Item 4N MemoItem 4N Page 1 of 3 M E M O R A N D U M (October 1, 2019) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Subject: Authorize expenditures with Davidson Reconstruction, Inc. for various projects in City facilities in an amount not to exceed $220,000. Action Requested: Authorize expenditures with Davidson Reconstruction, Inc. for various projects in City facilities in an amount not to exceed $220,000. Background Information: The City of Southlake contracts with a construction firm to complete facility projects as needed. These projects are necessary to maintain City buildings and renovate work spaces. Typical projects include painting and remodeling of public spaces, construct ion of offices, and repairs to the buildings and roofing systems. In the FY 2020 adopted budget, City Council allocated funds to complete the restroom remodeling of the 1st and 4th floors of Town Hall and at the Activity Center. The restroom remodeling at Town Hall is a continuation from FY 2019 project, with the remodels on the 2nd and 3rd floor restrooms completed. The Town Hall restroom remodeling projects are necessary to update the restroom facilities and comply with the Americans with Disabilities Act (ADA) per the City’s Accessology Report dated September 16, 2015. The project at the Activity Center includes relocating the restroom facilities from the south end of the building to the north end of the building. The current location of these facilitie s are positioned next to the conference rooms where meetings and trainings are held. By relocating these facilities to the north end of the building, the conference rooms will no longer be disturbed by these facilities and will offer a better experience to the general public. Item 4N Page 2 of 3 Financial Considerations: The City’s purchasing policy for these construction services is met through The Interlocal Purchasing System (TIPS) government purchasing contract #170201. TIPS is a purchasing cooperative of the Texas Region 8 Education Service Center (ESC). Each awarded vendor has met strict Competitive Bidding Process guidelines established by the ESC 8 administration and the TIPS legal team. Below are the budgeted amounts for each FY 2020 Facility Project. Facility Projects Cost Town Hall Restroom Remodeling (1st & 4th Floor) $ 150,000 Activity Center Restroom Remodeling $ 50,000 5% Contingency $ 10,000 Various Construction Related Repairs As Needed $ 10,000 Total $ 220,000 Funding for the Restroom Remodeling projects and other various projects is provided in the FY 2020 Facilities Operating Budget, and the Strategic Initiative Fund and TIF Operating Fund Budgets. Expenditures will not exceed budgeted funds. Strategic Link: This item links to the City’s Strategy Map strategic focus areas of Infrastructure and Performance Management & Service Delivery. It specifically relates to the City’s Corporate Objectives, B2: Collaborate With Select Partners to Implement Service Solutions, and F2: Invest to Provide & Maintain High Quality Public Assets. Citizen Input/ Board Review: None. Legal Review: None Alternatives: The City Council may approve or deny the request. Staff