Loading...
PZ Item 10 - Building PlansF.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" RIBBED METAL WALL PANELS NATURAL STONE VENEER STEEL COLUMNS, REF. STRUCTURE NATURAL STONE VENEER POLYCARBONATE PANELS PREFABRICATED METAL CANOPY RIBBED METAL WALL PANELS RIBBED METAL WALL PANELS METAL PANEL MECHANICAL SCREEN 2'-0" TALL CAST ALUMINUM LETTERS ACF PANEL FASCIA ACF PANEL FASCIA CONCRETE BENCHC.J. (TYP.) C.J. (TYP.) F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" NATURAL STONE VENEER RIBBED METAL WALL PANELS RIBBED METAL WALL PANELS ACF PANEL FASCIA CONCRETE BENCH RIBBED METAL WALL PANELS PREFABRICATED METAL CANOPY CONCRETE BENCH PREFABRICATED METAL SUNSHADES (TYP.) STEEL COLUMN, REF. STRUCTURE FIBER CEMENT PANELS PREFABRICATED METAL LOUVERS ACF PANEL FASCIA ACF PANEL FASCIA METAL PANEL MECHANICAL SCREEN FIBER CEMENT PANELS PREFABRICATED METAL CANOPY C.J. (TYP.) F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" NATURAL STONE VENEER METAL PANEL MECHANICAL SCREEN C.J. (TYP.)PREFABRICATED METAL CANOPY TOP OF STEEL 129' -0" NATURAL STONE VENEER RIBBED METAL WALL PANELS PREFABRICATED METAL CANOPY ACF PANEL FASCIA C.J. (TYP.) Drawn By REVISION SHEET NO. PROJECT NO. ISSUE DATE Fl o r e n c e E S R e p l a c e m e n t CE 19104.00 A100 KE L L E R I . S . D . SO U T H L A K E , T E X A S SCALE:1" = 20'-0"1 UNIT A - WEST ELEVATION SCALE:1" = 20'-0"2 UNIT A - NORTH ELEVATION SCALE:1" = 20'-0"3 UNIT A - EAST ELEVATION - ADMIN SCALE:1" = 20'-0"4 UNIT A - EAST ELEVATION F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" RIBBED METAL WALL PANELS NATURAL STONE VENEER STANDING SEAM CONCRETE BENCH STEEL COLUMN, REF. STRUCTURE SINGLE PLY ROOFING PREFABRICATED METAL CANOPY C.J. (TYP.) F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" DOWNSPOUT PREFABRICATED METAL SUNSHADES (TYP.) 2'-0" WIDE FIBER CEMENT PANELS (TYP.) NATURAL STONE VENEER PREFABRICATED METAL SUNSHADES (TYP.) C.J. (TYP.)PREFABRICATED METAL CANOPY FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.) PREFABRICATED METAL CANOPY NATURAL STONE VENEER COLLECTOR HEAD AND DOWNSPOUT, (TYP.) FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.) C.J. (TYP.) F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" NATURAL STONE VENEER FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.) C.J. (TYP.) F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" NATURAL STONE VENEER PREFABRICATED METAL SUNSHADES (TYP.) FIBER CEMENT PANELSFIBER CEMENT PANELS PREFABRICATED METAL CANOPY COLLECTOR HEAD AND DOWNSPOUT (TYP.) COLLECTOR HEAD AND DOWNSPOUT (TYP.) C.J. (TYP.) Drawn By REVISION SHEET NO. PROJECT NO. ISSUE DATE Fl o r e n c e E S R e p l a c e m e n t CE 19104.00 A101 KE L L E R I . S . D . SO U T H L A K E , T E X A S SCALE:1" = 20'-0"1 UNIT A - SOUTH ELEVATION SCALE:1" = 20'-0"2 UNIT B - SOUTH ELEVATION SCALE:1" = 20'-0"3 UNIT B - WEST ELEVATION SCALE:1" = 20'-0"4 UNIT B - NORTH ELEVATION - SPED SCALE:1" = 20'-0"5 UNIT B - EAST ELEVATION F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" NATURAL STONE VENEER PREFABRICATED METAL SUNSHADES (TYP.) PREFABRICATED METAL CANOPY FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.)FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.) C.J. (TYP.) F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" PREFABRICATED METAL SUNSHADES (TYP.) 2'-0" WIDE FIBER CEMENT PANELS (TYP.) NATURAL STONE VENEER PREFABRICATED METAL SUNSHADE C.J. (TYP.) F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" LOUVER L-1 NATURAL STONE VENEER FIBER CEMENT PANELS COLLECTOR HEAD AND DOWNSPOUT, (TYP.) E.J. C.J. (TYP.) F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" 2'-0" WIDE FIBER CEMENT PANELS (TYP.) PREFABRICATED VERTICAL METAL SUNSHADES (TYP.) NATURAL STONE VENEER LOUVER L-2 PREFABRICATED VERTICAL METAL SUNSHADES (TYP.) NATURAL STONE VENEER FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES, (TYP.) COLLECTOR HEAD AND DOWNSPOUT, (TYP.) C.J. (TYP.) Drawn By REVISION SHEET NO. PROJECT NO. ISSUE DATE Fl o r e n c e E S R e p l a c e m e n t CE 19104.00 A102 KE L L E R I . S . D . SO U T H L A K E , T E X A S SCALE:1" = 20'-0"1 UNIT C - WEST ELEVATION SCALE:1" = 20'-0"2 UNIT C - NORTH ELEVATION - K SCALE:1" = 20'-0"3 UNIT C - NORTH ELEVATION - 1ST GRADE SCALE:1" = 20'-0"4 UNIT C - EAST ELEVATION F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" NATURAL STONE VENEER FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.) C.J. (TYP.) F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0" FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.) LOUVER L-1 E.J. COLLECTOR HEAD AND DOWNSPOUT, (TYP.) NATURAL STONE VENEER C.J. (TYP.) F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" TOP OF PARAPET 134' -0"PREFABRICATED METAL LOUVERS PREFABRICATED METAL SUNSHADES (TYP.) NATURAL STONE VENEER FIBER CEMENT PANELS C.J. (TYP.)Drawn By REVISION SHEET NO. PROJECT NO. ISSUE DATE Fl o r e n c e E S R e p l a c e m e n t CE 19104.00 A103 KE L L E R I . S . D . SO U T H L A K E , T E X A S SCALE:1" = 20'-0"1 UNIT C - SOUTH ELEVATION - K SCALE:1" = 20'-0"2 UNIT C - SOUTH ELEVATION - 1ST GRADE SCALE:1" = 20'-0"3 UNIT C - SOUTH ELEVATION - LIBRARY EXTERIOR ELEVATION LEGEND DS DOWNSPOUT DSC DOWNSPOUT W/ SCUPPER & CONDUCTOR HEAD, REF. 2/A5.31 OS OVERFLOW SCUPPER, REF. 1/A5.31 CJ CONTROL JOINT, REF. _ & _/A_.__ EJ EXPANSION JOINT, REF. _/A_.__ SXX ALUMINUM STOREFRONT, REF. SHEETS A7.22 - A7.23 CXX ALUMINUM CURTAIN WALL, REF. SHEET A7.21 1. Refer to Sheet A3.__ for Typical Control Joint and Building Expansion Joint Details. 2. Based on the applicable design criteria, submit the proposed pattern of control joints in masonry veneer, CMU and stucco/cement plaster to the Architect for review and approval prior to construction. 3. Verify mounting heights of all Electrical and Mechanical items on the exterior of the building prior to construction, whether specifically indicated on the Exterior Elevations or not. 4. Install cast stone in accordance with the recommendations of the Cast Stone Institute, unless specifically noted or detailed otherwise. 5. Refer to Sheet A3.__ for Loose Lintel Details. Refer to Structural Drawings for maximum span and bearing requirements. 