Item 6A - PlansLEVEL G2
EL. 110' -6"
G1G3G4G5G6G8
LEVEL G3.5
EL. 128' -3"
LEVEL G4.5
EL. 138' -6"
LEVEL G3
EL. 120' -9"
LEVEL G4
EL. 131' -0"
G7.7 G1.5
10
'
-
6
"
10
'
-
3
"
10
'
-
3
"
3'
-
8
"
STEEL BARRIER
CABLES TYP. REFER
DETAIL 08/G3.90
ENTRY RAMP
ARCHITECTURAL
PRECAST CONCRETE
SPANDREL PANELS
TYP. REFER SHEETS
A4.10 & A4.70 FOR
PANEL ELEVATIONS
AND DETAILS
G2G6.8
LEVEL G1
EL. 100' -0"
LEVEL G1
EL. 100' -0"
LEVEL G2.5
EL. 118' -0"
SCHEDULED POST AND
LIGHT FIXTURE REFER
ELECTRICAL DWGS.
/01 G4.02
18
'
-
0
"
10
'
-
3
"
10
'
-
3
"
3'
-
8
"
42
'
-
2
"
34
'
-
8
"
VEHICLE
CLEARANCE
BAR
ARCHITECTURAL
PRECAST CONCRETE
COLUMNS TYP. PER
PRECAST MFGR.
CONCRETE RETAINING
WALL REFER STRUCTURAL
DWGS.
1
3
3
5
LEVEL 1
EL. 100' -0"
LEVEL G2
EL. 110' -6"
GA GB G-C
LEVEL G3
EL. 120' -9"
LEVEL G4
EL. 131' -0"
LEVEL G1 ENTRY
ARCHITECTURAL PRECAST CONCRETE
SPANDREL PANELS TYP. REFER SHEETS
A4.10 & A4.70 FOR PANEL ELEVATIONS
AND DETAILS
10
'
-
3
"
10
'
-
3
"
10
'
-
6
"
LEVEL G2 ENTRY
STEEL BARRIER CABELS
TYP. REFER DETAIL
08/G3.90
GA.7 GB.3
LEVEL G1
EL. 100' -0"
GA.3
ALUMINUM FRAME W/
PERFORATED ALUMINUM
PANELS
VEHICLE CLEARANCE BAR
REFER 07/G3.90 DETAIL "B"
VEHICLE CLEARANCE BAR
REFER 07/G3.90 DETAIL "A"
SCHEDULED LIGHT FIXTURE
TYP. REFER ELECTRICAL
DWGS.
GARAGE SIGNAGE
GARAGE SIGNAGE
3
4 4
IBC OPEN PARKING GARAGE (406.5)
THE EXTERIOR SIDE OF THE STRUCTURE SHALL HAVE UNIFORMLY DISTRIBUTED
OPENINGS ON TWO OR MORE SIDES. THE AREA OF THE OPENINGS SHALL BE NOT
LESS THAN 20% OF THE TOTAL PERIMETER WALL AREA OF EACH TIER.
LEVEL G1 -WALL AREA = 12,300 SF x 20% = 2,460 SF
1,925 SF OPEN AREA PROVIDED
* MECHANICAL VENTILATION REQUIRED
LEVEL G2 -WALL AREA = 7,001 SF x 20% = 1,400 SF
1,622 SF OPEN AREA PROVIDED
LEVEL G3 -WALL AREA = 6,170 SF x 20% = 1,234 SF
2,360 SF OPEN AREA PROVIDED
LEVEL G4 -OPEN ROOF
IBC OPEN PARKING GARAGE (406.5)
THE AGGREGATE LENGTH OF THE OPENINGS CONSIDERED TO BE PROVIDING
NATURAL VENTILATION SHALL BE NOT LESS THAN 40% OF THE PERIMETER OF
THE TIER.
PARKING DECK PERIMETER = (249.58' x 2) + (122.33 x 2) = 743.82'
MIN. OPEN PERIMETER REQUIRED = 743.82 x 40% = 297.53'
OPEN PERIMETER PROVIDED LEVEL G1 = 220.24' + 11.30' + 23.97' = 255.51' < 297.53'
OPEN PERIMETER PROVIDED LEVEL G2 = 220.24' + 45.46' + 32.97 = 298.67' > 297.53'
OPEN PERIMETER PROVIDED LEVEL G3 = 220.24' + 135.43' = 355.67' > 297.53'
IBC OPEN PARKING GARAGE (406.5)
INTERIOR WALL SHALL NOT BE LESS THAN 20% OPEN WITH UNIFORMLY
DISTRIBUTED OPENINGS.
INTERIOR WALL AT GRIDLINE GB -WALL AREA = 6,259 SF x 20% = 1,252 SF
2,020 SF OPEN AREA PROVIDED
PROPOSED CONSTRUCTION TYPE: IB
AREA PER TIER = 29,757.63 SF < 50,000.00 SF (TABLE 406.5.4)
NUMBER OF TIERS = 4 < 8 (TABLE406.5.4)
GB G-C
LEVEL G3.5
EL. 128' -3"
LEVEL G4.5
EL. 138' -6"
GB.3
ARCHITECTURAL
PRECAST CONCRETE
SPANDREL PANELS TYP.
