PZ Item 12 - Comprehensive Plan ReviewComprehensive Plan Analysis
Case No.: ZA19-0072 Review by: Jerod Potts Date of Review*: 12/27/19
Project Name: Life Time
Current Project Address: 550 W. State Hwy. 114
Existing Zoning: S-P-2
Proposed Zoning: S-P-2
Existing Future Land Use: Mixed Use
Proposed Future Land Use: Mixed Use
*This information was initially put together in advance of the June 27, 2019, Corridor
Planning Committee meeting. Minor additions and formatting changes have been made
to make the analysis since that date in order to make the analysis more compatible with
the packets for the Planning & Zoning Commission and City Council meetings.
Overview
The property is located to the east of the SH 114 frontage road, south of W. Dove Rd. and west
of N. White Chapel Blvd. The Verizon campus is to the north across from W. Dove Rd. To the
east of the subject property is the future residential development, Metairie of Southlake. This
subdivision was approved in 2018 for 56 residential lots and three (3) open space lots.
This property is in the SH 114 Corridor planning area. The property has a Mixed Use Land Use
Designation.
Mixed Use Land Use Category
The recommended land use for this property within the Southlake 2035 SH 114 Corridor Land
Use Plan (SH 114 Corridor Plan) is Mixed Use, which is consistent with the existing future land
use. The purpose of the Mixed Use land use category as defined by the SH 114 Corridor Plan is
as follows:
To provide an option for large-scale, master-planned, mixed use developments that
combine land uses such as office facilities, shopping, dining, parks, and residential
uses. Please see the Southlake 2035 Consolidated Future Land Use Plan for a complete
description of this land use category.
The definition for the Mixed Use land use category “necessitates comprehensively planned and
coordinated development.” Further, “new development must be compatible with and not
intrusive to exiting development,” and that typically, “the Mixed Use designation is intended for
medium- to higher-intensity office buildings, hotels, commercial activities, retail centers, and
residential uses.”
Comprehensive Plan Review
Carillon Parc – ZA19-0072 Page 2
Campus Office Overlay
Employment Center 1 (EC-1) Overlay
Optional Land Use Designations
Campus Office Overlay
The Campus Office overlay category is a commercial overlay category designed and intended
for the use of high-quality, medium to large-scale office buildings or campuses and their
ancillary uses and structures. This district is inherently suited for the development of built-to-
suit office developments 100,000 square feet or larger for the use of corporate or regional
headquarters, professional services firms, financial firms, information technology and media
companies, biomedical companies, and other users which drive demand for medium to large-
scale office buildings or campuses.
Generally characterized by 2-4 story buildings that have a floor-to-area ratio (FAR) under 1,
with highly integrated green space as a key feature of the design, parking structures or
underground parking dispersed and/or separated from the main building, horizontally-
integrated floor plans, more subdued low-impact building design, and the presence of
multiple buildings or building wings if accomplished in an environmentally sensitive
manner. Amenities such as walking trails, open space, plazas, water features, special
roadway and sidewalk treatments, and unique landscaping should be incorporated into
the development.
In most cases campus office type development is envisioned to occur near or adjacent to
established neighborhoods. While it is understood that developments of this scale and size will
change the development characteristics in the area, special attention must be paid to
designing the development in a manner that addresses neighborhood adjacency
concerns. This may be accomplished by preserving natural buffers or establishing new buffers,
installing low-level lighting, locating buildings and parking structures in a manner which will
create the least impact, including locating parking structures underground, and designing traffic
circulation to disperse traffic or focus it on higher-capacity roads which create the least impact
on residential properties.
Employment Center 1*
The purpose of the Employment Center (EC) land
use designation is to provide for a comprehensive
set of design standards and guidelines for the
development of the City’s premier corridor – the S.H.
Comprehensive Plan Review
Carillon Parc – ZA19-0072 Page 3
114 Corridor. The EC land use category is intended for a continuum of development from the
highest intensity mixed use development immediately adjacent to the highway to the lowest
intensity residential uses adjacent to existing neighborhoods.
*Staff note: this is being shown for reference only. Because the applicant is proposing to
develop one lot, a full explanation of the Employment Center overlay has not been provided.
According to the land use plan, this category should be applied to contiguous properties that are
a minimum of 75 acres. The subject property is approximately 24 acres.
Applicable Comprehensive Plan Recommendations
Southlake 2035 SH 114 Corridor Plan
LU1 (Fidelis and Shivers Tracts)
Recommendations
• Retain the existing underlying Mixed Use land use designation and apply the Campus
Office Overlay district.
• Future development on these properties should be approved in a manner that is
sensitive to potential impacts on adjacent residential areas, particularly as related to
noise, traffic, building heights, lighting and views.
• Provide a corner enhancement feature at SH 114 and W. Dove Rd in conjunction with
development on the west half of the Fidelis tract.
• Development of the Shivers property should be integrated with the Carillon commercial
to the east.
• For areas immediately along and east of the planned Kirkwood Blvd. extension, low-
impact development such as residential with a similar design and pattern to the existing
neighborhoods across White Chapel may be considered as a transition to the
neighboring single-family residential properties. Also, a low-scale or garden office
component may be considered if development is planned in a comprehensive manner
which maximizes tree preservation.
