Item 6A PlansSouthlake meadows
Simpson 8 sonsTradln❑ r
ir..-7
i
a W
G ik W I nd.=3i
`'-'-r PV System
Solar PV System Location
:on Wireless Q North Park Flag Football
Southlake DPS North, Liberty Park
A Training Center i Sheltonwoos
North Park (� E Dove Rd
Daa a Rd
Winfield Est
,u Carlllort Southlake Q
9
Silverado Greg
Lonnle Wllllarns Q rumnyrcu w eir= aar� at Southlake b
,y, r
Welding Sbrvlces
.5 s Allegiance Title p� '�j. �+y, Southlake
Western Union q n Company Southlake lI '�� M Animal Hospital G
The Manogt Mlnt P
f y e T N 160A Devon Court
s
3 � e
1Nka® Lo - s
N4agv"'�uO rH �
�dwet Highland Landscapmg Q
.luti�bVv"�
?+� F'llnw0ip Church--
V kellur/SoviNake Campus
r�as,r �4r+oi 3 wind+�catk G
m Q
s
N
� x,vsu GIa�Alllin'r�+
fir¢
Countryside. Bible Church
Falcon Holdings LLC �}
[;race Community�y
Church
AY✓f
Mike's Garden Center f
New Day Church Gy Ei, y a,us
at Southlake Y
E ..
L >iry E
-
Carroll Nigh School p a.
S Cc
r
Owner:
C.D. Peebles
1604 Devon Court
Southlake, TX 76092
Axium Solar:
1005 Placid Ave. STE 100
Plano, TX 75074
O: 972-633-8680
Andrew Whitehead
Business Development Manager
and rewwhitehead@axiumsolar.com
Charles Wright, BSEE
Project Engineer
charleswright@axiumsolar.com
Project Description
Installation of a rooftop solar array on the West and South facing
rooftops. SolarEdge inverter mounted on interior garage wall of
house, SE optimizers mounted under each module to comply with
rapid shutdown requirements and utility disconnect mounted on the
South exterior wall of house, near meter.
Applicable Building Code Compliance
2017 National Electric Code (including 690.12, rapid shutdown)
2018 IRC / IBC
2018 IFC (1204)
Drawing Index
PV 100 Cover Page
PV 101 Site Layout
PV 102 One Line Electrical
PV 103 Attachment Detail
PV 104 Labels
0%
AXIOM SOLAR
1005 PLACID AVE. (855) 633-8680
SUITE 100 (972) 633-8680
PLANO, TX 75074 WWW.AXIUMSOLAR.COM
�oo�,c�opp�4
OF .TFCC
v � .•° 9s��Co
BENNETT A. FORD D
�...........................c
13 109875
S N
PLAINVIEW ENGINEERING LLC
TX FIRM# 20680
11-11-2019; ELECTRICAL ONLY
PROJECT:
C.D. PEEBLES
SOLAR PV SYSTEM
ADDRESS:
1604 DEVON COURT
SOUTHLAKE, TX 76092
REVISIONS
TOTAL SYSTEM CAPACITY - 8.7 KW
(29) TRINA ALLMAX 30OW MODULES
(1) SOLAREDGE 7.6KW INVERTER(S)
SNAPNRACK SERIES 100 RACKING
40o & ----0 TILT(S)
275o & 185o ORIENTATION(S)
Utilitv Meter. ESI ID# ?
DATE 11/5/19
PROJECT # 2609
DESIGNED BY: C. WRIGHT
DRAWN BY: C. WRIGHT
SCALE NONE
CONSTRUCTION
COVER PAGE
PV 100
Coventry Lane
Property Line -
�81
o�
N
U
E
O
w
c
E
� I
1 1 1 1 1
/
No. shown in module indicates string# ' 2 ` 1
2 1
Single module width is 39 1/8" 2 2 1
1
� PV Inverter - m/n SE760OH-US 2 -
� PV AC Disconnect
0 Main Electrical Panel 65
E0 Utility Meter 1so.s~
196"
Garage 1.5"
Notes: 1) No equipment will extend beyond the limits of existing building
footprint. No property setbacks will be encroached upon.
2) Solar modules to be mounted to existing roof structure.
3) Exact layout to be adjusted as required to avoid roof and
plumbing vents.
4) Locate solar AC disconnect within 10 feet of utility meter.
5) Installation to comply with the requirements of Section
1204 of IFC 2018.
