Item 6A PresentationCostco Zoning Change and Concept Plan/Site Plan ZA19-0060 ZA19-0060 OWNER:Costco Wholesale APPLICANT:Barghausen Consulting Engineers,Inc. REQUEST: Approval of a 2nd Reading for a Zoning Change and Concept Plan/Site Plan from “S-P-2” Generalized Site Plan District to “S-P-2” Generalized Site Plan District to allow for the expansion of the existing Costco gasoline fueling facility LOCATION: 2601 E SH 114 Aerial View View North Fueling Facility Aerial View Fueling Facility Approved Concept Plan (ZA00-020) Approved Site Plan (ZA00-045) Existing 8 approved fueling dispensers with site plan approval and six (6) installed and two (2) were not installed at west end of fueling facility 62 Ex. landscape island Proposed Concept Plan/Site Plan (ZA19-0060) Costco Gas Refueling Facility Accessible Parking Space Relocation 78% S-P-2 S-P-2 New fueling controller building Note: Reduction of a total of 6 parking spaces for accessible parking space relocation and removing 3 compact parking spaces from total parking spaces Existing 8 Accessible Parking Space to be relocated on site North Driveway Entrance Existing Fueling Dispensers Proposed Fueling Dispenser Expansion Proposed Canopy Proposed Reduction in Landscape Island for Expansion and Fuel Delivery Proposed Controller Enclosure Proposed Fueling Facility Enlarged Site Plan (ZA19-0060) Proposed Fuel Storage Tank Existing Fuel Storage Tanks to remain Existing Landscape Island Proposed Canopy Expansion Elevations Elevations New Controller Building Elevations Elevations Existing Controller Building Proposed Tree Preservation 5 trees (2 canopy trees and 3 accent trees) are proposed to be removed X XXX X Proposed Landscape Plan North Existing Fueling Facility Site Photographs Costco is requesting all language within Ordinance 480-337 to remain the same with the exception of the Concept Plan. The project includes a 4,326-square-foot addition to the fuel canopy, the installation of six (6) new multi-product dispensers (MPDs), one (1) new 40,000-gallon underground storage tank (UST), and remote fill ports for the new and existing USTs and associated site improvemen ts. Ordinance No. 480-337c The Costco expansion project will maintain compliance with the regulations of the Gateway Plaza Phase II: “S-P-2” Development Regulations, as detailed in the responses below. 1.Use Regulations: Permitted Uses --Permitted uses shall be in accordance with the C-3 Zoning District including outdoor dining, tire, battery, and automotive accessory sales and gasoline service stations. Non-Permitted uses are provided below (as approved in Phase I) C-3 with the following exceptions: 7) Conventional golf courses, including outdoor driving ranges necessary. 16) Lodges, sororities, and/or fraternities. 17) Medical care facilities to include nursing homes. 18) Mortuaries, funeral homes and undertakers. 23) Plumbing and heating appliance, repair and installation service. O-1 with the following exceptions: 29) Radio recording and television broadcasting offices and studios. C-2 with the following exceptions: 8) Business colleges or private schools for vocational training. 24) Frozen food lockers fir individual or family use. Other Limitations included: a) Limited any office related training to 30% of the tenant's floor area. b) Limiting the number of screens in auditoriums, theaters, and cinemas to ten screens. The project will expand the existing gasoline service station, which is a permitted use under Ordinance No. 480-337. Impervious Coverage: The maximum impervious coverage for the overall development site shall be 80% for Tracts A, B, and C. Building Materials and Facades:The building front facades are a combination of cultured stone, brick, EFIS, and split face block applied over tilt wall or concrete block construction, with terra cotta colored concrete tile roofs. Other materials to be used on the fronts of the buildings are ornamental ironwork, cast stone medallions and granite tile. The backs of the buildings and other nonvisible areas are designed as tilt wall or concrete block with textured paint. Vertical wall heights may be modified slightly to accommodat e screening of mechanical units as contract documents are developed. Some of the PAD site buildings are planned to be national restaurants, the facades of these buildings may have some variation in architectural style, however some of the same construction materials will be integ rated into these buildings. Lot Lines, Side Yard Setback Lines, and Bufferyards:As shown on the concept plan, we have established the required bufferyards for the development, however, to accommodate some retailers, it may be necessary to subdivide the property into additional lots. We request that this be allowed, without additional bufferyards being placed internal to the development, without side yard setback lines. Front Building Setback Lines:As with Phase I of Gateway Shopping Center, we request that the pad site buildings along FM 1709 and SH 114 access road have a minimum thirty-foot setback. No drives or parking will be allowed within the thirty (30) foot setback. All other buildings will be per ordinance, which is fifty (50) foot setback along Southlake Blvd and Highway 114, and thirty (30) foot setback along Nolan Drive. Parking Spaces:We request up to a 10% variance on the number of required parking spaces. Outside dining areas shall not be counted in calculating the required number of parking spaces. Outside Storage:Shopping cart storage will be permitted within a non-airconditioned enclosure that is under roof, enclosed on three sides, and carts are not visible from the R.O.W. The enclosure will be integral to the design of the building. Outside storage will comply with Ordinance 480, Section 45.11 as amended. Proposed Amendments to Ordinance No. 480-337, as amended Planning and Zoning Commission October 17, 2019; Approved (7-0) subject to the Staff Report dated October 14, 2019 and the Site Plan Review Summary No. 3 dated October 14, 2019. City Council November 5, 2019; Approved (7-0) at the 1st Reading on the Consent Agenda; subject to the Staff Report dated October 29, 2019 and the Site Plan Review Summary #4 dated October 29, 2019. Questions?