• Buffer any residential uses from non-residential uses on this property.
• Traffic signals at major street intersections should be anticipated and addressed with
development.
• As development is proposed traffic impacts on Dove St. and White Chapel Blvd
(including the traffic circle) should be assessed.
• Development should be sensitive to the existing tree cover and attempts should be
made during the planning process to maximize tree cover along with natural features
and topography.
• Any development should be walkable and pedestrian friendly.
• Family history of Shivers tract should be preserved or recognized possibly through use
of open space.
• As development occurs drive access to Kirkwood Blvd. should be encouraged with
limited drive access onto White Chapel Blvd.
LU10
Recommendations
Comprehensive Plan Review
Carillon Parc – ZA19-0072 Page 4
• Create an overlay or optional Future Land Use to allow for the development of large-
scale office developments on the north side of 114.
• Future development should be approved in a manner that is sensitive to potential
impacts on adjacent residential areas, particularly as related to noise, traffic, building
heights, lighting and views.
LU12
Recommendation
• New office development should conform to areas and formats addressed in overlay
districts.
LU15
Recommendation
• Surface parking along S.H. 114 is discouraged unless adequately screened and
buffered. Underground parking or structured parking is preferred when development
scale permits.
LU16
Recommendation
• Modify the Zoning Ordinance to allow for incentives on projects that reduce their
development footprint such as but not limited to allowing for a greater height or number
of stories permitted in conjunction with a massing study, if a greater degree of
landscaping or open space is provided or with features such as underground/structured
parking.
LU17
Recommendation
• Encourage creative design and development to address potential impact on adjacent
residential subdivisions. Future development should be approved in a manner that is
sensitive to potential impacts on adjacent residential areas, particularly as related to
noise, traffic, building heights, lighting and views.
M1
Recommendations
• Design and implement a portal plan at S.H. 114 and Dove Street which enhances the
bridge structure and redesigns the bridge embankments.
• Fund improvements through the CIP.
• Explore public private partnerships to improve the entry portal as development occurs.
M4
Comprehensive Plan Review
Carillon Parc – ZA19-0072 Page 5
Recommendations
• Construct the SH 114 frontage road from Dove Street to Kirkwood Blvd.
• Explore the possibility of a Texas turnaround in one or both directions at the Kirkwood
intersection.
• Evaluate intersection improvements particularly at SH 114 and Kirkwood to
accommodate traffic.
• Assist with the funding of the project through the CIP.
• Ensure future development in this area includes primary access to and from S.H. 114
frontage road.
M6
Recommendations
• Work with developers to have roughly proportional sections of Kirkwood constructed in
conjunction with development.
• Fund construction of critical sections such as the bridge crossing at Carillon and the
intersection improvements at Carroll Ave./Highland through the CIP.
M8
Recommendations
• Coordinate through a Developer’s Agreement and the CIP the widening of N. White
Chapel to a 4-lane divided facility between Kirkwood and SH 114 as development occurs
in this area.
• Evaluate the capacity of the White Chapel/Dove intersection to adequately handle
anticipated development in the area.
E2
Recommendation
• Address tree protection requirements or incentives for protecting trees at key
intersections or view corridors along SH 114.
Southlake 2030 Mobility Master Plan
MT5
Recommendations
• Acquire private ROW for public use along this section of Kirkwood.
MT7
Recommendations
Comprehensive Plan Review
Carillon Parc – ZA19-0072 Page 6
• While the majority of the roadway is anticipated to be constructed along with
development, participate in the extension of Kirkwood from Dove to Highland as
appropriate.
Southlake 2025 Major Corridors Urban Design Plan
• The Southlake 2025 Major Corridors Urban Design includes a Plan for Undergrounding
Utility Lines on pages 45-46 of the document. Per the Prioritization Plan for
Undergrounding Overhead Utility Lines, the subject property is located along a segment
of SH 114 identified as Medium – Private, Future Development. Please be aware the
City of Southlake Subdivision Ordinance Section 8.05 speaks to the requirement that
new subdivisions provide all wire and communication utilities underground.
Environmental
Legend for environmental map above:
• blue lines – 2-foot contours (elevations labeled in yellow)
• light green shaded areas represent existing tree cover
• light blue shaded areas represent tree preservation areas
Comprehensive Plan Review
Carillon Parc – ZA19-0072 Page 7
Site
Master Thoroughfare Plan / Transportation
Per the Master Thoroughfare Plan the site is surrounded
by the following roadway classifications:
W. Dove Rd. – 88’ (A4D) Arterial
W. SH 114 – 300-500’ (Freeway) Arterial
W. Kirkwood Blvd. (Future) – 100’ (A4D) Arterial
Pathways Master Plan
Per the pathways Master Plan, the site will require the following future sidewalks:
• Along W. SH 114 – Multi-Use (≥8’)
• Along W. Dove Rd. – (≤8’)
• West side of future W. Kirkwood Blvd. – Multi-Use (≥8’)
Site
Note from the Plan: The portion of
Kirkwood Boulevard that is located
on the Jeroll Shivers Tract shall not
be constructed until such time as the
property is sold and developed.