Item 7C - PresentationCITY VF
OSOUTHL,4
Item 7C
Amendments to the Southlake Mobility
Master Plan
•
The City's Comprehensive Plan serves as a framework/blueprint
for the provision and funding of capital projects and programs.
Sidewalks are a critical element to the City's overall mobility
strategy and a complete and robust sidewalk system is desired
by the Citizens of Southlake.
City has completed an extensive constructability evaluation for
future publicl funded sidewalks and is using this as guide to
prioritize sidewalk construction projects.
Official Pathways Map Amendment.
UTHLAKE
LPM
M
J
Sidewalks are built as part of the City's
CIP program
Roadway projects (White Chapel Blvd,
Rucker Road, Village Center and Brumlow Ave_)
Ordinance requirements — new cc
residential
Parks contain pathways when cor
(Bicentennial Park, Southlake Spc
Infill — Gap Projects
Neighborhood Matching Fund pro,
U SOUTHLADE
r1
Criteria Assessed:
r-]
Connectivity to other sidewalk systems
Location near a park or school
Available right of way or easement
Tree removal
Utility relocations
Bridge construction
Drainage improvements
C�
1KQ
CONNECTING
SOUTHLAKE
CITY PATHWAYS PROGRAM
O�®
o2035
Q
asz
DRAFT
3
Tier 1 Priority
'•� Z
Sidewalk
Segments
r�
1012212021
'
470
F.M. 1709
W.
CONTINENTAL BLVD 466
E. DOVE RD
483
49 486
����:�\�1
PROJECT 7
S
OUthiake
•J yA F
GIB
yL., 19
Pathway
Program managemeni
PROJECT 58
A.g-t2071
Ll
Aff
dill,
C—E —NE33 P
jo
0
Z
iA-
EXCHANGE BLVD
LEGEND
7 f9e
PROP NDEWALK
*NIWM =A
EA7577W WUNOARY
33 3-1 ph 81-2913
Th. City aF S.ohl.k.
Southlake Pathway Program
Management
PROJECT
308
Aug-t 2021
W-CONTFNINTAL UVD
'd
R
pp
Southlake Pathway Program Management
PROJECT 466
---21
LEGEND
^ ��
l
PROP SfUFWALK
---- PARCEL UNEWORK
FROM TAD
1�q��>IE�
fart-h, Tayor 1.131
eii3as.»>3 Ph s17.3-2513 N
TAe CRy of SuuMlnka
T6PE �eglanef�lan N�eTFilo
Southlake Pathway Program Management
PROJECT
Odnder 2071
470
l
-MESA RANCH CT _
f ice`
t _
LEGEND
PW YDEUWX -M &T
R,4 _ i \'�. s'=i['.a• —__— PARCELLUMW*ftK
•C'00 FROMTAO 8f 1.196.sn1 ph pf ].39e.]Bls Fx
�I �gREO Jf/ � fereR��.fN�ra�o
rna ary �t S-ffilam
Southlake Pathway Program Management
Y PROJECT 482
O.I.b., 2021
SOUTHILAKE BLVD
PR6P 9DENALK
PARCEL LINEWORK
FROM TAD
T- C" of S—thl 1.
Southlake Pathway Program Management
PROJECT 483
Od.b., 2021
_ IF
z _ Q
-------------
41
Q i
CC 1
LLI
S •�
r _ ..iv; �' '�` PP �# �l � �L .♦'I� i# d7 x "' � 1 � - �',1YM.ta1, ' 1 _ - �k^
PROJECT 486
Official
Pathways Map
LegeRa
—r"'""" •a�" DRAFT
—,�zR�n•R�+,
—nr>Flkn�P��Ro„ ONLY
SOUTHLAKE
TEXAS
9
Im+Bcenq Reiam:101tlV21
Project 7 (Union Project 7 {Union Project 15 (S. Project 304 (S.
Church) Church) Kimball Ave.) Peytonville Ave.)
Project 58 (Silicon Project 21 Project 28 (N. Project 305 (N.
Dr.) (CrookedLn.) Carroll Ave.) White Chapel
Blvd-)
Project 308 (S. Project 70 Project 32, 33, 34 Project 399 (E.
Nolen Dr.) (Pearson Ln.) (Southridge Lakes Dove Rd.)
Pkwy. )
Project 466 (S. Project 71 Project 39, 41 Project 467, 468
White Chapel (Chesapeake Ln.) (Kirkwood Blvd.) (E. Continental
Blvd.) Blvd.)
Project 470 (Davis Project 76a Project 68 Project 469
Blvd.) (Continental Blvd.) (Pearson Ln.) (Davis Blvd.)
Project 482 Project 86 Project 79 (T W Project 471 (S.H.
(Sunrise Ranch (Crooked Ln.) King) 114 Frontage
Rd.) Rd.)
Project 483 (Byron Project 88 Project 92 Project 472, 473
Nelson Pkwy.) (Parkwood Dr.) (Johnson Rd.) (S. Kimball Ave.)