REFER SHEETS A4.10 &
A4.70 FOR PANEL
ELEVATIONS AND
DETAILS
SCHEDULED POST AND
LIGHT FIXTURE REFER
ELECTRICAL DWGS.
3'
-
8
"
10
'
-
3
"
3
date
project number
title
The drawings and written material herein constitute original work of the
architect, and as intellectual property and instruments of service, are
subject to copyright and may not be reproduced, distributed, published
or used in any way without the express written consent of the architect.
p
l
o
t
t
e
d
:
revisions
sheet
original issue
District 114 - Kimball Office II
2102 E. State Highway 114
Southlake, TX 76092
landscape architect
TBG PARTNERS
2100 BRYAN ST., STE. 1450
DALLAS, TX 75201
structural engineer
L.A. FUESS
3333 LEE PKWY, STE. 300
DALLAS, TX 75219
mep engineer
ME ENGINEERS
1825 MARKET CENTER BLVD., STE. 415
DALLAS, TX 75207
civil engineer
KIMLEY-HORN
13455 NOEL RD.
TWO GALLERIA OFFICE TOWER, STE. 700
DALLAS, TX 75240
architecture interiors planning graphics
8070 Park Lane, Ste. 300 Dallas, Texas 75231
Tel 972.701.9000 Fax 972.991.3008
www.bokapowell.com
owner
MEDICI DEVELOPMENT PARTNERS
2106 E. STATE HIGHWAY 114, STE. 103
SOUTHLAKE, TX 76092
12
/
2
/
2
0
2
0
1
0
:
3
1
:
3
0
A
M
C:
\
B
O
K
A
P
\
R
E
V
I
T
_
P
R
O
J
E
C
T
S
\
A
R
C
H
_
1
8
1
6
5
_
D
I
S
T
R
I
C
T
_
1
1
4
_
K
I
M
BA
L
L
_
O
F
F
I
C
E
-
C
E
N
T
R
A
L
_
v
1
8
_
j
s
h
a
r
p
3
8
.
r
v
t
G4.00
EXTERIOR ELEVATIONS -
GARAGE
12.04.2020
ISSUED FOR CONSTRUCTION
18165.100
11.25.2019
11.25.2019
SCALE:1/8" = 1'-0"01 EXTERIOR GARAGE ELEVATION NORTH
SCALE: 1/8" = 1'-0"02 EXTERIOR GARAGE ELEVATION WESTSCALE: 1/8" = 1'-0"
03
EXTERIOR GARAGE
ELEVATION WEST
2
2
2
4
1 PR - 01 01.28.2020
2 PR - 02 04.14.2020
3 PR - 03 05.20.2020
4 PR - 08 08.21.2020
5 PR - 11 12.04.2020
LEVEL G3.5
EL. 128' -3"
LEVEL G4.5
EL. 138' -6"
LEVEL G1
EL. 100' -0"
LEVEL G2.5
EL. 118' -0"
1
date
project number
title
The drawings and written material herein constitute original work of the
architect, and as intellectual property and instruments of service, are
subject to copyright and may not be reproduced, distributed, published
or used in any way without the express written consent of the architect.
p
l
o
t
t
e
d
:
revisions
sheet
original issue
District 114 - Kimball Office II
2102 E. State Highway 114
Southlake, TX 76092
landscape architect
TBG PARTNERS
2100 BRYAN ST., STE. 1450
DALLAS, TX 75201
structural engineer
L.A. FUESS
3333 LEE PKWY, STE. 300
DALLAS, TX 75219
mep engineer
ME ENGINEERS
1825 MARKET CENTER BLVD., STE. 415
DALLAS, TX 75207
civil engineer
KIMLEY-HORN
13455 NOEL RD.
TWO GALLERIA OFFICE TOWER, STE. 700
DALLAS, TX 75240
architecture interiors planning graphics
8070 Park Lane, Ste. 300 Dallas, Texas 75231
Tel 972.701.9000 Fax 972.991.3008
www.bokapowell.com
owner
MEDICI DEVELOPMENT PARTNERS
2106 E. STATE HIGHWAY 114, STE. 103
SOUTHLAKE, TX 76092
12
/
2
/
2
0
2
0
1
0
:
3
1
:
3
5
A
M
C:
\
B
O
K
A
P
\
R
E
V
I
T
_
P
R
O
J
E
C
T
S
\
A
R
C
H
_
1
8
1
6
5
_
D
I
S
T
R
I
C
T
_
1
1
4
_
K
I
M
BA
L
L
_
O
F
F
I
C
E
-
C
E
N
T
R
A
L
_
v
1
8
_
j
s
h
a
r
p
3
8
.
r
v
t
G4.02
ENLARGED ELEVATIONS -
GARAGE
12.04.2020
ISSUED FOR CONSTRUCTION
18165.100
11.25.2019
11.25.2019
SCALE:1/4" = 1'-0"01
ENLARGED ELEVATION -
GARAGE SCREENWALL
2
1 PR - 01 01.28.2020
2 PR - 02 04.14.2020
3 PR - 11 12.04.2020
3
.760
2.5423.03
76.97