Loading...
Item 4D MemoMEMORANDUM (June 16, 2020) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Item 4D Subject: Award the contract for the construction of SH 114 Water and Sanitary Sewer Relocation Project to Canary Construction, Inc. in an amount not to exceed $905,168. Action Requested: Award the contract for the construction of SH 114 Water and Sanitary Sewer Relocation Project to Canary Construction, Inc. in an amount not to exceed $905,168. Background Information: This project includes the relocation of existing water and sanitary sewer facilities that conflict with the planned SH 114 Frontage Road and Ramp Improvements from Kirkwood Boulevard to Dove Road. Solicitation of bids for this project began on May 2, 2020 and sealed bids were received and opened on May 21, 2020. The 6 bids received for this project are shown in below bid tabulation: BIDDER BID AMOUNT Canary Construction, Inc. $ 822,880.00 Gomez Brothers Construction, Inc. $ 1,019,716.00 Atkins Brothers Equipment Co., Inc. $ 1,074,982.00 Joe Funk Construction, Inc. $ 1,097,753.58 Wilson Contractor Services, LLC $ 1,124,438.28 M -CO Construction, Inc. $ 1,394,281.30 City staff and the design consultant, Kimley-Horn and Associates, Inc. reviewed and scored the submitted bids based on the best value criteria described in the project manual. The evaluation criteria for this bid are Proposed Contract Price, Qualifications and Experience, and the Vendor's Past Relationship with the City. The evaluation of materials and references provided led to the recommendation of Canary Construction, Inc. for this project. Page 1 of 2 Item 4D The recommended bid from Canary Construction, Inc. was submitted as $822,880.00 for anticipated work; staff is requesting authorization for an additional 10% contingency, for construction expenses that may arise due to unforeseen field conditions, for a total of $905,168. The City will be responsible for the expense of the relocation of the water facilities currently located within the TxDOT right-of-way. The water line portion of the contract is $149,260. The remaining $673,620 of the contract will be reimbursed by TxDOT as the sanitary sewer facilities are located within utility easements. Financial Considerations: Funding for the SH 114 Water and Sanitary Sewer Relocation Project is budgeted as part of the approved Capital Improvement Program. The agreement is within the project budget. Strategic Link: This item links to the City's Strategy Map strategic focus areas of Infrastructure and Performance Management & Service Delivery. It specifically relates to the City's Corporate Objectives, 132: Collaborate with Select Partners to Implement Service Solutions, and F2: Invest to Provide & Maintain High Quality Public Assets. Citizen Input/ Board Review: None Legal Review: This is the standard construction services contract that has been previously