6) Coordinate with homeowner for all equipment and conduit
placements.
Visible, Lockable
Labeled, AC Disconnect
(Located Min 10' of meter)
Neighboring Property SITE PLAN N
Solar Modules
(M/N: TSM-300DD05A.05) i
I
Driveway
EA,
40*
AXIUM SOLAR
1005 PLACID AVE. (855) 633:8680
SUITE 100 (972) 6338680
PLANO, TX 75074 WWW.AXIUMSOLAR.COM
���cOF
c�opGG
.......
BENNETT A. FORD C
�...........................
109875
PLAINVIEW ENGINEERING LLC
TX FIRM# 20680
11-11-2019; ELECTRICAL ONLY
PROJECT:
C.D. PEEBLES
SOLAR PV SYSTEM
ADDRESS:
1604 DEVON COURT
SOUTHLAKE, TX 76092
REVISIONS
TOTAL SYSTEM CAPACITY - 8.7 KW
(29) TRINA ALLMAX 30OW MODULES
(1) SOLAREDGE 7.6KW INVERTER(5)
SNAPNRACK SERIES 100 RACKING
40° & ----0 TILT(S)
275° & 185° ORIENTATION(S)
Utility Meter. ESI ID# ?
DATE 11/5/19
PROJECT # 2609
DESIGNED BY: C. WRIGHT
DRAWN BY: C. WRIGHT
SCALE 1/16" = V-0"
CONSTRUCTION
SITE LAYOUT
PV 101
Peebles Residence - PV Wire Calculations
ASH RAE Temperatures Totals
Characteristics Qty.
Nominal
Short -Circuit
Temperature Coefficients (%/°C)
Coldest DaY Voc
Warmest Day
Vmp
2%High (°C) Extreme Min(°C) 2%High (°F)
Extreme Min STC Watts / System Size (STC pTC Watts / System Size (PTC
(,Fl Modules Module kSi Module kW)
Inverter Efficiency
System Size (CEC
AC ize
Modules
Vmp Imp
Voc Isc
Voc Isc Pmax
Site
37 -7 98.6
19.4 29 1300 8.70 270.60 7.85
96.2 %
7.55
Single Trina Allmax Plus 30OW (TSM-DD05A.05(11)) 1
32.60 9.19
39.80 9.77 .0,29 0.050 -0.39 43.49 27.26
Optimizers
Volts
Note: Values below r--------alYNirtBf02 Mt 'wtotalnum6erafN "' nduttprs run'n home mn cpndurcminverter. (EGCI'
Tempera!u Adder bCu
Approx. One -Way gmbien(Temperature ying
Amps Maw mpSm Con[mps y OCPD size (Amps) Distance lft.) ('FI (°n Temperature Factor onductorz onduit Flll Factor tied Amps
COD Corrected Mlnimum Wlre Calculated%Vtlrop at selectetl Wire Calculated%Vdrop at
Amps Selected Selected EGC
512 Mc..%m m10 EG
solarEdgeywo string pl is
400
1 M
t5
18.8
n
0
0.91 4
0.8
18.8
2s.8
10
0.35%
to
SolarEdge 7600 string b2 la
400
30.z0
tS
18.8
0
0.91 4
0.8
18.8
29.8
12
0.z2%
10
0.33%
10
to
50-dge 7600 stung b3
0.00
11
18.8
100
0
0.91 4
0.8
18.a
12
0.00%
10
0.00%
10
10
Max Output "' y -
Volt
ps (Phases)
12z%of Maw Amps
OCPD size (Amps)
Approx. One -Way
Distance (k.l
Ambient Temperature
("FI
emperature Adder
('F)
emperature Factor
n[Carrying
ontlucrors
ontlui[Fill Factor
cted Amps
C.- Corrcred
Amps
Mlnimum Wlre
5i8e
z
Calculatetl%Vdrop at
nimu
M3.80%m
selected Wire
58e
iz
Calculated%Vdropac
Selected
0 mum EG
Selected EGC
Inverter to Panel 240
32 32
40.0
40
100
100
0
0.91
3
3
40.0
440
180%
10
10
Note: Calculations shown are based on installation of SWC conductors. Some equipment lugs are rated at 75'C and conductors verified to remain within limits. Some conductors may have been upsized for voltage drop. Copper conductors unless otherwise noted on drawings.