6. Terminate recessed and projected masonry veneer courses at 4” from intersecting window frames, door frames, sloping roofs, etc., unless noted otherwise. 7. For exterior sunshading legend types, refer to 5/A3.02. EXTERIOR ELEVATION GENERAL NOTES F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" RIBBED METAL WALL PANELS NATURAL STONE VENEER STEEL COLUMNS, REF. STRUCTURE NATURAL STONE VENEER POLYCARBONATE PANELS PREFABRICATED METAL CANOPY CONCRETE BENCH RIBBED METAL WALL PANELS RIBBED METAL WALL PANELS 5.9 6 7 9 9.5 9.8 10 10.2 11 12 12.8 13 13.7 13.8 14 1515.2 16 17 CAA SAASABO.H.SABSABO.H.SABSAC TOP OF PARAPET 134' -0" METAL PANEL MECHANICAL SCREEN 2'-0" TALL CAST ALUMINUM LETTERS ACF PANEL FASCIA ACF PANEL FASCIA CONCRETE BENCH C.J. (TYP.) C.J. (TYP.) 2' - 0" 8' - 2 3/4" 5' - 11 3/4" 6' - 0" 6' - 0 1/4" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 7' - 2 7/8" 8' - 11 7/8" 2' - 0" 2' - 0"25' - 0" METAL COPING, TYP. 12.9 F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" NATURAL STONE VENEER RIBBED METAL WALL PANELS RIBBED METAL WALL PANELS ACF PANEL FASCIA CONCRETE BENCH RIBBED METAL WALL PANELS PREFABRICATED METAL CANOPY CONCRETE BENCH PREFABRICATED METAL SUNSHADES (TYP.) STEEL COLUMN, REF. STRUCTURE J K L M N P Q.5 RK.5 N.3 P.1 P.9 CAC SADSABO.H.SABSAD CAC 5 A5.42 8 A4.06 FIBER CEMENT PANELS 7 A5.42 SBV TOP OF PARAPET 134' -0" PREFABRICATED METAL LOUVERS ACF PANEL FASCIA ACF PANEL FASCIA METAL PANEL MECHANICAL SCREEN FIBER CEMENT PANELSPREFABRICATED METAL CANOPY C.J. (TYP.)METAL COPING, TYP. F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" NATURAL STONE VENEER 5.966.46.977.47.8989.29.39.59.8 O.H.SAB SAB SAF METAL PANEL MECHANICAL SCREEN PREFABRICATED METAL CANOPY A114A C.J. (TYP.) 12' - 4 5/8"18' - 0"6' - 0"10' - 0"6' - 2 3/8"11' - 1 1/2"2' - 0" METAL COPING, TYP. F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" 7 A4.04 RIBBED METAL WALL PANELS NATURAL STONE VENEER STANDING SEAM CONCRETE SEATINGSTEEL COLUMN, REF. STRUCTURE SINGLE PLY ROOFING K5 A5.42 8 A4.06 B126A128A129A132CA132D TOP OF PARAPET 134' -0" PREFABRICATED METAL CANOPYC.J. (TYP.) METAL COPING, TYP. GUTTER CAST STONE CAP F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" 7 A4.05 6 A4.06 NATURAL STONE VENEER 9.81010.210.87.18 111212.81313.713.8141515.21617 RIBBED METAL WALL PANELS A127 A126 PREFABRICATED METAL CANOPY ACF PANEL FASCIA C.J. (TYP.) 2' - 0" 12.9 30 ' - 1 0 " Director VLK Architects, Inc. 2821 West 7th Street, Suite 300 SHEET NO. COPYRIGHT © 2020 VLK ARCHITECTS SHEET TITLE PROJECT NO. REVISIONS ARCHITECT Revision No. Drawn By Designer Quality Control Proj. Arch. Fort Worth, Texas 76107 Main Phone: 817.633.1600 www.vlkarchitects.com Revision Date Fl o r e n c e E S R e p l a c e m e n t LC JK JW DU EXTERIOR ELEVATIONS ISSUED: March 20, 2020 19104.00 A3.01 KE L L E R I . S . D . SO U T H L A K E , T E X A S MM SCALE:1/8" = 1'-0"1 UNIT A - WEST ELEVATION SCALE:1/8" = 1'-0"2 UNIT A - NORTH ELEVATION SCALE:1/8" = 1'-0"3 UNIT A - EAST ELEVATION - ADMIN SCALE:1/8" = 1'-0"5 UNIT A - SOUTH ELEVATION SCALE:1/8" = 1'-0"4 UNIT A - EAST ELEVATION 1/ A 3 . 