reviewed by the City Attorney. Alternatives: The City Council may approve or deny the contract. Supporting Documents: Attachment A: Recommendation Letter Attachment B: Bid Tabulation Attachment C: Location Map Staff Recommendation: Award the contract for the construction of SH 114 Water and Sanitary Sewer Relocation Project to Canary Construction, Inc. in an amount not to exceed $905,168. Staff Contact: Rob Cohen, Director of Public Works Kyle D. Hogue, P.E., Deputy Director/City Engineer Page 2 of 2 May 26, 2020 Robert Cohen, P.E. City of Southlake Public Works Director 1400 Main Street, Suite 320 Southlake, Texas 76092 r Dear Mr. Cohen, On May 21, sealed bid proposals were received and opened for the construction of the SH 114 Water and Sanitary Sewer Relocation Project. Six bids were submitted, and the total contract prices are summarized below: Bidder Contract Price Canary Construction, Inc. $ 822,880.00 Gomez Brothers Construction, Inc. $1,019,716.00 Atkins Bros. Equip. Co., Inc. $1,074,982.00 Joe Funk Construction, Inc. $1,097,753.58 Wilson Contractor Services, LLC $1,124,438.28 M -CO Construction, Inc. $1,394,281.30 Kimley-Horn has reviewed all the bids and found them to be complete and responsive. We found an error in the Wilson Contractor Services, LLC bid proposal and the contract price above shows the revised price. Kimley-Horn has contacted project references and verified that the contractors have successfully completed similar projects. Based upon our findings, we recommend award of this contract to Canary Construction, Inc. in the amount of $822,880.00. If you have any questions or comments, please call me at (817) 339-2287. Very truly yours, KIMILEY-HORN AND ASSOCIATES, INC. Texas Registration No. F-928 (74isj�v 10. 1 40?vow 4 Carl T. DeZee, P.E. Attachments: Bid Tabulation cc: Jerry Hodge, Hodge & Associates, Inc. BID TABULATION KIMLEY-HORN AND ASSOCIATES, INC. CHECKED BY: Carl DeZee, P.E., 5/22/2020 1 NEESE= Site Preparation 1 EMEMMEM LS $2,000.00 $2,000.00 $20,000.00 $20,000.00 $5,000,00 $5,000.00 $15,600.00 $15,600.00 $19,358.60 $19,358.60 $10,655.00 $10,655.00 _ 2_ Temporary Erosion, Sedimentation, & Water Pollution Prevention Control 1 LS $1,520.00 $1,520.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $11,050M $11,050.00 $3,802.00 $3,802.00 $1,980.00 $1,980.00 3 Traffic Control Measures 1 LS $1,520.00 $1,520.00 $10,000M $10,000.00 $5,000M $5,000.00 $12,350.00 $12,350.00 $2,550.00 $2,550.00 $9,105,00 $9,165.00 4 24" Steel Casing By Open Cut* 30 LF $350.00 $10,500.00 $400.00 $12,000.00 $200,00 $6,000.00 $17016 $5,122.80 $140.00 $4,200.00 $742,00 $22,260.00 5 12" Water Carrier Pipe 127 LF $155,00 $19,685.00 $380,00 $48,260.00 $200M $25,400.00 $99.26 $12,606.02 $120.00 $15,240.00 $607.00 $77,089.00 6 Ductile Iron Water Fittings w/ Restraint* 1 TON $4,000.00 $4,000.00 $3,000.00 $3,000.00 $4,000.00 $4,000.00 $5,200.00 i $5,200.00 $10,880.00 $10,880.00 $6,690.00 $6,690.00 7 12" Water Pipe 69 LF $125,00 $8,625.00 $230.00 $15,870.00 $170.00 $11,730.00 $112.26 $7,745.94 $997.72 $68,842.68 $212.00 $14,628.00 8 Connection to Existing 4"-12" Water Main* 1 EA $3,200.00 $3,200.00 $5,000.00 $5,000.00 $4,000.00 = $4,000.00 $1,950.00 $1,950.00 $2,450,00 $2,450.00 $2,942.00 $2,942.00 9 1" Water Service, Meter Reconnection* 1 EA $2,200.00 $2,200.00 $1,600.00 $1,600.00 $1,000.00 $1,000.00 $1,722.50 $1,722.50 $985.00 $985.00 $1,914.00 $1,914.00 10 Curb and Gutter Repair 20 LF $11000 $2,200.00 $80.00 $1,600.00 $60M $1,200.00 $15.60 $312.00 $35.00 $700.00 $184.00 $3,680.00 11 Utility Markers 1 1 LS $92000 $920.00 $1,500.00 $1,500.00 $200.00 $200.00 $2,600.00 $2,600.00 $600.00 $600.00 $567.00 $567.00 12 Trench Excavation Safety for Depth >4' 160 LF $5.00 $500.00 $20.00 $2,000.00 $4.00 $400.00 $2.60 $260.00 $5.00 $500.00 $1.00 $100M 13 ITOP Soil in Disturbed Areas 45 CY $25.00 $1,125.00 $10.00 $450M $1,000.00 $1,800.00 $71.50 $3,217.50 $50M $2,250.00 $2,210.00 $1,642.50 14 1 Hydromulch Seeding in Disturbed Areas 390 EA $2,00 $780.00 $10.00 $3,900.00 �$40M $4.00 $1,560.00 $2M $1,014.00 $4,36 $1,700.40 �$36.50 $1.53 $596.70 Total Task 2 Sanitary Sewer Service Connection to Main 2 EA $58,775.00 $6,200.00 $130,180.00 $3,000.00 $72,290.00 1 $80,750-7C, $4,290.00 $134,058.68 1 $153,849.20 1 Site Preparation 1 LS $2,000.00 $2,000.00 $20,000.00 $20,000.00 $5,000.00 $5,000.00 $13,000.00 $13,000.00 $19,308.60 $19,308.60 $69,555.00 > $69,555.00 2 Temporary Erosion, Sedimentation, & Water Pollution Prevention Control 1 LS $1,520.001 $1,520.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $9,750.00 $9,750.00 $2,434.40 $2,434.40 $12,446.00 $12,446.00 3 Traffic Control Measures 1 LS $1,520.00 $1,520.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $11,050.00 $11,050.00 $2,550.00 $2,550.00 $14,745.00 $14,745.00 4 Pre -Construction TV Inspection of Sanitary Sewer 478 LF $3.00 $1,434.00 $5.00 $2,390.00 $4.00 $1,912.00 $6.50 $3,107.00 $2.48 $1,185.44 $3.50 $1,673.00 5 Post -Construction TV Inspection of Sanitary Sewer 382 LF $3.00 $1,146.00 $5.00 $1,910.00 $4.00 $1,528.00 $34.26 $13,087.32 $2.48 $947.36 $3.50 $1,337.00 6 112" Dia. SDR -26 PVC Sewer Pipe (Open Cut) 69 LF $210.00 1 $14,490.00 $220.00 1 $15,180.00 $250.00 1 $17,250.00 $112.26 1 $7,745.94 $114.67 1 $7,912.23 $291.00 1 $20,079.00 7 Concrete Encasement 100 LF $200.00 $20,000.00 $100.00 $10,000.00 $60.00 $6,000.00 $32.50 $3,250.00 $36.00 $3,600.00 $106.00 $10,600.00 8 Abandon Existing 12" Sanitary Sewer Pipe with Controlled Low Strength Material 437 LF $42.00 $18,354.00 $70.00 $30,590.00 $40M $17,480.00 $5176 $23,493.12 $27,03 $11,812.11 $28.50 $12,454.50 9 5 -foot Dia. Std. Manhole (0-6 ft depth)* 2 EA $12,500.00 $25,000.00 $10,00000 $20,000.00 $15,000.00 $30,000.00 $7,090.20 $14,180.40 $6,580.00 $13,160.00 $7,310M $14,620.00 10 Extra depth for 5 -foot Diameter Manhole* 17 VF $450.00 $7,650.00 $250.00 $4,250.00 $400.00 $6,800.00 $455.00 $7,735.00 $395.00 $6,715.00 $370.00 $6,290.00 11 Concrete Collar* 2 EA $650,00 $1,300.00 $500.00 $1,000.00 $1,000.00 $2,000.00 $455M $910.00 $1,900.00 $3,800.00 $1,310.00 $2,620.00 12 Clay Dam 1 EA $620.00 $620.00 $1,000.00 $1,000.00 $500.00 $500.00 $3,900.00 $3,900.00 $410.00 $410.00 $1,080.00 $1,080.00 13 Abandon Existing Sanitary Sewer Manhole with Controlled Low Strength Material 2 EA $1,200.00 $2,400.00 $1,500.00 $3,000.00 $1,000.00 $2,000.00 $2,340.00 $4,680.00 $2,178.00 $4,356.00 $2,210.00 $4,420.00 14 SSMH Vacuum or Exfiltration Test 2 EA $200.00 $400.00 $250.00 $500.00 $1,000.00 $2,000.00 $1,950.00 $3,900.00 $275.00 $550.00 $715.00 $1,430.00 15 Sanitary Sewer Service Connection to Main 2 EA $3,100.00 $6,200.00 $1,500M $3,000.00 $900.00 $1,800.00 $2,145.00 $4,290.00 $2,245.00 $4,490.00 $1,640.00 $3,280.00 16 Bypass Pumping 1 LS $45,000.00 $45,000.00 $50,000.00 $50,000.00 $15,000M $15,000.00 $32,500.00 $32,500.00 $21,796.79 $21,796.79 $91,835.00 $91,835.00 17 Trench Excavation Safety for Depth >4' 124 LF $12.00 $1,488.00 $20.00 $2,480.00 $10,00 $1,240.00 $5.20 $644.80 $25.00 $3,100.00 $4.00 $496.00 18 Top Soil in Disturbed Areas 295 CY $25.00 $7,375.00 $10.00 $2,950.00 $40.00 $11,800.00 $71.50 $21,092.50 $17.05 5,029.75 $36.50 $10,767.50 19 1 Hyd omulch Seeding in Disturbed Areas 2,620 SY J $2.00 $5,240.00 $5.00 $13,100.00 $4,00 1 $10,480.00 $6,812.00 0 1 $6,026.001 $1.53 $4,008.60 [Total Task 3 I $163,137-00 L 1 $201,350-0011 1 $142,790.00 $185,128'L08 1 $119,183.681 1 $283,736.60 BID TABULATION KIMLEY-HORN AND ASSOCIATES, INC. CHECKED BY: Carl DeZee, P.E., 5/22/2020 1 Site Preparation 1 LS LS $2,000.00 $2,000.00 $20,000.00 $20,000.00 7$5,1000.00 7$5,000.00 $13,000.00 $13,000.00 $24,508.60 $24,508.60 No= $51,120M $51,120.00 2 Temporary Erosion, Sedimentation, & Water Pollution Prevention Control 1 LS $1,520.00 $1,520.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $12,350.00 $12,350.00 $4,742.80 $4,742.80 $10,109.00 $10,109.00 3 Traffic Control Measures 1 LS $1,520.00 $1,520.00 $10,000.00 $10,000.00 $5,000.00 $5,000!.00 $11,050.00 $11,050.00 $2,550.00 $2,550.00 $11,080.00 $11,680.00 4 'Pre -Construction TV Inspection of Sanitary Sewer 317 $3.00 $951.00 $5.00 $1,585.00 $4M $1,268.00 $6.50 $2,060.50 $2A8 $786.16 $3.50 $1,109.50 5 Post -Construction TV Inspection of Sanitary Sewer 679 LF $3.00 $2,037.00 $5.00 $3,395.00 $4.00 $2,716.00 $6.50 $4,413.50 $2.48 $1,683.92 $3.50 $2,376.50 6 10" Dia. SDR -26 PVC Sewer Pipe (Open Cut) 27 LF $120.00 $3,240.00 $100.00 $2,700.00 $250.00 iii $6,750.00 $86.26 $2,329.02 $95.00 $2,565.00 $187.00 $5,049.00 7 12" Dia. SDR -26 PVC Sewer Pipe (Open Cut) 233 LF $145.00 $33,785.00 $150.00 $34,950.00 $260.00 $60,580.00 $105.76 $24,642.08 $85.00 $19,805.00 $191.00 $44,503.00 