Item 6B - SPIN Meeting ReportOSOUTHLAKE
SPIN MEETING REPORT
SPIN Item Number: SPIN2019-32
City Case Numbers: NA
Project Name: The Hills Church
SPIN Neighborhoods: SPIN #11
Meeting Date: October 22, 2019
Meeting Location: 1400 Main Street, Southlake, TX
City Council Chambers
Total Attendance: 27
Host: Sherry Berman, Community Engagement Committee
Vandana Tanneru, Community Engagement Committee
Applicants Presenting: Tom Rutledge, Jill P. Styron-Smith; Phone: (817) 313-0567
Email: jill.smith@basicarch.com
City Staff Present: Patty Moos, Planner
Presentation begins: 6:04 pm Presentation ends: 6:25 pm
Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com and clicking
on "I Want to" and "View" "Video on Demand" — forums are listed under SPIN by meeting date.
FORUM SUMMARY:
Property Situation: The Hills Church Southlake existing building on 9.63 acres at 2501 W
Southlake Blvd.
Details: The applicant is proposing to remodel and a site renovation to include waiver request
to allow an entrance along Brock Drive. Renovation of the approximately 29,000 SF on both
levels of the existing building and building expansion of approximately 16,760 SF on two levels.
The existing 450 seats in the worship area will be increased to 600 seats. The parking lot area
will be increased from 206 parking spaces to 261 parking spaces. The proposed site work would
also include eliminating two of the four existing drives along Southlake Blvd. allowing for other
improvements along Southlake Blvd. (in cooperation and conjunction City of Southlake) such as
the City achieving the 1709 Sidewalk Project to have a continuous sidewalk system along both
sides of F.M. 1709. Fencing and landscaping is proposed along Brock Drive.
• The church held a meeting with the neighbors on Brock Drive to present the plan and
received feedback.
• Brock Drive will be used on Sunday for 9 am and 10:45 am services only. Additionally, a
Mother's Day Out is proposed for Tuesdays and Thursday 9 am — 2 pm with access to
Brock Drive. The church does not have a private school during the week.
• Signage and security will be provided on Sunday for traffic.
• A drainage study will be needed for the new expansion.
• A Traffic Impact Analysis for the proposed driveway changes is nearly complete.
Presentation:
PROPOSED REMODEL AND SITE RENOVATION
elf
SII _ ;9
I
r
_y� U
.Awl
or
CHURCH CAMPUS - LOOKING WEST FROM
SOUTHLAKE BLVD.
CHURCH CAMPUS - LOOKING SOUTH FROM
*11THLAKE BLVD.
r
CHURCH CAMPUS - LOOKING WEST FROM
SOUTHLAKE BLVD.
Questions and Concerns:
1. Concerns with the location of the proposed driveway on Brock Drive and a preference to
move it further north to lessen the impact of the traffic on the street.
2. Concerns with the impact of the traffic and noise on the neighborhood.
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official
meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and
the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are
strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council.
Southlake Connect Results for the October 22, 2019 SPIN Town Hall Forum
Oenilea NIM111tiGd A1e1y616
SPIN T—, Hall F—m - UcWber 22, 2919
GeLlls
caul knau�ta
xom�.amO 34]1ibBaln�i:b
■.:. :. mplW
Nvemee. Raiaa RA lat39e 181 a1'.1
w ome x'b'Sa cant /�nerv'm^W tltixmw�wma
Aneng4al
cm tn..lwq va — ■z70 f]tttil Oerer
6erma waoTm pesaggrpWlvery wtli
waxnnu Mem'amonN
Iwvw ma. q...asaeaui Wl oelmmeu 8r:pnn Niiiq Lq 110] I]pl•
meaxy l6mWe firm INW I. px
teluemvmt.vzRnr Heg+W B1fi 64tf
roomy 6nm� lel oeo-aca. ua4,>'ax 9mp 316IA
SseMery L.rue
6 Nme gmee# 1eIGeM1�eiN-q,lMewe�e tm] ..49N
�a rn,Tlppm.le �❑eNn'"a mvaltl Nuiam �.1 OWM
IAl Gehiaaa-GWaae PnF. u I.mx
Nx Oedlee
Hol belrvmetl ❑manMleam Communwatmn Elrm
29
0 2o%
Nol Aaemp.b- IlnmldatY�pei
177
135%
AlkemP. Over Time
13k
18k
5k
}Jd Ael Is
Attempt Tn�
Gell ry otl
Attempt'I
Aueanpt]
Alhmpt3
AMmpta
AtbmptA
Anempt6 A p
A R
Ammpt9
Totals
Od 21,2D1912.41.35GGT
1—SMS
55❑
0
0
m
G
0 9
0
0
550
Sl:conda,y SMS
Poe Emall
hmary lAobue
6
13fi
9
❑
0
6
0
0
6
0
IT
G
❑
❑
❑
6 6
0 P
0 o
o
0
a
9
9
0
6
1.