0 0 4/ A3.00 2/ A3.00 A B C KEY PLAN 3/ A 3 . 0 0 1/ A3.01 2/ A 3 . 0 1 3/ A3.01 4/ A3.01 5/ A 3 . 0 1 1 / A 3 . 0 2 2/ A3.02 3/ A 3 . 0 2 4/ A3.02 1/ A3.03 2/ A 3 . 0 3 4/ A3.03 5/ A 3 . 0 3 3/ A 3 . 0 3 6/ A 3 . 0 3 7/ A 3 . 0 3 F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" 2'-0" WIDE FIBER CEMENT PANELS (TYP.) DOWN SPOUTPREFABRICATED METAL SUNSHADES (TYP.) 2'-0" WIDE FIBER CEMENT PANELS (TYP.) CEIJKE.2 SAQ O.H.SAH SAH 6 A5.42 SAP B123B TOP OF PARAPET 134' -0" NATURAL STONE VENEER PREFABRICATED METAL SUNSHADES (TYP.) C.J. (TYP.)C.J. (TYP.)PREFABRICATED METAL CANOPY 7' - 0" 4' - 0" 7' - 0" 18' - 5 1/2" 25' - 0" 2' - 0"2' - 0" 25' - 0" METAL COPING, TYP. CAST STONE CAP 34 ' - 3 1 / 4 " F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" 5 A4.02 5 A4.02 9 A4.0414 A4.04 8 A4.05 10 A4.05 FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.) PREFABRICATED METAL CANOPY NATURAL STONE VENEER COLLECTOR HEAD AND DOWNSPOUT, (TYP.) 9.8 10 10.2 10.8 7.1811 12 12.8 13 13.7 13.8 14 1515.2 SAH FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.) FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.) O.H.SAH SAH O.H.SAH SAH TYPE C TYPE C TYPE C TYPE C TYPE C A5.31 13 TOP OF PARAPET 134' -0" PREFABRICATED METAL SUNSHADES (TYP.) C.J. (TYP.) 3' - 9"7' - 0"13' - 0"2' - 0" METAL COPING, TYP. METAL COPING, TYP. CAST STONE CAP F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" NATURAL STONE VENEER PREFABRICATED METAL SUNSHADES (TYP.) PREFABRICATED METAL SUNSHADES (TYP.) FIBER CEMENT PANELS FIBER CEMENT PANELS 10.87.18 111212.81313.713.8141515.2 O.H.SAH SAH SAH O.H.SAH O.H.SAH SAH O.H.SAH SAH O.H.SAH SAH SAK SAR PREFABRICATED METAL CANOPY TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A TYPE ATYPE A C101A TOP OF PARAPET 134' -0" COLLECTOR HEAD AND DOWNSPOUT (TYP.) COLLECTOR HEAD AND DOWNSPOUT (TYP.) C.J. (TYP.)C.J. (TYP.) METAL COPING, TYP. METAL COPING, TYP. 1. Refer to Sheet A3.__ for Typical Control Joint and Building Expansion Joint Details. 2. Based on the applicable design criteria, submit the proposed pattern of control joints in masonry veneer, CMU and stucco/cement plaster to the Architect for review and approval prior to construction. 3. Verify mounting heights of all Electrical and Mechanical items on the exterior of the building prior to construction, whether specifically indicated on the Exterior Elevations or not. 4. Install cast stone in accordance with the recommendations of the Cast Stone Institute, unless specifically noted or detailed otherwise. 5. Refer to Sheet A3.__ for Loose Lintel Details. Refer to Structural Drawings for maximum span and bearing requirements. 6. Terminate recessed and projected masonry veneer courses at 4” from intersecting window frames, door frames, sloping roofs, etc., unless noted otherwise. 7. For exterior sunshading legend types, refer to 5/A3.02. EXTERIOR ELEVATION GENERAL NOTES EXTERIOR ELEVATION LEGEND DS DOWNSPOUT DSC DOWNSPOUT W/ SCUPPER & CONDUCTOR HEAD, REF. 2/A5.31 OS OVERFLOW SCUPPER, REF. 1/A5.31 CJ CONTROL JOINT, REF. _ & _/A_.