1999-06-28 City of Southlake, Texas MEMORANDUM June 25. 1999 TO: Southlake Parks Development Corporation FROM: Kevin Hugman. Director of Community Services SUBJECT: Additional funding capacity for land acquisition program Action Requested: SPDC discussion of potential land acquisition funding through additional debt issuance. Direction from SPDC as to specific land acquisition projects that should be funded through additional debt, and total amount to be funded. Background Information: SPDC approved a five-year capital projects budget on October 26, 1998, showing anticipated revenues (bond proceeds, grant proceeds, interest earnings, donations, etc.) and expenditures (land acquisition, park development projects, community matching funds, joint use projects). The plan allocated approximately $6.3 million for land acquisition during the five year period, of which $1.9 million would be available for "unspecified" acquisitions. ate► In early 1999, SPDC began to consider the purchase of several large tracts land which had unexpectedly become available. The potential impact on the 5-year Parks CIP was such that SPDC faced a dilemma in deciding how to simultaneously pay for the desired properties while also continuing. to move forward with project development. The expected revenues from senior lien bond proceeds were assumed to occur every other year, but the funds were also allocated to the various projects planned in the CIP. At its March 22, 1999 meeting, the City's financial advisor Jim Sabonis discussed various options the Board has in issuing additional debt, resulting in the near-term availability of additional revenues. As you recall, the ability to issue additional debt stems from the use of the "excess funds" in the SPDC operating fund. These "excess funds" are the difference between sales tax collections and debt service payments out. This $500,000 had traditionally been appropriated from the operating fund and transferred to the SPDC project fund at the end of each fiscal year. (The 5-year Parks CIP shows this $500,000 as a constant revenue sum each fiscal year.) Mr. Sabonis had suggested that these funds could be used as debt service if additional bonds were issued %r above and beyond the senior lien program. His analysis indicated that the sales tax projections supported the necessary debt coverage for this type of issuance. 7 4-1 Southlake Parks Development Corporation June 25, 1999 Page 2 At its May 24, 1999 meeting, SPDC again considered the potential land acquisition projects, compared to the risk of issuing additional debt. SPDC stated they were uncomfortable with an issuance of the maximum available $10 million, which would be required to obtain the tracts previously discussed. It was also stated that the current land acquisition amount allocated in the CIP should be reserved for future opportunities and not exhausted at this time. Mr. Sabonis has done additional analysis, and has indicated that the debt service for an issuance of $2.26 million at this time, with existing senior lien debt service, would still be below the projected sales tax revenues for FY 1998-99. This means that even if sales tax revenues immediately flattened out, SPDC would still have revenues sufficient to meet current senior debt service and additional debt service required for the new bonds. Financial - Considerations: Additional debt issuance at this time of approximately $2.26 million would still allow the capability