Recommendation: Authorize expenditures with Davidson Reconstruction, Inc. for various projects in City facilities in an amount not to exceed $220,000. Item 4N Page 3 of 3 Supporting Documents: Attachment A: Town Hall Restroom Remodeling Proposal Attachment B: Activity Center Restroom Remodeling Proposal Attachment C: TIPS/TAPS Contract Renewal #170201 Staff Contact: Rob Cohen, Director of Public Works Kyle D. Hogue, P.E., Deputy Director/City Engineer Hunter Harris, Project Manager 1 DRI CONSTRUCTION Client:Southlake Town Hall Restroom - 1st floor Property:1400 Main St Southlake, TX 76092 Operator:DEREKDAV Estimator:Derek Davidson Business:(817) 733-0730 E-mail:derekdavidson77@gmail. com Type of Estimate:Other Date Entered:10/1/2019 Date Assigned:10/1/2019 Date Est. Completed:10/1/2019 Date Job Completed: Price List:TXDF8X_MAR19 Labor Efficiency:Restoration/Service/Remodel Estimate:SL_TH_RR_1ST_FINAL_1 This estimate is based on TIPS / TAPS contract # 170201 2 DRI CONSTRUCTION SL_TH_RR_1ST_FINAL_1 8/29/2019 Page: 2 SL_TH_RR_1ST_FINAL_1 Main Level 1st Floor Mens Height: 8' DESCRIPTION QTY 1. General Demolition - Remove Tile & Drywall on Walls and Floors 1.00 EA 2. 5/8" drywall - hung, taped, ready for tile 482.67 SF 3. Tile mat - uncoupling membrane - Ditra 226.33 SF 4. Tile covering - up to 3.00 SF material allowance 660.73 SF 5. Tile base - match flooring - 4"x24"60.33 LF 6. Paint more than the ceiling 274.60 SF 7. Recessed light fixture - trim only 5.00 EA 8. Prime & paint register and speakers 4.00 EA 9. R&R Grid for recessed lighting 13.00 LF 10. Paint door 1.00 EA 11. Toilet partition - cascara teakwood 8909-NG - oversized/handicap 1.00 EA 12. Toilet partition - cascara teakwood 8909-NG 2.00 EA 13. Urinal partition - cascara teakwood 8909-NG 1.00 EA 14. R&R Light bar - 200.00 Allowance 1.00 EA 15. R&R Switch - stainless 2.00 EA 16. R&R Outlet - stainless 1.00 EA 17. R&R Outlet or switch cover - stainless 2.00 EA 18. R&R Vanity - Handicapp accessible 7.50 LF 19. Stain & finish vanity - Dark Walnut 7.50 LF 20. Countertop - Avonite - 7503 Morning Tundra 16.00 SF 21. Add on for undermount sink cutout - single basin 3.00 EA 22. R&R Sink - single - white kohler K-2355 3.00 EA 23. R&R Sink faucet - Sloan SF2350 3.00 EA 24. R&R P-trap assembly - K-8998 3.00 EA 25. Detach & Reset Toilet - standard 3.00 EA 26. Detach & Reset Toilet seat - standard 3.00 EA 27. (Install) Toilet auto flush - standard 3.00 EA 28. R&R Soap dispenser - Bobrick 826.1 2.00 EA 29. R&R Paper towel dispenser / waste recepticle - Bobrick B-3974 1.00 EA 30. Robe hook - B-671 1.00 EA 31. Detach & Reset Toilet paper holder 3.00 EA 32. (Install) Access panel 1.00 EA 33. Detach & Reset Handicap grab bar 2.00 EA 34. Detach & Reset Door stop - wall or floor mounted 1.00 EA 35. Detach & Reset Door closer - stainless 1.00 EA 36. Detach & Reset Door kick plate - stainless 1.00 EA 37. Detach & Reset Door pull plate - stainless 1.00 EA 38. R&R Door handle - Stainless 1.00 EA 40. Detach & Reset Mirror 1.00 EA 3 DRI CONSTRUCTION SL_TH_RR_1ST_FINAL_1 8/29/2019 Page: 3 CONTINUED - 1st Floor Mens QTYDESCRIPTION 41. On-Site Evaluation and/or Supervisor/Admin - per hour 1.00 EA 1st Floor Womens Height: 8' DESCRIPTION QTY 42. General Demolition - Remove Tile & Drywall on Walls and Floors 1.00 EA 43. 