__ EJ EXPANSION JOINT, REF. _/A_.__ SXX ALUMINUM STOREFRONT, REF. SHEETS A7.22 - A7.23 CXX ALUMINUM CURTAIN WALL, REF. SHEET A7.21 F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" CB.4 NATURAL STONE VENEER FIBER CEMENT PANELS TOP OF PARAPET 134' -0" PREFABRICATED METAL SUNSHADES (TYP.) C.J. (TYP.) 2' - 0" TYPE A FIN ON LEFT SIDE TYPE B FINS ON BOTH SIDES STOREFRONT AS SCHED.STOREFRONT AS SCHED. TYPE C FIN ON RIGHT SIDE STOREFRONT AS SCHED. REF. EXTERIOR ELEVATIONS FOR EXTERIOR SHADING LOCATIONS Director VLK Architects, Inc. 2821 West 7th Street, Suite 300 SHEET NO. COPYRIGHT © 2020 VLK ARCHITECTS SHEET TITLE PROJECT NO. REVISIONS ARCHITECT Revision No. Drawn By Designer Quality Control Proj. Arch. Fort Worth, Texas 76107 Main Phone: 817.633.1600 www.vlkarchitects.com Revision Date Fl o r e n c e E S R e p l a c e m e n t LC JK JW DU EXTERIOR ELEVATIONS ISSUED: March 20, 2020 19104.00 A3.02 KE L L E R I . S . D . SO U T H L A K E , T E X A S MM SCALE:1/8" = 1'-0"1 UNIT B - SOUTH ELEVATION SCALE:1/8" = 1'-0"2 UNIT B - WEST ELEVATION SCALE:1/8" = 1'-0"4 UNIT B - EAST ELEVATION SCALE:1/8" = 1'-0"3 UNIT B - NORTH ELEVATION - SPED SCALE:1/4" = 1'-0"5 EXTERIOR SUNSHADING LEGEND 1/ A 3 . 0 0 4/ A3.00 2/ A3.00 A B C KEY PLAN 3/ A 3 . 0 0 1/ A3.01 2/ A 3 . 0 1 3/ A3.01 4/ A3.01 5/ A 3 . 0 1 1 / A 3 . 0 2 2/ A3.02 3/ A 3 . 0 2 4/ A3.02 1/ A3.03 2/ A 3 . 0 3 4/ A3.03 5/ A 3 . 0 3 3/ A 3 . 0 3 6/ A 3 . 0 3 7/ A 3 . 0 3 F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" NATURAL STONE VENEER PREFABRICATED METAL SUNSHADES (TYP.)PREFABRICATED METAL CANOPY FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.)FIBER CEMENT PANELS 5.9 6 6.4 6.9 7 7.4 7.8 9 8 9.2 9.3 9.5 9.8 O.H.SAH SAH O.H.SAH SAH O.H.SAH SAH SAHO.H.SAHSAHO.H.SAHSAHO.H.SAH O.H.SAH SAH SAG PREFABRICATED METAL SUNSHADES (TYP.) SBT TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C 8 A5.42 5.1 5.3 O.H.SBT C105F TOP OF PARAPET 134' -0" FIBER CEMENT PANELS C.J. (TYP.)C.J. (TYP.) 9 A4.06 CAST STONE CAP METAL COPING, TYP. 10 A4.06 F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" 2'-0" WIDE FIBER CEMENT PANELS (TYP.) PREFABRICATED METAL SUNSHADES (TYP.) 2'-0" WIDE FIBER CEMENT PANELS (TYP.) NATURAL STONE VENEER 2'-0" WIDE FIBER CEMENT PANELS (TYP.) C E I J KE.2 SAT SAJ TOP OF PARAPET 134' -0" PREFABRICATED METAL SUNSHADE 2' - 0" 25' - 0" C.J. (TYP.)C.J. (TYP.)NATURAL STONE VENEER 25' - 0" 2' - 0" METAL COPING, TYP. F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" 2'-0" WIDE FIBER CEMENT PANELS (TYP.) PREFABRICATED VERTICAL METAL SUNSHADES (TYP.) NATURAL STONE VENEER LOUVER L-2 PREFABRICATED VERTICAL METAL SUNSHADES (TYP.) NATURAL STONE VENEER NATURAL STONE VENEER FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES, (TYP.) 5.966.46.977.47.899.29.39.59.81010.210.87.18 11 SAS SAMSAN SAR SAK O.H.SAH SAH O.H.SAH SAH O.H.SAH SAH SAHO.H.SAHSAHO.H.SAH TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A 5.15.3 SAS C100A TOP OF PARAPET 134' -0" 2'-0" WIDE FIBER CEMENT PANELS (TYP.) COLLECTOR HEAD AND