Project 486 (S.H. Project 93 Project 115 Project 475 (N. /
114 & Cherry Ln. I (Jchnson Rd.) (Southridge Lakes) Kimball Ave.) /
N. Kimball Ave.)
Project 98 Project 144, 154 Project 476
(furnberry Ln.] {E. Dave 5t.) (Shady Oaks ❑r.)
https://www.cityofsouthlake.com/806/Mobility-Master-Plan
I--HY OF
SOUTHLAKE
Randol Mill Avenue
. t-4
IR
Google
Dove and Randol Mill
4111My:ba.�
r
ft
THE TOWN
OF WESTLAKE
TRAILS MAP
LEGEND TRAILS
t Trailhead with Parking
(Thewea--!.,hyr flh—� .iy a—meie ,-1 h—(
— Dove -Davis Trail
8.4 miles
-'S Pedestrian Underpass
— Solana Trail
3.3 miles
Shade Structure & Drinking Fountain
Granada Trail
1.3 miles
Fire Station
Glenwyck Trail
1.5 miles
-+ Town Historical Marker
^ Entrada Loop Trail
1.2 miles
A Town Hall
Entrada Canal Trail
0.9 miles
East Dove Road - #491
.Coll Etl 'anon
Oft
a • i
f
i
x
* m Gaogle
East
~f nytiry'.Ajitl � EMPf Td �wW
r
a
. wr
treet -
mm
#492
l H91irm 8, I`n9hUm SiR��
I v:
r
r,
r µ P 4J
.... Y:..� .+ fir..... ......
North Peytonville Avenue - #204
,� a_
■■■� ��r,0%
■i���i
,. . y_� � .. „��T •��Fi�i_�'. �'•� .�.Jci ,qt:v �. '... it �_' ., '•w",. i
South Peytonville Avenue - #304
South White Chapel Boulevard
White Chapel Blvd Rucker Property
Connects to an existing
(constructed) sidewalk system
SOUTHLAKE
Pathways Map Amendment
Pathways Map Amendment
N
www.ConnectSouthlake.com
CONNECT
§->SOUTHLAKE
sm,�n� where von. �
' � ecynesa«�e
Traffic Management Division
s SouthlakeSidewalks
t
Southlake Meadows
Neighborhood
T.W. King
Cliffs park trails
and Kirkwood
Cnv os
Fast Continental
North White Chapel SOUTHLAKE
at Hollow Drive
from Emerald to SH 114
.
Southlake Blvd.
near The Hill Church
Zena Rucker Road
Kirk -wood BoWevard
East of Byron Nelson
from Dove to Tyler
—,, ,,,,,py Lake Carillon East of N. Carroll
Shady Oaks/Highland
Evaluate intersection
Construct intersection
Mobility,
Efficient
3.1, PW
Intersection Improvements
improvement options and
improvements if determined
Infrastructure
Mobility
3.6,
Increased traffic has reduced
implement recommended
necessary.
C1, C2
Options
3 $
MT51
the level of service of the
improvements if
3.10 2
Shady Oaks/Highland
determined necessary.
6.1
intersection.
In conjunction with TXDOT -
Conduct a study to
Based on study findings —
Mobility,
Efficient
3.1, PW
conduct a study on SH114 Main
determine cost and
create a CIP project request
Infrastructure
Mobility
3.6,
Lane Expansion and Ramp
construction feasibility.
and project timeline for the
C1, C2
Options
3 $
f'--
�.,
Reversals Between Kimball
implementation of the
3.10
Avenue and White Chapel
6.1
Boulevard. Reversing ramps will
project.
allow for increased accessibility to
properties along the frontage
MT52
road; improve safety by moving
2
the traffic "weaving area" between
y
an entrance ramp and exit ramp
from the main lanes to the
frontage road, where speeds and
volumes are lower; and reduce
traffic congestion on intersections
by allowing through traffic to
access the highway.
U
5UU I HLAKL
Road Project Amendments
Turnberry Lit or
0 Hig Llangt A
r qw, beil pow
XILJ"Mdmu
I f ��fryJ
4�H I
SOUTHLAKE
SN 114 RAMP Project
CONTROL COS E]
WHITE CHAPEL RC
KIMALL Al ,
FIGURE
a _
1
I
LEGEND
�Pz
1— . -- --
�
....... -- Imo- _ �
t ��o 1 C
SOUTMILAKE BOULEVARD _ r � 1 `
SOUTHLAKE
Road Project Amendments
Approved (6-0), with the following recommendations to staff
and City Council:
• First with respect to South Peytonville #304 and the
Highland sections that staff go ahead and refine the
costs considering the connectivity to schools and
evaluate moving those up to Tier 1 and Tier 2;
• With respect to Randol Mill, talk to the City of Westlak
about connectivity and consider moving that "lii I�prionty
as well;,TY F ///
�'"'"' - CITY
• For the East Dove Road #491 project, evaluate any
grant money that might be available as well as moving
that up to Priority 1; and
• For North Peytonville #204 evaluate cost refinement and
the project overall and moving that up in priority; and
Then also noting generally the Commission's
recommendation to approve the Pathways M
amendments, the Thoroughfare Plan amend
the road project amendmenti��
♦•
I CITY F
Lf
CITY OF
SOUTHLAK