5/8" drywall - hung, taped, ready for tile 496.00 SF 44. Tile mat - uncoupling membrane - Ditra 238.00 SF 45. Tile covering - up to 3.00 SF material allowance 684.40 SF 46. Tile base - match flooring - 4"x24"62.00 LF 47. Paint more than the ceiling 287.60 SF 48. Recessed light fixture - trim only 5.00 EA 49. Prime & paint register and speakers 4.00 EA 50. R&R Grid for recessed lighting 13.00 LF 51. Paint door 1.00 EA 52. Toilet partition - cascara teakwood 8909-NG - oversized/handicap 1.00 EA 53. Toilet partition - cascara teakwood 8909-NG 4.00 EA 54. R&R Light bar - 200.00 Allowance 1.00 EA 55. R&R Switch - stainless 2.00 EA 56. R&R Outlet - stainless 1.00 EA 57. R&R Outlet or switch cover - stainless 2.00 EA 58. R&R Vanity - Handicapp accessible 7.50 LF 59. Stain & finish vanity - Dark Walnut 7.50 LF 60. Countertop - Avonite - 7503 Morning Tundra 16.00 SF 61. Add on for undermount sink cutout - single basin 3.00 EA 62. R&R Sink - single - white kohler K-2355 3.00 EA 63. R&R Sink faucet - Sloan SF2350 3.00 EA 64. R&R P-trap assembly - K-8998 3.00 EA 65. Detach & Reset Toilet - standard 3.00 EA 66. Detach & Reset Toilet seat - standard 3.00 EA 67. (Install) Toilet auto flush - standard 3.00 EA 68. R&R Soap dispenser - Bobrick 826.1 2.00 EA 69. R&R Paper towel dispenser / waste recepticle - Bobrick B-3974 1.00 EA 70. Robe hook - B-671 1.00 EA 71. Detach & Reset Toilet paper holder 3.00 EA 72. (Install) Access panel 1.00 EA 73. Detach & Reset Handicap grab bar 2.00 EA 74. Detach & Reset Door stop - wall or floor mounted 1.00 EA 75. Detach & Reset Door closer - stainless 1.00 EA 76. Detach & Reset Door kick plate - stainless 1.00 EA 77. Detach & Reset Door pull plate - stainless 1.00 EA 78. R&R Door handle - Stainless 1.00 EA 4 DRI CONSTRUCTION SL_TH_RR_1ST_FINAL_1 8/29/2019 Page: 4 CONTINUED - 1st Floor Womens QTYDESCRIPTION 80. Detach & Reset Mirror 1.00 EA 81. On-Site Evaluation and/or Supervisor/Admin - per hour 1.00 EA Grand Total 85,000.00 Derek Davidson Grand Total Areas: 978.67 SF Walls 464.33 SF Ceiling SF Walls and Ceiling1,443.00 464.33 SF Floor 51.59 SY Flooring 122.33 LF Floor Perimeter 0.00 SF Long Wall 0.00 SF Short Wall 122.33 LF Ceil. Perimeter 464.33 Floor Area 506.00 Total Area 978.67 Interior Wall Area 1,149.00 Exterior Wall Area 127.67 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length 1 DRI CONSTRUCTION Client:Southlake Town Hall Restroom - 4th floor Property:1400 Main St Southlake, TX 76092 Operator:DEREKDAV Estimator:Derek Davidson Business:(817) 733-0730 E-mail:derekdavidson77@gmail. com Type of Estimate:Other Date Entered:10/1/2019 Date Assigned:10/1/2019 Date Est. Completed:10/1/2019 Date Job Completed: Price List:TXDF8X_MAR19 Labor Efficiency:Restoration/Service/Remodel Estimate:SL_TH_RR_4TH_FINAL This estimate is based on TIPS / TAPS contract # 170201 2 DRI CONSTRUCTION SL_TH_RR_4TH_FINAL 9/6/2019 Page: 2 SL_TH_RR_4TH_FINAL Main Level 4th Floor Mens Height: 8' DESCRIPTION QTY 1. General Demolition - Remove Tile on Walls and Floors 1.00 EA 2. 