2001-07-23 City of Southlake, Texas
MEMORANDUMC)3
July 19, 2001
TO: SPDC Board of Directors
FROM: Kevin Hugman, Director of Community Services
SUBJECT: Board Meeting— Tuesday, t1y 2 a 3, 2001
1. Agenda Item No. 2. Executive Session. At this time, we do not have anything to discuss
with you in executive session.
2. Agenda Item No. 4. PUBLIC FORUM: This is the public's opportunity to address the
Board about non-agenda items. During this proceeding it is important that the Board not
deliberate (discuss among yourselves) or take action on any item brought up at this time.
The Boards' options during this topic are 1) to listen, 2) ask questions and respond to the
presenter only, 3) request staff to look into the issue and report back to the Board or 4)
request that the Chair put the item on a future agenda for the Board to discuss or consider.
3. Agenda Item No. 5A. Approval of the minutes of the regular SPDC meeting held June 19,
2001 and the Special SPDC meeting held June 26, 2001. If you have corrections to the
meeting minutes, please let Secretary to the City Manager Kim Bush know in advance or
make it part of the motion for consideration. Kim can be reached via e-mail at
kbush(a�ci.Southlake.tx.us or by calling her at 481-1420
4. Agenda Item No. 6A. Award of bid to Choate Irrigation for irrigation improvements at
Chesapeake Park. As you may know, the land for this park was dedicated to the City by
the original developer of Chesapeake Place. An SPDC Matching Funds grant was
approved in February of 2000 with Vista Oaks Development for the construction of
Chesapeake Park. Due to the lack of progress and quality of work provided, the City took
the project over in March of 2001. The developer paid to the City $35,826 to cover their
remaining construction costs. In addition, $35,794 in unspent matching funds also remains
to cover the costs of final grading, irrigation, and landscape installation. The project is
scheduled for completion this fall.
The packet item cover memo describes the irrigation improvements planned and the bids
received. This item is one of the major items left to complete this phase of the park
construction. Staff recommends approval of the bid to Choate Irrigation in the amount of
$38,776.
5. Agenda Item No. 6B. Award of bid to Sturdisteel Company for bleachers and approval of
Change Order #1 for additional bleachers. The packet item cover memo describes the
bids received. The bleachers are budgeted in the FY 2000-01 SPDC CIP for Bob Jones
Park soccer fields. Change Order #1 is to purchase additional bleachers for the soccer
SPDC Board of Directors
Board Meeting—Monday, July 23, 2001
■ Page 2
fields and for the Southlake Tennis Center, to take advantage of the vendor price offered.
Staff recommends approval of the award of bid and Change Order #1 to Sturdisteel
Company, for a total amount of$17,068.
6. Agenda Item No. 6C. Award of bid to R.J. Thomas Manufacturing Company for park
benches. This item is also related to item 6B and is part of the budget item for bleachers and
benches for Bob Jones Park soccer fields. Staff recommends award of the bid to R.J.
Thomas Manufacturing Company in the amount of$6,726.20.
7. Agenda Item No. 6D. Proposed 5-Year Capital Improvements Plan (CIP) priority rankings.
As part of the annual budget process, parks capital projects are reviewed and prioritized. A
five year Capital Improvements Plan (CIP) is developed, with the upcoming fiscal year
projects being considered and approved as the capital projects budget, and the remaining
years' projects being planned. This year, staff undertook a different process to review and
rank all capital projects prior to being presented to the various boards and City Council. This
process, briefly explained in the packet item cover memo, sought to approach the review and
prioritization with specific, objective criteria. The results of the staff ranking are included in
your packet. The projects were discussed with the Park Board at their July 9 meting and they
gave input as to ranking of the projects as well, which is also included in your packet.
We will discuss the projects in detail with you and get your direction as to priorities.
Before next month's meeting, staff will use the project priority ranking to develop a Fiscal
• Year 2001-02 Capital Projects Budget and 5-Year Capital Improvements Plan (CIP) based
on expected revenues and expenditures. The FY 2001-02 budget and 5-year CIP will be
brought before SPDC and City Council for consideration and adoption.
8. Agenda Item No. 7A. Programming and Design of Proposed Recreation Center. At your
last meeting, you directed staff to proceed with the grant application to Texas Parks and
Wildlife, and further directed staff to reduce the facility size and construction budget. We
have been unable to discuss this further direction with the architect since he is out of town
until next Monday. We will try our best to accomplish the Board's direction without
deleting any of the functional areas, by reducing the sizes of the areas and/or by alternative
designs. However, should we find that certain functional areas will become unusable due
to the size, we are uncomfortable in making the choices as to which programming
items/functional areas should be deleted without your input. Since the grant application
deadline is rapidly approaching, we would like your direction and thoughts as to what items
can be deleted if that becomes necessary. We are also hoping to have the architect at your
meeting to answer questions and provide input.
9. Agenda Item No. 7B. Board meeting dates and times. Since our recent meetings have
pushed the City Council work sessions, Board President Evans has suggested that perhaps
I the meetings need to be changed to another day. We have put this item on your agenda to
get input from the board. There are no packet materials associated with this item.
SPDC Board of Directors
Board Meeting—Monday, July 23, 2001
■ Page 3
10. Agenda Item No. 7C. Sales tax report. The monthly sales tax report is included in your
packet.
11. Agenda Item No. 7D. Project Status Report. The monthly status report is included in your
packet.
12. Also included in your packet is the Project Budget Status Sheets for FY 2000 and FY 2001,
showing each project approved budget, awarded budget, and expenditures to date.
We appreciate your commitment and service to the City. If you have any questions regarding
the agenda or materials, please feel free to contact me at 481-1527.
KH
STAFF CONTACT INFORMATION:
Sharen Elam, Director of Finance, 481-1713
Kevin Hugman, Director of Community Services, 481-1527
Steve Polasek, Deputy Director of Community Services, 481-1543
Ben Henry, Park Planning and Construction Superintendent, 481-1584
• Chris Carpenter, Senior Parks Planner, 481-1585
I
City of Southlake, Texas
MEMORANDUM
July 18, 2001
TO: Billy Campbell, City Manager
FROM: Kevin Hugman, Director of Community Services (xt. 1527)
SUBJECT: Award of bid to Choate Irrigation for irrigation improvements
at Chesapeake Park.
Action Requested: SPDC award of bid to Choate Irrigation in the amount of$38,776 for
irrigation improvements at Chesapeake Park.
Background
Information: Chesapeake Park is an 11-acre neighborhood park acquired through
park dedication and currently under construction. An SPDC Matching
Funds grant was approved in February of 2000 with Vista Oaks
Development for the construction of Chesapeake Park. Developer
costs for the matching funds grant, in addition to the park land
dedication, was $125,114 with the City match at $35,794. Due to the
lack of progress and quality of work provided, the City took the
project over in March of 2001. The developer paid to the City
$35,826, in addition to the $35,794 in unspent matching funds, to
cover the costs of final grading, irrigation, and landscape installation.
Project completion is scheduled for this fall.
The irrigation plan prepared by staff will serve the park as well as the
3-acre area obtained through a joint-use agreement with St. Martin-in-
the-Fields Episcopal Church for soccer and ballfield practice facilities.
The City received and opened three bids on July 17, 2001 in
accordance with State bidding procedures. The bids on the project
ranged from a high of$56,484 to a low of$38,776, with the low bid
being submitted by Choate Irrigation.
Choate Irrigation is the second largest irrigation firm in the country
and is currently installing the Vaquero Community and Golf Course
irrigation. Choate Irrigation is a certified installer for both Rainbird
and Maxicom. Projects are completed with Frisco ISD and several
general contractors for related work. Choate has a reputation for
professional and quality workmanship.
Financial
Considerations: Funding in the amount of $71,620 is currently available in the FY
1999-00 SPDC Community and Matching Funds account and through
the payment from the developer for the completion of Chesapeake
Billy Campbell, City Manager
P July 18, 2001
Page 2
Park. Irrigation costs were estimated at $40,000, leaving $31,620
unencumbered for final grading ($12,000), hydromulch ($15,000),
and contingency ($4,620).
Citizen Input/
Board Review: Not Applicable.
Legal Review: The City received and opened three bids on July 17, 2001 in
accordance with State bidding procedures.
Alternatives: Approve or reject bids as submitted.
Supporting
Documents: Bid tabulation.
Staff
Recommendation: SPDC award of bid to Choate Irrigation in the amount of$38,776 for
irrigation installation at Chesapeake Park.
p
6A- L
Billy Campbell, City Manager
July 18, 2001
Page 3
City of Southlake
COMMUNITY SERVICES DEPARTMENT
BID TABULATIONS
PROJECT NAME: Chesapeake Park Irrigation
PROJECT NO: 00302001 B DATE: July 18, 2001
WORKING DAYS: 30 Calendar Days EST.: $ 40,000
BIDDER BID BID AMOUNT
BOND
Choate Irrigation Yes S38,776
Carrollton, Texas 75011
Irricon Yes $39,814
Plano, Texas 75086
Sprinkle n Sprout Yes $56,484
Roanoke, Texas 76262
F
06-63-0003
City of Southlake, Texas
MEMORANDUM
July 18, 2001
TO: Billy Campbell, City Manager
FROM: Kevin Hugman, Director of Community Services (xt. 1527)
SUBJECT: Award of bid to Sturdisteel Company for bleachers and approval of
Change Order No. 1 for additional bleachers.
Action Requested: SPDC award of bid to Sturdisteel Company in the amount of$14,452
for the purchase and delivery of thirty-two bleachers for Bob Jones
Park soccer fields and approval of Change Order No. 1 in the amount
of$2,616 for six additional bleachers for a total amount not to exceed
$17,068.
Background
Information: The City received and opened seven bids on July 17, 2001 in
accordance with State bidding procedures. The bids on the project
were separated into two categories (bleachers and player benches)
with the City reserving the right to award the low bid in each
category. The bids for the aluminum bleachers ranged from a high of
_ $25,760 to a low of $14,452, with the low bid being submitted by
Sturdisteel Company.
As a result of the excellent pricing, a change order in the amount of
$2,616 for six additional bleachers to be used at the Tennis Center (4)
and Bob Jones Park (2) is also recommended.
Sturdisteel Company is located in Waco, Texas and has a good
reputation for quality bleachers. The City has previously purchased
bleachers from Sturdisteel.
Financial
Considerations: Funding in the amount of $35,000 is currently budgeted in the FY
2000-01 SPDC fund for the purchase of bleachers. The combined
low bids (bleachers and benches) and including the change order
request equal $23,794.20 leaving an unencumbered balance of
$11,205.80.
Citizen Input/
Board Review: SPDC approved funding for the bleachers at their September 25, 2000
meeting as part of the SPDC CIP approval process. Staff has met
with the Grapevine Southlake Soccer Association regarding the
number and type of bleachers and benches being provided.
/it? — /
Billy Campbell, City Manager
July 18, 2001
P Page 2
Legal Review: Process followed State bidding procedures.
Alternatives: . Approve or reject base bid for bleachers
• Approve or reject Change Order No. 1 for bleachers
Supporting
Documents: Bid Tabulation
Staff
Recommendation: SPDC award of bid to Sturdisteel Company in the amount of$14,452
for the purchase and delivery of thirty-two bleachers and approval of
Change Order No. 1 in the amount of $2,616 for an additional six
bleachers for a total amount of$17,068.
EN
�,3-Z
City of Southlake
COMMUNITY SERVICES DEPARTMENT
BID TABULATIONS
PROJECT NAME: Bob Jones Bleachers and Benches
PROJECT NO: N/A DATE: July 17, 2001
WORKING DAYS: 60 days ENGR. EST.: $ 35,000
BIDDER BLEACHERS BENCHES TOTAL BID AMOUNT
Sturdisteel Company $14,452 No Bid $14,452 (Bleachers only)
P.O. Box 2655, Waco TX 76702
R.J. Thomas Manufacturing Co., Inc. No Bid $6,726.20 $6,726.20 (Benches only)
Cherokee, IA
Modlin Recreation No Bid $7,264 $7,264 (Benches only)
P.O. Box 50048, Denton TX
Hunter Knepshield $16,800 $8,000 $24,800
P.O. Box 260677, Plano TX
Playwell Group $19,113 $6,400 $25,513 **
2750 Northaven Rd., Suite 103
Dallas, TX
Jim Lea and Associates $25,760 $6,784 $32,544
2109 Brandeis Drive, Richardson TX
Paul E. Allen Co., Inc. No Bid No Bid No Bid
P.O. Box 271003, Flower Mound TX
** Bid as all or none
06-63-0003
/ ,4. 2
City of Southlake, Texas
MEMORANDUM
111 July 18, 2001
TO: Billy Campbell, City Manager
FROM: Kevin Hugman, Director of Community Services (xt. 1527)
SUBJECT: Award of bid to R.J. Thomas Manufacturing Company for park
benches.