Note: COU (Conditions of Use) Corrected Amps refers to conductor derating. NEC Table 310.15(B)(2)(A), 75°C column used for temperature derating. NEC Table 310.15(B)(3)(a) used as conduit fill derating. NEC Table 310.15(B)(16) used for conductor ampacity.
Note: Ambient Temperature sourced from ASHRAE 2%high values and appropriate temperature adder from NEC table 310,15(B)(3)(C) applied. Amperage escalated to select appropriate conductor.
Calculations above based on: ffaipipli7&e) Operating Current=(#strings)"(Imp) Operating Voltage=(#modules in series)"(Vmp) Short Circuit Current=(#strings)"1.25 per NEC 690.8(A)(1) Max System Voltage=(#modules in series)'((((-.#N%V/°C".01)"(lowest temp C-25))"Voc))+Voc)I
SHEET NOTES:
1. THE INSTALLATION OF THIS SOLAR PV SYSTEM SHALL COMPLY WITH THE 2017 NATIONAL ELECTRIC CODE (NEC).
2. DERATE CONDUCTORS FOR ACTUAL INSTALLATION CONDITIONS.
3. ALL DISTANCES SHOWN ARE ESTIMATES ONLY. ACTUAL DISTANCES WILL VARY AND SHALL BE VERIFIED ON SITE.
4. CONDUIT, WHERE INSTALLED, SHALL BE AS FOLLOWS:
4.1. ABOVEGROUND - EMT W/ ALL -STEEL COMPRESSION TYPE FITTINGS.
4.2. UNDERGROUND - SCH40 PVC
4.3. SUPPLY-SIDE / SERVICE ENTRANCE / WHERE SUBJECT TO DAMAGE - GALV. RIGID STEEL
5. EGC REFERS TO EQUIPMENT GROUNDING CONDUCTOR; GEC REFERS TO GROUNDING ELECTRODE CONDUCTOR.
6. ALL CONDUCTORS SHALL BE COPPER.
7. ELECTRICAL EQUIPMENT AND MATERIALS APPROVED, LISTED, LABELED, IDENTIFIED AND INSTALLED PER A
NATIONALLY RECOGNIZED ELECTRICAL TESTING LABORATORY.
8. SERVICE EQUIPMENT LABELED PER NEC FOR DUAL SOURCES. PV EQUIPMENT/SYSTEM LABELING PER NEC 690.
Router, connection to I
Sense Circuit Breaker Provided by Customer
ternet
Sense Antenna
must be 2 pole
(no tandum breakers)
DC Conductors
2#10 PVWire per string of optimizers to Inverter
1#10G EGC THWN-2,
1" Raceway Solar Modules
Junction Box (AR) DC Optimizer
Sense
String of 15 Optimizers (15 modules)
Unit
Un
t2��A/2 0
0
3#8 THWN -2
SE Zigbee
Comms
= �_
J -_
1#10G THWN-2
M
Min. 3/4" Conduit
200A t°
Typical
Main `v
L
0
Z
J_
F Built-in DC Optimizer whips (#10 PVWire).
Sense CTs
�i
Field -installed #10 PVWire jumpers installed
1 set on incoming service
as necessary. (TYPICAL)
lines, 1 set on PV input
Equipment Grounding Conductors (TYPICAL)
#6 Bare within array, #10G THWN-2 in conduit
-
- - - - - - - - - - - -
4 0 A _
String of 14 Optimizers (14 modules)
AC Grounding
J
Electrode System
AC SPDVisible,
7-j-i-L
Lockable,
LL
Labeled Solar PV
AC Disconnect
(Located w/in 10' of
utility meter)
EQUIPMENT
UTILITY METER
MAIN ELECTRICAL PANEL
SOLAR PV AC DISCONNECT
SOLAR INVERTER
SOLAR MODULES
LOCATION
SERVICE ENTRANCE
SOUTH INTERIOR GARAGE WALL
EAST EXTERIOR WALL
TBD
SOUTH & WEST -FACING ROOFTOPS
[Existing]
[Existing]
[New / By Axium Solar]
[New / By Axium Solar]
[New / By Axium Solar]
200 A
200 A MCB, 200 A Bus
Trina Allmax 30OW Modules (M/N: TSM-30ODD05A.05)
240/120 VAC
240/120, 10, 3W
Fused Disconnect
SolarEdge Inverter
SolarEdge, P400 Optimizers
w/ 2 - 40A Fuses
(1) SE760OH-US
MC4 connectors, PVWire module and optimizer leads. Modules
Utility Meter
Breakers are GE Q-Line type
2P, 60A, 240VAC
are compatible with ungrounded / transformer -less inverter
ESI ID# ?
