Item 6C - PresentationSite Plan
Next Century Health Care Plaza
Item 6C ZA19-0070
ZA19-0070
Owner/
Applicant:Bonola Family LTD Partnership
Request:Approval of a Site Plan for six single story medical office
buildings totaling approximately 50,000 square feet on
approximately 6.8 acres
Location:2540 and 2600 E. S.H. 114, described as Lots 1R2 and 2,
Block 1, Bonola Family Addition
Aerial View
Aerial View
2035 S.H 114 Corridor Plan
MEDICAL AND WELLNESS DISTRICT OVERLAY
The Medical Cluster category is an overlay category designed and
intended for the concentration of local to regional healthcare and
related facilities,including Medical/Wellness,specialty surgical
centers,pediatric care,geriatric care of an outpatient nature,
research and development facilities including those operated in
partnership with a hospital,university,or other similar institutions,
and health,beauty and wellness clinics and facilities.
Master Pathways Plan
Environmental Resource Protection Map
Street View
Street View
Street View
Mainstreet Transitional Center Site Plan
Site Plan for an approximately 66,333 square foot,two-story transitional
care/post-acute care facility on 5.68 acres approved February 16,2016
Approved Feb. 2, 2016
Conceptual Site Plan at Corridor Committee
Site Plan at P&Z Commission
Site Data Summary
Lot 1R2 Lot 2 Total
Land Use Designation Mixed Use Mixed Use Mixed Use
Existing Zoning “C-3”“C-3”“C-3”
Gross/Net Acreage 1.12 ac.5.68 ac.6.80 ac.
Open Space Area 0.40 ac.1.82 ac.2.22
Open Space %35.71%32.04%32.65%
Imp. Coverage Area 0.72 ac.3.86 ac.4.58 ac.
Imp. Coverage %64.29%67.96%67.35%
Building Area 8,000 sf 42,000 sf 50,000 sf
Parking Required*1/150 with 10%
variance
1/150 with 10%
variance
1/150 With 10%
variance
Parking Provided 62 226 288
Site Plan (Alternate) at P&Z Commission
Site Data Summary
Lot 1R2 Lot 2 Total
Land Use Designation Mixed Use Mixed Use Mixed Use
Existing Zoning “C-3”“C-3”“C-3”
Gross/Net Acreage 1.12 ac.5.68/5.61 ac.6.80/6.73 ac.
Open Space Area 0.40 ac.1.76 ac.2.16
Open Space %35.71%31.37%32.10%
Imp. Coverage Area 0.72 ac.3.85 ac.4.57 ac.
Imp. Coverage %64.29%68.63%67.90%
Building Area 8,000 sf 42,000 sf 50,000 sf
Parking Required*1/150 with 10%
variance
1/150 with 10%
variance
1/150 With 10%
variance
Parking Provided 62 226 288
38’ setback requested
P&Z Commission Conditions
P&Z Commission Condition Applicant’s Response
The applicant’s willingness to provide additional landscape
at the east emergency entrance and on the Shady Ln.side
of the property near the detention pond.
Additional landscaping has been provided in the area where the
western emergency access driveway has been eliminated and
additional trees are shown to be preserved along the north
property line due to the reduced width of the private street from
Shady Ln.The plans were being reviewed by the Landscape
Administrator as of the date of the meeting packet.
Subject to the Landscape Administrator’s approval of a
Tree Preservation survey.
The Landscape Administrator is reviewing revised plans submitted
November 25,2019 and a revised evaluation of a good faith effort
to preserve trees will be made prior to the City Council meeting on
December 3,2019.
Any new trees should be evergreen with foliage the full
year.Canopy trees have been designated to be Live Oaks in the
Landscape Plan plant list.
Noting the applicant’s willingness to move the north side
fence further south onto the property to allow landscape
plantings on both sides of the fencing and to review the
material type to either a wood a wrought iron type.
8’cedar fence with cap and metal posts,stained on both sides,
shown along the north side of the private street from Shady Ln.
meets the “F-1”bufferyard screening requirement.