Action Requested: SPDC award of bid to R.J. Thomas Manufacturing Company in the
amount of $6,726.60 for the purchase and delivery of thirty-two
player benches for Bob Jones Park soccer fields.
Background
Information: The City received and opened seven bids on July 17, 2001 in
accordance with State bidding procedures. The bids on the project
were separated into two categories (bleachers and player benches)
with the City reserving the right to award the low bid in each
category. The bids for the aluminum player benches ranged from a
high of $8,000 to a low of $6,400, however, the low bidder on the
player benches bid the project as a total bid (benches and bleachers)
or nothing. As a result, R.J. Thomas Manufacturing Company out of
Cherokee, Iowa submitted the next lowest bid at $6,726.20.
R.J. Thomas Manufacturing has been designing and producing
commercial grade outdoor park equipment for over thirty-eight years.
Financial
Considerations: Funding in the amount of $35,000 is currently budgeted in the FY
2000-01 SPDC fund for the purchase of bleachers. During
discussions with the Grapevine Southlake Soccer Association, player
benches were also requested and were added to the bid should funds
be available. The combined low bids (benches and bleachers) and
including Change Order No. 1 for additional bleachers equals
$23,794.20, leaving an unencumbered balance of$11,205.80.
Citizen Input/
Board Review: SPDC approved funding for the bleachers at their September 25, 2000
meeting as part of the SPDC CIP approval process. Staff has met
with the Grapevine Southlake Soccer Association regarding the
number and type of bleachers and benches being provided.
Legal Review: Process followed State bidding procedures.
Alternatives: • Approve or reject base bid for player benches
Billy Campbell, City Manager
1' July 18, 2001
Page 2
Supporting
Documents: Bid Tabulation
Staff
Recommendation: SPDC approval of the purchase and delivery of thirty-two player
benches from R.J. Thomas Manufacturing Company in the amount of
$6,726.20.
— z
•
City of Southlake
COMMUNITY SERVICES DEPARTMENT
BID TABULATIONS
PROJECT NAME: Bob Jones Bleachers and Benches
PROJECT NO: N/A DATE: July 17, 2001
WORKING DAYS: 60 days ENGR. EST.: $ 35,000
BIDDER BLEACHERS BENCHES TOTAL BID AMOUNT
Sturdisteel Company $14,452 No Bid $14,452 (Bleachers only)
P.O. Box 2655, Waco TX 76702
R.J. Thomas Manufacturing Co., Inc. No Bid $6,726.20 $6,726.20 (Benches only)
Cherokee, IA
Modlin Recreation No Bid $7,264 $7,264 (Benches only)
P.O. Box 50048, Denton TX
Hunter Knepshield $16,800 $8,000 $24,800
P.O. Box 260677, Plano TX
Playwell Group $19,113 $6,400 $25,513 **
2750 Northaven Rd., Suite 103
Dallas, TX
Jim Lea and Associates $25,760 $6,784 $32,544
2109 Brandeis Drive, Richardson TX
Paul E. Allen Co., Inc. No Bid No Bid No Bid
P.O. Box 271003, Flower Mound TX
•
** Bid as all or none
06-63-0003
City of Southlake, Texas
MEMORANDUM
July 20, 2001
TO: SPDC Board of Directors
FROM: Kevin Hugman. Director of Community Services (x1527)
SUBJECT: Proposed 5-Year Capital Improvement Plan (CIP) Priority Rankings
Action Requested: SPDC consideration and recommendation of the proposed 5-Year Capital
Improvement Plan (CIP) Priority Rankings.
Background
Information: Annually, prior to the adoption of the city's overall budget in September for
the fiscal year beginning October 1, all capital improvements related to the
installation of city infrastructure and facilities are reviewed as part of the
Capital Improvement Plan (CIP). The 5-year CIP that is developed contains
the funding sources for the four out-years as well as a breakdown of projects
in the current-year CIP (projects funded in the upcoming fiscal year).
As you know, the SPDC CIP has traditionally been reviewed and adopted by
the SPDC and City Council with Park Board recommendations. This year,
the budget review process has been modified somewhat to include a staff
CIP Technical Committee to preliminarily combine all of the projects in all
of the funding sources (SPDC, Utility Fund, Crime Control District, TIF
District, General Fund, etc.). A ranking and scoring system was then used
to evaluate them based on categories relating to health, safety, welfare,
economy of scale, combination with other projects. revenue generation,
maintenance requirements, etc. The result of the exercise is hoped to give
the various boards and officials a preliminary, and hopefully mostly
objective, ranking of projects in each funding source as a starting point for
the budget review period.
Attached to this memo are the preliminary priority rankings of projects for
SPDC (parks) funding using this system. The projects are ranked in columns
by both the staff CIP Technical Committee and the Park Board (7/9/01).
The Park Board scored each project on a scale of 1 to 3, with 3 being high
priority and 1 being low. The scores were compiled for a total overall
ranking. The parks projects themselves were generated from the adopted
SPDC CIP and the Park Board's suggestions for new projects given to staff
at the February 2001 Park Board Retreat.
Financial
Considerations: The CIP projects will ultimately be ranked by priority and included in the
current-year (FY 01-02) CIP. Those not funded in the current year will be
Kevin Hugman, Director of Parks and Recreation
July 20, 2001
Page 2
ranked and placed in the next available fiscal year by priority for the
remaining four years, with consideration of available funding by project
year.
Citizen Input/
Board Review:
• Park Board, SPDC and City Council approved the current three-year
CIP in 2000 (all three years' projects approved are also included in this
preliminary ranking).
• The Park Board suggested priority ranking of new projects (all of which
are included in the CIP Technical Committee listing attached) at the
February 2001 Park Board Retreat.
• The CIP Technical Committee preliminarily ranked the projects.
• The Park Board also ranked the same projects (7/9/01).
Legal Review: Not Applicable.
Alternatives: Input toward the prioritization as desired.
Supporting
Documents: Supporting documents include the following:
• Table 1 - Priority Rankings of SPDC-Funded Projects by the CIP
Technical Committee and the Park Board
• Project Request Forms/Background Information Sheets
• An example scoring sheet from the CIP Review Team process
Staff
Recommendation: SPDC discussion and recommendation of the proposed 5-Year Capital
Improvement Plan (CIP) Priority Rankings.
Kevin Human, Director of Parks and Recreation
July 20, 2001
Page 3
L
Table 1 - Priority Rankings of SPDC-Funded Projects by by the
CIP Technical Committee and the Park Board
Project Description Park CIP
SPDC Board Committee
7/9/01
Girls Softball Complex T1 T4
Noble Oaks Park Development T1 T7
Koalaty Park Development T2 T7
Royal & Annie Smith Park Development T2 T4
Bob Jones Park Development 3 1
Recreation Center T4 3
Recreation Center Site Development T4 5
Bicentennial Landscaping Improvements 5 ! T13
In-Line Hockey Rink T6 i T14
Ongoing Trail Implementation T6 2
Bicentennial Baseball Field Realignment T7 9
11. Parks Maintenance Facility T7 T7
Lacrosse Facility T8 T14
Lonesome Dove Playground Replacement i T8 12
Sand Volleyball Court T8 T11
Timarron/Richards Pond Enhancement 9 T8
Nature Center Improvements T10 1 10
New Community Park T10 j T11
Farhat Property Improvements 11 15
BMX Facility T12 17
Community Building Removal T12 T11
Entry Portals T12 T4
[Family Leisure Aquatics Center T12 T8
Sheltonwood Park Development T12 6
Equestrian Facility T13 T13 I
Skate Park T13 16
In-Line Hockey Rink Covering 14 19
Working Farm [ 15 18
PROJECT REQUEST FORM—Girls' Softball Complex
Project Contact: Kevin Hugman x1527 New Request? N Mandated Project? N
Department: Community Services Continuation? Y Documented Project/Need?
Project Dates: 7/2001 — 12/2002 Replacement/ N Other Cntty. Need/Service? Y
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Purchase of existing facilities and reconstruction of new -Park Master Plan not implemented as adopted.
girls'softball complex, to include four game fields,
restroom/concession,fencing, lighting, bleachers,
parking, etc.
Annual Impact of the Operating Budget
Location: (Provide$impact and explanation):
-S. Kimball Ave. - (Need help here)
Will this project generate revenue?
Project Justification: - Yes. The facility is will generate concession
- The city currently has two softball fields dedicated for money which will provide support to the softball
girls'softball use. A third field is shared with the adult league;not significant revenue to the city
softball program. A fourplex of game fields has been
planned(Park Master Plan).
Companion Project? Y/N-No
If yes,please explain:
PRIOR FY01!02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
11111 FUNDING TOTA
EXPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition $ -
3. Site Irrprwerrent and Utility $ -
4. Construction $ 1,100,000 $ 1,100,000
5. Furniture and Equprrent $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 1,10 ,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 1,100,000 $ 1,100,000
6. Crime Tax Funds $
TOTAL= $ 1.1C0,000
FY 2001/02-FY 2005/06 Capital Improvements Program
•
PROJECT REQUEST FORM —Noble Oaks Park Development
Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project? N
Department: Community Services Continuation? ,\` Documented Project/Need?
Project Dates: 7/2005— 7/2006 Replacement/ N Other Cmty. Need/Service? Y
Major Rehab?
Project Description: Alternatives Impact if not completed:
- Construction of minor improvements (trails,picnic -Park Master Plan not implemented as
shelters,parking, irrigation. etc.) to Noble Oaks Park approved
Annual Impact of the Operating Budget
Location: (Provide$impact and explanation):
- The northwest corner of Continental Blvd. and South -Incidental to citv's current park maintenance
Carroll Ave.
Project Justification: Will this project generate revenue?
- The Park Master Plan. notes minor improvements to -No
Noble Oaks Park.
Companion Project? Y/.N-No
If yes,please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOT
IlltPENDITURE SCHEDULE
1. Planning and Design $ 20,000 $ 20,000
2. Land Acquisition $ -
3. Site Improvement and Utility $ 80,000 $ 80,000
4. Construction $ 200,000 $ 200,000
5. Furniture and Equipment $ 30,000 $ 30,000
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 330,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 330,000 $ 330,000
6. Crime Tax Funds $ -
TOTAL= $ 330,000
FY 2001/02-FY 2005/06 Capital Improvements Program
•
PROJECT REQUEST FORM — Koalaty Park Development
Project Contact: Kevin Hugman x1527 New Request? N Mandated Project? N
iDepartment: Community Services Continuation? Y Documented Project/Need?
Project Dates: 7/2004—5/2005 Replacement/ N Other Only. Need/Service? Y
Major Rehab?
Project Description: Alternatives/Impact if not completed:
-Development enhancements to current baseball practice -Park Master Plan not implemented as
fields, etc.. located in Koalaty Park, to include trails,field approved.
enhancement,park signs, tables benches, irrigation. etc.
Annual Impact of the Operating Budget
Location: (Provide$impact and explanation):
- West Continental Blvd., in Koala°•Park. -Incidental to park maintenance
Project Justification: Will this project generate revenue?
-Neighborhood Park development is priority of the Park -No
Master Plan. The minor improvements noted would
complete this park construction.
Companion Project? Y/N-No
If yes,please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
14 .PENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition $ -
3. Site Improvement and Utility $ -
4. Construction $100,000 $ 100,000
5. Furniture and Equipment $ 15,000 $ 15,000
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 115,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fccc S -
3. TIF S -
4. Utility Fund $ -
5. SPDC Funds $115,000 $ 115,000
6. Crime Tax Funds $ -
TOTAL= $ 115,000
•
FY 2001/02-
FY 2005/06 Capital Improvements Program
•
•
PROJECT REQUEST FORM —Royal and Annie Smith Park Improvements
Project Contact: Kevin Hugman x1527 New Request? N Mandated Project:' N
Department: Community Services Continuation? Y Documented Project/Need?