NEMA 3R Enclosure
240V, NEMA 3R
topology.
NOTES
For solar interconnection, perform line -side tap of incoming
32A Maximum Output Amps
supply feeders of main electrical panel.
Each module is attached to an optimizer. Optimizers are wired
Install 240V AC surge
Integral Arc Fault protection
in series. Modules are UL 1703 listed. Optimizers are listed,
Install Sense energy monitor with added 20A/2P breaker in
protection
Integral DC Disconnect
UL1741, UL-94. Clips attached to module frames and wire tray
main panel. Shown installed inside panel board, but may
Integral Rapid Shutdown Capable
on racking system support conductors. Modules bonded to
work better to install externally using the supplied bracket.
racking system via UL listed module clamps. Optimizers bonded
Inverter is listed, UL 1741
via #6 bare, solid EGC. Install ground lug on each independent
array assembly.
Monitoring means: SE Zigbee Wireless
DC+ conductor jacket is red and DC- is black.
0%
AXIUM SOLAR
1005 PLACID AVE. 1855)633-8680
SUITE 100 (972) 633-8680
PLANO, TX 75074 W W W.AXIUMSOLAR.COM
BENNETi A. FORD
109875 ��•4Q,
PLAINVIEW ENGINEERING LLC
TX FIRM# 20680
11-11-2019; ELECTRICAL ONLY
PROJECT:
C.D. PEEBLES
SOLAR PV SYSTEM
ADDRESS:
1604 DEVON COURT
SOUTHLAKE, TX 76092
REVISIONS
TOTAL SYSTEM CAPACITY - 8.7 KW
(29) TRINA ALLMAX 30OW MODULES
(1) SOLAREDGE 7.6KW INVERTER
SNAPNRACK SERIES 100 RACKING
400 TILT
2750 and 1850 ORIENTATIONS
Utility Meter, ESI ID# ?
DATE 11/5/19
PROJECT # 2609
DESIGNED BY: C. WRIGHT
DRAWN BY: C. WRIGHT
SCALE NONE
CONSTRUCTION
ONE LINE ELECTRICAL
PV 102
SNAPNRACK SERIES 1DD RACKING SYSTEM TYPICAL ROOF LAYOUT
NOTES:
- STANDARD LAG BOLT SPEC ASSUMES
W 16" LAG BOLTS WITH 2.5"
EMBEDMENT IN ROOF STRUCTURAL.
MEMBERS/RAFTERS
- TORQUE ALL A" HARDWARE TO THE
FOLLOWING:
-SILVER S-S. 10.16 FT -LIPS
- BLACK S.S- 7-9 FT-LBS
RAIL CAN MOUNT TO EITHER SIDE OF
POST (UPSLOPE vs- DOWNSLOPE)
-FOR UNEVEN ROOF SURFACES, USE
UP TO TWO LEVELING SPACERS PER L
FOOT OR STANDOFF. SEE DRAWING P
"STANDARD RAIL LEVELING' FOR
DETAILS AND LIMITATIONS .-
STANDOFFS ARE BOLTED
INTO ROOF RAFTERS OR
STRUCTURAL MEMBER
Z '"
"RAIL SPAN"
DISTANCE BETWEEN
ROOF ATTACHMENTS
4-6 Feet
Preferred
2 UL4U n A f� =F2iT!!T ENERO�C(M DESIGNER. G At>PUHNxe
IIID,'JVI IIrAT�I171�41'LJITuQ➢� •.. .....e.....�-.._. DRAFTER. U(
PV -___= APPRGVEDBY:
SNAPNRACK SERIES 100 RACKING SYSTEM
SHOWN MOUNTED ON STANDOFFS
J' X 2.75' (TYP.) S.S. BOLT
WITH SPLIT LOCK WASHER
SNAPNRACK MID CLAMP
SNAPNRACK CHANNEL NUT
SNAPNRACK
UNIVERSAL m
END CLAMP
ASSEMBLY
SnapNrack Bonding Lug Assembly
C
5NAPNRA.a(
STANDARD
PAIL
.rT _1M JR�OSUQIEL
-'-BONDING
SJS6.1H%1[N— � f
STAINLESS BOLT 1 IJ
5116 IN STAINLESS J+PPER WIRE, TYP.
SPLIT LOCK WASHER
SNAPNPAEK GROUHIID J'
LUG, 6-17AN5
ROOF RAFTERS OR
STRUCTURAL MEMBERS
SNAPNRACK MODULE
MID CLAMPS MODULE OVERHANG
(NOT TO EXCEED 30%
OR MANUFACTURERS
RECOMMENDATIONS)
Trina AIIMax Modules to be
' between 0" and 16"
(0" and 9"in Landscape)
MODULE OVERHANG ._
a.
