Loading...
Item 6A North Carroll Avenue Access EvaluationN. Carroll Avenue Access Evaluation March 6, 2015 Study Purpose •Identify any operational deficiencies related to access along N. Carroll Avenue between SH 114 and FM 1709 •Develop alternatives to improve access to N. Carroll Avenue •Lake Wood Acres •South View •Foxborough Data Collection •Recent traffic studies •Reviewed 2030 Mobility Master Plan •In-field observations during AM and PM peak periods •Turning movement counts •SH 114 interchange •Lakewood Drive •NB left-turn into 7-Eleven property Existing Traffic Counts •SH 114 Interchange •N. Carroll Ave. at Lakewood Drive AM [PM] Existing Traffic Counts •N. Carroll Ave. at FM 1709 AM [PM] ] Field Observations Lakewood Drive •PM rush hour is critical peak •Existing median configuration for SB left-turn creates numerous conflict points and potential safety problems •Existing raised island design on retail drive is not effective •No significant delays along EB and WB approaches during peak periods (queue 1-2 vehs) •Vehicle gaps are created from upstream traffic signals at SH 114 and Federal Way N. C a r r o l l A v e n u e Lakewood Drive Traffic Analysis Lakewood Drive •Acceptable LOS during the AM peak •EB approach is LOS F during the PM peak •However, avg. queue is only 1 vehicle long Movement AM Peak PM Peak Delay (sec/veh )LOS Delay (sec/veh )LOS NB Left 9.6 A 11.3 B SB Left 9.6 A 9.9 A EB Approach 31.8 D 60.8 F WB Approach 11.3 B 11.4 B Access Alternatives Wild Wood Lane •Option A (C2U-60’) •Aligns with existing drainage channel between 800 and 850 Wild Wood Lane •Includes TxDOT deceleration lane •ROW acquisition ($252,000) •Construction Cost ($853,000) •Engineering/Survey ($85,000) •Total Project Cost ($1,190,000) Access Alternatives Wild Wood Lane •Option B (C2U-60’) •Includes TxDOT deceleration lane •ROW acquisition ($210,000) •Construction Cost ($696,000) •Engineering/Survey ($69,600) •Total Project Cost ($975,600) Access Alternatives Wild Wood Lane •Option C (C2U-60’) •Aligns with existing driveway along SH 114 •Does not meet TxDOT spacing requirements from existing off-ramp •Includes TxDOT deceleration lane •ROW acquisition ($168,000) •Construction Cost ($609,500) •Engineering/Survey ($61,000) •Total Project Cost ($838,500) Access Alternatives •Option D (C2U-60’) •Includes TxDOT deceleration lane •ROW acquisition ($132,000) •Construction Cost ($534,500) •Engineering/Survey ($53,500) •Total Project Cost ($720,000) Wild Wood Lane Access Alternatives Lakewood Drive (Option 1) •Extend median for SB left- turn lane •Add access drive along Lakewood Drive •Stripe EB approach as a two-lane approach (11’ lanes) •No significant change in LOS for EB approach •Reduces conflict points •Eliminates confusion •Improves safety •Total Project Cost ($30,000) Access Alternatives •Option 1 plus… •Relocate existing driveway along N. Carroll •Modify existing raised island and driveway radius along east approach •Total Project Cost ($85,000) Lakewood Drive (Option 2) Access Alternatives •Option 1 plus… •Relocate existing driveway along N. Carroll •Install median island to restrict left-turn from side streets •Total Project Cost ($85,000) Lakewood Drive (Option 3) Traffic Analysis –Lakewood Drive Option 2 •Revised traffic for proposed modifications and the future retail development traffic •Delay increases for EB and WB approaches •EB Queue = 2 veh •WB Queue = 1 veh Movement AM Peak PM Peak Delay (sec/veh )LOS Delay (sec/veh )LOS NB Left 10.3 B 12.7 B SB Left 9.7 A 10.3 B EB Left/Thru 52.7 F 179.1 F EB Right 11.4 B 13.1 B WB Approach 11.6 B 11.6 B Traffic Analysis –Lakewood Drive Option 3 •No left-turns from side streets •Minimal delay along side streets •Previous left-turns from Lakewood Drive are required to make U-turn south of intersection Movement AM Peak PM Peak Delay (sec/veh )LOS Delay (sec/veh )LOS NB Left 10.5 B 12.9 B SB Left 10.4 B 10.3 B EB Left/Thru -------- EB Right 11.7 B 13.4 B WB Approach 11.6 B 11.6 B Lakewood Acres •Conclusions/Recommendations •No significant congestion problem at N. Carroll Avenue & Lakewood Drive •Vehicle gaps are created from upstream traffic signals at SH 114 and Federal Way •Do not implement access connections from Wild Wood Lane •Option 2 results in fewer restrictions for Lakewood Drive approach •Consider implementing Option 3 if side street delay increases along Lakewood Drive Field Observations Foxborough Neighborhood •No significant delays observed along Foxborough Lane or Owenby Lane •Foxborough Lane traffic can easily turn right out of neighborhood and make a U-turn at Byron Nelson Parkway Access Alternatives Foxborough Neighborhood •Extension of Cross Lane •ROW acquisition ($504,000) •Construction Cost ($1,051,000) •Engineering/Survey ($105,000) •Total Project Cost ($1,660,000) •Connection not needed to support current conditions •Consider implementing when vacant tract develops Field Observations South View Neighborhood •No significant delays along Southcrest Court and Owenby Lane •Vehicle gaps are created from upstream traffic signals at FM 1709 and Federal Way •No recommended access improvements FM 1709 at N. Carroll Avenue SB Right-Turn Lane •Existing storage is approx. 120 feet (too short) •Poor utilization because peak hour queues extend beyond turn bay •Extend turn bay approximately 200 feet to 2nd driveway to increase utilization and reduce queues •Total Project Cost ($75,000) SH 114 Ramp Reversal SH 114 Ramp Reversal Project Cost: $3,000,000 (Approx. $1.5M per ramp, includes potential for auxiliary lanes) SH 114 Ramp Reversal Looking East under the N. Carroll Avenue Bridge SH 114 Ramp Reversal Looking East under the N. Carroll Avenue U-Turn Bridge -Avoid U-Turn bridge abutment SH 114 Ramp Reversal Looking East just past N. Carroll Avenue U-Turn Bridge -Note change in grade SH 114 Ramp Reversal Looking East toward location of proposed on-ramp -Change in grade -Sign relocations