5/8" drywall - hung, taped, ready for tile 400.00 SF 3. Tile mat - uncoupling membrane - Ditra 154.00 SF 4. Tile covering - up to 3.00 SF material allowance 514.00 SF 5. Tile base - match flooring - 4"x24"50.00 LF 6. Paint more than the ceiling 194.00 SF 7. Recessed light fixture - trim only 5.00 EA 8. Prime & paint register and speakers 4.00 EA 9. R&R Grid for recessed lighting 13.00 LF 10. Paint door 1.00 EA 11. Toilet partition - cascara teakwood 8909-NG - oversized/handicap 1.00 EA 12. Urinal partition - cascara teakwood 8909-NG 1.00 EA 13. R&R Light bar - 200.00 Allowance 1.00 EA 14. R&R Switch - stainless 2.00 EA 15. R&R Outlet - stainless 1.00 EA 16. R&R Outlet or switch cover - stainless 2.00 EA 17. R&R Vanity - Handicapp accessible 5.00 LF 18. Stain & finish vanity - Dark Walnut 5.00 LF 19. Countertop - Avonite - 7503 Morning Tundra 10.00 SF 20. Add on for undermount sink cutout - single basin 2.00 EA 21. R&R Sink - single - white kohler K-2355 2.00 EA 22. R&R Sink faucet - Sloan SF2350 2.00 EA 23. R&R P-trap assembly - K-8998 2.00 EA 24. Detach & Reset Toilet - standard 1.00 EA 25. Detach & Reset Toilet seat - standard 1.00 EA 26. (Install) Toilet auto flush - standard 1.00 EA 27. R&R Soap dispenser - Bobrick 826.1 1.00 EA 28. R&R Paper towel dispenser / waste recepticle - Bobrick B-3974 1.00 EA 29. Robe hook - B-671 1.00 EA 30. Detach & Reset Toilet paper holder 1.00 EA 31. (Install) Access panel 1.00 EA 32. Detach & Reset Handicap grab bar 2.00 EA 33. Detach & Reset Door stop - wall or floor mounted 1.00 EA 34. Detach & Reset Door closer - stainless 1.00 EA 35. Detach & Reset Door kick plate - stainless 1.00 EA 36. Detach & Reset Door pull plate - stainless 1.00 EA 37. R&R Door handle - Stainless 1.00 EA 38. Cleaning (post construction clean up)1.00 EA 39. Detach & Reset Mirror 1.00 EA 3 DRI CONSTRUCTION SL_TH_RR_4TH_FINAL 9/6/2019 Page: 3 CONTINUED - 4th Floor Mens QTYDESCRIPTION 40. On-Site Evaluation and/or Supervisor/Admin - per hour 42.00 HR 4th Floor Womens Height: 8' DESCRIPTION QTY 41. General Demolition - Remove Tile on Walls and Floors 1.00 EA 42. 5/8" drywall - hung, taped, ready for tile 400.00 SF 43. Tile mat - uncoupling membrane - Ditra 154.00 SF 44. Tile covering - up to 3.00 SF material allowance 514.00 SF 45. Tile base - match flooring - 4"x24"50.00 LF 46. Paint more than the ceiling 194.00 SF 47. Recessed light fixture - trim only 5.00 EA 48. Prime & paint register and speakers 4.00 EA 49. R&R Grid for recessed lighting 8.00 LF 50. Paint door 1.00 EA 51. Toilet partition - cascara teakwood 8909-NG - oversized/handicap 1.00 EA 52. Toilet partition - cascara teakwood 8909-NG - and an extra door for the third toilet 1.00 EA 53. R&R Light bar - 200.00 Allowance 1.00 EA 54. R&R Switch - stainless 2.00 EA 55. R&R Outlet - stainless 1.00 EA 56. R&R Outlet or switch cover - stainless 2.00 EA 57. R&R Vanity - Handicapp accessible 5.00 LF 58. Stain & finish vanity - Dark Walnut 5.00 LF 59. Countertop - Avonite - 7503 Morning Tundra 10.00 SF 60. Add on for undermount sink cutout - single basin 2.00 EA 61. R&R Sink - single - white kohler K-2355 2.00 EA 62. R&R Sink faucet - Sloan SF2350 2.00 EA 63. R&R P-trap assembly - K-8998 2.00 EA 64. Detach & Reset Toilet - standard 3.00 EA 65. Detach & Reset Toilet seat - standard 3.00 EA 66. (Install) Toilet auto flush - standard 3.00 EA 67. R&R Soap dispenser - Bobrick 826.1 1.00 EA 68. R&R Paper towel dispenser / waste recepticle - Bobrick B-3974 1.00 EA 69. Robe hook - B-671 1.00 EA 70. Detach & Reset Toilet paper holder 3.00 EA 71. (Install) Access panel 1.00 EA 72. Detach & Reset Handicap grab bar 2.00 EA 73. Detach & Reset Door stop - wall or floor mounted 1.00 EA 74. Detach & Reset Door closer - stainless 1.00 EA 75. Detach & Reset Door kick plate - stainless 1.00 EA 76. Detach & Reset Door pull plate - stainless 1.00 EA 77. R&R Door handle - Stainless 1.00 EA 4 DRI CONSTRUCTION SL_TH_RR_4TH_FINAL 9/6/2019 Page: 4 CONTINUED - 4th Floor Womens QTYDESCRIPTION 78. Cleaning (post construction clean up)1.00 EA 79. Detach & Reset Mirror 1.00 EA 80. On-Site Evaluation and/or Supervisor/Admin - per hour 43.00 HR Grand Total 70,000.00 Derek Davidson Grand Total Areas: 800.00 SF Walls 308.00 SF Ceiling SF Walls and Ceiling1,108.00 308.00 SF Floor 34.22 SY Flooring 100.00 LF Floor Perimeter 0.00 SF Long Wall 0.00 SF Short Wall 100.00 LF Ceil. Perimeter 308.00 Floor Area 342.22 Total Area 800.00 Interior Wall Area 948.00 Exterior Wall Area 105.33 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length 1 DRI CONSTRUCTION Client:Sothlake Activity Center Restrooms Property:307 Park Wood Southlake, TX 76092 Operator:DEREKDAV Estimator:Derek Davidson Business:(817) 733-0730 E-mail:derekdavidson77@gmail. com Type of Estimate:Other Date Entered:10/1/2019 Date Assigned:10/1/2019 Date Est. Completed:10/1/2019 Date Job Completed: Price List:TXDF8X_MAR19 Labor Efficiency:Restoration/Service/Remodel Estimate:SL_ACTIVITY_CENTER This estimate is based on TIPS / TAPS contract # 170201 2 DRI CONSTRUCTION SL_ACTIVITY_CENTER 9/22/2019 Page: 2 SL_ACTIVITY_CENTER Existing Existing Womens Height: 8' Door 2' 6" X 6' 8"Opens into Exterior DESCRIPTION QTY UNIT PRICE TOTAL 1. General Demolition - Remove Partitions, Countertops, Tile, Drywall 1.00 EA @ 1,000.00 =1,000.00 on Walls where tile is installed 4 ft up, and Accessories. 2. Install 5/8" - drywall per LF - up to 4' tall 41.50 LF @ 10.15 =421.23 3. Texture drywall - light hand texture 452.33 SF @ 1.50 =678.50 4. Paint the walls and ceiling 452.33 SF @ 3.00 =1,356.99 5. Cove base molding - rubber or vinyl, 4" high 41.50 LF @ 3.50 =145.25 6. Vinyl plank flooring - DRI to provide selections to choose from 117.00 SF @ 6.77 =792.09 7. Detach & Reset Interior door unit 1.00 EA @ 57.12 =57.12 Existing Mens Height: 8' Door 2' 6" X 6' 8"Opens into Exterior DESCRIPTION QTY UNIT PRICE TOTAL 8. General Demolition - Remove Partitions, Countertops, Tile, Drywall 1.00 EA @ 1,000.00 =1,000.00 on Walls where tile is installed 4 ft up, and Accessories. 9. 