Center to Center --
rail spacing: 34"
min, 63.5" max
"RAIL END OVERHANG' (NOT TO EXCEED
34 % OF ACCEPTABLE RAIL SPAN)
LR
SCALE: DNS PARTNUMBER. DESCRIFTIDN:
O"TE. SI00 D05 SERIES IGO TYPICAL LAYOUT F
NOTES!
- STANDARD LAG BOLT SPEC ASSUMES
5"18' LAG BOLTS WITH 2.5' EMBEDMENT
IN ROOF STRUCTURAL MEMBERS/RAFTERS
- TORQUE ALL &' HARDWARE TO
THE FOLLOWING
SILVER S.S. I11-16 FT-LBS
BLACK S.S. 7-9 FT-LBS
RAIL CAN MOUNT TO EITHER SIDE
OF POST (UPSLOPE vs. DOWNSLOPE)
- FUR UNEVEN ROOF SURFACES. USE
UP To TWO LEVELING SPACERS PER
L FOOT OR STANDOFF. SEE DRAWING
'STANDARD RAIL LEVELING' FOR
DETAILS AND LIMITATIONS
SNAPNRACK RAIL STANDARD
_ _ 1 SNAPNRACK SPLICE STANDARD INSERT
SNAPNRACK SPLICE STANDARD BASE
�tI X J' S.S. BOLTS WITH
SPLIT LOCK WASHERS
P *0 (3 PER SPLICE)
SNAPNRACK STANDOFF CLAMP
SNAPNRACK a' X 2' TYP. (OR 1.5') S.S. BOLT
CHANNEL NUT WITH SPLIT LUCK WASHER
SNAPNRACK STANDOFF SHAFT STANDARD
(VARIOUS SIZES)
` STAINLESS LAG BOLT WITH WASHER
SNAPNRACK STANDOFF BASE STANDARD I -HOLE
" X I' S.S. BOLT WITH SYSTEM SHOWN WITH STANDOFF MOUNTING
SPLIT LOCK WASHER COMPATIBLE WITH ALL ROOF TYPES
USE FLASHED L FOOT FOR FASTER INSTALLATION
ON COMPOSITION SHINGLE ROOFS
GAP RAILS 0.1-9.r'
FOR EXPANSION
ASSEMBLED SYSTEM
(SOLAR PANELS NOT SHOWN:
SNAPNRACK
COMPOSITION L FOOT
SNAPNRACK
CHANNEL NUT
SHAPMRACK
STANDARD
RAIL
SMAPNRACK COMPDSI ION
RLpF FLASe-i]NG `��
SNARPlACK
L FOOT BASE
SEAL PENETRATION AND
UNDER BASE WITH
APPROPRIATE ROOF SEALANT
RAFTER rYP.
J' S.S. LAG SCREW WITH FLAT WASHER
(SEE ENGINEERING DOCUMENTS FUR
BOLT EMBEDMENT REQUIREMENTS - 2-5'
MIN. EMBEDMENT IS TYPICAL)
x V S.S. BOLT AND
PLLfIT WASHER R
— S.S. FLANGE NUT
ROOF DECKING TYP.
FLASHED L FOOT MOUNTING POINT FOR
USE ON COMPOSITION ROOF SURFACES
WI IN LOW TO MODERATE TILT
RAILS CAN BE LEVELED NIP TO 3'
USING UP TO TWO LEVELING SPACERS
AS SHOWN IN 'SERIES I09 RAIL
LEVELING'
HE+NST9n.
NOTES.
