1990-052City of Southlake, Texas
RESOLUTION NO.90-52
A RESOLUTION OF THE CITY COUNCIL OF THE
j
CITY OF SOUTHLAKE, TEXAS, AUTHORIZING THE
EMERGENCY REPLACEMENT OF THE UPSTAIRS HEATING/AIR
CONDITIONING SYSTEM IN CITY HALL; PROVIDING
AN EFFECTIVE DATE.
WHEREAS, during the summer months, temperatures are high
and it is imperative that air conditioning equipment is
operational in order for employees of the City to be able to be
most effective in there assorted responsibilities; and,
WHEREAS, an emergency exists due to malfunctioning air
conditioning equipment in the upstairs Police Department; now,
THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SOUTHLAKE, TEXAS, THAT:
Section 1. That the City Council hereby authorizes the City
Staff to have the air conditioning equipment repaired or replaced
as necessary.
Section 2. That this resolution is hereby effective upon passage
by the City Council.
PASSED AND APPROVED this the
H
At, IWAIT'11%00%
4Sandra L. LeGrand
City Secretary
APPROVED AS TO FORM:
City Attorney
City of Southlake, Texas
17 day of ?"
CITY OF SOUTHLAKE, TEX
By:
Gi6ry Fic ks, Mayor
City of Southlake, Texas
6rfj L
July 11, 1990
TO: Curtis E. Hawk, City Manager
FROM: Michael H. Barnes, Director of Public Works
SUBJECT: Upstairs Air Conditioning - Police Department
It has come to my attention that the air conditioning unit
for the upstairs Police Department is not sufficient to
maintain a temperature less than 80 degrees Farenheit.
Watco Air Conditioning & Refridgeration Inc. has checked out
the upstairs system and has submitted a proposal (attached)
to remedy the situation.
The existing 5 ton unit is proposed to be replaced with a
7.5 ton unit. The total cost of replacing the existing
system is $11,230 and consists of the following:
1. Replace existing ductwork and grills.
2. Replace existing 5 ton a.c. unit with a 7.5 ton.
3. Build a platform for the air handling unit.
4. Install required electrical wiring for proposed
unit.
The new unit will be large enough to handle the upstairs
area. It will take approximately two weeks to install the
proposed system from start to finish. If approved, other
proposals will be obtained from A/C companies and the most
economical and reputable company will be selected to perform
the work. I will proceed with this project upon your
approval. If there are any questions, please contact me.
o
MHB/ew
attachment
Page No. of Pages
WATCOREFRIGERATION,N
INC.
P. 0. Box 1090, Keller, Texas 76248
817) 431-2211 431-2680
PROPOSAL SUBMITTED TO
L -1-r, cj/ S7v
STREET /
V
CITY,
oG7 /V•
CITY, STATE AND ZIP CODE /
n UTlI Gh-KC %GO q/
ARCHITECT r I DATE OF PLANS
We hereby submit specifications and estimates for:
PHONE
8/'7 • 48 /
JOB NAME
JOB LOCATION
DATE
7/9 I9
s•J'n-izs
JOB PHONE
ZS f I it' -J- --.s %b I - 7 7a N G jfr7C /6X
Payment to be made as follows:
dollars ($
Terms are net 10 days upon submittal of -invoice. The Indebtedness evidenced hereby Is due and payable at the offices of WATCO In
Keller. Tarrant County, Texas together with Interest frorn maturity and all expen&06 Of C0119GtiOn If plaGed In the hands of a third
party for collection.
All material Is guaranteed to be as specified. All work to be completed in a workmanlike
L
manner according to standard practices. Any alteration or deviation from above speciflca- Authorized
r `
tions Involving extra costs will be executed only upon written orders, and will become an Signature
extra charge over and above the estimate All agreements contingent upon strikes, accidents
or delays beyond our control. Owner to carry fire, tornado and other necessary Insurance. Note: This propo may be u
Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not acce ted within /
t
4
Arreptaurr at t1rapa8M1 —The above prices, specifications
and conditions are satisfactory and are hereby accepted. You are authorized Signature
to do the work as specified. Payment will be made as outlined above.
Date of Acceptance:
Signature
FORM 118-3 COPYRIGHT 1960 - Available from Inc, Groton, Mass 01471
days.
C-0we-nE,ils
c'f=6s % -fir—
11230
P piopOSP hereby to furnish material and labor — complete in accordance with above specifications, for the sum of:
Payment to be made as follows:
dollars ($
Terms are net 10 days upon submittal of -invoice. The Indebtedness evidenced hereby Is due and payable at the offices of WATCO In
Keller. Tarrant County, Texas together with Interest frorn maturity and all expen&06 Of C0119GtiOn If plaGed In the hands of a third
party for collection.
All material Is guaranteed to be as specified. All work to be completed in a workmanlike
L
manner according to standard practices. Any alteration or deviation from above speciflca- Authorized
r `
tions Involving extra costs will be executed only upon written orders, and will become an Signature
extra charge over and above the estimate All agreements contingent upon strikes, accidents
or delays beyond our control. Owner to carry fire, tornado and other necessary Insurance. Note: This propo may be u
Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not acce ted within /
t
4
Arreptaurr at t1rapa8M1 —The above prices, specifications
and conditions are satisfactory and are hereby accepted. You are authorized Signature
to do the work as specified. Payment will be made as outlined above.
Date of Acceptance:
Signature
FORM 118-3 COPYRIGHT 1960 - Available from Inc, Groton, Mass 01471
days.