of additional senior lien debt issuance planned in FY 2000-01, assuming current sales tax growth projections. ar Citizen Input/ Board Review: At the joint SPDC/Park Board meeting held on April 26, 1999, SPDC and Park Board agreed that land acquisition is the highest priority. Legal Review: Bond counsel will be required to review final plans for debt issuance. q Alternatives: Alternates are: (1) Senior lien debt issuance - continue with plan in place. Approximately $12.3 million over next five fiscal years. (2) Senior / Junior lien debt combination - Assuming current sales tax projections, funding capacity of$18,120,000 through FY 2002-03. (3) Senior / CO combination - require City of Southlake to issue certificates of obligation with repayment by SPDC through sales tax collections. Supporting Documents: Five year Parks Capital Improvements Plan Staff Recommendation: SPDC consideration of land acquisition projects and funding capacity for these additional purchases. lbw Approved for Submittal to SPDC: ity anager's Office • 1 SOUTHLAKE PARKS DEVELOPMENT CORPORATION 1/2% SALES TAX REPORT [flaw 1998-99 collected budget balance budget to date balance percent IE $1,510,525 $991,892 $518,633 34.33% FISCAL FISCAL FISCAL YEAR % Inc YEAR % Inc YEAR % Inc MONTH 96-97 -Dec 97-98 -Dec 98-99 -Dec 1 October $80,946 25.8% $118,582 46.5% $155,384 31.0% November 67,684 21.0% 96,832 43.1% 103,444 6.8% CDecember 57,542 10.7% 81,935 42.4% 94,247 15.0% lcJanuary 99,437 41.7% 133,219 34.0% 156,915 17.8% February 62,836 31.9% 84,457 34.4% 99,787 18.2% March 52,366 1.5% 80,074 52.9% 97,318 21.5% April 91,192 33.1% 107,650 18.0%- 155,959 44.9% - May 76,289 39.5% 108,880 42.7% 128,839 18.3% June 85,906 53.0% 100,117 16.5% - n/a July 111,927 24.5% 137,036 22.4% - n/a IIAugust 92,426 39.7% 112,063 21.2% - n/a September 86,958 42.0% 100,085 15.1% - n/a TOTAL $965,508 30.8% $1,260,929 30.6% $991,892 22.2% Actual Budget Actual Estimated (budget-est.) % 1997-98 1998-99 1998-99 1998-99 Difference Change October $ 118,582 $ 142,061 $ 155,384 $ 155,384 $ 13,322 9.38% November 96,832 116,005 103,444 103,444 (12,561) -10.83% December 81,936 98,159 94,247 94,247 (3,912) -3.99% IJanuary 133,219 159,596 156,915 156,915 (2,680) -1.68% February 84,457 101,179 99,787 99,787 (1,393) -1.38% March 80,074 95,928 97,318 97,318 1,390 1.45% April 107,650 128,964 155,959 155,959 26,995 20.93% May 108,880 130,438 128,839 128,839 (1,599) -1.23% June 100,117 119,940 - 119,940 - 0.00% July 137,036 164,169 - 164,169 - 0.00% August 112,063 134,251 134,251 0.00% (tiseSeptember 100,085 119,835 - 119,835 - 0.00% $ 1,260,928 $ 1,510,525 $ 991,892 $ 1,530,087 $ 19,562 1.30% 19.79% 21.35% Slstx99.xls I -7B - I Southlake Parks Development Corporation FY1998/99 Capital Projects Budget Presented June 28,1999 E1 , AI B I D I E I F I G I I-I 2 Total Actual Actual 3 ' FY1997-98 FY1998-99 FY1998-99 Transactions Transactions 4 Carry-over Approved Approved Fiscal YTD Project To Date 5 Budget Budget Budget May-99 as of 5-99 6 E 7 REVENUES/OTHER SOURCES 8 Fund Balance $ - $ (447,000)', $ 5,405,038 $ - $ 5,405,038 9 (unaudited) (unaudited) 10 Interest Earnings I $ - ' $ 175,000 , $ 175,000 ' $ 49,319 $ 49,319 11 Donations-Matching Funds $ $ $ $ 12,463 $ 12 TPW Grant Proceeds $ $ 250,000 $ 250,000 $ $ 13 Texas Forest Service Grant-Tree Farm#2(Shady Oaks) $ $ $ 8,400 $ $ 14 Operating Fund Transfer $ - $ 500,000 ' $ 500,000 $ 333,333 $ - 15 Bond Proceeds $ - $ 4,500,000 $ 4,500,000 $ - $ _ IC16 Total Revenue/Other Sources(excluding fund balance carried forward) $ 17 - $ 5,425,000 $ 5,433,400 $ 395,115 $ 49,319 18 REVENUES and FUND BALANCE in excess of/ $ - $ 565,241 $ 722,899 $ (3,226,719) $ (438,893) 19 (Less than)EXPENDITURES ' 20 , 21 EXPENDITURES 22 RESERVE FOR UNANTICIPATED PROJECTS I $ - $ - I $ - $ - $ _ 23 C24 LAND ACQUISITION: I $ $ 1,900,000 $ 1,900,000 $ $ 25 TRANSFER TO DEBT SERVICE TO LIQUIDATE NOTES $ - $ 450,000 $ 450,000 $ - $ 26 _ 27 NEIGHBORHOOD PARKS: $ - $ - $ - $ - S _ 28 29 COMMUNITY PARKS: 30 Southwest $ - $ - $ - $ - $ _ 31 Southeast $ - $ - $ - $ - $ _ 32 33 CITY PARKS: 34 Bicentennial Park-adjacent tracts i $ 300,000 $ - I $ 300,000 $ 389,852 , $ 389,852 35 Bob Jones Park-lots(West Beach) ' $ 1,621,600 . $ - $ 1,621,600 $ 932,717 ' $ 2,144,518 36 Bob Jones Park-adjacent tracts $ - $ - ' $ _ $ - 37 38 SPECIAL PARKS: 39 Teen Center site $ - $ - $ - $ - $ - 40 41 LINEAR PARKS AND TRAILS: $ - $ - $ - $ - $ - 42 Park land acquisition 43 Trail system development(additional ROW) 44 45 OPEN SPACE LAND ACQUISITION , $ 470,000 $ - $ 470,000 $ 472,753 $ 472,753 46 a7 PARK DEVELOPMENT: 48 NEIGHBORHOOD PARKS: , 49 Koalaty Park 50 Planning ' $ 10,000 $ $ 10,000 $ $ 5,095 51 Phase I $ $ $ $ $ - 52 Phase II ' $ - $ - $ - $ _ ' g 53 54 Noble Oaks Park 55 Planning $ - $ - $ - $ - $ 56 Phase I $ - $ _ F $ - $ _ ' $ 57 Phase II I $ - $ - $ - $ - ' $ - 58 _59 Lonesome Dove Park 60 Planning , $ - $ -I$ - $ - $ - 61 Phase I !$ - $ 60,000 $ 60,000 F $ -1 $ - 62 Phase II $ _ , $ _ . $ - $ _ . $ - 63 64 COMMUNITY PARKS: • 35 Royal and Annie Smith Park d6 Planning I $ - ' $ - $ - $ - j$ - E Prepared 6/24/99,5:22 PM Page 1 of 3 L:\finance\spdc\Spdc599.xls Southlake Parks Development Corporation FY1998/99 Capital Projects Budget Presented June 28,1999 Et 11 AI B I D I E I F I G I_ H IWO 2 Total Actual Actual 3 - FY1997-98 FY1998-99 FY1998-99 Transactions Transactions 4 Carry-over Approved Approved Fiscal YTD Project To Date 5 Budget Budget Budget May-99 as of 5-99 67 Phase I $ - $ - $ - $ _ $ - 68 Phase II $ $ $ $ $ _ 69 70 Southeast Park 71 : Planning $ - • $ - $ - $ - , $ _ 72 Phase I $ - $ - $ $ - $ C 73 Phase II $ - $ - ' $ - $ - $ - 74 75 Southwest Park 76 Planning $ - $ - $ - $ - $ _ 77 Phase I $ $ $ $ $ 78 Phase II $ $ $ $ $ 79 80 Teen Center 81 Planning $ - $ 150,000 $ 150,000 $ - $ - 82 : Phase I $ _ . $ _ , $ _ $ _ $ 83 I Phase II $ - $ _ , $ _ ' $ _ ; $ _ 84 i 85 Community Center/Recreation Center C 86 Planning $ $ $ $ $ 87 Phase I $ $ $ $ $ 88 Phase II $ _ - S - $ - $ _ - $ - 89 • II90 CITY PARKS: 91 Bicentennial Park 92 ,Phase II L93 Bid Package#1 ,Earthwork,Utilities,Vehicular paving $ 597,263 ' $ - $ 597,263 $ 579,083 $ 579,339 94 4/98 Pittman Construction$590,646 $ - ' $ - $ - $ - $ 95 co#1-7/98 drainage=($5,217);co#2-7/98 concrete=$12,000 $ $ - $ $ $ IllOr 96 Bid Package#2 Court Construction $ 851,019 $ - $ 851,019 ' $ 525,593 ; $ 525,593 97 8/98 American Tennis Court Contractors $ - ' $ - $ - $ _ ! $ - 98 Bid Package#2a,Court Lighting $ 377,281 • $ - $ 377,281 $ 294,127 $ 300,125 99 8/98 NEMA 3 Electric,w/Ballfields#1,#3 $ - $ - $ - $ - $ - 100 Bid Package#3,Structures,McWilliams Enterprises $ $ 443.259 $ 443,259 $ 70,890 $ - 101 Tennis Facility $ $ $ $ $ - 102 Restroom/Storage $ - $ - $ - $ - $ - 103 Design Contract(Mesa) $ 161,910 $ - $ 161,910 $ 3,478 $ 151,608 104 Landscape/Irrigation $ $ 70.000 $ 70,000 $ 572 $ - 105 Fence Extension-Adventure Alley $ $ 5,000 $ 5,000 $ $ - 106 ,Entry Road Patching $ - $ 5,000 $ 5,000 $ - $ - 107 Fences-Fields#4&#5 ' $ 16,805 $ - $ 16,805 $ - $ 15,482 108 109 Phase III 110 Loop trait within park $ - $ 100,000 $ 100,000 $ ' $ - 111 roofing for in-line hockey court $ - $ 60,000 $ 60,000 . $ - $ - 112 Aquatics facility $ $ $ $ $ 113 North Berm construction $ - ' $ - $ - $ - $ - 114 Additional ballfield construction $ - $ - $ - $ - $ _ 115 116 CITY PARKS: 117 Bob Jones Park 118 Phase) 119 Grading/Berm($369,718 awarded 8/97 J Arnold,CO#1-4/98) $ 369,718 $ - ' $ 369,718 ' $ 56,592 1 $ 371,518 120 ' Cultural Resource Survey $ 8,900 $ - $ 8,900 $ - ' $ 8,753 121 Engineering Services($166,733 Cheatham-part A and B)II $ 166,733 $ $ 166,733 $ 27,155 $ 182,286 122 6/98 irrigation(A New Deal Irrigation) $ 164,345 $ $ 164,345 $ 18,578 ! $ 162,771 123 'Water well(JJ Biffle-$8943310/98) ; $ - $ - $ 89,433 ! $ 61,806 i$ 61,806 124 Fence-12/97 Ratliff-c/o#1-3/98 gates=$2100;co#2-8/98 fence=$6512) : $ 45,437 I $ - $ 45,437 $ 12,042 1 $ 45,237 125 Parking($248,970 awarded 12/97 Bertram) $ 248,970 : $ $ 248,970 $ 18,374 $ 272,359 126 par6/98 sod 14 soccer fields(Thomas Brothers)co#1-10/98$5604 $ 53,762 $ - $ 59,366 $ 59,919 : $ 59,919 127 • 3 Soccer Fields w/o lights(GRANT)($93,000 part of 14 fields) $ $ $ $ $ - kri 28 * 15 Picnic Tables w/grills(15 in Phase II)$19,250 $ $ 19,250 $ 19,250 $ $ 29 * Fishing Dock$38,500 $ $ 38,500 $ 38,500 $ $ E Prepared 6/24/99,5:22 PM Page 2 of 3 L:1financelspdclSpdc599.xls L ---7� 3 • Southlake Parks Development Corporation FY1998/99 Capital Projects Budget Presented June 28,1999 EL _ AI B I D ( E I F l G l H 1 11111. 2 Total Actual Actual 3 FY1997-98 FY1998-99 FY1998-99 Transactions Transactions 4 ' Carry-over ' Approved Approved Fiscal YTD Project To Date 5 Budget Budget Budget May-99 as of 5-99 130 * Playground$96,000 $ - ' $ 96,000 j $ 96,000 $ - $ C 131 *'Practice Fields$38,500 $ - $ 38,500 I $ 38,500 $ - $ 132 *',Pavilion$85,000 $ - ' $ 85,000 $ 85,000 I $ - $ 133 1 134 (Phase II 135 * Playground$96,000 $ - $ 96,000 1 $ 96,000 I$ - $ - 136 *i 15 Picnic Tables w/grills$19,250 $ - $ 19,250 1 $ 19,250 ; $ -: $ _ 137 *'Fishing Pond$102,500 $ - $ 102,500 1 $ 102,500 $ - $ 138 ' Day Camping Facilities$64,000 $ - $ 64,000 $ 64,000 j $ - $ - 139 ' Amphitheater$64,000 $ - $ 64,000 I $ 64,000 I $ - $ - 140 * Signage$1,000 $ - $ 1,000 1 $ 1,000 , $ - $ II 141 * Lighting Soccer Fields$35,000 ' $ - $ 35,000 ' $ 35,000 ' $ 7,500 $ 7,500 142 Loop Road-$500,000(in addition to grant money) $ - $ - $ - $ - $ - 143 * Hike&Bike Trail$128,000 $ - $ 128,000 1 $ 128,000 ! $ - $ - 144 Planning and Construction$45,500 ' $ - $ 45,500 ; $ 45,500 i $ - 145 ; i I I 146 I CITY PARKS: I ; 147 ;Bob Jones Park i 1 ; 148 ,Phase III I 149 Nature Center $ 20,000 • $ $ 20,000 $ 13,000 $ 150 151 'Phase IV $ _ S - , $ - ' 5 - $ - 152 153 LINEAR PARKS AND TRAILS: 154 Signage for On-Road Trails $ $ 5,000 $ 5,000 $ - $ 155 156 Continental-Phase 1 $ 9,000 $ 150,000 , $ 159,000 , $ - $ 3,568 L157 Continental-Phase 2 $ $ __ $ - $ - $ - �� 158 159 ;Loop trail from Bicentennial to Durham/CJHS $ - , $ - 1 $ - $ _ $ 160 161 Fox Hollow equestrian trail $ - $ 12,000 I $ 12,000 i$ - $ - 162 163 ISTEA Grant-Cottonbelt Trail$48,000 $ 48,000 ' $ $ 48,000 $ 16,050 $ 18,450 164 165 MATCHING FUNDS-COMMUNITY PROJECTS: 166 Adventure Alley Pavilion addl$10,000 10/98 $ 15,000 $ $ 25,000 $ 25,000 $ 25,000 167 Tree Farm(app.12/97-donations FY98=$2,069+$1,500=$3,569) $ 1,500 $ $ 1,500 $ 