5/8" - drywall per LF - up to 4' tall 35.50 LF @ 12.19 =432.75 10. Texture drywall - light hand texture 375.33 SF @ 1.50 =563.00 11. Paint the walls and ceiling 375.33 SF @ 3.00 =1,125.99 12. Cove base molding - rubber or vinyl, 4" high 35.50 LF @ 3.50 =124.25 13. Vinyl plank flooring - DRI to provide selections to choose from 88.00 SF @ 6.77 =595.76 14. Detach & Reset Interior door unit 1.00 EA @ 57.12 =57.12 New New Mens Height: 8' Door 3' X 6' 8"Opens into Exterior DESCRIPTION QTY UNIT PRICE TOTAL 15. General Demolition - One wall, Countertops, Tile and Accessories.1.00 EA @ 800.00 =800.00 16. 5/8" drywall 71.00 SF @ 3.00 =213.00 17. Framing - new wall in between new womens bathroom 1.00 EA @ 800.00 =800.00 18. Paint door 1.00 EA @ 150.00 =150.00 19. Install Toilet partition 1.00 EA @ 154.75 =154.75 3 DRI CONSTRUCTION SL_ACTIVITY_CENTER 9/22/2019 Page: 3 CONTINUED - New Mens DESCRIPTION QTY UNIT PRICE TOTAL 20. Install Toilet partition 3.00 EA @ 134.53 =403.59 21. Install Electrical - Relocate outlet, switch, and lighting 1.00 EA @ 500.00 =500.00 22. Install Vanity - Handicapp accessible - cut down existing and re-use 3.00 LF @ 45.00 =135.00 23. Install Sink 4.00 EA @ 97.98 =391.92 24. Install Sink faucet 4.00 EA @ 70.54 =282.16 25. Detach & Reset Toilet 5.00 EA @ 220.04 =1,100.20 26. Install Soap dispenser 2.00 EA @ 9.55 =19.10 27. Install Paper towel dispenser 1.00 EA @ 14.93 =14.93 28. Install Toilet paper holder 3.00 EA @ 9.55 =28.65 29. Detach & Reset Handicap grab bar 2.00 EA @ 30.00 =60.00 30. Install Door stop - wall or floor mounted 1.00 EA @ 5.73 =5.73 31. Install Door closer - stainless 1.00 EA @ 17.64 =17.64 32. Cleaning (post construction clean up)1.00 EA @ 250.00 =250.00 33. Mirror 2x3 1.00 EA @ 200.00 =200.00 34. Texture drywall - light hand texture 372.00 SF @ 1.50 =558.00 35. Paint the walls and ceiling 372.00 SF @ 3.00 =1,116.00 36. Cove base molding - rubber or vinyl, 4" high 35.00 LF @ 3.50 =122.50 37. Vinyl plank flooring - DRI to provide selections to choose from 88.00 SF @ 6.77 =595.76 38. Detach & Reset Interior door unit 1.00 EA @ 57.12 =57.12 New Womens Height: 8' Door 3' X 6' 8"Opens into Exterior DESCRIPTION QTY UNIT PRICE TOTAL 39. General Demolition - Carpet, Countertops, and Accessories.1.00 EA @ 500.00 =500.00 40. Framing - new walls for new womens bathroom and closet 1.00 EA @ 1,800.00 =1,800.00 41. 5/8" drywall 396.00 SF @ 3.00 =1,188.00 42. Paint door 1.00 EA @ 150.00 =150.00 43. Install Toilet partition 1.00 EA @ 154.75 =154.75 44. Install Toilet partition 3.00 EA @ 134.53 =403.59 45. Install Outlet and switch - re-locate and move around lighting 1.00 EA @ 500.00 =500.00 46. Install Vanity - Handicapp accessible - cut down existing and re-use 3.00 LF @ 45.00 =135.00 47. Install Sink 4.00 EA @ 97.98 =391.92 48. Install Sink faucet 4.00 EA @ 70.54 =282.16 4 DRI CONSTRUCTION SL_ACTIVITY_CENTER 9/22/2019 Page: 4 CONTINUED - New Womens DESCRIPTION QTY UNIT PRICE TOTAL 49. Install Toilet 5.00 EA @ 188.12 =940.60 50. Install Soap dispenser 2.00 EA @ 9.55 =19.10 51. Install Paper towel dispenser 1.00 EA @ 14.93 =14.93 52. Install Toilet paper holder 3.00 EA @ 9.55 =28.65 53. Detach & Reset Handicap grab bar 2.00 EA @ 30.00 =60.00 54. Install Door stop - wall or floor mounted 1.00 EA @ 5.73 =5.73 55. Install Door closer - stainless 1.00 EA @ 17.64 =17.64 56. Cleaning (post construction clean up)1.00 EA @ 250.00 =250.00 57. Mirror - DRI to