Loading...
Item 8 - PresentationZoning Change and Site Plan Mustang Business Park Item 8 ZA21-0007 ZA21-0007 OWNER:Wright Mustang Business Park,LLC APPLICANT:Kimley-Horn REQUEST:Approval of a Zoning Change and Site Plan from “I-1”Light Industrial District to “S-P-1”Detailed Site Plan District for three distribution warehouse buildings totaling approximately 340,180 square feet on approximately 26.24 acres LOCATION:1800 SH 26 Aerial View 751 Street View 751 771 Street View 751 771 Pathways Master Plan S-P-1 Regulations Development Regulation Proposed “S-P-1” Requirement “I-1” Light Industrial District Building Height Any building lying more than one hundred (100)feet from any area zoned in a residential classification shall not exceed forty-five (40)feet in height. Any building lying more than one hundred (100)feet from any area zoned in a residential classification shall not exceed two and one-half (2 ½)stories or thirty- five (35)feet in height. Permitted Uses: The permitted uses are as allowed in the “I-1” Light Industrial District. Development Regulations: The development will comply with the “I-1” Light Industrial District with the following exceptions: Variance Request 1)Driveway Ordinance No.634,Section 5.2.d requires a minimum stacking depth of 150’.No stacking distance is provided.A variance is requested to allow a minimum stacking depth of 0’measured to the first turning movement internal to the site.A functional stacking depth of ±60’is provided. 2)Zoning Ord.No.480,as amended,Section 33.19 and Subdivision Ord.No. 483,as amended,Section 5.06 require a 5’sidewalk along Southwestern St.A variance to this requirement is requested. Previous Site Plan (P&Z 2/25/21) Emergency only access driveway Variances requested to allow a 0’ stacking depth and no sidewalk P&Z Commission Issues and Concerns discussed at the February 25, 2021 meeting P&Z Commission Issues and Concerns Applicant’s Response Reduce the building heights.Higher interior clearance affects the user type and velocity. The maximum building height has been reduced from 45’to 40’and building heights now range from 39’to 39’9”. Eliminate the parking along the north driveway. The row of parking facing the “MH”zoned properties on Woodsey Ct. and Timberline Ct.has been removed.The required parking has been reduced by reducing the percentage of office space allowed from 15% to 6%of the floor area. Provide as much landscaping as possible along the north property line. Additional landscaping along the north property line is shown on the plans. Consider relocating the south driveway closer to Building 3 to increase stacking depth from the intersection of Mustang Ct.and Southwestern St.to that turning movement. The driveway to the south has been relocated to the west as requested. Provide an opaque gate at the emergency access at the end of Woodsey Ct. A photo example and rendering of the proposed opaque gate have been submitted. Consider access to Brumlow Ave.A 60’wide private access easement to the west property line has been provided to allow a possible future connection. Provide a TIA that addresses the Lee Engineering review comments.A revised TIA and Lee Engineering review are attached separately. Provide a sidewalk along Southwestern St.The required 5’sidewalk along Southwestern St.has been added and the previous variance request has been removed. Site Plan Comparison 5’ sidewalk provided Row of parking removed Driveway relocated Access easement provided Height 39’3”Height 39’ Height 39’9” April 8, 2021February 25, 2021 Height 42’6” Height 40’ Height 39’ Revised Site Plan Emergency only access driveway Variance requested to allow a 0’ stacking depth Previous Elevations Building 1 12 3 February 25, 2021 Revised Elevations Building 1 12 3 April 8, 2021 Previous Elevations Building 2 12 3 February 25, 2021 Revised Elevations Building 2 12 3 April 8, 2021 Previous Elevations Building 3 12 3 February 25, 2021 Revised Elevations Building 3 12 3 April 8, 2021 View at Entrance Previous Line of Sight Exhibits February 25, 2021 Revised Line of Sight Exhibits April 8, 2021 Street View Street View Previous Tree Conservation Plan (P&Z 2/25/21) Required canopy to be preserved –60% Proposed canopy to be preserved –21.6% Revised Tree Conservation Plan Required canopy to be preserved –60% Proposed canopy to be preserved –27.6% Previous Overall Landscape Plan February 25, 2021 Revised Overall Landscape Plan April 8, 2021 Previous Overall Landscape Plan February 25, 2021 Revised Overall Landscape Plan April 8, 2021 Previous Landscape Plan LP1.01 North February 25, 2021 Revised Landscape Plan LP1.01 North April 8, 2021 Previous Landscape Plan LP1.02 North February 25, 2021 Revised Landscape Plan LP1.02 North April 8, 2021 Previous Landscape Plan LP1.03 North February 25, 2021 Revised Landscape Plan LP1.03 North April 8, 2021 Previous Landscape Plan LP1.04 North February 25, 2021 Revised Landscape Plan LP1.04 North April 8, 2021 Previous Landscape Plan LP1.05 North February 25, 2021 Revised Landscape Plan LP1.05 North April 8, 2021 Previous Landscape Plan LP1.06 North February 25, 2021 Revised Landscape Plan LP1.06 North April 8, 2021 Previous Landscape Plan LP1.07 North February 25, 2021 Revised Landscape Plan LP1.07 North April 8, 2021 Surrounding Property Owner Responses For: Opposed: Undecided: P&Z Commission February 25, 2021; tabled at the request of the applicant (7-0). Preliminary Utility Plan Preliminary Grading Plan (North) Preliminary Grading Plan (South) Questions? Building 3 Masonry Exhibit