Loading...
Item 7A - PlansLEVEL G2 EL. 110' -6" G1G3G4G5G6G8 LEVEL G3.5 EL. 128' -3" LEVEL G4.5 EL. 138' -6" LEVEL G3 EL. 120' -9" LEVEL G4 EL. 131' -0" G7.7 G1.5 10 ' - 6 " 10 ' - 3 " 10 ' - 3 " 3' - 8 " STEEL BARRIER CABLES TYP. REFER DETAIL 08/G3.90 ENTRY RAMP ARCHITECTURAL PRECAST CONCRETE SPANDREL PANELS TYP. REFER SHEETS A4.10 & A4.70 FOR PANEL ELEVATIONS AND DETAILS G2G6.8 LEVEL G1 EL. 100' -0" LEVEL G1 EL. 100' -0" LEVEL G2.5 EL. 118' -0" SCHEDULED POST AND LIGHT FIXTURE REFER ELECTRICAL DWGS. /01 G4.02 18 ' - 0 " 10 ' - 3 " 10 ' - 3 " 3' - 8 " 42 ' - 2 " 34 ' - 8 " VEHICLE CLEARANCE BAR ARCHITECTURAL PRECAST CONCRETE COLUMNS TYP. PER PRECAST MFGR. CONCRETE RETAINING WALL REFER STRUCTURAL DWGS. 1 3 3 5 LEVEL 1 EL. 100' -0" LEVEL G2 EL. 110' -6" GA GB G-C LEVEL G3 EL. 120' -9" LEVEL G4 EL. 131' -0" LEVEL G1 ENTRY ARCHITECTURAL PRECAST CONCRETE SPANDREL PANELS TYP. REFER SHEETS A4.10 & A4.70 FOR PANEL ELEVATIONS AND DETAILS 10 ' - 3 " 10 ' - 3 " 10 ' - 6 " LEVEL G2 ENTRY STEEL BARRIER CABELS TYP. REFER DETAIL 08/G3.90 GA.7 GB.3 LEVEL G1 EL. 100' -0" GA.3 ALUMINUM FRAME W/ PERFORATED ALUMINUM PANELS VEHICLE CLEARANCE BAR REFER 07/G3.90 DETAIL "B" VEHICLE CLEARANCE BAR REFER 07/G3.90 DETAIL "A" SCHEDULED LIGHT FIXTURE TYP. REFER ELECTRICAL DWGS. GARAGE SIGNAGE GARAGE SIGNAGE 3 4 4 IBC OPEN PARKING GARAGE (406.5) THE EXTERIOR SIDE OF THE STRUCTURE SHALL HAVE UNIFORMLY DISTRIBUTED OPENINGS ON TWO OR MORE SIDES. THE AREA OF THE OPENINGS SHALL BE NOT LESS THAN 20% OF THE TOTAL PERIMETER WALL AREA OF EACH TIER. LEVEL G1 -WALL AREA = 12,300 SF x 20% = 2,460 SF 1,925 SF OPEN AREA PROVIDED * MECHANICAL VENTILATION REQUIRED LEVEL G2 -WALL AREA = 7,001 SF x 20% = 1,400 SF 1,622 SF OPEN AREA PROVIDED LEVEL G3 -WALL AREA = 6,170 SF x 20% = 1,234 SF 2,360 SF OPEN AREA PROVIDED LEVEL G4 -OPEN ROOF IBC OPEN PARKING GARAGE (406.5) THE AGGREGATE LENGTH OF THE OPENINGS CONSIDERED TO BE PROVIDING NATURAL VENTILATION SHALL BE NOT LESS THAN 40% OF THE PERIMETER OF THE TIER. PARKING DECK PERIMETER = (249.58' x 2) + (122.33 x 2) = 743.82' MIN. OPEN PERIMETER REQUIRED = 743.82 x 40% = 297.53' OPEN PERIMETER PROVIDED LEVEL G1 = 220.24' + 11.30' + 23.97' = 255.51' < 297.53' OPEN PERIMETER PROVIDED LEVEL G2 = 220.24' + 45.46' + 32.97 = 298.67' > 297.53' OPEN PERIMETER PROVIDED LEVEL G3 = 220.24' + 135.43' = 355.67' > 297.53' IBC OPEN PARKING GARAGE (406.5) INTERIOR WALL SHALL NOT BE LESS THAN 20% OPEN WITH UNIFORMLY DISTRIBUTED OPENINGS. INTERIOR WALL AT GRIDLINE GB -WALL AREA = 6,259 SF x 20% = 1,252 SF 2,020 SF OPEN AREA PROVIDED PROPOSED CONSTRUCTION TYPE: IB AREA PER TIER = 29,757.63 SF < 50,000.00 SF (TABLE 406.5.4) NUMBER OF TIERS = 4 < 8 (TABLE406.5.4) GB G-C LEVEL G3.5 EL. 128' -3" LEVEL G4.5 EL. 138' -6" GB.3 ARCHITECTURAL PRECAST CONCRETE SPANDREL PANELS TYP. REFER SHEETS A4.10 & A4.70 FOR PANEL ELEVATIONS AND DETAILS SCHEDULED POST AND LIGHT FIXTURE REFER ELECTRICAL DWGS. 3' - 8 " 10 ' - 3 " 3 date project number title The drawings and written material herein constitute original work