Loading...
Item 6D PlansLittles Residence
 1210 Wyndham Hill Lane, Southlake, TX
 Lot 45, Block 2 Monticello Phase III Array location: top rear roof. Direction Southwest. Array cannot be seen by either side neighbor and no neighbors in back of home which is backed by greenway. System Size 11.5KW Solar Energy Project Annual Production 16,000 kWh ! N Approved In 2012 City of Southlake Special Use Permit Meeting Jan 3, 2012 Approved In 2012 City Case # ZA19-0036 City Case # ZA19-0036 11.5KW SunPower Solar Array -Grid Connected
 36 SunPower E19/320Watt Solar Panels and (1) SunPower Inverter Model 11,401f-UNI
 Array Dimensions: 10.5 ft x 61.2 ft Approved In 2012 City Case # ZA19-0036 Littles Google Image Shows 2012 11.5KW Solar Installation Solar Array Is Not Visible To Neighbors from Any Angle Home is backed by Greenway City Case # ZA19-0036 Littles Residence
 1210 Wyndham Hill Lane, Southlake, TX
 Lot 45, Block 2 Monticello Phase III 2019 Request to Expand Solar Energy System 36 Additional Solar Panels on 2 Southwest Roofs 19 panels Main SW Roof 12 panels Left SW Roof 5 Panels East Rooftop Patio System Size 11.5KW Solar Energy Project Annual Production 16,000 kWh Array location: top rear roof. Direction Southwest. Array cannot be seen by either side neighbor and no neighbors in back of home which is backed by greenway. Confirming: solar panels will be installed with a 6” maximum distance from the roof to bottom of solar panel. 2019 Request To Expand Solar Energy System City Case # ZA19-0036 3’ 3’ 3’ 3’ 3’ 3’ 3’ 3’3’ A B C A B C City Case # ZA19-0036 Firecode 605.11 3 ft. Paths for firefighters where required. LG 320N1K-A5 320 Watt Black-On-Black Solar Panel For Aesthetics
 18.7% total panel conversion efficiency
 Certification: Tested to UL 1703 City Case # ZA19-0036 SolarEdge StorEdge 7.6KW + StorEdge 3.8KW Total Inverter Total Inverter 11,400 Watts 
 Tested to UL 174 1 SA Certified, CPUC Rule 21 Grid Compliance City Case # ZA19-0036 Trained & Certified Solar, Wind & Geothermal Installer Government, Commercial & Residential Projects Client: U.S. Department of Energy/City of Irving Installed the Largest Off-Grid Solar LED Streetlight System in the U.S. in City of Irving TX Client: U.S. Department of Labor Installed Three 20KW Wind Turbines North TX & Laredo Job Corps Centers Client: Legacy North Apartments City of Plano & Austin Legacy North Phase III – first solar array on apartment complex in City of Plano Legacy North Phase IV – first solar powered carports in City of Plano The Domain Apartments - first solar on an apartment in Austin Client: Retina Institute of Texas Installed 30KW solar energy systems on Denton & Arlington offices Client: SECO Fort Worth ISD - South Hills High School Innovative Renewable Energy Project – solar, wind & solar streetlights Client: Oklahoma Medical Research Foundation Eighteen 5KW helical wind turbines building integrated on top of new research tower SWG Energy Inc 3824 Cedar Springs Rd # 537 Dallas, TX 75219 214-870-4332 SWG Energy Inc 7040 Avenida Encinas # 104-648 Carlsbad, CA 92011 760-978-8666 Project Credentials City Case # ZA19-0036