DOWNSPOUT, (TYP.) LOUVER L-2 PREFABRICATED METAL SUNSHADES (TYP.) C.J. (TYP.)C.J. (TYP.) 25' - 0" C.J. (TYP.)C.J. (TYP.) 25' - 0" 9 A4.06 10 A4.06 CAST STONE CAP METAL COPING, TYP. F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" LOUVER L-1NATURAL STONE VENEER FIBER CEMENT PANELS A B CB.2 B.4A.1 A.5 O.H.SAL SAL SALO.H.SALSALO.H.SAL O.H.SAH C124 TOP OF PARAPET 134' -0" COLLECTOR HEAD AND DOWNSPOUT, (TYP.) E.J. C.J. (TYP.)C.J. (TYP.) METAL COPING, TYP. CAST STONE CAP F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" FIBER CEMENT PANELS PREFABRICATED METAL SUNSHADES (TYP.) ABCB.2B.4 A.1A.5 SALO.H.SALSALO.H.SAL O.H.SAL SAL O.H.SAL SAL LOUVER L-1 SAH SAH TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TOP OF PARAPET 134' -0" E.J.COLLECTOR HEAD AND DOWNSPOUT, (TYP.) NATURAL STONE VENEER PREFABRICATED VERTICAL METAL SUNSHADES (TYP.) C.J. (TYP.) METAL COPING, TYP. CAST STONE CAP F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" PREFABRICATED METAL LOUVERS PREFABRICATED METAL SUNSHADES (TYP.) NATURAL STONE VENEERPREFABRICATED METAL SUNSHADES (TYP.) JK 7 A5.42 O.H.SBV TOP OF PARAPET 134' -0" FIBER CEMENT PANELS C.J. (TYP.) 2' - 0" CAST STONE CAP METAL COPING, TYP. METAL COPING, TYP. 1. Refer to Sheet A3.__ for Typical Control Joint and Building Expansion Joint Details. 2. Based on the applicable design criteria, submit the proposed pattern of control joints in masonry veneer, CMU and stucco/cement plaster to the Architect for review and approval prior to construction. 3. Verify mounting heights of all Electrical and Mechanical items on the exterior of the building prior to construction, whether specifically indicated on the Exterior Elevations or not. 4. Install cast stone in accordance with the recommendations of the Cast Stone Institute, unless specifically noted or detailed otherwise. 5. Refer to Sheet A3.__ for Loose Lintel Details. Refer to Structural Drawings for maximum span and bearing requirements. 6. Terminate recessed and projected masonry veneer courses at 4” from intersecting window frames, door frames, sloping roofs, etc., unless noted otherwise. 7. For exterior sunshading legend types, refer to 5/A3.02. EXTERIOR ELEVATION GENERAL NOTES EXTERIOR ELEVATION LEGEND DS DOWNSPOUT DSC DOWNSPOUT W/ SCUPPER & CONDUCTOR HEAD, REF. 2/A5.31 OS OVERFLOW SCUPPER, REF. 1/A5.31 CJ CONTROL JOINT, REF. _ & _/A_.__ EJ EXPANSION JOINT, REF. _/A_.__ SXX ALUMINUM STOREFRONT, REF. SHEETS A7.22 - A7.23 CXX ALUMINUM CURTAIN WALL, REF. SHEET A7.21 F.F -LEVEL ONE 100' -0" F.F. -LEVEL TWO 114' -0" TOP OF STEEL 129' -0" C B.4 NATURAL STONE VENEER PREFABRICATED METAL SUNSHADES (TYP.) TOP OF PARAPET 134' -0" FIBER CEMENT PANELS C.J. (TYP.)2' - 0" CAST STONE CAP Director VLK Architects, Inc. 2821 West 7th Street, Suite 300 SHEET NO. COPYRIGHT © 2020 VLK ARCHITECTS SHEET TITLE PROJECT NO. REVISIONS ARCHITECT Revision No. Drawn By Designer Quality Control Proj. Arch. Fort Worth, Texas 76107 Main Phone: 817.633.1600 www.vlkarchitects.com Revision Date Fl o r e n c e E S R e p l a c e m e n t LC JK JW DU EXTERIOR ELEVATIONS ISSUED: March 20, 2020 19104.00 A3.03 KE L L E R I . S . D . SO U T H L A K E , T E X A S MM SCALE:1/8" = 1'-0"1 UNIT C - WEST ELEVATION SCALE:1/8" = 1'-0"2 UNIT C - NORTH ELEVATION - K SCALE:1/8" = 1'-0"4 UNIT C - EAST ELEVATION SCALE:1/8" = 1'-0"3 UNIT C - NORTH ELEVATION - 1ST GRADE SCALE:1/8" = 1'-0"6 UNIT C - SOUTH ELEVATION SCALE:1/8" = 1'-0"7 UNIT C - SOUTH ELEVATION SCALE:1/8" = 1'-0"5 UNIT C - SOUTH ELEVATION - KINDERGARTEN 1/ A 3 . 