Further investigation into eliminating the east emergency
access if not required by the Fire Marshal.
The eastern emergency access driveway is required by the Fire
Marshal for the pavement width of the private street from Shady
Ln.to be reduced from 24’to 19’per the P&Z Commission motion
for approval of The Canopy (ZA19-0071).The western emergency
access driveway has been eliminated and an approved hammerhead
turnaround is provided.
Revised Site Plan
Site Data Summary
Lot 1R2 Lot 2 Total
Land Use Designation Mixed Use Mixed Use Mixed Use
Existing Zoning “C-3”“C-3”“C-3”
Gross/Net Acreage 1.12 ac.5.68/5.61 ac.6.80/6.73 ac.
Open Space Area 0.40 ac.1.71 ac.2.11
Open Space %35.71%30.48%31.35%
Imp. Coverage Area 0.72 ac.3.90 ac.4.62 ac.
Imp. Coverage %64.29%67.96%68.65%
Building Area 8,000 sf 42,000 sf 50,000 sf
Parking Required*1/150 with 10%
variance
1/150 with 10%
variance
1/150 With 10%
variance
Parking Provided 68 219 287
*Reciprocal parking agreement with Lot 1R1 to the east (66 spaces). Total spaces
provided –353. Total spaces required with 10% variance –351 spaces.
Pavement width reduced from 24’ to 19’ and fence moved to north side of street
Western emergency access has been eliminated 38’ setback requested
Variance Requests
Variance to the Zoning Ordinance No.480,as amended,Section 42,
Bufferyards,to waive the requirement for bufferyards along internal lot
lines.
Variance to Zoning Ordinance No.480,as amended,Section 35.6 –
Number of Parking Spaces Required,for a 10%reduction from 389
required spaces to 351 required spaces including Lot 1R1 to the east.
Variance to Zoning Ordinance No.480,as amended,Section 43.9.c.2 –
Setback along S.H.114 from 50’to 38’.
Landscape Plan at P&Z Commission
Revised Landscape Plan
Tree Preservation Criteria
The criteria within Section 4.5 which the Planning and Zoning Commission and the City Council take into consideration
for tree preservation in determining whether to deny or approve any concept plan,site plan,or preliminary plat.
a)Whether or not a reasonable accommodation or alternative solution can be made to accomplish the desired activity without the alteration of
the tree;
b)The cost of preserving the tree;
c)The increased development costs caused by preserving the tree;
d)Whether the tree is worthy of preservation;
e)The effect of the alteration on erosion,soil moisture,retention,flow of surface waters,and drainage systems;
f)The need for buffering residential areas from the noise,glare,and visual effects of nonresidential uses;
g)Whether the tree interferes with a utility service;
h)Whether the proposed tree replacement procedures pursuant to Section 7 of this Ordinance adequately mitigate the alteration of the tree;and
i)Whether the alteration adversely affects the public health,safety or welfare.
Tree Conservation Plan at P&Z Commission
Revised Tree Conservation Plan
Drainage Plan
Elevations –Building 1
Elevations –Buildings 2 & 4
Elevations –Building 3
Elevations –Building 5
Elevations –Building 6
P&Z Commission Action
November 21, 2019; Approved (4-1) (Dyche) referencing the staff report dated November 21, 2019 and
the Revised Staff Review No. 2 dated November 21, 2019 and noting the following:
•The applicant’s willingness to provide additional landscape at the east emergency entrance and on
the Shady Ln. side of the property near the detention pond,
•Subject to the Landscape Administrator’s approval of a Tree Preservation survey,
•Any new trees should be evergreen with foliage the full year,
•Noting the applicant’s willingness to move the north side fence further south onto the property to
allow landscape plantings on both sides of the fencing and to review the material type to either a
wood a wrought iron type,
•Further investigation into eliminating the east emergency exit if not required by the Fire Marshal,
•Specifically granting the variances requested of the 50’ setback would be moved to 38’ if TxDOT
approved the decel lane, 10% parking reduction and no internal bufferyards.
Questions?