24 $ 3,288 168 Tree Farm#2(Shady Oaks-Grant) $ $ $ 4,200 $ 2,601 $ 2,601 169 Southlake Baseball Association(app.1/99) $ - ' $ - $ 30,000 ' $ 22,113 $ 22,113 170 Remaining Balance $ - . $ 100,000 $ 39,300 ; $ - 171 172 SPECIAL PROJECTS: $ $ 50,000 $ 50,000 $ $ - 173 I Senior Activity Center ' $ 55,000 $ - $ 55,000 : $ 9,910 $ 59,611 II 174 , 175 JOINT USE PROJECTS: 176 Equipment $ 5,000 $ $ 5,000 $ - $ - 177 :Signage-All Parks $ 7,000 r $ - $ 7,000 ; $ - ' $ - 178 Gymnasiums $ _ $ _ 1 $ - $ - $ - 179 Ball field development $ - $ 20,000 i $ 20,000 $ 2,106 $ 2,106 180 181 GRAND TOTAL EXPENDITURES , $ 5,624,243 ' $ 4,412,759 1 $ 10,115,539 : $ 3,621,834 $ 5,893,250 182* TPW GRANT ELIGIBLE E I Prepared 6/24/99,5:22 PM Page 3 of 3 L:\finance\spdc1Spdc599.xls I -0)6_i.../ SOUTHLAKE PARK DEVELOPMENT CORPORATION Capital Projects Status Report June 15, 1999 MCI \TE\\I; L. PARK Land Acquisition - 1 Status: None. Phase II construction Design -Phase II Contract Began: June 17, 1997 ' Estimated Completion of Construction: August, 1999 Consultant: MESA Design Group Status: Bid package #1 with Pittman Construction was closed June 2, 1999 for a total contract amount of 5593,779. SPDC awarded bid package #2 to American Tennis Court Contractors for$851,019.00 to include 13 tennis courts, 3 basketball courts, and 1 in-line hockey court. Change Order #1 (resurfacer) was approved in February to add 513,000. Change Order #2 resulted in a credit of$1,531. Change Order #3 resulted in a credit of S6,373. Tennis Iv" court surfacing is 95%complete. Center court seat walls and steps are substantially complete. Sidewalks will progress with establishment of grade. SPDC awarded bid package #2a to NE:VIA3 Electric for$377,281.00 to include lighting ballfrelds 1 and 3 with all Phase II court lighting with exception of the basketball courts which are unlighted Ballfield lighting is complete. Phase II tennis lighting will be completed with pro-shop construction. Phase II hockey lighting will resume as planned with delivery of materials. Manufacturer material cost increase and delivery increased ' cost$3,000. SPDC awarded bid package #3 to McWilliams Enterprises, Inc.for 5443,259.00 to ' include the Tennis Center and restroom/storage facility. Contract and construction issues delayed progress. Concrete piers and mechanical services are complete with foundation progressing. ' Written estimates for Tennis windscreens were received and awarded to American Tennis Court Contractors Inc.for$14,433.00. Installation is expected in mid July. Written estimates for tennis court shade structures were received and awarded to SunPorts International Inc.for$7,960. Installation is essentially complete. Written estimates for Ilbro the pond surface aeration system were received and awarded to Greenscape Pump Services Inc.for$12,775. Installation is expected in early July. Page 1 ge-/ I kiii Bicentennial Park Phase II I I I i 1999 ID Task Name I Duration I Dec I Jan I Feb j Mar I Apr I May I Jun � Jul I Aug I Sep I Oct Nov[ 'Dee Jan I Feb I Mar I Apr 1 Bid Package/1 21d iimip I 2 Bid Package 82 156d 3 Tennis Courts gpINMEMIIIIIMINIIIIIIIIII 72d iiponommip 4 Concrete 31d ate 5 Fencing 15d I ompMte 6 Surfacing25d 7 Basketball Courts 304 t5X • 6 Concrete Complete 15d _— Iompkte - —_ I 9 10 Surtatkg In-Li — 15d In-Line Hockey Facility w/o cover 114d 90X 11 Concrete Complete 1003 60% I12 Dasher Boards 14d 13 Bid Package/2A 155d 14 Softbal Lighting 37dMEI Complete • 15 