- LAG WILTS MUST EMBED IN ROOF
STRDETURAL MEMBERS/RAFTERS
TORQUE ALL WLW HARDWARE TO
THE FULLOWING
- SILVER S.S. ID-16 FT -LIPS
- BLACK S.S. 7-9 FT -LIPS
- RAILS CAN MOUNT TO EITHER SIDE
OF L FOOT ttPSLOPE VS DDWNSLDPE7
STEP 3� PLACE L FOOT ON TOP
OF FLASHING AND TIGHTEN NUT
STEP 2. SLIP
FLASHING OVER
L FOOT BASE
STEP 1- BOLT L FDO
D-L To RUQF +rIT,;
LAG BOLT
ROOF DECKING TYP.
COLETL4 lt;St PLLA[lUN
DESIGNER G. MCPHEETERS SUYE DNS PART • REv
'U G. NCPHEETERS DAT'IP ITtD1D PEN-D01 PEN DETAIL Qi FLASHED L FOOT C
,•.,.nsmu �®�,'�' a rLanc 1®`fn A-�ie. 1�Lo+c
at
4P
nEIGrH -f.g� W P�-RS' - wL [GHT•
ra +bwy`."ts'n�gr�,(x .eaVe nenf.`iu.,x
+Harr �r �uwr rs�nwn
we nrwna -ar
a—Oai wMr�fur Ncf +� wa
STANDARD SERIES NOD ATTACHMENTS
FEATURE 3' OF VERTICAL
ADJUSTABIL I TY ON ALL MOUNTING
POINTS WITH THE USE OF I' LEVELING
SPACERS
THE FIRST INCH OF ADJUSTABILITY IS
ACCOMPLISHED WITH SLIDING FEATURES
BUILT INTO BOTH L FOOT AND
STANDOFF CLAMP COMPONENTS
FOR AN ADDITIONAL INCH OF HEIGHT
ADJUSTMENT, ADD UK LEVELING
SPACER. USE OF SINGLE LEVELING
SPACER NOT TO EXCEED 3aY.. OF
ATTACHMENT POINTS.
FOR A SECOND ADDITIONAL INCH OF
HEIGHT ADJUSTMENT, ADD ANOTHER
LEVELING SPACER. USE OF TWO
LEVELING SPACERS NOT TO EXCEED
102 OF ATTACHMENT POINTS.
THE LIMITS ABOVE APPLY WHEN YOU
ARE AT THE KUIMUM STANDOFF
HEIGHT DEPENDING ON THE STANDOFF
BASE BEING USED. FOR STANDOFFS ON
L FOOT BASES, THE MAXIMUM STANDOFF
HEIGHT (BEFORE APPLYING THE
LIMITATIONS ABOVE) IS 3'. FOR
STANDOFFS ON STANDOFF BASES, THE
MAXINUH HEIGHT BEFORE APPLYING THE
LIMITATIONS ABOVE IS W.
AXIUM SOLAR
1005 PLACID AVE. 1855) 633-8680
SUITE 100 (972) 633-8680
PLANO, TX 75074 WWW.AXIUMSOLAR.COM
For Reference Only
Refer to separate, stamped engineering
report and calculations for roof mounting.
PROJECT:
C.D. PEEBLES
SOLAR PV SYSTEM
ADDRESS:
1604 DEVON COURT
SOUTHLAKE, TX 76092
REVISIONS
TOTAL SYSTEM CAPACITY - 8.7 KW
(29) TRINA ALLMAX 30OW MODULES
(1) SOLAREDGE 7.6KW INVERTER(S)
SNAPNRACK SERIES 100 RACKING
400 & ----0 TILT(S)
2750 & 1850 ORIENTATION(S)
Utility Meter. ESI ID# ?
DATE 11/5/19
PROJECT # 2609
DESIGNED BY: C. WRIGHT
DRAWN BY: C. WRIGHT
SCALE NONE
CONSTRUCTION
ATTACHMENT DETAIL
*' ` a sT F G.M`PNE F RT DNs `A"'' I SERIES 100 ASSEMBLY DETAILS UEC I"
^'°'d RAPPER. G. M(PHEFTERS DATE IZDIIT 5100 Df)3 E
.�.,.". DC'SIGMER G.MM:PHEETERS 2% 101 PAN'= I SERIES 100 RAIL LEVELING IREV
e...a.. RAFTER G_MFPHBETERS DATIe I�DD1T 5106 DO6
PV 103
idth (1 each)
HT # 596-00241, roll, custom printed fields, (qty. 1)
11.3
400
400
15
INVERTER 1 LABELING
HT # 558-00312, Continuous, Red Vinyl, 2" width (5 each)
DC ]-BOX LABELING
71 F 5`Jb-VU4yb,
ELECTRICAL SHOCK HAZARD
DO NOT TOUCH TERMINALS.