H
Sn tinderyE 0
Secondary Mod.
Ham.1—
0
2
7148
0
0
❑
0
o
0
G
a
G
❑
o
G
0 G
0 ❑
6 G
❑
❑
0
0
0
0
0
2
7148
Hame %ware U2
&slness Phone
0
2783
0
U
0
0
I
a
a
IT
❑
a
0 0
0 P
0
o
9
0
0
2763
Od 21, -912 35 COT Sub Tda.
OC12i, P➢191P-48P5 COT
Ranary SMS
10815
0
❑
G
❑
0
0
0
❑
❑
0 a
0 0
❑
0
0
d
1.15
I]
Sn'ontlary 5M5
a
186
3
G
❑
a a
0
d
1.
Prmary E—I
a
397
In
a
❑
0 0
0
V
524
PAnary—D
a
93
183
IT
❑
0 ❑
n
a
2fifi
Secondary 5—m
a
2
2t
a
o
u a
D
a
a
Secondary Mod.
0
3
B
G
❑
0 0
❑
0
11
Hanle FYme
HomeP 12
Me
a
4
1
]
0
G
D
❑
0
0 ❑
U 0
0
G
9
B
457
I
0<121, 2019124635CDTSub Tap*
Cc121, 2D1912.51,35 CDT
ft.—Ph—
Primary SMS
124
570
0
2
680
0
I
408
0
o
0
D
D
9
0
9
0
0
0
o
0
0
0
0
0
8
0
133
1605
0
S ,—, SMS
%unary Eman
Primary Mo6Ae
e
0
c
d
0
D
D
0
c
d
0
114
D
0
o
0
0
a
❑
o
o
0
0
D
D
0
c
D
0
114
Se[omery EmaM
Se,w ,rAobik
0
0
0
0
0
o
59
12
65
40
d
o
D
0
0
0
0
D
124
52
—Phone
Home Phone A2
6umness Ph—
D
o
c
d
0
0
D
o
0
i
2
22
2
16
d
D
0
o
o
0
0
0
0
D
0
0
9
3
SS
W 21, 20191251.35 CDT Sub T—
1121, all 1-35 COT
1mary 5M5
0
o
0
d
0
o
=3
D
138
o
0
d
0
d
d
d
0
0
No
0
Seo , SMS
Primary Email
o
o
d
0
o
o
P
D
o
o
0
d
o
0
9
d
0
0
0
o
Primary MotWe
Sec ry a4
o
0
D
0
D
0
0
d
0
o
0
d
D
0
0
0
0
0
0
Seco ,Modk
o
0
o
D
0
50
o
0
0
5o
Home PM1one
Home P— IQ
o
0
d
8
o
0
d
D
o
D
{
1
o
❑
D
0
o
0
4
1
6umness Phone
0
0
0
o
0
$
0
0
0
5
04121, 20191256.35CDTSub Td
u
0
0
o
0
71
0
0
0
71
Ca121. 2D1613:01.35 CDi
Primary eM5
0
0
o
d
D
d
0
0
D
o
.,.a -SMS
Primary E—I
o
0
D
0
o
o
D
o
D
0
D
D
❑
o
D
0
❑
o
D
o
Primary MmYe
sac ry a4
c
o
0
a
c
o
0
D
0
o
0
0
o
a
D
0
o
c
0
SecmrOary Mobik
o
D
o
D
0
d
0
0
0
0
Horne Phone
Home PFome%2
o
o
d
0
o
0
D
D
D
D
D
0
4
1
0
D
0
0
4
1
60aness Phone
0
0
0
o
0
0
11
2
c
1
TTY ( TTD Device
C
0
0
0
0
0
3
1
❑
4
Oct 21, 201913 01' 35 CDT Sub Totals
0
0
0
❑
0
0
19
3
0
22
Oct 21, 201913.0311 CDT
Primary SMS
0
0
0
0
0
0
0
0
0
0
Secondary SMS
0
0
0
0
0
0
0
0
C
0
Primary Email
0
0
0
0
0
0
0
0
0
0
Primary Mobile
0
0
0
0
0
0
0
0
0
0
Secondary Email
0
0
0
0
0
0
0
0
0
0
Secondary Mobile
0
C
0
0
0
0
0
0
0
0
Home Phone
0
C
0
0
0
0
❑
0
0
C
Home Phone#2
C
C
0
0
0
0
0
0
0
0
Business Phone
0
0
0
0
0
0
0
0
0
0
TTY l TTD Device
0
0
0
0
0
0
0
0
1
1
Oct 21, 201913:03:11 CDT Sub Totals
0
c
0
0
0
0
0'
0
1
1