Tennis Lighting 134cl I 16 Installation — 15d ElComplete '. - 1T 'Monq +4d _ M - 16 Bid Package/3 154d 1. I Its Tennis Pro Shop and Restroom Faaleies 154d 10% 20 Deduct Change Order 10d • 21 SPDC Approval 6d 22 CM Counal Approval lid ----- ----- -- ---- II VW 23 Foundation 20d I 1999 ID Task Name Duration Dec ) Jan I Feb I Mar I Apr I May I Jun I Jul I Aug J Sep j Oct I Nov I Dec Jan I Feb I Mar I Apr 24 Phase II Remaining Items 136d 25 Tennis Shade Structure 20d 26 women approval of estimates 10d I 27 Installation 10d CompleH 26 Tennis Wind Screens 126d Complete 29 Written approval of estimates 10d_----- .O..mpM.. 30 Installation �� I • 31 Pond Aeration 670 1111111, ---- 32 Written approval of estimates 22d a-- ______ l.b. im. 33 Instalation 21d I 34 Bid Package 4 toad 35 Irrigation 108d 36 — Design t7tl ___fie I 37 Park Board and SPDC Approval 25d 36 Receive Authorization to Bid from SPDC td 39 Advertise 21d ---------------L-- ---. Ida Tabulation and Award of Contract 7d 41 ObtainContract Documents 7d 42 Constroction 30d IL . I Page 2 7e-a I 1999kW ID Task Name Duration Dec Jan I Feb I Mar I-Apr F May I Jun 1 Jul I Aug I Sep I Oct 1 Nov J Dec Jan I Feb I Mar I Apr 43 Bid Package 6 106d I +4 1 Landscaping 106d 45 Design 17d 111%.1rri_ 46 Park Board and SPDC Approval 250 I 47 43 Receive Authorization to Bid from SPDC Id Advertise21d 49 Tabulation and Award of Contract 7d Iso 51 Obtain Contract Documents 7d Construction 304 IAdventure Alley Fence Extension—F.Y. 1998-99 Status: The 45'pavilion constructed by Southlake Playgrounds, Inc. will I incorporate a portion of the fence extension. Estimates are being sought to complete the enclosure. I 1999 tO Task Name Duration Dec Jan I Feb I Mar I Apr I May I Jun I Jul I Aug I Sep I Oct 1 Nov I Dec Jan I Feb [Mar I Apr 71 Adventure Alley Fence Extension 56d.I Entrance Road Repair—F.Y. 1998-99 ,, Status: Contractor recommendations and estimates are being received. low 1999 to Task Name Duration Dec Jan I Feb l Mar I Apr I May I Jun I Jul qug I Sep 1 Oct I Nov I Dec Jan ]Feb I Mar I Apr 72 Entrance Road Repair 107d r 73 Design 15d I 74 Park Board and SPDC Approval lad WettIQ 75 Receive Approval to Bid born SPDC 1d 76 Advertise 16tl I 77 Tabulation and Award of Contras ad 76 Obtain Contract Documents 7d • 79 Construction 25d I Phase III Park Trail—F.Y. 1998-99 I Status: Alignment of the park trail is being designed by staff and will be submitted when completed for Park Board approval. Staff is coordinating with Tom Thumb to ensure an acceptable transition across property lines. Site base information is being I assembled to illustrate existing conditions and improvements. The portion of trail south of Oak Hill Subdivision is anticipated to be improved within the month of July, 1999. lit I Page 3 I 7C-3 I !lie . 1999 ID Task Name Duration Dec , Jan I Feb I Mar I Apr j May I Jun I Jul I Aug I Sep I Oct I Nov I Dec Jan I Feb I Mar I Apr I 64 I Park Toil — 191d 65 I Design 15d , tt`l • 66 Park Board and SPDC Approval 8d 67 Advertise 254 i 68 I Tabulation and Award of Contract 8d 89 Obtain Contract Documents 7d 70 1 Construction 660 I Cover for In-line Hockey-F.Y. 1998-99 I Status: Proposals from qualified design consultants were received and reviewed for the cover of the in-line hockey facility. A contract for S6,000 has been accepted from Ron Hobbs Architects for two conceptual designs with cost estimates to construct. I 1999 ID Task Name Duration Dec Jan I Feb I Mar I Apr