Project Dates: 7/2002— 7/2003 Replacement/ :V Other Cnrty. Need/Service? F
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of park-related amenities such as trails, -Park Master Plan not implemented as
tennis courts, practice fields. gardens. etc., for currently approved.
undeveloped 13.2-acre Royal and Annie Smith Park.
Annual Impact of the Operating Budget
Location: (Provide$impact and explanation):
-Johnson Road. - I FTE maintenance = S27,000, utilities =
$20,000
Project Justification: Will this project generate revenue?
- The Park Master Plan identifies several park -No.
improvements such as trails, tennis courts,practice fields,
gardens, etc., in this park.
Companion Project? V/V-No
If yes,please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRANL
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design $ 50,000 $ 50,000
2. Land Acquisition $ -
3. Site Improvement and Utility $ 100,000 $ 100,000
4. Construction $ 300,000 $ 300,000
5. Furniture and Equipment $ 50,000 $ 50,000
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 500,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 50,000 $ 450,000 $ 500,000
6. Gime Tax Funds $ -
TOTAL= $ 500,000
FY 2001/02-FY 2005/06 Capital Improvements Program
loD - to
PROJECT REQUEST FORM —Bob Jones Development
Project Contact: Kevin Hugman x1527 New Request? N Mandated Project?
Department: Community Services Continuation? Y Documented Project/Need?
Project Dates: 10/2001 — 7/2002 Replacement/ N Other Cntty. Need/Service? I
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Continuing improvements in Phase II of Bob Jones Park -Important elements of Bob Jones Park
development, includes restroom building, water well and development would not be completed as
aeration for the ponds, road improvements, etc. originally presented to the public.
Location: Annual Impact of the Operating Budget
- Bob Jones Park. (Provide S impact and explanation):
-Incidental to current park operations.
Project Justification:
-Several items intended to be included in Bob Jones Will this project generate revenue?
Phase II development were omitted due to budget No.
overruns. These items were moved out to future year
construction and include irrigation system expansion,
additional trails, and loop road expansion.
Companion Project? Y/N—No.
Ifyes,please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAI"[
FUNDING TOTA
EXPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition $ -
3. Site Improvement and Utility $ -
4. Construction $ 2,979,041 $ 200,000 $ 350,000 $ 3,529,04"
5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 3,529,04'
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 2,979,041 $ 200,000 $ 350,000 $ 3,529,04-
6. Crime Tax Funds $ -
TOTAL= $ 3,529,04'
FY 2001/02-FY 2005/06 Capital Improvements Program
•
•
PROJECT REQUEST FORM - Recreation Center
Project Contact: Kevin Hugman x1527 New Request? N Mandated Project? N
aY Department: Conmunitp Services Continuation? Documented Project/Need?
Project Dates: 7/2002—12/2003 Replacement/ N Other Cmty. Need/Service? Y
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of new Recreation Center. including - Critical recreational needs not adequately met
indoor gymnasium.fitness center, activity rooms, indoor through city programming
track. dance/exercise room, etc.
Location: Annual Impact of the Operating Budget
- On city property at Byron Nelson and FM 1709. (Provide S impact and explanation):
- To be determined through Enterprise Plan
Project Justification: prepared by consultant as part of design fee.
- The city currently has no recreation center to meet the
needs for fitness, dance activities, multi-use sport courts,
etc. The need for a recreation center is identified in the Will this project generate revenue?
Park Master Plan. - Yes. The facility is expected to recapture
anywhere from 50 to 100 percent of operating
Companion Project? Y/V- Yes costs, depending on the fee policy adopted.
If yes,please explain:
- Water, sewer, drainage, and roadway improvements in
the area will need to be addressed. Roadwork needed to
eliminate Sr. Center access from Park-wood
N PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GP"''D
FUNDING T. _
EXPENDITURE SCHEDULE
1. Planning and Design $410,000 $ 410.000
2. Land Acquisition $ -
3. Site Improvement and Utility $ -
4. Construction' $ 700,000 $ 3,200,000 $ 3,900,000
5. Furniture and Equipment $ 200,000 $ 200,000
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 4,510,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fc $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $410,000 $ 700,000 $ 3,400,000 $ 4,510,000
6. Crime Tax Funds $ -
TOTAL= $ 4,510,000
TPWD grant in the amount of$750,000,if awarded, may offset this cost
Council revised total construction amount to$4.1 million;design costs based on this revised budget
S
FY 2001/02-FY 2005/06 Capital Improvements Program
L c —9Z.
PROJECT REQUEST FORM — Recreation Center Site Development (Unfunded Portion)
Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project? N 1
Department: Community Services Continuation? N Documented Project/Need?
Project Dates: 7/2002—2/2003 Replacement/ N Other Curty. Need/Service? }
_ Major Rehab?
I
Project Description: Alternatives/Impact if not completed:
- Utilities. drainage,parking improvements(Senior -Recreation Center construction would not
Center) drive improvements (north property line) and comply with conceptual plan approved.
road improvements(closing of Parks+good to Senior
Center). etc.. related to Recreation Center construction.
Trails. a pavilion, landscaping, etc. added as amenities.
Annual Impact of the Operating Budget
Location: (Provide S impact and explanation):
- On city property at Byron Nelson and FM 1709. -Incidental to site maintenance
Project Justification: Will this project generate revenue?
-Prior to or concurrent with the Recreation Center -No
construction, the above-mentioned improvements must be
made to promote access as presented during the site
selection public meetings. These items were not included
in the Recreation Center funding because they were
unknowns at the time.
Companion Project? Y/.V- Yes
If yes,please explain:
-Recreation Center construction
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition $ -
3. Site Improvement and Utility $ 400,000 $ 400,000
4. Construction $5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= S 400,000
FUNDING SCHEDULE
1. General Fund $ 400,000 $ 400,000
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds •
Crime Tax Funds $
TOTAL= $ 400,(
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM— Bicentennial Park Landscape Improvements
111 Project Contact: Kevin Hugman x1527 New Request? N Mandated Project? .N
Department: . Community Services Continuation? N Documented Project/Need?
Project Dates: 7/2003—12/2003 Replacement/ Y Other Cmty. Need/Service? Y
Major Rehab?
Project Description: Alternatives/Impact if not completed:
-Landscaping, turf improvements. irrigation. etc..for -Status quo maintained:park softscape remains
areas between baseball fields, entrance features. unimproved
improved open space near Shady Oaks
Annual Impact of the Operating Budget
Location: (Provide$impact and explanation):
-Bicentennial Park -0.5 FTE maintenance=$15,000
Project Justification: Will this project generate revenue?
-Bicentennial Park, as the city's most visible recreational -No.
area, is in need of beautification of the natural elements
in the park. The landscaping, turf and irrigation in the
park need substantial improvement.
Companion Project? Y/N- Yes
If yes,please explain:
-Can be combined with Baseball Field
Construction/Realignment and/or Community Buildings
Removal
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
EXPENDITURE SCHEDULE
I. Planning and Design $
2. Land Acquisition $ -
3. Site Improvement and Utility $100,000 $ 1C0.000
4. Construction $ -
5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 100,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $5. SPDC Funds $100,000 $ 100,000
6. Crime Tax Funds $ -
TOTAL= $ 100,000
FY2001/02-FY2005/06 Capital Improvements Program
low— `o
PROJECT REQUEST FORM — In-Line Hockey Rink #2
Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project? N
Department: Community Services Continuation? N Documented Project/Need?
Project Dates: 7/2003—5/2004 Replacement/ N Other Cmty. Need/Service? Y
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of second in-line hockey rink to -In-line hockey needs of Southlake residents
accommodate growth in local hockey league dependent on Keller facility.
Location: Annual Impact of the Operating Budget
-Bicentennial Park, adjacent to existing rink. (Provide$impact and explanation):
- Incremental additions to maintenance, utilities.
etc.
Project Justification:
- The growth of the in-line hockey participation by city
residents has been substantial. The Park Master Plan Will this project generate revenue?
currently shows a planned second rink. Southlake - No
currently relies on a second facility in Keller to
accommodate needs of the combined leagues. A second
in-line rink would alleviate that dependence on the Keller
facility.
Companion Project? Y/N-No
If yes,please explain:
PRIOR FY01'02 FY02/03 FY03/04 FY04'05 FY05/06 GRA
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design S 20,000 $ 20,000
2. Land Acquisition $ -
3. Site In xovement and Utility $ 100,000 $ 100,000
4. Construction $ 600,000 $ 600,E
5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 720,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 720,000 $ 720,000
6. Crime Tax Funds $ -
TOTAL= $ 720,000
I
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM — Trail Plan Implementation
• Project Contact: Kevin Nuptial!x1527 New Request? 1' Mandated Project?
Department: Community Services Continuation? N Documented Project/Need?
• Project Dates: Ongoing Replacement/ N Other Cmty. Need/Service? Y
Major Rehab?
Project Description: ..11ternatives/Impact if not completed:
- Trail system implementation in key, high-use areas to - Trail Master Plan not implemented as
compliment existing trails, make critical connections, or approved.
construction as part of other capital projects. On-going
funding allocated every year.
Annual Impact of the Operating Budget
(Provide S impact and explanation):
Location: .. -Incidental to existing maintenance
- Varies by selected project(s)
Will this project generate revenue?
Project Justification: - :No
- Trail Plan implementation is consistently ranked by the
Park Board and Southlake citizens as one of the highest
priorities. The recently adopted Trail Master Plan
suggests key near-term trails and implementation plans.
Companion Project? YN-No
If yes,please explain:
PRIOR FY01'02 FY02/03 FY03/04 FY04,05 FY05/06 GRV''
_ FUNDING TC
EXPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition $ -
3. Site Irrproverrent and Utility $ -
4. Construction $150,000 $150,000 $150,000 $ 450.000
5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 450,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $150,000 $150,000 $150,000 $ 450.000
6. Crime Tax Funds $ -
TOTAL= $ 450.000
•
FY 2001/02-FY 2005/06 Capital Improvements Program
•
PROJECT REQUEST FORM — Baseball Field Construction/Realignment
Project Contact: Kevin Hugntan x152 7 New Request? N Mandated Project? .N"
Department: Community Services Continuation? Y Documented Project/Need?
Project Dates: 7/2003— 12/2003 Replacement/ N Other Citify. Need/Service? F
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of one new youth baseball field, -Park Master Plan not implemented as
realignment of existing softball field and reconfiguration approved.
of nvo existing softball field for youth baseball play.
Includes additional parking in eastern lot of the park..
Annual Impact of the Operating Budget
Location: (Provide S impact and explanation):
- Bicentennial Park. -Incidental to current park maintenance
Project Justification: Will this project generate revenue?
- The Park Master Plan .identifies a new baseball field -No
and realigned softball fields adjacent to the existing
community buildings.
Companion Project? fi:V-- Yes
If yes,please explain:
- Coincides with removal of existing community buildings
_ PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FYO5/06 GRA,
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design $ '
2. Land Acquisition $
3. Site Improvement and Utility $ -
4. Construction $ 350,000 $ 350,000
5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 350,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 350,000 $ 350,000
6. Crime Tax Funds $ -
TOTAL= $ 350,000
FY 2001/02-FY 2005/06 Capital Improvements Program
LaD- `3
PROJECT REQUEST FORM— Parks Maintenance Facility
111 Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project?
Department: Community Services Continuation? N Documented Project/Need?
Project Dates: :/2002— 6/2003 Replacement/ N Other Cinry. Need/Service? Y
Major Rehab?
Project Description: Alternatives/Lnpact if not completed:
- Construction of new parks maintenance building on city- -anticipated parks maintenance staff will not
owned property, to include additional work areas, have the proper work environment to function
storage. equipment yard space, office space. screening, efficiently.
etc.
Location: Annual Impact of the Operating Budget
- yet to be determined;possibly on city property on south (Provide S impact and explanation):
side of east Continental. -Incidental to park maintenance
Project Justification: Will this project generate revenue?
- The maintenance facility in Bicentennial Park is - �o
seriously undersi:ed for an ever-increasing maintenance
staff and equipment. Plans for such a facility, be it
expansion or a new location, have been in the works.for
years.
