1995-050City of Southlake, Texas
RESOLUTION NO. 95-50
N
A RESOLUTION OF THE CITY OF SOUTHLAKE, TEXAS,
AMENDING RESOLUTION NO. 94-46; PROVIDING THAT
THIS RESOLUTION SHALL BE CUMULATIVE OF ALL
PROVISIONS OF RESOLUTION NO. 94-46, NO. 94-61, NO.
95-05, AND NO. 95-34; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City Council of the City of Southlake heretofore adopted Ordinance No.
592 providing for the adoption of fees and revisions thereto from time to time by resolution; and
WHEREAS, thq City Council with Resolution No. 94-46 set a schedule of fees for certain
services; and,
WHEREAS,the City Council has reviewed House Bill 391 which amends Article 6701d
of V.T.C.S. relating to release of accident reports and has determined that said fees should be
included in the fee schedule.
Now -THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF SOUTHLAKE, TEXAS:
Section 1. That Schedule of Fees, Section 1, Administrative Activities, #5, Offense/Accident
Report is amended per the following:
Basic $4.00
Certified $6.00
Written Certification that no report exists $4.00
Section 2. That this resolution shall be cumulative of all provisions of Resolution No. 94-46
of the City of Southlake, Texas, except where the provisions of this resolution are in direct
conflict with provisions of such resolution, in which event he conflicting provisions of such
resolution are hereby repealed.
Section 3. That the fee established herein shall be effective upon passage of this Resolution
and shall take precedence over any fees previously adopted which are in conflict herewith.
U111K ,FD AND APPROVED this the / day okwj, 1995.
yOJ '
AT ST:
off IsM,
Sandra L. LeGrand
City Secretary
C.\ORD-RES.AGR\95-50 FEE/kb
CITY OF SOUTHLAKE, TEXAS
Mayor ary FickG
SCHEDULE OF FEES.
ACTIVITY
SECTION I. Administrative Activities
FEE
1. NSF Check Return Charge 20.00
2. Copy Charges 10/page
3. Water Service Customer Listing 1.00/computer page
4. Water Customer Mailing Labels 35.00
5. Offense/Accident Report Eepies: (Amended Res. s95-50) 4.00
Basic 4:00
Certified 6.00
Wriften Certifitatibn thatno report exists 4 00
6. Burning Permits 0.00
7. Ambulance Fees:
Transport -Baylor, Grapevine (w/o oxygen) $150.00
Transport -Baylor, Grapevine (with oxygen) $160.00
Transport -Other Hospitals (w/o oxygen) $300.00
Transport -Other Hospitals (with oxygen) $310.00
8. House Moving Permit $10.00 + $1,000 Surety Bond + 1.5
9. Solicitation/Vendor Permit
10. Seasonal Permits
11. Vital Statistics:
Certificate of Death
Certificate of Birth (Amended Res. #95-34)
C:\ORD-RES.AGR\SCH995.FEE
x hourly rate of 2 police officers
utilized in the move
35.00 (Co. license) +$10.00/Agent
1,000 Surety Bond
25.00
9.00 / 1st copy 3.00 each add' 1 copy
at time of initial request
13.00 / copy
ACTIVITY FEE
12. Wrecker Permit Fee: (Amended Res.N94-61)
Permit fee per wrecker vehicle $24.00 per year
waived for contract agency)
Permit Fee per authorized driver $12.00 per year
waived for contract agency)