I May I Jun I Jul J Aug I Sep I Oct I Nov I Dec I Jan I Feb I Mar I Apr 52 Hockey Cover 326d ' I I 53 Consultant Selection and Approval 97d Corirptete 54 Conceptual Desgn wen Estimates 44d, ___ SS Park Board and SPDC Approval 14d I 56 Preliminary Design Approval 300 --- --- _—� 57 Park Board and SPDC Approval 15d • 58 Construction Documents 30d w 59 Receive Authonzatron to 04 from SPDC 16d I-e 60 Advertise 30d • 61 Tabulation and Award of Contract 7d 62 Obtain Contract Documents 7d I63 Construction 60d -- --- IItOI3 JOKES PARK I Land Acquisition- Status: Progressing through the City Manager's Office. IPhase I with TPWD Grant- Consultant: Cheatham and Associates Began: March 18, 1997 I Status: Contracts are closed with: James Arnold Construction for Phase I earthwork. J.L. Bertram for vehicular paving. IThomas Bros. Grass for sodding soccer fields. Ratliff Iron Works for perimeter fencing. Daniel Electric for power services. ILProBuild Construction for phase I pump enclosure. I Page 4 C 7e .5/ - SPDC awarded irrigation improvements to 'A New Deal'Inc. Construction. Installation is complete with parking lot islands remaining. Closeout discussions are progressing. SPDC approved schematic plans for TPWD grant improvements as presented in April to include the pavilion/boardwalk,playground, trails, and ballfields. Construction ' documents are being finalized. Authorization to bid will be requested from SPDC pending approval of the TPWD contract. Issues remain concerning deed and boundary information submitted. Staff is awaiting a response from TPWD. 1999 ID Task Name Duration ;Dec Jan I Feb J Mar f Apr I May Jun I Jul f Aug j Sep I Oct f Nov I Dec Jan I Feb I Mar j Apr f May 1 PhaseI 61d Grass Sodding Pipe Fen 210ME 1 Complete Sto C Penang ompklte 3 4 Tree Transplamng 21a I Complete 5 Water WM 40a "Y." Phase II with TPWD Grant- Status: To begin after substantial completion of Phase I. Nature Center Planning- Status: A location has been recommended and approved by the Park Board. The donated facility is being stored until site conditions will allow for final placement. Nl:IGHBORIuooD PARKS Noble Oaks Park- F.Y.2000-01 ' Status: Design has been held pending coordination of adjacent improvements with CISD. Staff is progressing with the development of a designated parking area to deter vehicular traffic through the park Koalaty Park-F.Y.2000-01 Status: A public hearing was held February 5, 1998 with Park Board. The layout of the Master Plan was approved with the inclusion of relocating the restroom facility, ' creating a berm south of the school,providing a natural barrier to Country Walk Estates, and providing 25 additional parking spaces. Primary elements include four unlighted ballfields and two practice soccer fields, both sized for elementary-age use; one larger practice soccer field and adult practice ballfield. A trail loop is planned which would tie in with the anticipated Continental IBlvd. trail. Page 5 7c-5- 1 khire Problems continue with parking along the Country Walk entrance. "No Parking"signs were installed but have been of little benefit to resolve the conditions. I Royal and Annie Smith Park-F.Y. y . 