Item 4M Memo Item 4M Page 1 of 2 M E M O R A N D U M (October 20, 2020) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Subject: Award the contract for the Town Hall HVAC Upgrade Replacement to Infinity Contractors International, Ltd. in an amount not to exceed $2,075,000. Action Requested: Award the contract for the Town Hall HVAC Upgrade Replacement to Infinity Contractors International, Ltd. in an amount not to exceed $2,075,000. Background Information: In the FY 2021 adopted budget, City Council allocated funds to complete the Town Hall HVAC upgrade replacement. The Town Hall HVAC equipment is the original from the building’s inspection and has been in service for over 20 years. With several costly mechanical failures due to age and deterioration of equipment, the dependability is questionable and is expected to have future increases in repairs and maintenance costs, therefore it is recommended for replacement. The upgrade replacement project includes removal and replacement of the existing cooling tower system and package water-cooled A/C units in Town Hall, as well as a UV lighting disinfection system, located in the unit discharge airstream, to eliminate odors, bacteria, viruses, and microbials. This project’s execution follows a 2015 Feasibility Evaluation, in which City staff selected the air-cooled chilled water system as the best option. The anticipated start date of this project is November 2020 and is expected to last four months. Solicitation of bids for this project began on August 30, 2020 and sealed bids were received and opened on September 29, 2020. The 4 bids received for this project are shown in below bid tabulation: Bidder Bid Amount Infinity Contractors International, Ltd. $ 1,793,184.00 Century Mechanical Contractors, Inc. $ 2,048,000.00 TDR Contractors, Inc. $ 2,070,000.00 Decker Mechanical $ 2,123,677.00 Item 4M Page 2 of 2 City staff and the design consultant, Romine, Romine, & Burgess Inc. reviewed and scored the submitted bids based on the best value criteria described in the project manual. The evaluation criteria for this bid are Proposed Contract Price, Qualifications and Experience, and the Vendor’s Past Relationship with the City. The evaluation of materials and references provided led to the recommendation of Infinity Contractors International, Ltd. for this project. The bid from Infinity Contractors International, Ltd. came in at $1,793,184 for anticipated work; staff is requesting authorization for a total of $2,075,000, which includes a $281,816 contingency, for replacement expenses that may arise due to unforeseen obstacles. Financial Considerations: Tarrant County reimburses the City for 25% of preventative and corrective maintenance expenses related to Town Hall. Funding for the Town Hall HVAC Upgrade Replacement project is budgeted in the FY 2021 Facility Maintenance Fund and the TIF Operating Fund Budgets. The agreement is within the project budget. Strategic Link: This item links to the City’s Strategy Map strategic focus areas of Infrastructure. It specifically relates to the City’s Corporate Objectives, B6: Optimize Use Of Technology and F2: Invest to Provide & Maintain High Quality Public Assets. Citizen Input/ Board Review: None Legal Review: This is the standard construction services contract that has been previously reviewed by the City Attorney. Alternatives: The City Council may approve or deny the contract. Supporting Documents: Attachment A: Bid Tabulation Staff Recommendation: Award the contract for the Town Hall HVAC Upgrade Replacement to Infinity Contractors International, Ltd. in an amount not to exceed $2,075,000. Staff Contact: Rob Cohen, Director of Public Works Hunter Harris, Project Manager Co n t r a c t o r A d d e n d a   R e c e i p t s B i d   B o n d B a s e   B i d Ce n t u r y   M e c h a n i c a l   C o n t r a c t o r s ,   I n c . Y e s Y e s $ 2 , 0 4 8 , 0 0 0 De c k e r   M e c h a n i c a l Y e s Y e s $ 2 , 1 2 3 , 6 7 7 In f i n i t y   C o n t r a c t o r s   I n t e r na t i o n a l ,   L t d . Y e s Y e s $ 1 , 7 9 3 , 1 8 4 TD R   C o n t r a c t o r s ,   I n c . Y e s Y e s $ 2 , 0 7 0 , 0 0 0 TH   H V A C   U p g r a d e   R e p l a c e m e n t   P r o j e c t :     B i d   T a b u l a t i o n