SECTION II. Communitv Development Activities
1. Board of Adjustment requests 200.00/request
2. Amendment to Zoning Ordinance 200.00/request
3. Zoning Only 200.00 + $10/Acre
4. Concept Plan Only 200.00 + $10/Acre
5. Zoning & Concept Plan 300.00+ $10/Acre
6. Zoning and Site Plan 300.00 + $10/Acre
7. Zoning/Concept & Site Plan 500.00 + $10/Acre
8. Specific Use Permit 200.00 + $10/Acre
9. Site Plans 300.00 + $10/Acre
10. Amended Plat s 4 lots 200.00 + $20/Lot/Res
200.00 + $20/Ac-Comm
11. Amended Plat > 4 lots 300.00 + $20/Lot-Res
300.00 + $20/Ac-Comm
12. Plat Showing (1 lot) 200.00 + $20/Lot-Res
200.00 + $20/Ac-Comm
13. Plat Showing (multiple lots) 300.00 + $20/Lot-Res
300.00 + $20/Ac/Comm
14. Preliminary Plat (Non-P.U.D.) 300.00 + $20/Lot-Res
300.00 + $20/Ac-Comm
C:\ORD-RES.AGR\SCH995.FEE
ACTIVITY
15. Preliminary Plat (P.U.D.)
16. Final Plat (Non-P.U.D.)
17. Final Plat (P.U.D.)
18. Plat Revision
19. Plat Vacation
20. Rush Plat Filing
21. Two -County Filing
22. Extra Plat Page Filing
23. Mapping (1:1000) -Blueprint
Color
24. Mapping (1:2000)-Black/White
Color
25. Mapping 11 "x 17" plat reduction copies
26. Mapping (digital tape format)(Aaaea Res. #95-34)
27. Street Name Change
28. Temporary Batch Plant Permit
29. Tree Removal Permit
30. Park land Dedication- Raw acreage cost
C:\ORD-RES.AGR\SCH995.FEE
FEE
300.00 + $30/Lot-Res
300.00 + $30/Ac-Comm
300.00 + $20/Lot-Res
300.00 + $20/Ac-Comm
300.00 + $30/Lot-Res
300.00 + $30/Ac-Comm
300.00 + $20/Lot-Res
300.00 + $20/Ac-Comm
200.00 Flat Fee
300.00 Flat Fee
50.00 Flat Fee
20.00 Flat Fee
20.00 per map
30.00 per map
5.00 per map
10.00 per map
2.00 per map
140.00 per tape
100.00 per street
00 per Permit
00 per Permit
25,000.00 per acre
ACTIVITY FEE
SECTION III. Public Works Activities
1. Administrative Processing Fee 2% Actual Construction Cost
2. Computer Drainage Study:
HEC I : 400.00 + $10/Linear Foot
HEC II: 400.00 + $10/Linear Foot
3. Construction Inspection 3 % Actual Construction Cost
4. Street Cut Permit 15.00 per Street
5. Easement Abandonments 150.00 Flat Fee
6. R.O.W. Abandonments 150.00 Flat Fee
7. Easement/R.O.W. Dedications 100.00 per Easement
8. Water Tap Fee
1 " Meter 360.00
2" Meter 600.00
4" Meter 1,900.00
i 6" Meter 2,777.00
i
8" Meter 4,054.00
9. Sewer Tap Fee 75.00
10. Sewer Participation Fee (Added Res. #95-34) 1,300/lot
11. Water Administrative Service Charge 15.00
12. Water Deposits:
Residential Accounts 50.00
Commercial Accounts Reviewed by Utility Billing
Supervisor
13. Fire Plug Meter Deposit (City Meter) 650.00
Fire Plug Meter Deposit (Own Meter) 100.00
C:\ORD-RES.AGR\SCH995.FEE
ACTIVITY FEE
14. Water Reconnect Fees for Non -Payment,
Business Days Only:
8 a.m.-5 p.m.: 1st/2nd/3rd & subsequent 20/$40/$60
After 5 p.m.: 1st/2nd/3rd & subsequent 40/$60/$80
Weekends, anytime 40/$60/$80
15. Water Meter Re -installation Fee 50.00
16. Water Meter Reread Fee 5.00
17. Damaged or Broken Lock 25.00
18. Late Utility Payment Fee 5% of Outstanding Balance
19. Street Light Costs Developer pays installation + 2 -year
operation cost
20. Building Permit Fees Per the currently adopted U.B.C.
Administrative Code)
21. Water Well Permit 42.00
22. Tent Permit 15.00
23. Sign Permit, Permanent Type (1 - 50 sq ft) 50.00 minimum
Sign Permit, Permanent Type (> 50 sq ft) 1.00 / sq ft
Sign Permit, Temporary Type 25.00
Illuminated Sign, Electrical Permit 35.00 (in addition to above)
24. Request for Variance to Sign Ordinance 100.00/request
25 Culvert and/or Approach Permit 42.00
26. Building Contractor's Registration Fee 75.00
27. Perimeter Street Fees (Amended Res.#95-05, Res. #95-34) See Exhibit "A"
28. Critical Drainage Structure Fees. (Added Res. #95-34) See Exhibit "B"
C:\ORD-RES.AGR\SCH995.FEE
ACTIVITY
SECTION IV. Park Activities (Amended Res. #95-34)
1. Building Reservations for Residents:
Regular Meetings Reservation
Security Deposit
Week day meeting
2. Building Reservations for Special Activities:
Security Deposit
The Lodge (with Kitchen)
Community Center/room
Community Center/entire building
3. Organized Athletic Programs
4. TV/VCR Rental Fee
FEE
25.00 per year
50.00 (refundable)
10.00/hr
50.00 (refundable)
15.00/hr
15.00/rm/hr
35.00/hr
1,000,000 General Liability Insurance Policy
5. Equipment Rental: (Driver's license held)
Tennis Racket & Balls No charge
Volleyballs
Basketballs
6. Reservations of Park Facilities:
Security Deposit
Hilltop Picnic Area
Pine Tree Picnic Area
Bicentennial Pavilion
7. Reservations for Fields and Courts:
Ballfields (No Lights)
Ballfields (With Lights)
Soccer Fields
Field Preparation Fees:
Weekday Games
Weekend Games
Multi -use Court (Hockey/Basketball)
Multi -use Court (With Lights)
Sand Volleyball Courts
Tennis Courts
C:\ORD-RES.AGR\SCH995.FEE
No charge with reservation
No charge
No charge
50.00 (refundable)
5.00/4 hrs
5.00/4 hrs
8.00/4 hrs
7.50/1.5 hr/field
15.0011.5 hr/field
2.50/1.5 hr/field
25.00/field
37.50/field
10.00/hr
15.00/hr
5.00/hr/court
5.0011.5 hr/court
Exhibit "A"
Perimeter Street Fees
September 5, 1995
PER -LINEAR -FOOT COST ESTIMATES
Roadway Cost Cost
Classification Per Linear Foot Per Linear Foot
Arterial - Interim 24' Section
No curb & Gutter - 4" HMAC
Arterial - Interim 48' Section
No Curb & Gutter - 4" HMAC
Arterial - Ultimate A41) Boulevard Section
With Curb & Gutter
Arterial - Ultimate A41) Boulevard Section
With Curb & Gutter - 6" PCC
Arterial - Ultimate A5U Undivided Section
With Curb & Gutter - 7" HMAC
Arterial - Ultimate A5U Undivided Section
With Curb & Gutter - 6" PCC
Arterial - Ultimate A4U Undivided Section
With Curb & Gutter - 7" HMAC
Arterial - Ultimate A4U Undivided Section
With Curb & Gutter - 6" PCC
Collector - Interim 24' Section
No Curb & Gutter - 4" HMAC
Collector - Interim 48' Section
No Curb & Gutter - 4" HMAC
Collector - Ultimate C2U Section
With Curb & Gutter - 7" HMAC
C \ORD -RES AGRTEESEXA WPDdah/kb (9-95)
without Drainage with Drainage
60.00 $105.00
105.00 200.00
165.00 220.00
190.00 250.00
190.00 255.00
230.00 305.00
145.00 195.00
175.00 235.00
60.00 105.00