TERMINALS ON BOTH LINE AND
LOAD SIDES MAY BE ENERGIZED
DC VOLTAGE IS ALWAYS PRESENT
WHEN SOLAR MODULES
ARE EXPOSED TO SUNLIGHT
HT # 596-00588, pre-printed, (qty. 1)
ELECTRICAL SHOCK HAZARD
THE DC CONDUCTORS OF THIS
PHOTOVOLTAIC SYSTEM ARE
UNGROUNDED AND MAY BE ENERGIZED
DC Raceways (every 10', every turn, above and below penetrations) - (AR) 1" x 9"
WARNING: PHOTOVOLTAIC POWER SOURCE
HT # 596-00499, roll, pre-printed, (qty. 1)
A WARNING
TURN OFF PHOTOVOLTAIC AC
DISCONNECT PRIOR TO
WORKING INSIDE PANEL
HT # 596-00495, roll, pre-printed, (qty. 1)
CE
EM
TIE-IN PANEL
HT # 596-00588, pre-printed, (qty. 2)
ELECTRICAL SHOCK HAZARD
THE DC CONDUCTORS OF THIS
PHOTOVOLTAIC SYSTEM ARE
UNGROUNDED AND MAY BE ENERGIZED
ALL DC JUNCTION BOXES/SOLADECKS
PVLables.com p/n 05-112, pre-printed, (qty. 1)
SOLAR PV SYSTEM
EQUIPPED WITH
RAPID SHUTDOWN
3301-RR ELECTFIC
PY PANELS
TURN RAPID SHUTDOWN SWITCH TO
THE "OFF" POSITION TO SHUT DOWN
PV SYSTEM AND REDUCE
SHOCK HAZARD IN THE ARRAY i
HT # 596-00497, roll, pre-printed, (qty. 1)
WARNING
HT # 596-00239, roll, pre-printed, (qty. 1)
ELECTRICAL SHOCK HAZARD
DO NOT TOUCH TERMINALS.
32 TERMINALS ON BOTH LINE AND
24o LOAD SIDES MAY BE ENERGIZED IN
THE OPEN POSITION.
MAIN PV DISCONNECT LABELING
HT # 596-00633, White with Orange Warning Header, 4" height, 6" N
WARNIN
7rA
WER TO THIS SERVICE
EQUIPMENT IS ALSO SUPPLIED BY
ON -SITE SOLAR SYSTEMS
DISCONNECT LOCATED WITHIN 10
FEET OF METER
METER BASE / TRANSFORMER POLE LABELING
idth
A WARNING _&
THIS TRANSFORMER IS SUPPLIED
BY BOTH UTILITY AND SOLAR
POWER SOURCES DISCONNECTS
LOCATED ON ADJACENT BLDG
MAX PV AMPS 32 A AC
MAX PV VOLTS 240 V AC
AXIUM SOLAR
1005 PLACID AVE. (855) 633-8680
SUITE 100 (972) 633-8680
PLANO, TX 75074 WWW.AXIUMSOLAR.COM
OF
9kP
............
�BENNETi°A. FORD ° .�'.°°°°109875
Y n °
PLAINVIEW ENGINEERING LLC
TX FIRM# 20680
11-11-2019; ELECTRICAL ONLY
PROJECT:
C.D. PEEBLES
SOLAR PV SYSTEM
ADDRESS:
1604 DEVON COURT
SOUTHLAKE, TX 76092
REVISIONS
TOTAL SYSTEM CAPACITY - 8.7 KW
(29) TRINA ALLMAX 30OW
(1) SOLAREDGE 7.6KW
SNAPNRACK SERIES 100 RACKING
40° TILT
275° & 185° ORIENTATION(S)
Utility Meter, ESI ID# ?
DATE 11/5/19
PROJECT # 2609
DESIGNED BY: C. WRIGHT
DRAWN BY: C. WRIGHT
SCALE NONE
CONSTRUCTION
LABELS
PV 104
39
' 1664 Devon Couh g
l4'
L � -
1
t
r a.
r.- /
it
Solar PV on this roof surface (west)
and adjacent roof (south)
_ - -�,...
„6 ����� 1 ... ��
t `fit e-�ag4 �: _., t.
.I
5