provide 1.00 EA @ 150.00 =150.00 58. Texture drywall - light hand texture 498.28 SF @ 1.50 =747.42 59. Paint the walls and ceiling 498.28 SF @ 3.00 =1,494.84 60. Cove base molding - rubber or vinyl, 4" high 49.00 LF @ 3.50 =171.50 61. Vinyl plank flooring - DRI to provide selections to choose from 102.28 SF @ 6.77 =692.44 62. Detach & Reset Interior door unit 1.00 EA @ 57.12 =57.12 63. Interior door unit - closet 1.00 EA @ 154.44 =154.44 64. Heat/AC register - relocate where necessary 1.00 EA @ 500.00 =500.00 Miscellaneous DESCRIPTION QTY UNIT PRICE TOTAL 65. On-Site Evaluation and/or Supervisor/Admin and Permitting 40.00 HR @ 44.04 =1,761.60 66. Dumpster load 1.00 EA @ 641.00 =641.00 Plumbing DESCRIPTION QTY UNIT PRICE TOTAL 67. Plumbing (Bid Item) See Bid from Pearson Plumbing 12,900.00 1.00 EA @ 13,400.00 =13,400.00 Concrete 5 DRI CONSTRUCTION SL_ACTIVITY_CENTER 9/22/2019 Page: 5 DESCRIPTION QTY UNIT PRICE TOTAL 68. Concrete floor sawing - 4" slab 16.00 LF @ 100.00 =1,600.00 69. Concrete slab on grade - 4" - finished in place where removed 16.00 SF @ 40.00 =640.00 Grand Total Areas: 1,302.67 SF Walls 395.28 SF Ceiling SF Walls and Ceiling1,697.94 395.28 SF Floor 43.92 SY Flooring 161.00 LF Floor Perimeter 0.00 SF Long Wall 0.00 SF Short Wall 172.00 LF Ceil. Perimeter 395.28 Floor Area 449.89 Total Area 1,385.33 Interior Wall Area 1,318.67 Exterior Wall Area 154.67 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length 6 DRI CONSTRUCTION SL_ACTIVITY_CENTER 9/22/2019 Page: 6 Summary Line Item Total 45,178.53 Replacement Cost Value $45,178.53 Net Claim $45,178.53 Derek Davidson 7 SL _ A C T I V I T Y _ C E N T E R 9/22/2019 Page: 7 Ex i s t i n g Ex i s t i n g W o m e n s Ex i s t i n g M e n s Existing 9' 9' 8 " 1 3 ' 1 3 ' 8 " 8' 8' 8 " 11'11' 8" 8 SL _ A C T I V I T Y _ C E N T E R 9/22/2019 Page: 8 Ne w Ne w M e n s Ne w W o m e n s Ar e a 1 ( A 1 ) Ar e a 2 ( A 2 ) Ar e a 3 ( A 3 ) Ar e a 4 ( A 1 ) Ar e a 5 ( A 2 ) New 11 ' 11 ' 6 " 8'8' 8" 13 ' 13 ' 6 " 4' 8 " 25 ' 5' 8' 5'3' 2' 5' 3' 2 '  4845 US Hwy 271 North | Pittsburg, TX 75686 www.tips-usa.com 866-839-8477 tips@tips-usa.com April 26,2018  Davidson Reconstruction Inc  Derek Davidson  108 Primrose Dr  Weatherford, TX 76087  RE: TIPS Contract – Trades, Labor and Materials (JOC)         TIPS Contract Number – 170201  Renewal Letter  Dear Derek Davidson,  TIPS – The Interlocal Purchasing System, has reviewed the above listed Awarded Agreement for Annual Renewal. Your Agreement has been RENEWED until its final potential expiration date by the Region 8 Education Service Center Board of Directors, at the regularly scheduled board meeting, held on 04/26/2018. This renewal is effective 04/26/2018  to 04/26/2020. If you have not reported sales through your TIPS Awarded Agreement, please make every effort to promote and encourage Sales under your TIPS Agreement during remainder of the contract term.  If you have any questions, please contact the TIPS office at 866-839-8477.  If you object to this renewal, please contact TIPS immediately at Bids@tips-usa.com.  Sincerely,  Meredith Barton TIPS Vice-President of Operations The Interlocal Purchasing System