1990-064City of Southlake, Texas RESOLUTION NO.90-64 A RESOLUTION OF THE CITY COUNCIL OF THE CITY COUNCIL OF THE CITY OF SOUTHLAKE, TEXAS, AMENDING THE CONTRACT WITH CHEATHAM AND ASSOCIATES FOR THE S-6 SANITARY SEWER LINE. AUTHORIZING THE MAYOR TO EXECUTE THE AMENDED CONTRACT. PROVIDING AN EFFECTIVE DATE. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SOUTHLAKE, TEXAS, THAT: Section 1. That the City Council hereby amends the contract between the City of Southlake and Cheatham and Associates, for engineering of the S-6 Sanitary Sewer Line, in the form attached hereto as Exhibit "A" and authorizes the Mayor to have delivered an executed copy of the agreement to Cheatham and Associates. Section 2. That this resolution shall become effective on the date of approval by the City Council. PASSED AND APPROVED this the O a s un ung`" andra L. eGrand City Secretary APPROVED AS TO FORM: City Attorney City of Southlake, Texas day of CITY OF SOUTHLAKE, TEXAS By: ary Fic , Mayor N EXHIBIT A Res. 90-64 CHEATHAM AND OFFICIAL RECORDASSOCIATES August 29, 1990 City of Southlake 667 North Carroll Avenue Southlake, Texas 76092 Re: Proposal/Contract Amendment for providing Professional Services in connection with the Construction of Sewer Line S-6 and now to include N-3. CONSULTANT'S UNDERSTANDING The City of Southlake intends to construct sanitary sewer lines to serve the central portion of the city. The lines are identified as Lines S-6 and N-3. The City has approved a contract with Cheatham & Associates for services in connection with the. construction of S-6. That agreement is dated March 27, 1990. This is a letter admendment to that original agreement. This amendment will set out an additional scope of services for tasks to be performed in connection with N-3 and additional fees to be charged. General provisions of the original agreement are applicable to this amendment. SCOPE OF SERVICES ADDITIONAL WORK TO BE PERFORMED - FOR N-3:, 1. Surveying (40% complete, excepting surveying for easements - propose to complete remaining 60% and easement surveying) 1.1 our firm will furnish all necessary surveying field and office work necessary to perform the engineering design and to prepare construction plans. 1.2 We will also furnish all construction staking. 1.3 Surveying for easement preparation will also be furnished. (see item 3.2) ENGINEERS - PLANNERS - SURVEYORS A Subsidiary Firm of Southwest Planning and Design, Inc. 1170 Corporate Drive West - Suite 207 - Arlington, Texas 76006 817/633-1023 - Metro 640-4329 Res. 90-64, 2. Engineering (40% complete, propose to complete remaining 60%) 2.1 our firm will furnish all necessary technical expertise required to accomplish the engineering design of the sewer line and appurtenances. The design will be in accordance with applicable state and federal regulations. 2.2 our firm will then prepare construction plans, specifications and contract documents based on the engineering design. 2.3 we will assist in the advertising for and taking of construction bids. We will issue any required adendums. Our firm will assist in the processing of contract documents after contract award and will issue notice -to -proceed. 2.4 Periodic on-site visits by an engineer will take place during construction. We will issue and process any required change orders. 2.5 We will provide assistance in conducting the final inspection and issuance of certificate of completion. 2.6 our office will prepare "As -Built" plans from the contractor and inspector's "Mark-Up" plans. 3.0 Easements 3.1 our firm will conduct the search for deeds and conduct other research at the Tarrant County Courthouse necessary for the preparation of the required easements. 3.2 We will then prepare the legal (metes & bounds) descriptions of the easements with computer plotting. This work element also includes the surveying work necessary to prepare easements and to tie easements to the base line(s). This element includes preparation of the final written easement document and of the accompanying drawing. 3.4 (OPTIONAL ITEM) Our office will assist in the acquiring Grantor's signatures on the easement forms. This proposal does not contemplate our firm participating in any condemnation proceedings. VA Res. 90-64 FEES We will provide all the services and products described in the scope of services including all services necessary for engineering surveying, engineering, contract administration, construction staking and periodic visits during construction, and Owner's project representation for the project as follows: ADDITIONAL FEES - FOR N-3: For Fee Calculation: Estimated Construction Cost: Estimate Cost for CISD Force Main and Lift Station Total City Portion 365,750 67,500) 298,250 Subtotals 75,735 Fee remaining for N-3 q 75,735 26,322) 49,413 26,322 Res. Amount Fee Previously Paid (40%) Engineering Fee (9.2%) 9.2% x $298,250 27,439 10,976 9.2% x $ 67,500 6,210 0 Plats/legals 14,400 5,760 Surveying for easements 7,500 3,000 Surveying (Plans & Construction) - City Portion 16,465 6,586 Carroll ISD Part 3,721 0 Subtotals 75,735 Fee remaining for N-3 q 75,735 26,322) 49,413 26,322 Res. AMENDMENT ACCEPTANCE If this amendment meets with your approval, it can also serve as our agreement, which you may indicate by signing in the space provided below. Please do not hesitate to call should you have any questions or requested modifications of the proposal. The opportunity to be of service to you and Southlake is greatly appreciated. Eddie Cheatham, P EPrincipal 06ry Fickes mayor 4