PZ Item 11 - PresentationSpecific Use Permit for
The Ding King Training Institute
ZA19-0078
ZA19-0078
OWNER:Southlake Flex Properties,LLC
APPLICANT:Silver Oak Commercial Realty
REQUEST:Approval of a Specific Use Permit for a Trade
School.
LOCATION:1603 Hart Street
Aerial View
Enlarged Oblique View
Ding King Training
Institute
Project Details
•Private certified training classes in hail damage repair;may also include business
management and start-up,accounting,incorporation,marketing,administration,
point of sale and banking.
•Currently eight (8)campuses nationwide;Southlake will be the largest.
•Intensified effort to train U.S.Military Veterans and Service Members.
•Anticipating 5-30 students per class plus staff of 3-6
•Monday –Friday from 8 a.m.to 5 p.m.and 8 a.m.to noon on the occasional
Saturday.
•Many of the students will travel to the facility from other parts of the country.
The Post-911 GI bill provides for their meals and lodging.A local hotel shuttle will
drop off and pick up these students daily.
•No insurance or repair vehicles serviced for the public at this location.
•The proposed facility is for training purposes only.
•Training vehicles are provided by manufacturer partners or in-house resources.
•The public is not permitted to bring any vehicles to this training facility.
•No outdoor storage of training vehicles;all training vehicles will be parked
indoors and all training is performed indoors.
•No large equipment,hazardous materials or chemicals will be utilized or stored
on site.No paint booth at this training location.
•Requesting a 5-year approval with 5-year renewal options per lease
Floor Plan
Existing 6,000 s.f.
single-tenant
building
Parking Details
Parking Assessment
Hart Street Office (1/300 sf)Warehouse
(1/1,000 sf)Medical Student (1/3)Total Spaces
Required
Total Bldg.
Spaces Required
Total
Provided
1605, Ste. 180: Fasst Performance 1605, Ste. 100:
Tx Fitness/Chiro
NA NA NA 5 5 20 19NANA10515
1601: FMC Dialysis NA 2 27 NA 29 29 29
1603: The Ding King NA NA NA 16 16 16 12
1607, Ste. 100: Peak Performance
1607, Ste. 200: US Instruments
NA NA NA 5 5 14 1454NANA9
1609, Ste. 100: TEJ/Precision Door
1609, Ste. 200: Build Workshop
3 3 NA NA 6 13 1352NANA7
1611, Ste. 100: Apex
1611, Ste. 200: Vacant
7 1 NA NA 8 8 14NANANANANA
Additional Parking in Medians and Site NA NA NA NA NA NA 34
Total Site Parking NA NA NA NA NA 100 135
The existing building has access to Hart Street via two driveways for six
commercial buildings with a common parking lot. There is a total of 135
parking spaces for the site. The proposed training facility requires 16 parking
spaces. There are 25 parking spaces immediately adjacent to the subject
building. All the buildings are owned by the same owner and the applicant has
stated that there is cross access/shared parking arrangement for the property.
The applicant has noted based on current and future tenant mix, the property
has excess available parking.
Site Photos
Questions?