0 0 4/ A3.00 2/ A3.00 A B C KEY PLAN 3/ A 3 . 0 0 1/ A3.01 2/ A 3 . 0 1 3/ A3.01 4/ A3.01 5/ A 3 . 0 1 1 / A 3 . 0 2 2/ A3.02 3/ A 3 . 0 2 4/ A3.02 1/ A3.03 2/ A 3 . 0 3 4/ A3.03 5/ A 3 . 0 3 3/ A 3 . 0 3 6/ A 3 . 0 3 7/ A 3 . 0 3 RSRS RS RS RSRS RS RS RS RS RS RS A REF. A2.11A B REF. A2.11B C REF. A2.11C FIRST GRADE CLASSROOM 3 C138 FIRST GRADE CLASSROOM 5 C127 FIRST GRADE CLASSROOM 2 C139 FIRST GRADE CLASSROOM 1 C141 DESIGN LAB C134 IMPACT C126 ? ? SHELTER CONTROL ROOM C130 MECH C124 KINDERGARTEN CLASSROOM 3 C118 K/ 1 GRADE CLASSROOM, TYP. C119 KINDERGARTEN CLASSROOM 1 C120 DESIGN LAB C114 KINDERGARTEN DISCOVERY C116 KINDERGARTEN CLASSROOM 4 C115 KINDERGARTEN CLASSROOM 5 C113 KINDERGARTEN CLASSROOM 6 C109 LIBRARY C105 MAKER SPACE B101 MUSIC B120 THEATRE B121 GT B122 STARS B109 DYSLEXIA B106 RESOURCE B105 STORAGE B103 PLATFORM A123 CAFETORIUM A131 GYMNASIUM A132 RECEPTION A100 CORRIDOR A121 MDF C103 SERVING A130 KITCHEN A129 MECH A126 ELEC A127 RISER A128 CORRIDOR C143 ART C102 KILN C102A STORAGE C102B LEARNING STAIR C104 CONFERENCE ROOM A106 TEACHER LOUNGE A114 WORK ROOM A104 DYSLEXIA B104 STACC B111 ESL B115 FLEX B117 CUSTODIAL A140 CORRIDOR B112 BOOK ROOM A118 CLINIC A119 PRINCIPAL A103 COUNSELOR A117 SECURE TEST STORAGE A111 IMPACT B102 OFFICE B113 SPEECH B114 AFTER SCHOOL STORAGE A131A CUSTODIAL OFFICE A122 PLATFORM STORAGE A123A VESTIBULE A120 STORAGE A132B OFFICE A132A TOILET B118 STORAGE B110 TOILET B110A TOILET B110B FIRST GRADE STORAGE C132 ELEC C129 ? ? CUSTODIAL C110 TOILET C122 KINDERGARTEN STORAGE C111 ELEVATOR C140 LIBRARY OFFICE C105A LIBRARY WORKROOM C105B COSTUME & PROP STORAGE B121A GENERAL STORAGE B120BINSTRUMENT STORAGE B120A BOYS B127 GIRLS B128 CHAIR STORAGE A125 WAREWASH A129A OFFICE A129B TOILET A129D CUSTODIAL A129ECOOLER A129F FREEZER A129G DRY STORAGE A129HTOILET A113 TOILET A110 OFFICE A119A TOILET A119B SECRETARY A101 DIAGNOSTICIAN A115 COOL DOWN A112 IST B108 TEST B116 AP A133 TOILET A141 PTA STORAGE A131B FIRST GRADE CLASSROOM 4 C135 THINK C108 STORAGE A143 FILE A144 IDF A139 ELEC A138 CUSTODIAL A142 Director VLK Architects, Inc. 2821 West 7th Street, Suite 300 SHEET NO. COPYRIGHT © 2020 VLK ARCHITECTS SHEET TITLE PROJECT NO. REVISIONS ARCHITECT Revision No. Drawn By Designer Quality Control Proj. Arch. Fort Worth, Texas 76107 Main Phone: 817.633.1600 www.vlkarchitects.com Revision Date Fl o r e n c e E S R e p l a c e m e n t Approver Checker Designer Author ORIENTATION PLAN - LEVEL ONE March 20, 2020 19104.00 A2.11 KE L L E R I . S . D . SO U T H L A K E , T E X A S SCALE:1/16" = 1'-0"1 ORIENTATION PLAN - LEVEL ONE N A B C KEY PLAN 03/23/202003/20/2020