Item 10 & 11 - SPIN Meeting Report
SPIN MEETING REPORT
SPIN Item Number: SPIN2021-34
City Case Number: ZA21-0087
Project Name: Granite Place Phase 2
SPIN Neighborhood: 7
Meeting Date: October 26, 2021
Meeting Location: 1400 Main Street, Southlake, TX
City Council Chambers
Total Attendance: 3
Host: Sherry Berman, Chair of the Southlake Community Engagement
Committee
Applicant Presenting: David Cunningham, phone: (972) 731-2300, email:
dcunningham@graniteprop.com
City Staff Present: Madeline Oujesky, Assistant to the Director
Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com and clicking on “I Want to” and “View”
“Video on Demand” – forums are listed under SPIN by meeting date.
FORUM SUMMARY:
Property Situation:
The property is located at 550 Reserve St.
Development Details:
The applicant is proposing to develop an approximately 150,000 sq. ft. Class A
professional office building adjacent to Granite Place Phase 1. The building will be
designed as a multi-tenant 5-floor office building. Granite Place Phase 2 is 23% smaller
than the previously approved Phase 2 building in the Master Plan.
Project Improvements include:
• 142,000 RSF, 5 Story Class A Office
• 265 car parking garage addition
• 50 street parking spaces
• Approx. 50% open space including an outdoor conference center
Presentation:
Questions and Concerns:
1. We have had drainage issues from Town Square to Gateway and to our properties. Will
this be drained through the same drainage way?
In the original design, there was a stormwater main in a stormwater drainage ditch that
was put in place. This storm main drains the water and brings it through the cistern, under
S.H. 114, and flows downstream through the pond system on the northside of S.H. 114.
2. I know this development will bring additional drainage. This area has been engineered all
the way up to Kirkwood Blvd. and the capacity for water retention is overwhelming. Beyond
that, it has not been engineered, it’s all natural. The area is just eroding away, so I’m just
trying to get the attention we need to do something about this.
All the water for these sites is retained on-site and drained out at a controlled flow.
3. From our perspective it ends up being additional capacity. If its engineered, we don’t have
any erosion up through Kirkwood Blvd. After that, there is additional flow that causes
erosion over time and with more volume.
4. For the restaurants, will they have outdoor seating?
Yes, they will.
5. The garage capacity, will that account for the restaurant concepts?
Yes, it will. This site is self-parked.
6. DPS Headquarters is still clear on the sideline view from Division St. as an anchor on the
west-end. Is that correct?
Yes, we tried to camp the building back for provisions for that reason.
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official
meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and
the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are
strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council.
Southlake Connect Results for the October 26, 2021 SPIN Town Hall Forum