Companion Project? -
If yes,please explain:
PRIOR FY01/02 FY02/03 FY03t04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
EXPENDITURE SO-EELLE
1. Planning and Design $ 60.000 $ 60,000
2 Lard AcgUsition $ -
3. Site Irrprcvement and Utility $ -
4. Construction $ 600,000 $ 600,030
5. Furniture and E'iprrent $ 150,000 $ 150,000
6. Other(Reese explain on attached sheet) $ -
TOTAL= $ 810,000
FUZING Sa-EDU E
1. General Find $ -
2 Irrpact Fees $ -
3. TIF $ -
4. Utility Find $ -
5. SPDC Fuds $ 810,000 $ 810,000
6. Crime Tax Funds $ -
TOTAL= $ 810,000
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM — Lacrosse Facility: Lighting of CIS Field
Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project? N
Department: Community Services Continuation? N Documented Project/Need?
Project Dates: :/2002— 9/2002 Replacement/ N Other Cntty. Need/Service? Y
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Lighting the existing Joint Use field at Carroll -Park Master Plan not implemented as
Intermediate School to provide a practice and game approved.
faciiin for the growing lacrosse participation in
South lake(over 100 participants).
Annual Impact of the Operating Budget
(Provide$impact and explanation):
Location: -Incidental to existing maintenance
- Carroll Intermediate School, North Carroll Avenue
Will this project generate revenue?
Project Justification: -No
- The growing Lacrosse Association has asked the Park
Board.for assistance in lighting this field. Lacrosse yields
are identified as a need in the Park Master Plan.
Companion Project? WA'-No
If yes.please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTS
_ CPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition $ -
3. Site Irrprovement and Utility $ -
4. Construction $150,000 $ 150,C0
5. Furniture and Equipment $
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 150,CC0
FUNDING SCHEDULE
1. General Fund S -
2. Irrpact Fees $ -
3. TIF $
4. Utility Fund $ -
5. SPDC Funds $150,000 $ 150,CCC
6. Crime Tax Funds $ -
TOTAL= $ 150.CCO
I
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM — Lonesome Dove Park Playground Replacement
Project Contact: Kevin Hugman x1527 New Request? N Mandated Project? .`
Department: Community Services Continuation? Y Documented Project/Need?
Project Dates: 7/2003-12/2003 Replacement Y Other Cmty. Need/Service? F
Major Rehab?
Project Description: Alternatives/Impact if not completed:
-Replacement of existing, aging playground equipment in -Status quo maintained with aging playground
ciry-owned Lonesome Dove Park equipment.
Location: Annual Impact of the Operating Budget
-Lonesome Dove Park, Lonesome Dove Subdivision (Provide S impact and explanation):
-Incidental to park maintenance
•
Project Justification:
-Lonesome Dove Park has aging and undersized Will this project generate revenue?
playground equipment supplied by the developer. -No
Playground equipment in this park should be upgraded
and expanded to complete the park construction.
Companion Project? Y/N-No
If yes,please explain:
PRIOR FY01/02 FY02'03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
XPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition $ -
3. Site Improvement and Utility $ -
4. Construction $ -
5. Furniture and Equipment $ 80,000 $ 80,C00
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 80,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 80,000 $ 80,CCO
6. Crime Tax Funds $ -
TOTAL:: $ 80,000
I
FY 2001/02-FY 2005/06 Capital Improvements Program
•
PROJECT REQUEST FORM - Sand Volleyball Courts
Project Contact: Kevin Hugman x1527 New Request? N Mandated Project? N
Department: Community Services Continuation? Y Documented Project/Need?
Project Dates: 12/2001 —5/2002 Replacement/ Y Other Citify. Need/Service? F
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of two new lighted sand volleyball courts -Park Master Plan not implemented as
approved
Location:
- Bicentennial Park.
Annual Impact of the Operating Budget
(Provide S impact and explanation):
Project Justification: -Incidental to current park maintenance
- The Park Master Plan identifies two new sand volleyball
courts in the central area of the park to provide a more
diverse user experience in the park.They replace old sand Will this project generate revenue?
volleyball court previously located behind the expanded -No.
Toni Thumb.
Companion Project? }%V-No
If yes,please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRt
FUNDING TO , _
EXPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition S -
3. Site Improvement and Utility $
4. Construction $ 30,000 $ 30,000
5. Furniture and Equipment $
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 30,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees S -
3. TIF S -
4. Utility Fund $ -
5. SPDC Funds $ 30,000 S 30,000
6. Crime Tax Funds $ -
TOTAL= $ 30,000
r
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM —Timarron-Richards Pond Enhancement
111 Project Contact: Kevin Hugman x1527 .Vew Request? Y Mandated Project? N
Department: Conununity Services Continuation? N Documented Project/Need?
Project Dates: 7/2002— 12/2002 Replacement/ N Other Cmty. Need/Service? I
Major Rehab?
Project Description: Alternatives/Impact if not completed:
-Dredging, clearing, berming, landscaping,fountain with - Fill in the pond; Recreation Center
aeration, electrical, etc., for the historic pond on the site construction would not comply with
of the future Recreation Center to make it a viable conceptual plan approved.
anzenit•.
Location: Annual Impact of the Operating Budget
- On city property at Byron :Nelson and FM 1709. (Provide S impact and explanation):
-Incidental to site maintenance
Project Justification:
- To enhance the natural aspect of the Recreation Center Will this project generate revenue?
site and to use it in a drainage capacity, the existing pond -.No
must be modified.
Companion Project? WY- Yes
If yes.please explain:
-Recreation Center construction
PRIOR FY01;02 FY02/03 FY03/04 FY04/05 FY05/06 GRA'
FUNDING TO.
EXPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition S -
3. Site Irrprovement and Utility $ 300,000 S 300.0CC
4. Construction S -
5. Furniture and Equipment $
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 300,000
FUNDING SCHEDULE
1. General Fund $ 300,000 S 300.CCC
2. Impact Fees S -
3. TIF $ -
4. Utility Fund S -
5. SPDC Funds S -
6. Crime Tax Funds S -
TOTAL= $ 300,000
I
FY 2001/02-FY 2005/06 Capital Improvements Program
•
PROJECT REQUEST FORM —Nature Center Improvements
Project Contact: Kevin Hugman x1527 New Request? N Mandated Project? N
Department: Community Services Continuation? Y Documented Project/Need?
Project Dates: 7/2002— 7/2003 Replacement/ N Other Cmty. Need/Set-vice? Y
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Reconstruction of Nature Center at Bob Jones Park. -Park Master Plan not implemented as
including septic, landscaping, and renovation. approved.
Location: Annual Impact of the Operating Budget
-Bob Jones Park (Provide S impact and explanation:
- Staffing of Nature Center (FT) = S35,000.
maintenance = S4000, utilities = S2500
Project Justification:
- The Park Master Plan identifies a Nature Center on
Corps property in Bob Jones Park.. Will this project generate revenue?
-No.
Companion Project? Y/\'-
If yes,please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TO
EXPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition $ -
3. Site Irrprovement and Utility $ -
4. Construction $ 105,000 $ 105,000
5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $
TOTAL= $ 105.000
FUNDING SCHEDULE
1. General Fund $ -
2. I n'pad Fees $ -
3. TIF $
4. Utility Fund $ -
5. SPDC Funds $ 105,000 $ 105.E
6. Crime Tax Funds $ -
TOTAL= $ 105,000
r
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM —New Community Park
Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project? .V
" Department: Community Services Continuation? N Documented Project/Need?
Project Dates: 7/2002— 12/2003 Replacement/ N Other Cmty. Need/Service? F
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of new Community Park to house major - Critical recreational needs not adequately met
lighted game and practice fields for baseball, softball, through city programming
soccer. etc..
Location: Annual Impact of the Operating Budget
- Yet to be determined. (Provide S impact and explanation):
- Depends greatly on size and content. Minimum
2 FTE maintenance staff= $60,000, equipment
Project Justification: = S20,000, utilities = S20,000
- The Park Master Plan identifies a tremendous need for
lighted sports facilities in Southlake. A new Community Will this project generate revenue?
Park would be ideal to house a large number of the fields - Yes. The facility could generate revenue
and minimize the need to decentralize lighted through rental to the public,fees from the sports
facilities.The Park Master Plan also identifies the acreage associations, and other means.
needed and potential areas for such a facility.
Companion Project? }';V-No
If yes,please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04105 FY05/06 GRAND
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design $ 500,000 $ 500,000
2. Land Acquisition $ 3,000,000 $ 3,000,000
3. Site Improvement and Utility $ 2,000,000 $ 2,000,000
4. Construction $ 3,500,000 $ 3,500,000
5. Furniture and Equipment $ 50,000 $ 50,000
6. Other(Please explain on attached sheet)-Landscaping, irrigation $ 250,000 $ 250,CC0
TOTAL= $ 9,300,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 8,800,000 $ 8,800,000
6. Gime Tax Funds $ -
TOTAL= $ 8.800,0'
FY 2001/02-FY 2005/06 Capital Improvements Program
•
PROJECT REQUEST FORM —Farhat Property Improvements
i Project Contact: Kevin Hugman x1527 New Request? N Mandated Project? N
Department: Community Services Continuation? Y Documented ProjectKVeed? -
Project Dates: 7/2005—5/2006 Replacement/ N Other Crnty. Need/Sen•ice? F
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of road entrance,parking spaces.pavilion, - Park Master Plan not implemented as
fishing pier. and other minor improvements to the city- approved.
owned Farhat Property.
Location: Annual Impact of the Operating Budget
-Far end of East Bob Jones Road. (Provide S impact and explanation):
- 0.5 FTE maintenance = 515.000
Project Justification:
- The Park Master Plan identifies minor road,parking Will this project generate revenue?
and other improi ements to the city-owned property - No
known as the Farhat Property.
Companion Project? Y/.`'-No
If yes,please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAY
_ FUNDING TOTS
EXPENDITURE SCHEDULE
1. Planning and Design $ 10,000 $ 10,000
2. Land Acquisition $ -
3. Site Irrprovement and Utility $ 70.000 $ 70,000
4. Construction $ 150,000 $ 150,000
5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 230,000
FUNDING SCHEDULE
1. General Fund $ -
2. Irrpact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 230,000 $ 230,000
6. Crime Tax Funds $ -
TOTAL= $ 230,000
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM—BMX Facility
Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project? N (�
Department: Community Services Continuation? N Documented Project/Need?
Project Dates: 7/2005—12/2005 Replacement/ N Other Cmty. Need/Service? Y
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of BMX(motocross)bicycle racing and -Diverse form of recreation identified in Park
stunt track closed circuit course. Master Plan not implemented
Location:
- Yet to be determined. Could be placed within existing Annual Impact of the Operating Budget
park or installed on new, separate location (Provide$impact and explanation):
- 0.5 FTE maintenance = SIS,000
Project Justification:
- The Park Master Plan identifies certain diverse forms of Will this project generate revenue?
recreation as opportunities for funding. These types of -No
facilities are on that list.
Companion Project? Y/N—Possible with other park
construction.
If yes,please explain:
PRIOR FY01/02 FY02'03 FY03/04 FY04,"05 FY05/06 GRAND
FUNDING TOTAL
XPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition $ -
3. Site Improvement and Utility $90,000 $ 90,000
4. Construction $ -
5. Furniture and Equipment $
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 90,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $90,E $ 90,E
6. Crime Tax Funds $ -
TOTAL= $ ,000
p
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM — Community Building Removal
Project Contact: Kevin Hugman x1527 New Request? N Mandated Project? N
Department: Community Services Continuation? Y Documented Project/Need?
Project Dates: 7/2002— 9/2002 Replacement/ Ar Other Cmty. Need/Service? Y
Major Rehab?
Project Description: .-llternatives/Impact if nor completed:
- Removal of existing community buildings in -Park Master Plan not implemented as
Bicentennial Park upon completion of the new Recreation approved.
Center.
Location: Annual Impact of the Operating Budget
-Bicentennial Park. (Provide S impact and explanation):
- Incidental to current park operations.