105.00 200.00
120.00 160.00
Exhibit "A"
Perimeter Street Fees
September 5, 1995
PER -LINEAR -FOOT COST ESTIMATES
Roadway Cost Cost
Classification Per Linear Foot Per Linear Foot
without Drainage with Drainage
Collector - Ultimate C2U Section
With Curb & Gutter - 6" PCC $135.00 $180.00
Residential Street - R2U Residential Street or
Cul De Sac - 31' Section
With Curb & Gutter - 6" HMAC $90.00 $115.00
Residential Street - R2U Residential Street or
Cul De Sac - 31' Section
With Curb & Gutter - 5" PCC $110.00 $145.00
HMAC = Hot Mix Asphaltic Concrete
PCC = Portland Cement Concrete
PLF = Per Linear Foot
CORD -RES AGRWEESEXAMPD-UhAb (9-95)
i
Exhibit "B"
Schedule of Fees
Critical Drainage Structures
per Engineering Report dated June 1995
Cheatham & Associates
Drainage Structure Fee Per Acre
1. Structure crosses T.W. King Road at
C:\ORD-RES AGR\FEESEXB.WPD-I h/KB (9-95)
approximately 1,250 ft. north of Bob Jones Road 437.34
2. Structure crosses N. White Chapel Blvd. at
Kirkwood Branch 149.11
3. Structure crosses N. White Chapel Blvd. at
south fork of Kirkwood Branch 186.15
4. Structure crosses W. Dove Street approx.
900' west of N. Peytonville Ave. 307.40
5. Structure crosses W. Dove Street approx.
300 ft. west of Shady Oaks Drive 331.38
6. Structure crosses E. Dove Street at Dove Creek 235.74
7. Structure crosses Plantation Drive at Higgins Branch 280.91
8. Structure crosses Shady Oaks Dr. at approx. 2,800'
south of W. Dove Street 479.34
9. Structure crosses N. Carroll Ave. at approx. 3,600'
north of State Highway 114 278.14
10. Structure crosses W. Highland St. approx. 300'
east of Shady Oaks Drive 694.29
11. Structure crosses Dove Creek Trail at approx.
1,000' south of Highland Street 466.91
12. Structure crosses East Highland St. at approx.
1,650' east on N. Carroll Ave. 983.63
13. Structure crosses North Kimball Ave. at approx.
2,800' north of State Highway 114 371.20
14. Structure crosses Shady Lane at approx. 2,800'
north of State Highway 114 222.80
15. Structure crosses North Kimball Ave. approx.
800' north of State Highway 114 406.50
16. Structure crosses Florence Rd. at approx.
3,000' west of Randol Mill Ave. 563.01
17. Structure crosses Johnson Rd. at approx.
1,700' west of Randol Mill Ave. 408.88
18. Structure crosses Southlake corporate limits
at approx. 600' west of FM1938. 212.61
C:\ORD-RES AGR\FEESEXB.WPD-I h/KB (9-95)
i
Exhibit "B"
Schedule of Fees
Critical Drainage Structures
per Engineering Report dated June 1995
Cheatham & Associates
Drainage Structure Fee Per Acre
19. Structure crosses W. Continental Blvd. at west
side of S. Peytonville Ave. 417.61
20. Structure crosses W. Continental Blvd. below
Timberlake Addition 214.29
21. Structure crosses W. Continental Blvd. adjacent
to S. Carroll Ave. 760.28
22. Structure crosses W. Continental Blvd. approx.
2,800' east of S. White Chapel Blvd. 566.02
23. Structure crosses W. Continental Blvd. approx.
1,100' west of S. Carroll Ave. 309.83
24. Structure crosses W. Continental Blvd. adjacent
to S. Carroll Ave. 652.13
25. Structure crosses S. Carroll Ave. adjacent to
E. Continental Blvd. 614.87
26. Structure crosses S. White Chapel Blvd. at
Big Bear Creek not developed
27. Structure crosses E. Continental Blvd. approx.
1,800' west of S. Kimball Ave. 878.95
culvert cost 2,850/l.f.
CHORD -RES AGR\FEESEXB WPD-I h/KB (9-95)