1990-029City of Southlake, Texas RESOLUTION NO.90-29 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOUTHLAKE, TEXAS, AWARD- ING AN ENGINEERING CONTRACT FOR CONSTRUC- TION OF THE S-6 SANITARY SEWER INTERCEPTOR LINE TO CHEATHAM AND ASSOCIATES; AUTHORIZ- ING THE MAYOR TO EXECUTE THE CONTRACT; AND, PROVIDING AN EFFECTIVE DATE. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SOUTHLAKE, TEXAS, THAT: Section 1. That the City Council hereby authorizes the Mayor to enter into a contract with the firm of Cheatham and Associates, for construction of the S-6 Sanitary Sewer Interceptor Line, in the form attached hereto as Exhibit "A" and authorizes and directs the Mayor to execute and deliver such contract to Cheatham and Associates, on behalf of the City. Section 2. That this Resolution shall be in full force and effect from and after its passage. PASSED AND APPROVED this the 4sana L. LeGrand City Secretary APPROVED AS TO FORM: City Attorney City of Southlake, Texas 11 day of &bid CITY OF SOUTHLAKE, TEXAS By: iff'atry Fick s, Mayor C; CHEATHAM Asso zEs OFFIC" RECORD March 27, 1990 City of Southlake 667 North Carroll Avenue Southlake, Texas 76092 Re: Proposal for providing Professional Services in connection with the Construction of Sewer Line S-6 CONSULTANT'S UNDERSTANDING The City of Southlake intends to construct a sanitary sewer line to serve the central portion of the city. This line is identified as Line S-6. This contract is for the construction phase of the project. This contract will be effective once the project has been put out for bids and a contractor has been selected and the construction phase begins. SCOPE OF SERVICES 1. Surveying Our firm will furnish all necessary surveying, field and office work, necessary to perform the construction staking for the construction of the sewer line S-6, according to the construction plans. The temporary easements for construction will be staked, as well as the permanent easements. Also, alignment and grade stakes will be set for the contractor with cut -sheets provided. 2. Engineering 2.1 Our firm will furnish all necessary technical expertise required to accomplish the construction phase of the sewer line. The following services will be provided for the duration of the construction phase of S-6. 2.1A Contract Administration 2.1B Periodic inspection of the project to assure proper interpretation of the construction plans. ENGWEERS - PLANNERS - SURVEYORS A Subsidiary Firm of Southwest Planning and Design, Inc. 2011 East Lamar Blvd. - Suite 200 - Arlington, Texas 76006 817/460-2111 - Metro 265-7948 2. Engineering (Continued) 2AC Review shop drawings and submittals of the contractor. 2.1D Review monthly pay requests for contractor's payment. 2.1E Prepare any contract change orders deemed necessary. 2.1F Preform a final inspection of the project. 2AG Prepare "As -Built" plans from the contractor and inspector's "Mark-Up" plans. FEES We will provide all the services and products described in the scope of services including all services necessary for engineering surveying, engineering, contract administration, construction staking and periodic visits during construction, and owner's project representation for the project as follows: Surveying Fee: Construction staking for a total Lump sum fee of $ 20,000.00 Engineering Fee: For the construction phase a total Lump sum fee of $ 15,000-00 Total Fees: ry -2%7 35,000.00 Monthly billing will be on a basis of percentage of completion. Invoices are normally mailed by the 5th of each month and payment is expected within ten working days. Cheatham & Associates guarantee to maintain the fees presented herein for 90 days from the date of this proposal unchanged. The above fees include all incidental costs and expenses (except where specifically noted), including all travel, out-of-pocket expenses, drafting, telephone, typing, etc. If the above meets with your approval, this proposal can also serve as our agreement, which you may indicate by signing in the space provided below. Please do not hesitate to call should you have any questions or requested modifications of the proposal. The opportunity to be of service to you and Southlake is greatly appreciated. t k- ' Eddie Cheatham, P.E., Principal CLfry Fickes, Moor The following is the current rate schedule used to calculate job and additional services fees. These hourly rates include all wages, benefits, overhead and profit. The fees include all incidental costs and expenses (except where specifically noted), including all travel, out-of-pocket expenses, drafting, telephone, typing, etc. PRINCIPAL ENGINEER 75.00 REGISTERED ENGINEER 65.00 STAFF ENGINEER 50.00 LAND PLANNER 50.00 CERTIFIED CITY PLANNER 55.00 LANDSCAPE ARCHITECT 55.00 _ TECHNICIAN 35.00 DRAFTER 30.00 INSPEC'T'OR 30.00 4 MAN SURVEY CREW 85.00 3 MAN SURVEY CREW 75.00 OWNER'S PROJECT REPRESENTATIVE 30.00 + Mileage TECHNICAL TYPING 30.00