of the architect, and as intellectual property and instruments of service, are subject to copyright and may not be reproduced, distributed, published or used in any way without the express written consent of the architect. p l o t t e d : revisions sheet original issue District 114 - Kimball Office II 2102 E. State Highway 114 Southlake, TX 76092 landscape architect TBG PARTNERS 2100 BRYAN ST., STE. 1450 DALLAS, TX 75201 structural engineer L.A. FUESS 3333 LEE PKWY, STE. 300 DALLAS, TX 75219 mep engineer ME ENGINEERS 1825 MARKET CENTER BLVD., STE. 415 DALLAS, TX 75207 civil engineer KIMLEY-HORN 13455 NOEL RD. TWO GALLERIA OFFICE TOWER, STE. 700 DALLAS, TX 75240 architecture interiors planning graphics 8070 Park Lane, Ste. 300 Dallas, Texas 75231 Tel 972.701.9000 Fax 972.991.3008 www.bokapowell.com owner MEDICI DEVELOPMENT PARTNERS 2106 E. STATE HIGHWAY 114, STE. 103 SOUTHLAKE, TX 76092 12 / 2 / 2 0 2 0 1 0 : 3 1 : 3 0 A M C: \ B O K A P \ R E V I T _ P R O J E C T S \ A R C H _ 1 8 1 6 5 _ D I S T R I C T _ 1 1 4 _ K I M BA L L _ O F F I C E - C E N T R A L _ v 1 8 _ j s h a r p 3 8 . r v t G4.00 EXTERIOR ELEVATIONS - GARAGE 12.04.2020 ISSUED FOR CONSTRUCTION 18165.100 11.25.2019 11.25.2019 SCALE:1/8" = 1'-0"01 EXTERIOR GARAGE ELEVATION NORTH SCALE: 1/8" = 1'-0"02 EXTERIOR GARAGE ELEVATION WESTSCALE: 1/8" = 1'-0" 03 EXTERIOR GARAGE ELEVATION WEST 2 2 2 4 1 PR - 01 01.28.2020 2 PR - 02 04.14.2020 3 PR - 03 05.20.2020 4 PR - 08 08.21.2020 5 PR - 11 12.04.2020 LEVEL G3.5 EL. 128' -3" LEVEL G4.5 EL. 138' -6" LEVEL G1 EL. 100' -0" LEVEL G2.5 EL. 118' -0" 1 date project number title The drawings and written material herein constitute original work of the architect, and as intellectual property and instruments of service, are subject to copyright and may not be reproduced, distributed, published or used in any way without the express written consent of the architect. p l o t t e d : revisions sheet original issue District 114 - Kimball Office II 2102 E. State Highway 114 Southlake, TX 76092 landscape architect TBG PARTNERS 2100 BRYAN ST., STE. 1450 DALLAS, TX 75201 structural engineer L.A. FUESS 3333 LEE PKWY, STE. 300 DALLAS, TX 75219 mep engineer ME ENGINEERS 1825 MARKET CENTER BLVD., STE. 415 DALLAS, TX 75207 civil engineer KIMLEY-HORN 13455 NOEL RD. TWO GALLERIA OFFICE TOWER, STE. 700 DALLAS, TX 75240 architecture interiors planning graphics 8070 Park Lane, Ste. 300 Dallas, Texas 75231 Tel 972.701.9000 Fax 972.991.3008 www.bokapowell.com owner MEDICI DEVELOPMENT PARTNERS 2106 E. STATE HIGHWAY 114, STE. 103 SOUTHLAKE, TX 76092 12 / 2 / 2 0 2 0 1 0 : 3 1 : 3 5 A M C: \ B O K A P \ R E V I T _ P R O J E C T S \ A R C H _ 1 8 1 6 5 _ D I S T R I C T _ 1 1 4 _ K I M BA L L _ O F F I C E - C E N T R A L _ v 1 8 _ j s h a r p 3 8 . r v t G4.02 ENLARGED ELEVATIONS - GARAGE 12.04.2020 ISSUED FOR CONSTRUCTION 18165.100 11.25.2019 11.25.2019 SCALE:1/4" = 1'-0"01 ENLARGED ELEVATION - GARAGE SCREENWALL 2 1 PR - 01 01.28.2020 2 PR - 02 04.14.2020 3 PR - 11 12.04.2020 3 .760 2.5423.03 76.97