Project Justification:
- The Park Master Plan shows the removal of the existing Will this project generate revenue?
community buildings in Bicentennial Park when a new -Possibly from the sale of the buildings. if so
Recreation Center is complete. In their places will be desired.
construction and realignment of baseball fields. The new
Community Center will leave these buildings obsolete, as
they are currently in deteriorating condition and in need
of complete renovation
Companion Project? YIN- Yes
If yes,please explain:
-Possibly Baseball Field Construction and/or
Bicentennial Landscape Improvements
so
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design $
2. Land Acquisition $ -
3. Site Inprovement and Utility $50,000 $ 50,000
4. Construction $ -
5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 50,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $
3. TIF $ -
4. Utility Fund $
5. SPDC Funds $50,E $ 50,000
I 6. Gime Tax Funds $ -
TOTAL= $ 50,C
FY 2001/02-FY 2005/06 Capital Improvements Program
•
PROJECT REQUEST FORM —City Portal Implementation
Project Contact: Kevin Hugman x152.' New Request? .V Mandated Project? .N"
Department: Community Services Continuation? F Documented Project/Veed?
Project Dates: Ongoing Replacement/ .V Other Cmty. Need/Service? F
Major Rehab?
Project Description: .4lternatives/Impact if not completed:
- Construction of city portals, or entry features, on city- - Urban design elements from 1995 Corridor
owned property at entrances to the city. Study not implemented
Annual Impact of the Operating Budget
Location: (Provide S impact and explanation):
- Varies. City entrance points identified in 1995 Corridor - 0.5 FTE maintenance = S15,000, utilities =
Study. S30,000
Project Justification: Will this project generate revenue?
-Since the adoption of the Corridor Study in 1995, the -No.
city has identified entry areas on city property to be
improved to promote a sense of place upon arriving in
Southlake. There have been numerous public meetings to
discuss varying concepts.
Companion Project? Y/.1--No
If yes,please explain:
t!
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design $ 50,000 S 50,000
2. Land Acquisition $ -
3. Site Improvement and Utility $ 70,000 $ 70,000
4. Construction $ 600,000 $ 600,000
5. Furniture and Equiprrent $ -
6. Other(Please explain on attached sheet) S -
TOTAL= $ 720,003
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fccs $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds -$ 720,000 $ 720,000
I 6. Crirre Tax Funds $ -
TOTAL= $ 720,0Cc
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM—Family Leisure Aquatics Center
Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project?
Department: Community Services Continuation? N Documented Project/Need?
Project Dates: 72005-4'2006 Replacement/ N Other Cnzty. Need/Service? 1'
Major Rehab?
Project Description: Alternatives/Intpact if not completed:
- Construction of aquatics facilities, such a:ero-depth- -Non-traditional recreational opportunity not
entry pools, ornamental spray fixtures,pools, slides, bath funded.
house, concession/rental building, trained lifeguards, etc.,
designed for toddlers and young children under adult
supervision. Annual Impact of the Operating Budget
(Provide S impact and explanation):
- Large annual maintenance costs (usually offset
Location: by user fees), including utilities = S80,000, staff
- Yet to be determined. Could be constructed in existing = $120,000, equipment = S80,000, chemicals =
park or on new park grounds. S70,000
Project Justification: Will this project generate revenue?
- These facilities are gaining widespread popularity. - Yes. User fees for these facilities are common.
Citi:en input has suggested the need for such a facility. 100%recapture is also not uncommon. Also,
The Park Master Plan currently identifies this item as a public/private ventures possible.
funding opportunity.
Companion Project? Y/'—Possible to combine with
other park construction.
If yes.please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design S 10,000 $ 10,000
2. Land Acquisition $ -
3. Site Improvement and Utility $ 200,000 $ 200,000
4. Construction $ 3,500,000 $ 3,500,000
5. Furniture and Equipment $ 100,000 $ 100,000
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 3,810,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fe $ -
3. T1F $ -
4. Utility Fund $ -
5. SPDC Funds $ 3,810,000 $ 3,810,000
6. Crime Tax Funds $ -
TOTAL= S 3,810,000
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM — Sheltonwood Park Improvements
111 Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project? •
Department: Community Services Continuation? _\' Documented Project/Need?
Project Dates: 7/2005— 12/2005 Replacement/ A' Other Cntty. Need/Service? F
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of parking, signage, trails,picnic areas. - Park Master Plan not implemented as
etc., in Sheltonwood Park. approved
Location: Annual Impact of the Operating Budget
-On city property on east Dove Road near Ridgecrest. (Provide S impact and explanation):
- 0.5 FTE maintenance = $27,000, utilities =
$20,000
Project Justification:
- The Park Master Plan identifies minor improvements
related to low-impact public access in Sheltonwood Park, Will this project generate revenue?
such as parking, trail improvements.picnic areas, etc. - No.
Companion Project? }%V-No
If yes,please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TC
— UPENDITURE SCHEDULE
1. Planning and Design $ 10,000 $ 10,000
2. Land Acquisition S -
3. Site Improvement and Utility $ 100,000 $ 100,000
4. Construction $ 250,000 $ 250,000
5. Furniture and Equipment $ 30,000 $ 30.000
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 390,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 390,E $ 390.000
6. Crime Tax Funds $ -
TOTAL= $ 390,000
I
FY 2001/02-FY 2005/06 Capital Improvements Program
PROJECT REQUEST FORM — Equestrian Facility Development (Tucker Property)
Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project? N
Department: Community Services Continuation? N Documented Project/Need?
Project Dates: 7/2005— 7/2006 Replacement/ N Other Cmtr. Need/Service? Y
Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of park amenities such as trails,parking, -Park Master Plan not implemented as
pens. corrals and an arena related to equestrian use of approved
the Tucker property. ADDITIONAL PLANNING
REOL7RED TO DEFINE SCOPE OF PROJECT.
Annual Impact of the Operating Budget
(Provide$impact and explanation):
Location: -DEFINITIVE COSTS DEPEND ON SCOPE
-South side of East Bob Jones Road
Will this project generate revenue?
Project Justification: -No.
- The Park Master Plan identifies equestrian-related
improvements to the Tucker property.
Companion Project? Y/.-V-No
If yes.please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRA
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design $ 40,000 $ 40,E
2. Land Acquisition S -
3. Site Improvement and Utility $ 100,000 $ 100,000
4. Construction $ 800,000 $ 800,000
5. Furniture and Equipment $ 40,E $ 40,E
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 980,000
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Fo $ -
3. T1F $ -
4. Utility Fund $ -
5. SPDC Funds $ 980,000 $ 980,000
6. Crime Tax Funds $ -
TOTAL= $ 980,000
FY 2001/02-FY 2005/06 Capital Improvements Program
•
PROJECT REQUEST FORM—Skate Park
Project Contact: Kevin Hug man x1527 New Request? Y Mandated Project? N
Department: Community Services Continuation? N Documented Project/Need?
Project Dates: :/200;—12/2005 Replacement/ N Other Cmty. Need/Service? F
_ Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Installation of equipment designed exclusively for the -Diverse recreational opportunity not funded.
use of skateboards and rollerblades. Includes a concrete
foundation with ramps.jumps, rails, etc.
Location: Annual Impact of the Operating Budget
- Yet to be determined;possible to combine with existing (Provide$impact and explanation):
park improvement or as new stand alone facility in New - 0.5 FTE maintenance = $1 5,000, utilities =
Community Park. $30,000
Project Justification:
- The Park Master Plan identifies diverse forms of Will this project generate revenue?
recreation as funding opportunities. A skatebording - Yes;possibly. It is not uncommon for these
facility would provide this user population a designated facilities to charge a nominal userfee.
place to go and cut down on unauthori:ed use in existing
parks.
Companion Project? }7N— Yes;possible.
If yes,please explain:
-Possible inclusion in New Community Park (Lighted
Facility)programming.
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design $ 3,000 $ 3,000
2. Land Acquisition $ -
3. Site Improvement and Utility $ 30,000 $ 30,000
4. Construction $ 30,000 $ 30,000
5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 63,00C
FUNDING SCHEDULE
1. General Fund $ -
2. Impact Feces $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 63,000 $ 63,000
1 6. Crime Tax Funds $ -
TOTAL= $ 63,001
FY 2001/02-FY 2005/06 Capital Improvements Program
I ' .+%
PROJECT REQUEST FORM -In-Line Hockey Rink Cover
Project Contact: Kevin Hugman x1527 New Request? N Mandated Project? Ni
Department: Community Services Continuation? F Documented Project/Need? I
Project Dates: 7/2005—2/2006 Replacement/ N Other Cmty. Need/Service? V
_ .Major Rehab?
Project Description: Alternatives/Impact if not completed:
- Construction of an all-weather cover for the existing in- - Funding opportunity identified in the Park
line hockey rink. Master Plan nor implemented.
Location: Annual Impact of the Operating Budget
-Bicentennial Park (Provide S impact and explanation):
-Incidental to park maintenance
Project Justification:
- With the ability to play games and practice in inclement Will this project generate revenue?
weather, the participants in the in-line hockey leagues -No.
would gain much more use out of the existing facility.
Additionally, other city events could be held during
inclement weather that would normally be postponed or
canceled. This item appears as a funding opportunity in
the Park Master Plan .
Companion Project? Y/'Y-No
If yes,please explain:
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design S -
2. Land Acquisition $ -
3. Site Irrprovement and Utility $ -
4. Construction $ 600,000 $ 600,000
5. Furniture and Equipment $ -
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 600,000
FUNDING SCHEDULE
1. General Fund S -
2. Impact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 600,000 $ 600,000
I 6. Crime Tax Funds $ -
TOTAL= $ 600,000
FY 2001/02-FY 2005/06 Capital Improvements Program
•
PROJECT REQUEST FORM—Working Farm
111 Project Contact: Kevin Hugman x1527 New Request? Y Mandated Project? N
Department: Community Services Continuation? N Documented Project/Need?
Project Dates: 7'2005-7/2006 Replacement/ N Other Cntty. Need/Service? V
_ Major Rehab?
Project Description: Alternatives/Impact if not completed:
-A working farm is a hands-on, working demonstration of -An element of opportunity identified in the Park
historical. local. or trade-related Master Plan not implemented.
agriculturalihorricultural/craft related activities. SCOPE
OF PROJECT YET TO BE DEFINED.
Annual Impact of the Operating Budget
(Provide$impact and explanation):
Location: -Anticipated staff, equipment, and utility costs
-Dependent on site selection process. Potential for
undeveloped Tucker and/or Farhat properties near Bob
Jones Park.
Will this project generate revenue?
-No
Project Justification:
- The Park Master Plan identifies diverse, atypical
recreational opportunities in addition to the traditional
sports-related ones. This item is identified as one of those
opportunities.
Companion Project? }%V—Possible, as part of other
park-related site development.
PRIOR FY01/02 FY02/03 FY03/04 FY04/05 FY05/06 GRAND
FUNDING TOTAL
EXPENDITURE SCHEDULE
1. Planning and Design $ -
2. Land Acquisition $ -
3. Site Improvement and Utility $ 100,000 $ 100,000
4. Construction $ 200,000 $ 200,000
5. Furniture and Equipment $ 50,000 $ 50,000
6. Other(Please explain on attached sheet) $ -
TOTAL= $ 350,000
FUNDING SCHEDULE
1. General Fund $ -
2. In-pact Fees $ -
3. TIF $ -
4. Utility Fund $ -
5. SPDC Funds $ 350,000 $ 350,000
6. Crime Tax Funds $ -
• .TOTAL= $ 350,000
FY 2001/02-FY 2005/06 Capital Improvements Program
7 I 7
Reviewer: Kevin ,►►►groan
Project Name: ° U)
o' o �• o
Criterion 1 3 2 1 0 u °'
Public health and safety Project is needed to alleviate Project is needed to alleviate Project would promote or No health or safety impact is A 3
existing health or safety hazard potential health or safety maintain health or safety. associated with project.
hazard
External requirements Project is required by law, Project is required by agreement Product will be conducted in Project is City only and not A 3
regulations,or court mandate. with other julisdretion. conjunction with another externally required
jurisdiction
Protection of Capital Project is critical to save Project will repair systems Project will improve facility No existing facility is involved A 3
Stock structural integrity of existing City important to facility operation. appearance or deter future
facility or repair significant expenditure.
structural deterioration.
Economic development Project will encourage capital Project will have no significant A 3
investment, improve the City's tax economic development impact.
base, improve job opportunities,
attract consumers to the City,or
produce public or private .