1999 00 I Status: A public hearing was held February 5, 1998 with Park Board. Approval was tabled. KISD is constructing a library and parking lot that will necessitate redesign of the park A temporary trail was constructed along the right-of-way from ' IRidgewood Subdivision to Florence Elementary. I Lonesome Dove Park-F.Y. 1998-99 Status: All requirements of the developer's agreement are being addressed. As-built information is being gathered to progress with considered improvements. I LINEAR PARRS AND TRAILS IISTEA -Grant Cottonbeft Trail-F.Y.F.Y. 1997-98 I Status: Southlake, Colleyville, and NRH entered into an interlocal agreement with each other to design and construct the trail under one contract with a more cost effective _ and efficient approach. MESA Design Group has been contracted as consultants by the three cities and TxDOT. Preliminary plans with alternatives are being reviewed. The City of Grapevine has agreed to assist through the City of Southlake portion of the trail. Ii,,. MI 2000 2001 2002 lD !Cotton Batt r..hn. Durolion Otr 2 I Otr 3 1 Otr♦ OS 1 !Otr 2 1 OP 2 I OW 4 Otr 1 I Otr 2 I Do-7 )Otr 4 Otr 1 1 Otr 2 )Dtr] I Otr/ Otr 1 I Otr 2 1 OD 3 672d 1 Cotton Galt Trails , 2 I Data Codes-ton and Site Analysis 145d P I 2 Srhema0c Design 17Od a Design Development 174d _ _ �_ 5 Construcaon Douwments 143d . Continental Boulevard Trail(White Chapel to Davis)-F.Y. 1998-99 Design -Phase I Contract Completed: November 25, 1997 IConsultant: Dunaway Associates, Inc. Status: Trail improvements are pending Phase I improvements to Continental IBoulevard I it I Page 6 7C- r COMINII MTV F,kCILITILS ' Royal and Annie Smith Park House- Status: Building Inspection has reviewed the house. Extensive work will be necessary for public use. Nature Center- 1111 Status: The facility has been located to Bob Jones Park and is currently staged until site conditions allow for final placement. \1.1TC11IN(; FINDS - CO\I\1l NUN. GROE I'S ' Total Budget-S100,000 Adventure Alley Pavilion by Southlake Playgrounds,Inc.- - Approved by SPDC: August 17, 1998 11,41, Approved by Park Board: February 3, 1997 Status: SPDC approved S1 5,000 at the August meeting to begin construction on the planned 20'and 45'pavilion. Funds received have allowed for the purchase and completion of six covered picnic tables and a 30'pavilion. A fourth pavilion (20) location was approved by Parks and Recreation Board near the Basketball courts of 111 Bicentennial Park. Senior Tree Farm #1 - IApproved by SPDC: January 16, 1998 Approved by Park Board: December 8, 1997 Status: All trees have been planted. The drip irrigation is 100%complete. Senior Tree Farm#2- IApproved by SPDC: Approved by Park Board: ' Status: The Texas Forest Service Grant of S8,400 (S4,200 Grant Award with a S4,200 Required Match) began on October 1, 1998. All grow bags and drip irrigation have been installed. Planting is complete with 403 seedlings. 111 Page 7 7e 7 1 .JOINT-t SE PROJECTS Soccer Practice Fields-F.Y. 1998-99 1 Status: Plans are being prepared for the layout of the irrigation system at St. Martin's in-the-Field. Minor earthwork is progressing to facilitate drainage. 1 I • 1999 ID Task Name Duration Sep ; Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 1 St Martin's in the Field Soccer Practice Fields Sad 2 Minor Gradmg 41d Joint-Use Equipment- 1 Status: Available as needed. 1 Signage for all Parks - Status: Available as needed. SPECIAL PROJECTS likW i 1 1 i 1 Page 8 71 - 8 Southlake Parks Development Corporation • • L.,CMO Follow up /a q Meeting Date I ?/2.09 Executive Session - Certified Agenda to City Secretary's office 08/7q Original, approved, minutes to City Secretary's office w/copy of packet information Executed Documents needed: I C Follow up items: C C I it L •