8 Concrete Encasement 160 LF $230.00 $36,800.00 $70.00 $11,200.00 $40.00 $6,400.00 $47,26 $7,561.60 $43.10 $6,896.00 $noo $14,560.00 9 0432 6006 Riprap (Conc) (CL B)* 58 CY $45.00 $2,610.00 $210.00 $12,180.00 $150.00 $8,700.00 $287.76 $16,690.08 $705.72 $40,931.76 $660.00 $38,280.00 10 0432 6033 Riprap (Stone Protection) (18 IN) 284 CY $55.00 $15,620.00 $80.00 $22,720.00 $170.00 $48,280.00 $255.26 $72,493.84 $202.72 $57,572.48 $177.00 $50,268.00 11 0432 6051 Riprap (Stone Common) (Grout) (18 IN) 86 CY $60.00 $5,160.00 $190.00 $16,340.00 $180.00 $15,480.00 $417.76 I $35,927.36 $220.59 $18,970.74 $248.00 $21,328.00 12 Abandon Existing 12" Sanitary Sewer Pipe with Controlled Low Strength Material 317 LF $45.00 $14,265.06 $50.00 $15,850.00 $40.00 $12,680.00 $53.76 $17,041.92 $32.70 $10,365.90 $20.50 $6,498.50 13 5 -foot Dia. Std. Manhole (0-6 ft depth)* 1 EA $15,200.00 $15,200.00 $10,000.00 $10,000.00 $17,000.00 $17,000.00 $7,090.20 $7,090.20 $6,580.00 $6,580.00 $7,310.00 $7,310.00 14 5 -foot Dia. Manhole with vent pipe (0-6 ft depth)* 1 EA $16,500.00 $16,500.00 $13,000.00 $13,000.00 $24,000.00 $24,000.00 $7,605.00 $7,605.00 $7,480.00 $7,480.00 $8,270.00 $8,270.00 15 Extra depth for 5 -foot Diameter Manhole* 12 VF $650.00 $7,540.00 $260.00 $3,016.00 $500.00 $5,800.00 $325.00 $3,770.00 $395.00 $4,582.00 $387.00 $4,489.20 16 Concrete Collar* 2 EA $650.00 $1,300.00 $500.00 $1,000.00 $1,000.00 $2,000.00 $520.00 $1,040.00 $1,900.00 $3,800.00 $1,310.00 $2,620.00 17 Clay Dam 1 EA $620.00 $620.00 $1,000.00 $1,000.00 $500.00 $500.00 $1,950.00 i $1,950.00 $410.00 $410.00 $1,080.00 $1,080.00 18 Abandon Existing Sanitary Sewer Manhole with Controlled Low Strength Material 2 EA $1,200.00 $2,400.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 $1,950.00 $3,900.00 $330.00 1660.00 $2,410.00 $4,820.00 19 SSMH Vacuum or Exfiltration Test 2 EA $200.00 $400.00 $350.00 $700.00 $1,000.00 $2,000.00 $1,950.00 $3,900.00 $275.00 $550.00 $715.00 $1,430.00 20 Sanitary Sewer Service Connection to Main 2 EA $3,200.00 $6,400.00 $1,500.00 $3,000.00 $900.00 $1,800.00 $1,950.00 $3,900.00 $2,230.00 $4,460.00 $1,565.00 $3,130.00 21 Bypass Pumping 1 LS $45,000.00 $45,000.00 $20,000.00 r $20,000.00 $15,000.00 $15,000.00 $24,375.00 $24,375.00 $25,220.49 $25,220.49 $48,080.00 $48,080.00 22 Trench Excavation Safety for Depth >4' 304 LF $5.00 $1,520.00 $5.00 $1,520.00 $10.00 $3,040.001 $6.50 i $1,976.00 $10.00 $3,040.00 4.00 $1,216.00 23 ITop Soil in Disturbed Areas 280 CY $25.00 $7,000.00 $10.00 $2,800.00 $40.00 $11,200.00 $71.50' $20,020.00 $17.05 $4,774.00 $36.50 1 $10,220.00 24 1HYdromulch Seeding in Disturbed Areas 1 2,520 SY $2.00 $5,040.00 $5.00 $12,600.00 $4.00 $10,080.001 $2.60 $6,552.00 $2.33 $5,871.60 $1.53 $3,855.60 Total Task 5 L_ 1 $228,428.00 $226,556.00 $272,274.00 L_ 1 $305,638.10 $258,806.45 $352,802.30 Total reflects correction to calculation error by Bidder