6— revenues.
cjOperating budget impact Project will result in decreased Project will have minimal or no Project will have some Project will require significant A 3
r costs in the operating budget. operating and maintenance costs additional operating costs, additions in personnel or other
Oand/or personnel additions will operating costs.
be necessary.
./ •
--Life expectancy of project Meets needs of community for Meets needs of community for Meets needs of community for Meets needs of community for A 3
next 20 years or more. next 15 to 19 years. next 10 to 14 years. less than 10 years.
Relation to adopted plans Project is identified in the Project is included in written plan Project is included in written Project is not included in any B 2
Comprehensive Plan or an or policy of a City board/ plans of City staff. written plans.
adopted City Council policy. commission.
Timeliness/external A limited window of opportunity Undertaking the project will allow External influences do not affect B 2
exists to significantly reduce the City to take advantage of a the timeliness of the project.
project costs by coordinating with favorable current situation, such
another project that is planned or as the purchase of land or
currently underway. materials at favorable prices.
Percentage of population 50%or more 25%to 49% 10% to 24% Less than 10% B 2
served by project
Intensity of use Project will be used year-round. Project will receive seasonal and Project will receive only B 2
as-needed use seasonal use.
Scheduling Project to be started within next Project to he stalled within 2 to 3 Project to be started within 4 to Project is uncertain. B 2
year years. 5 years.
CIP Priority F ing Form
Page 1
Reviewer: Kevin h..�..Ian
Project Name: -0.. _ I ..1,...?,./3
i.
rD
. O to O
Criterion _ 3 2 1 0 q u °'
Benefit/Cost Return on investment for the Return on investment cannot be Return on investment can he B 2
project can be computed and is readily computed computed and is negative.
positive
Potential for duplication No similar protects are provided Project may duplicate other B 2
by public of pi wale agencies available public ur pi Nate
outside of City government facilities.
Project Continuity Funding necessary to continue or No funding approved in a B 2
complete previously approved previously adopted CIP
multi-year CIP project.
Percentage of project 70%or more 40%to 69% 10%to 39% Less than 10% C 1
capital costs eligible for
non-city funding • •
Percentage of project 70%or more 40/° to 69/° 10%to 39/° t C 1
° ° ° Less than 10%
E.—operating costs eligible
for non-city funding
0 Dedicated funding Project is eligible to be funded Project does not qualify for C 1
from SPDC,Crime Control,or dedicated funds.
r J/ Impact Fee funds.
Qr3'Special need Project meets a community Project does not meet particular C 1
obligation to serve a special need needs of a special population.
of a segment of the City's
population,such as low/moderate
income,aged, minority,or
handicapped persons.
Energy consumption Project will reduce amount of Project will require no increase in Project will require minimum Project will require large C 1
energy consumed. energy consumption. increase in energy increases in energy
• consumption. consumption.
Public support Public has demonstrated a City staff reports that the Public has not expressed a C 1
significant desire for the City to project is desired by the specific preference for this
undertake the project,through community to be served. project.
neighborhood surveys,petitions,
rn other clear indicators.
WEIGHTED SCORE TOTAL
CIP Priorily Ray ' Form
.'age 2
SPDC Capital Improvements Plan (CIP) 2001-2003
Budgeted Actual/
' Encumbered
FY 1999/00 FY 1999/00 FY 2000/01 FY 2001/02 FY 2002/03
Carry Forward Balance $2,385,750 $1,789,990 S350,790
Interest earnings $125,000 $175,000 $125,000 $175,000
Oper Fund Transfer $500,000 $241,000 $100,000 $100,000
Grant Proceeds $250.000 $500,000 $0 $0
Senior Lien Debt $4,400,000 S0 55,500,000
Total Proceeds $5,316,000 $225,000 $',f 75,000
Total Available Funds $3,842.000 $3,985,750 $7,701,750 $2,014,990 $6,125,790 I
Capital Expenditures I
Matching Funds $100,000 I $52,000 $100,000 $100,000 $100,000
Joint Use $20.000 $19,000 $20,000 I $20,000 $20,000
Special Projects $50,000 533,000 $50,000 ' $50,000 S:,J,CJU
Smith Park $50,000 $50,000
Continental Trails * $320,000 $320,000
Trailhead Improvements* $16,000 $20,000
Capping Wells $20.000 $20,000
Bleachers * S11,000 $11,000
Game Field Lighting * $200.000 $105,000
tipNature Center Imprvments $100,000
Trail Signage $10,000
Girls Softball Complex $1,100,000
Bob Jones Development $2,250,000 $200,000 $350,000
RR Building($300,000)
'Nell&Aeration($150,000)
�'•atatorium $500,000 $500,000 S250.000
Teen Center Survey* $10.000 $15,000
Teen Center Construc.tior• $300 000
Land Acquisition $1,800,000 31,025,000 $775,000
Rec Center Planning $550,000
Rec Center Construction $700,000 $5,000,000
NEW ITEMS
Bob Jones Bleachers $35,000
Bic.Park Volleyball Improv. $30,000
Baseball Warm-up Area $13,000
Concession Stand A/C units $18,000
Project Expenditures $2,897,000 $1,600,000 $5,621,000 $1,570,000 $5,770,000
(Reserve(6%) $290,760 $94,200 $346,200
I(Total Proceeds Less $9,5,000 $2,385,750 $1,789,990 $350,790 $9,590
11 Total Commitments
I
`Bold/italic -- projects underway
SPDC-CIP 2001-03-appvd.xls Approved by City Council October 17, 2000
I AM
Project Expenditure Report
FY TO DATE
2000-2001
Project Project Description Account Budget Award Expenditures Under(over)
Number Number Amount Amount to Date Award
01302001 Community and Matching Funds
01302001A Bic. Park#4,#5, #10 irrigation (SBA-$1,250) 302.999.5985.47 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ -
01302001 B Bic. Park Shade Structures (SBA-$65,000) 302.999.5985.46 $ 130,000.00 $ 129,735.00 $ - $ 130,000.00
01302001C Bob Jones Soccer Goals ($5,000) 302.999.5985.50 $ 10,000.00 $ 8,100.00 $ 8,100.00 $ 1,900.00
SUBTOTAL $ 142,500.00 $ 140,335.00 $ 10,600.00 $ 131,900.00
01302002 Special Projects $50,000.00 $ 17,584.04
01302002A Bicentennial Park Irrigation Trinity Water Well 302.999.5.985.38 $ 1,500.00 $ 1,500.00 $ - $ 1,500.00
01302002E Tree Transplanting 302.999.5.985.39 $ 5,000.00 $ 5,000.00 $ 1,080.00 $ 3,920.00
01302002C Bicentennial Park Ballfield#4,5, 10 Irrigation 302.999.5985.40 $ 3,486.00 $ 3,486.00 $ 3,486.00 $ -
01302002D Lonesome Dove Grubing/Clearing 302.999.5985.41 $ 3,500.00 $ 3,500.00 $ 2,825.00 $ 675.00
01302002E Bob Jones Clean-up Roll Off Dumpsters 302.999.5985.42 $ 4,000.00 $ 4,000.00 $ 1,788.90 $ 2,211.10
01302002F Lonesome Dove Park Components 302.999.5985.45 $ 1,600.00 $ 1,600.00 $ 1,587.29 $ 12.71
01302002G Chesapeake Well Upgrade 302.999.5985.51 $ 5,000.00 $ 5,000.00 $ - $ 5,000.00
01302002H Speakers for Sound System 302.999.5985.52 $ 1,599.96 $ 1,599.96 $ 1,599.96 $ -
013020021 Bicen.Well Water Level Gauge 302.999.5985.55 $ 2,730.00 $ 2,730.00 $ 2,730.00 $ -
01302002J Water Scape Improvements 302.999.5985.56 $ 4,000.00 $ 4,000.00 $ - $ 4,000.00
SUBTOTAL $ 32,415.96 $ 32,415.96 $ 15,097.15 $ 17,318.81
Neighborhood Parks
SUBTOTAL
Bob Jones Park
01302004A Park Improvements-Phase 2 302.999.5985.44 $ 2,561,891.23 $ 2,561,891.23 $ 869,483.88 $ 1,692,407.35
01302004E Nature Center Improvements $ 100,000.00 $ 100,000.00 $ - $ 100,000.00
01302004C Bleachers $ 35,000.00 $ 35,000.00 $ - $ 35,000.00
01302004D Engineering Amend#4 302.999.5985.43 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ -
01302004E Park Improvements-Phase 3 Construction $ 420,000.00 $ 420,000.00 $ - $ 420,000.00
SUBTOTAL $ 3,146,891.23 $ 3,146,891.23 $ 899,483.88 $ 2,247,407.35
FinanceRpt(b)-intern updates.xls7/20/0111:03 AM
7
Project Expenditure Report
FY TO DATE
2000-2001
Project Project Description Account Budget Award Expenditures Under(over)
Number Number Amount Amount to Date Award
Bicentennial Park
01302005A Softball Complex $ 1,100,000.00 $ - $ - $ 1,100,000.00
01302005B Baseball Warm-up Area Fencing 302-999-5985.48 $ 13,000.00 $ - $ 13,000.00
01302005C Concession Stand A/C 302-999-5985.49 $ 18,000.00 $ 6,417.68 $ 11,582.32
01302005D Sand Volleyball Court $ 30,000.00 $ - $ - $ 30,000.00
SUBTOTAL $ 1,161,000.00 $ $ 6,417.68 $ 1,154,582.32
Recreation Center
01302006A Recreation Center Plannning $ 550,000.00 $ 11,000.00 $ - $ 550,000.00
SUBTOTAL $ 550,000.00 $ 11,000.00 $ - $ 550,000.00
01302009 Linear Parks and Trails
SUBTOTAL
Miscellaneous Projects/Joint Use($20,000)
01302010A Joint Use-Scoreboards at Durham 302-999-5985.53 $5,090.00 $5,090.00 $5,090.00 $ -
SUBTOTAL S vI k M : $ 5,090.00 $ 5,090.00 $ < 5,090.00 $ -
GRAND TOTALS $ 5,037,897.19 $ 3,335,732.19 $ 936,688.71 $ 4,101,208.48
FinanceRpt(b)-intern updates.xls7/20/0111:03 AM
7 I —a
SPDC
Project Expenditure Report FY 1999-00
Project Project Description Account Budget Award Expenditures Under(over)
Number Number Amount Amount to Date Award
00302001 Community and Matching Funds $ 100,000.00 $ 98,328.00 $ 1,672.00
00302001A Southlake Girls Softball Association 302.999.5.985.06 $ 3,366.50 $ 3,366.50 $3,366.50 $ -
00302001 B Chesapeake Park Development 302.999.5.985.23 $ 71,620.00 $ 71,620.00 $ 10,000.00 $ 61,620.00
00302101C Land Acquisition Survey $ 9,941.50 $ 9,941.50 $ -
00302101 D SBA- Batting Cage Lighting Design/Construct. 302.999.5.985.30 $ 12,200.00 $ 12,200.00 $ 2,485.98 $ 9,714.02
00302101E SGSA- Batting Cage Lighting Design 302.999.5.985.31 $ 1,200.00 $ 1,200.00 $ 1,200.00 $ -
SUBTOTAL $ 88,386.50 $ 98,328.00 $ 26,993.98 $ 71,334.02
00302002 Special Projects
00302002A Bic. Park Erosion Control 302.999.5.985.09 $ 2,842.85 $ 2,842.85 $ 2,842.85 $ -
003020028 Tree Transplanting @ Bob Jones Park 302.999.5.985.10 $ 3,000.00 $ 3,000.00 $ 1,890.00 $ 1,110.00
00302002C Tennis Center-Phase II- Iron Fence 302.999.5.985.02 $ 14,604.00 $ 14,604.00 $ 14,604.00 $ -
00302002D Tennis Center Pro Shop-Window Tinting 302.999.5.985.11 $ 499.00 $ 499.00 $ 499.00 $ -
00302002E Tennis Center-Signage 302.999.5.986.00 $ 459.00 $ 459.00 $ 459.00 $ -
00302002F Bob Jones Park-Water Discharge Piping 302.999.5.985.25 $ 1,300.00 $ 1,300.00 $1,300.00 $ -
00302002G Bicentennial Park II-Pond Aeration Electric 302.999.5.985.09 $ 1,657.50 $ 1,657.50 $ 1,657.50 $ -
00302002H Misc. Concrete Improvements 302.999.5.985.26 $3,619.70 $ 3,619.70 $3,619.70 $ -
003020021 Senior Tree Farms Capital Items 302.999.5.985.32 $999.99 $ 1,000.00 $999.99 $ 0.01
00302002J Hydromulching at Bicentennial Park Phase II 302.999.5.985.34 $6,000.00 $ 6,000.00 $6,000.00 $ -
00302002K Security Lighting in Bicentennial Park $3,356.83 $ 3,356.83 $3,356.83 $ -
SUBTOTAL $ 38,338.87 $ 38,338.88 $ ;ems
37,228.87 $ » 1,110.01
-..
