800 Cell (502) 554-2575
14201 Sovereign Road #101
Fort Worth, TX 76155
R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations.
- Delete F.
- On front elevation - see architect notes about angling the "E" light bars, and adding some around the
corners.
- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.
- Change sign C to open channel with exposed white LED stroke(s) in the letters
- Change sign B2 to an EVO Entertainment sign instead of play button
R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the
details of what's inside.
R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art
so that we can send it to the engineer.
- Add a separate item ID for the support bars behind sign A3 as well for the engineer.
7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white
Contour LED on the face of each as shown on the latest renderings in Downloads.
- Correct the item IDs on the floor plan- they seem to be labeled as G instead of F.
R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign
R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided
by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the
horizontal trellis is in our scope and will need to match that same finish.
(9/7/21)JGZ: Add electrical details.
R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5
(change to R6).
Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1
trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint
finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis
pieces we are building.
R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can
add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be
supplied by GC & note to reference stamped engineering for attachment details.
We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension
from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign
can be fully above the T-Bar ceiling dimension.
C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with
a survey note for location of power supplies.
Sign D will also need to be pre-wired.
B- We need to provide amp draw per each tower rather than a total for all since they are all around the
building and likely will not all be tied together to the same.
E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in
PT Art References folder dated 10/15 so you can also update power requirements.
R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical
277v.
**The art will be posted this week for us to release the job so we need to clean it up and remove as
many survey notes as possible on this revision.
A - Color temperature of LEDs is confirmed 6500k white for these signs.
Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of
the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD
note?
Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the
survey & information about location of leads per survey. Power supplies will be located behind wall.
Delete TBD note.
B - Change color temperature to 6500k white rather than warm white.
C - Add notes for location of power supplies/leads per survey. 6500k white LED
D - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.
E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from
survey re: j-boxes and no prewiring needed.
R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See
Art References folder for new location. Update attachment method- should be like A2 now.
9 of 9
E2E1
SCALE: 1/16" = 1'-0"
MANUFACTURE AND INSTALL
E 3E2E1 LED WALL WASHER (HORIZONTAL)
FABRICATED PAN PANELS WITH MINIMUM SEAMS.
PAINTED WHITE. CHANNELS INSTALLED FLUSH TO WALL WITH NON-CORROSIVE
FASTENERS.
INTERNALLY ILLUMINATED WITH WHITE 5000k TETRA BATTEN L.E.D. TO
ILLUMINATE ON ONE SIDE.
CHANNELS INSTALLED FLUSH TO WALL WITH NON-CORROSIVE FASTENERS.
NOTE: CUSTOMER TO PROVIDE PHOTOCELL @ THE WALL OR TIMECLOCK AT
SERVICE PANEL. SHUT OFF BREAKER AT LOCKABLE SERVICE PANEL TO
DISCONNECT FIXTURES FOR SERVICE.
ALL PENETRATIONS TO EXTERIOR OF BUILDING FOR MOUNTING HARDWARE,
ELECTRICAL, OR OTHER WILL BE SEALED WITH SILICONE OR OTHER 20 YEAR
SEALANT TO PREVENT WATER INTRUSION AT PENETRATIONS.
E3
5’-0”
5’-0”
28’-0”91’-1 5/8”
63’-0 7/8”3 1/2"3 1/2”3 1/2”DECOR ELEMENTS
384’-8” (+/-)
TOTAL LINEAR FT.
476’-7” (+/-)
TOTAL LINEAR FT.
196’-0” (+/-)
TOTAL LINEAR FT.
2”3 1/2"WALL2” x 2” ALUM. ANGLE
WHITE L.E.D.
PRE FINISHED WHITE ALUM.
BENT COVER
EASILY DAISY CHAIN UP TO 172 FT
PRIMARY ELECTRICAL 277V.
PER SURVEY: J BOXES WILL BE INSIDE OF BUILDING, NO PRE-WIRING
OR EXTERIOR J BOXES WILL BE NEEDED.
2021, 5Gstudio_collaboartive, llc. Allrights reserved12.7.2021
5Gstudio_Collabrative, llc. 1217 Main Street, Suite 500 Dallas, TX 75202 SOUTHLAKE, TEXASEVO ENTERTAINMENT
EVO Entertainment
05
05
+0'-0"
+38'-0"
+45'-0"
+49'-0"
+41'-0"
+0'-0"
05
05
+0'-0"
+38'-0"
+45'-0"
+49'-0"
+45'-0"
+0'-0"
05
05
+0'-0"
+38'-0"
+45'-0"
+38'-0"
+0'-0"
+45'-0"
05
05
+0'-0"
+41'-0"
+49'-0"
+45'-0"
+0'-0"
03
03
01 01 01 02
01 01
01
03
01
01
01 01 01
01
01 02
0303
03 03
01
01
01
01
03
03
02 01
01
01
01
03 02
01
01
03
01 01
03
03
04
030506 06
03
EXTERIOR ELEVATION KEYNOTES
01 CONCRETE TILT WALL WITH MEDIUM TEXTURE COATING AND ACRYLIC PAINT
02 1/2" STUCCO FINISH COAT ON EXISTING TILT WALL. MEDIUM TEXTURE AND ACRYLIC PAINT
03 INTERNALLY ILLUMINATED SIGNAGE ELEMENT
04 ALUMINUM DECORATIVE TRELLIS
05 THIN BRICK VENEER ON CONCRETE SITE CAST WALL
06 STAINLESS STEEL GUARDRAIL
07 INTERNALLY ILLUMINATED POSTER CASE
A3
EXTERIOR ELEVATIONS
NORTHWEST EXTERIOR ELEVATION : PLAZA PLACE SCALE 1/16" = 1'-0"
EXTERIOR ELEVATION GENERAL NOTES
A CONCRETE TILT PANELS TO BE PREPPED TO HAVE SMOOTH AND UNIFORM SURFACE PRIOR TO FINISHES.
B COLORS SUBJECT TO ARCHITECT AND OWNER'S APPROVAL OF 4' X 4' BUILDING APPLIED SAMPLES PRIOR TO WORK. ADDITIONAL SAMPLES MAY BE REQUIRED PRIOR TO FINAL APPROVAL.
C ALL SIGNAGE REQUIRES SEPARATE PERMIT REVIEW AND APPROVAL PROCESS EXCEPT ADDRESS NUMBERS.
SOUTHWEST EXTERIOR ELEVATION : FEDERAL WAY SCALE 1/16" = 1'-0"
SOUTHEAST EXTERIOR ELEVATION : CENTRAL AVENUE SCALE 1/16" = 1'-0"
NORTHEAST EXTERIOR ELEVATION : HIGHWAY 114 SCALE 1/16" = 1'-0"
EXTERIOR SIGN VARIANCE PROPOSALEVO ENTERTAINMENTSOUTHLAKE, TEXAS12.7.20212021, 5Gstudio_collaboartive, llc. 1217 Main Street, Suite 500 Dallas, Tx 75202 All Rights Reservedwww.5Gstudio.com