Neighborhood Parks
00302010A Smith Park Planning 302.999.5.985.16 $ 50,000.00 $ 50,000.00 $ - $ 50,000.00
00302006A Lonesome Dove Park Improvements (Trail) 302.999.5.985.00 $ 63,375.00 $ 63,375.00 $ 44,779.29 $ 18,595.71
SUBTOTAL $ 113,375.00 $ 113,375.00 $ 44,779.29 $ 68,595.71
Bob Jones Park
00302015A Capping Wells 302.999.5.985.20 $ 20,000.00 $ - $ - $ -
00302017A Trailhead Improvements 302.999.5.985.22 $ 16,000.00 $ 16,000.00 $ 15,601.65 $ 398.35
00302017E Trailhead Improvements 302.999.5985.35 $ 4,000.00 $ 4,000.00 $ 2,471.64 $ 1,528.36
SUBTOTAL $ 40,000.00 $ 20,000.00 $ 18,073.29 $ 1,926.71
FinanceRpt(b)-intern updates.xls7/20/0111:56 AM
SPDC
Project Expenditure Report FY 1999-00
Project Project Description Account Budget Award Expenditures Under(over)
Number Number Amount Amount to Date Award
Bicentennial Park
00302014A Bleachers 302.999.5.985.24 $ 11,000.00 $ 10,956.00 $ 10,956.00 $ -
00302016A Game Fields Lighting- Design 302.999.5.985.21 $ 2,000.00 $ 2,000.00 $ 1,470.00 $ 530.00
00302016B Game Fields Lighting-Construction 302.999.5.985.21 $ 180,000.00 $ 99,291.00 $89,361.90 $ 9,929.10
SUBTOTAL $ 193,000.00 $ 112,247.00 $ 101,787.90 $ 10,459.10
00302011 Teen Center
00302011A Teen Center Survey 302.999.5.985.03 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ -
00302011 B Teen Center Construction 302.999.5.985.17 $ -
SUBTOTAL $ 15,000.00 $ 15,000.00 $ 15,000.00 $ -
00302009 Linear Parks and Trails
00302009A Continental Phase I and II 302.999.5.985.15 $320,000.00 $320,000.00 $0.00 $320,000.00
SUBTOTAL $320,000.00 $320,000.00 $0.00 $320,000.00
Miscellaneous Projects
00302007A Grant-Senior Tree Farm#3 (Reimbursable) 302.999.5.985.36 $4,300.00 $4,300.00 $3,406.74 $893.26
00302003A Joint Use Improvements/Ballfield Development 302.999.5.985.33 $20,000.00 $2.0,000.00 $10,640.00 $9,360.00
SUBTOTAL $24,300.00 $24,300.00 $14,046.74 $10,253.26
GRAND TOTALS $ 832,400.37 $ 741,588.88 $ 257,910.07 $ 483,678.81
FinanceRpt(b)-intern updates.xls7/20/0111:56 AM
City of Southlake, Texas
MEMORANDUM
1111 July 19, 2001
TO: Billy Campbell, City Manager
FROM: Kevin Hugman, Director of Community Services (x1527)
SUBJECT: Programming and Design of Proposed Recreation Center
Action Requested: SPDC further direction to staff on recommended programming deletions if
necessary, prior to grant submission to the Texas Parks and Wildlife
Department (TPWD).
Background
Information: At the SPDC meeting of July 17, the Board authorized staff to continue
with a grant application submission to Texas Parks and Wildlife for a
$750,000 indoor recreation grant. However, the Board also directed staff
to reduce the size of the facility to approximately 27,000 square feet, with a
total construction budget not to exceed $4,100,000.
Staff will work with the architect to review design changes and alternatives,
as well as reducing the various functional areas to accomplish the Board
goals. However, should it become necessary to eliminate functional areas,
staff desires Board input as to recommendations.
Financial
Considerations: The board has authorized a total construction budget of$4,100,000, which
includes site development, landscaping, facility construction, fixtures,
furnishings and equipment (FFE), and project contingency.
Citizen Input/
Board Review: Various.
Legal Review: Not Applicable.
Alternatives: SPDC input and direction
Supporting
Documents: Supporting documents include the following:
• Parks, Recreation and Open Space Master Plan Priorities and
Recommendations (relevant to TPWD point allocation)
■ Schematic site plan and floor plans for proposed Recreation Center
• Preliminary floor space program and budget for proposed Recreation
Center
Staff
Recommendation: SPDC input and direction to staff.
7. Priorities and Recommendations
Park Land and Recreational Facility Priorities
The distillation of this park,recreation, and open space planning process—public
opinion surveys,public meetings, staff and park board input, application of national
and local standards, and consultant recommendations—has resulted in the project
priorities shown below. The land acquisition and the recreational facilities listed
represent the earliest projects to be undertaken. The balance of the priority list is
included in Appendix A.
Southlake currently has no recreation center offering the listed facilities 1 through 7.
Items 8 through 14—a new community park—will fulfill some of the greatest
deficits shown in the Needs Assessment in Section 6. Both projects would be good
candidates for funding assistance through Texas Parks and Wildlife. (Refer to
' Section 8 for more information.)
Table 7.1
Project
Priorities
Priority Facility Schedule
1. Gymnasium/Sport Court 2002-2004
2. Indoor Jogging Track 2002-2004
3. Exercise/Fitness Room 2002-2004
4. Youth Activity Center 2002-2004
5. Classroom 2002-2004
r _ 6. Aerobics/Dance Studio — 2002-2004
7. Craft Room 2002-2004
8. Community Parkland Acquisition 2003-2004
9. Soccer Field 2003-2004
10. Baseball Field 2003-2004
11. - Softball Field 2003-2004
12. -Lacrosse/Football Field 2003-2004
13. Multipurpose Trail 2003-2004
14. Picnic Station 2003-2004
7.1
Southlake Bivd.
(FM.1709)
��— / .. i
W
a
I I I h I I I I I z 1
I I I 1 -1_-_I J I w a
a I I Ur
I I I I 1— � I I I Z W
Imo — 1 I h— ,1 - - - — - .� L% � itc
�
r
ri[
›-
`" _1 Rertreation ^/LLJ LL
%% t i I I..L Z
Ce ter
� j /i future � �3�#i ?��; '!r3! � --�r r---_ I ^y
�� Library Lel 1:11: I:- + ) Z
4, I L_. . in
p\\ > . ,
., .
1 ca
_ _ _ d \ \z, J h• 1-1 319 si-e si-_-_. r— � r-
CNI
W c'i
II ;_
4G
. 0 f 1 Q
--
•
/� 110 IISouthlake Rec Center J ( i __ I
1"=120' --.....„.,__Site Plan O
PI
J L---.0 , Na
/ , D :,
1 0P '/1--- ! O its
i 1-'-i_r-, FrIl rh--1 3 'Iti°r— i-
t..,-.)
1
I U I� . - --- --1- —
l }�--
-4
1-- 11 1 M I
.....-, -_.... L }-- 11±1
z =
_ ____
Phase I UJ U
¢ - <
8 Spaces 35 Spaces i z V
Mr ss, 0
Cr
N ! L— — -- — —-----I
N. 30 Spaces i 1L�
:He
I 14 Spaces! I W 1
I Cardio/ -i
I I Weights I Walking Track-- --- I �I
i 1' , 1 Z r
p/
r
Future i
L
1 IClimng wall I � � Lll
i e d Liz---y � Toilets ;; C/
1 15 Spaces
i E
0C:meroom I _ I� N
!_i w
Communit ♦ /
���_ �\.. �.�- B':bysitting � L
I Services >'
l
Service Drive 12 Spaces
r I Aerobics _ _
Hike & Bike '1 ase I 1Trails Hike & Bike O
9� Trail I I
is •1. A
,� --I /� Southlake Rec Center (Level ) iC _
e ' O r=so' floor Ian c�
/ - \l Phase I Parking - 114 S aces I (I") tf)
L I L
Ce
L1J U
1..._ w
Z t II
j W
UQ
I z
.—_. I Z W
ur�ni _
U
Lockers 1 f O W ,n
Gym I 4 1f ,
H.
Storage i / >-
CI W
Climbing wall— i \ J t
1r j Meeting i jI V
� j Rooms m
1rzeO
w e.
/N Southlake Rec Center (Level 1) Q
" 1^=50' Floor Plan ! ..J
I
O cd
r ^ u
L I M
111 PRELIMINARY PROGRAM AREAS
July 11, 2001
Number of
Area Name Staff Size Unit Area spaces Area
Lobby
Waiting 500
Toilets 130 2 260
Control/Checkout Desk 2 10x 12 120 1 120
Storage Room 10x12 120 I 120
Office 1 10x13 130 1 130
Staff Desks 2 6x10 60 2 120
Work/Copy 6x9 54 I 54
Net Area 1,304
25%Circulation of Gross Area (NET/75)*25 435
Gross area of this Activity 1,739
Community Services Offices
Director Office I 12X 18 216 1 216
Admin.Sec 10x10 100 1 100
Waiting 10x20 200 1 200
Conference(10) 12X16 192 1 192
Work/Copy 10x10 100 1 100
Break(6)/lockers(12) 15X15 225 1 225
Work Room(5 Stations) 480 1 480
Storage Room 150 I 150
Recreation Staff 12X 16 192 5 960
Net Area 2,623
im 20%Circulation of Gross Area (NET/80)*20 656
Gross area of this Activity 3,279
Toilets/Lockers
Toilets/Lockers 1,200
Family Changing S x 10 80 2 160
Net Area 1,360
25%Circulation of Gross Area (NET/75)*25 453
Gross area of this Activity 1,813
Gameroom
Gameroom 34x46 1564 1 1,564
Vending 13x26 338 1 338
Net Area 1,902
15%Circulation of Gross Area (NET/85)*15 336
Gross area of this Activity 1,902
Gym
Basketball Courts(2) 10000 I 10,000
Seating 6x53 159 2 318
Storage 15x25 375 1 375
Net Area 10,693
1 10%Circulation of Gross Area (NET/90)*10 1,188
Gross area of this Activity 11,881
96013\P 2\S Q F T8-29.x l s
SOUTHLAKE RECREATION CENTER
lil PRELIMINARY PROGRAM AREAS
July 11, 2001
Number of
Area Name Staff Size Unit Area spaces Area
Walking/Running Track 10x400 4000 1 4,000
Stretching Area 9x58 522 1 522
Net Area 4,522
10%Circulation of Gross Area (NET/90)*10 502
Gross area of this Activity 5,024
Other Activity Areas
Aerobics Room(24) 1700 1 1,700
Storage room 20x10 200 1 200
Cardiovascular/Weights 3500 1 3,500
Meeting Room(100) 15 100 1,500
Divider Wall 25 2 50
Storage Alcove 8x12 96 1 96
Kitchenette 5x12 60 1 60
Climbing Wall 200 1 200
Toilets(singles) 6x9 54 2 108
Net Area 7,414
20%Circulation of Gross Area (NET/80)*20 1,854
Gross area of this Activity 9,268
Other Areas
Baby-sitting/Toddler Waiting 25x32 800 1 800
Storage Room 7x8 56 1 56
Toilet(child size) 5x8 40 1 40
IN Net Area 896
20%Circulation of Gross Area (NET/80)*20 224
Gross area of this Activity 1,120
Building Support
Janitor Closet 9x 13 117 I 117
Mechanical I0x 10 100 1 100
Electrical 9x12 108 1 108
Phone/Data 5x8 40 1 40
Net Area 365
15%Circulation of Gross Area (NET/85)*15 64
Gross area of this Activity 429
TOTAL BUILDING 36,455
I
96013\P2\SQ FT8-29.xls
a SOUTHLAKE RECREATION CENTER
PRELIMINARY PROGRAM AREAS
July 11,2001 BUDGET
Building Construction Costs S.F.
Recreation Center 36,455 $4,374,626
Sub Total Building Construction Costs $4,374,626
Furnishings&Equipment
Unique Spaces
Game Room $10,000
Office FF&E $110,000
General Equipment $240,000
Subtotal $360,000
Site Construction Costs(parking lot,landscaping,utilities,walks)
Parking and paving $180,000
Landscape $80,000
Utilities $150,000
Subtotal $410,000
Sub Total Estimated Project Costs: $5,144,626
Contingency $514,463
Bidding,Construction &Inflation 10%
go
Total Construction Costs: $5,659,089
Note:Cost Based on a March 2002 Bid Date
I
960131P21SQFT8-29.xls
SOUTHLAKE PARKS DEVELOPMENT CORPORATION
1/2% SALES TAX REPORT
Actual Budget Actual Estimated (budget-est.) %
1999-00 2000-01 2000-01 2000-01 Difference Change
October $155,259 $168,404 $196,516 $196,516 $28,112 16.69%
November 150,165 162,810 161,845 161,845 (965) -0.69%
December 125,632 136,241 162,616 162,616 26,375 17.10%
January 176,808 191,776 259,882 259,882 68,106 53.55%
February 135,803 147,228 151,056 151,056 3,828 3.29%
March 120,289 130,448 144,692 144,692 14,244 13.02%
April 182,799 198,169 233,457 233,457 35,288 19.92%
May 148,210 160,812 186,723 186,723 25,910 17.34%
June 150,396 163,210 211,055 211,055 47,845 33.59%
July 190,883 206,959 206,959 - 0.00%
August 153,898 167,005 167,005 - 0.00%
September 151,760 164,608 164,608 - 0.00%
$ 1,841,902 $ 1,997,670 $ 1,707,842 $ 2,246,414 $ 248,744 12.45%
Estimated sales tax collections as a %compared to FY 1999-2000 21.96%
SOUTHLAKE PARK DEVELOPMENT CORPORATION
Capital Projects Status Report
July 18, 2001
BICENTENNIAL PARK
Park Trail-F.Y. 1998-99
Status: Remaining trails will be reviewed and presented to the Parks and
Recreation Board at the August, 2001 meeting.
BOB JONES PARK
Phase II with TPWD Grant-
Design - Phase II Contract Began: January 3,2000
Consultant: Cheatham Associates Design Contract: $178,752.00
Status: The site plan was presented and reviewed by SPIN #1, the Parks and •
Recreation Board, and SPDC and City Council. The Texas Parks and Wildlife
Department and the U.S. Army Corp of Engineers have approved completed plans.
Construction is progressing well with completion of the pavilion, day camping area,
pond, amphitheater, and most trails. The ballfields and playground are progressing on
schedule. Components not associated with the TPWD have resumed construction.
Nature Center Planning-
Status: Recommended improvements to the donated facilities were developed by
the architectural design firm of Schutts Magee Associates, Inc. Necessary improvements
and expected costs were presented to Park Board in May for input. Primary utilities to
the facility are installed and complete.
NEIGHBORHOOD PARKS
Noble Oaks Park- F.Y. 2000-01
Status: The perimeter 8-foot pathway along South Carroll Avenue is included in
the construction plans for the widening of South Carroll Ave. A basic concept plan for
the park is included in the approved Park, Recreation and Open Space Master Plan. No
funding exists for additional improvements at this time.
Page 1
6.%
Koalaty Park- F.Y. 2000-01
Status: All requested improvements planned previously are complete.
Royal and Annie Smith Park—F.Y. 1999-00
Status: SPDC approved $50,000 for planning and construction of initial park
improvements in FY 1999-2000. The conceptual park plan is included within the Parks,
Recreation, and Open Space Master Plan update. Park maintenance staff has begun
clearing and grubbing of the site. Arrangements/plans being made for removal of house
and garage. Trail development within the park will be presented to the Parks and
Recreation Board at the August, 2001 meeting.
Lonesome Dove Park- F.Y. 1998-99
Status: All requirements of the developer's agreement are addressed. Pavilion
lighting, irrigation and playground improvements are complete. SPIN and the Park and
Recreation Board have accepted the loop walk improvements. Construction has begun
on the boardwalk with 95% of the concrete sidewalk complete. Park improvement
workday with the neighborhood being planned for Fall, 2001.
"Chesapeake" Park- F.Y. 1999-2000
Consultant: Carter Burgess Inc. Matching Funds Approved: S35,794
Approved by Parks Board: February 14, 2000
Approved by SPDC: February 28, 2000
Status: The trails, playground, benches, and fountain have been installed.
Irrigation and hydromulch will begin in August. Final site grading is scheduled within
the next month. Trees and shrubs are scheduled for planting in Fall, 2001.
"Sheltonwood" Park- F.Y.
Status: A basic concept plan for the park is included in the approved Park,
Recreation and Open Space Master Plan. No funding exists for improvements at this
time.
LINEAR PARKS AND TRAILS
Continental Boulevard Trail (White Chapel to Davis) - F.Y. 1998-99
Design - Phase II Contract Completed:
Consultant: Dunaway Associates, Inc.
Status: Construction of the designed 6-foot pathway has begun within areas not
affected by road improvements.
Page 2
COMMUNITY FACILITIES
Recreation Center -
Status: Based on City Council direction, staff is moving forward with the grant
application for the Recreation Center. Brinkley Sargent Architects will provide a
conceptual floor plan for the facility. Park Board has reviewed the recreational
components to incorporate in the preliminary plan. The grant due date is July 31, 2001.
MATCHING FUNDS—COMMUNITY GROUPS
Southlake Baseball Association —
Approved by SPDC:
Status: Proposed shade structures around the baseball backstops of fields #4, #5,
#6, #7, #8, #9, and#10 have been approved by SPDC and City Council. Engineering
documents are being prepared for approval. Installation is expected before the fall 2001
season.
Southlake Girls Softball Association—
No
Southlake Equestrian Association —
Approved by SPDC: September 27, 1999 /
Approved by Park Board: September 13, 1999 /March 19, 2001
Status: SPDC approved$10,000 at the September 1999 meeting to install various
items requested by the Southlake Equestrian Association. Completion of the northern
parking lot has begun. Grant components will follow this summer with a completion
date of fall, 2001.
Northeast Tarrant Tennis—
Approved by SPDC: September 27, 1999
Approved by Park Board: August 9, 1999
Status: NETT has issued a check to the City in the amount of$2,500 towards their
matching requirement. Funds have been used to purchase various components including
trash receptacles, tables, chairs, watercooler stands, etc.
Page 3
111
Senior Tree Farm #1 -
Approved by SPDC: January 16, 1998
Approved by Park Board: December 8, 1997
Status: Many of the trees will be planted in Chesapeake Park when ready.
Senior Tree Farm #2 —
Approved by SPDC:
Approved by Park Board:
Status: All project requirements are completed. The Texas Forest Service grant
money assisted in the planting of five hundred and twenty-eight (528) trees at Senior Tree
Farms #1 and#2, utilizing five hundred and eighty-three (583) volunteer hours.
Senior Tree Farm #3—
Approved by City Council: June 15, 1999
Approved by Park Board: June 7, 1999
Status: The Texas Forest Service Grant of$8,600 ($4,300 Grant Award with a
$4,300 Required Match or in-kind services) began on October 1, 1999. The third phase
has been established as an extension to Tree Farm #2 located at 275 Shady Oaks. Four
hundred (400) saplings (Lacebark Elm, Cedar Elm, Shumard Oak) were planted on
February 12, 2000.
JOINT-USE PROJECTS
Joint-Use Projects -
Status: City Council approved an interlocal agreement May 15, 2001 with St.
Martin-in-the-Fields Episcopal Church for use of additional land for practice ballfields.
Site grading is complete with irrigation to begin in August.
Signage for all Parks -
Status: Available as needed.
Page 4
r
SPECIAL PROJECTS
F.Y. 2000 -
Complete $ 2,817.85 Bicentennial Park Erosion Control.
Complete $ 3,000.00 Tree Transplanting at Bob Jones Park.
Complete $14,604.00 Bicentennial Park Phase II Wrought Iron Fencing.
Complete $ 499.00 Tennis Center Pro-Shop Window Tinting.
Complete $ 459.00 Tennis Center Signage.
Complete $ 1,300.00 Bob Jones Park Water Well Discharge Piping.
Complete $ 1,657.50 Bicentennial Park Pond Aeration Electric
Complete $ 3,619.70 Bicentennial Park Ballfield Concrete Improvements
Complete $ 1,000.00 Senior Tree Farm Capital Items.
Complete $ 6,000.00 Bicentennial Park Bermuda Hydro-mulch.
Complete $ 3,356.83 Bicentennial Park Baseball Security Lighting
Total $37,228.87
F.Y. 2001 -
In Progress $ 1,500.00 Bicentennial Park Trinity Well Repairs
In Progress $ 5,000.00 Tree Transplanting
• Complete $ 3,486.00 Bicentennial Park Ballfield Irrigation#4, #5, and #10
Complete $ 3,500.00 Lonesome Dove Park Grubbing and Clearing
Complete $ 4,000.00 Bob Jones Roll-off Dumpsters
Complete $ 1,600.00 Lonesome Dove Park Furniture
Complete $ 5,000.00 Chesapeake Water Well Upgrade
Complete $ 1,599.96 Speakers for Sound System
Complete $ 2,730.00 Bicentennial Water Storage Level Indicator
In Progress $ 4,000.00 Bicentennial Waterscape components
Total $32,415.96
Page 5
01)D e., ci
A RESOLUTION setting a public hearing on the Southlake Parks Development
Corporation undertaking a park project; and approving and authorizing
publicatiotl of notice of such public hearing.
WHEREAS, the Board of Directors of the Southlake Parks Development Corporation hereby
finds and determines the Corporation should undertake a park project involving the acquisition of
land, buildings, equipment, facilities and improvements required or suitable for use for professional
and amateur (including children's) sports, athletic, entertainment, and public park purposes and
events, including stadiums and ball parks (Softball World); and
WHEREAS, prior to undertaking such project, the Board of Directors is required to hold a
public hearing on Corporation's involvement in such project; now, therefore,
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE SOUTHLAKE PARKS
DEVELOPMENT CORPORATION THAT a public hearing on undertaking a park project involving
the acquisition of land, buildings,equipment,facilities and improvements required or suitable for use
for professional and amateur (including children's) sports, athletic, entertainment, and public park
purposes and events, including stadiums and ball parks (Softball World) shall be and is hereby
resolved to the held on the 24th day of July, 2001, during a meeting of the Board of Directors to the
held at 5:00 o'clock P.M. in the City Council Chambers at the City Hall, 1400 Main Street, Southlake,
Texas and the'Secretary of the Board of Directors is hereby authorized and directed to cause a
notice of such public hearing, substantially in the form and content of Exhibit A hereto attached and
incorporated herein by reference as a part of this resolution for all purposes, to be published in one
or more newspapers having a general circulation in the City of Southlake, Texas.
PASSED AND ADOPTED, this June 19, 2001.
Southlake Parks Development Corporation
4- POI/4...Sfor—.-4--s—
•
President, Bo..-. of Directors
Secretary, and of Direc ors
(Corporate Seal)
• _ Exhibit A
NOTICE OF PUBLIC HEARING ON A PROJECT
TO BE UNDERTAKEN BY SOUTHLAKE PARKS DEVELOPMENT CORPORATION
NOTICE IS HEREBY GIVEN that a public hearing is to be held by the Board of Directors of
the Southlake Parks Development Corporation during a meeting to be held at 5:00 o'clock P.M. on
July 24, 2001 in the City Council Chambers at the City Hall of Southlake, Texas, 1400 Main Street,
Southlake,Texas on the Corporation undertaking a park project involving for the acquisition of land,
buildings, equipment, facilities and improvements required or suitable for use for professional and
amateur(including children's)sports,athletic, entertainm , nd p?b c park parposes and events,
including stadiums and ball parks (Softball World),. —
rth°-?1
Secretary, Board of Directors
Southlake Parks Development Corporation