Loading...
Item 4C Ord 1209 2018 IBC1 2018 International Building Code ORDINANCE NO. 1209 AN ORDINANCE ADOPTING THE INTERNATIONAL BUILDING CODE, 2018 EDITION, REGULATING THE ERECTION, CONSTRUCTION, ENLARGEMENT, ALTERATION, REPAIR, MOVING, REMOVAL, DEMOLITION, CONVERSION, OCCUPANCY, EQUIPMENT, USE, HEIGHT, AREA AND MAINTENANCE OF ALL BUILDINGS OR STRUCTURES, EXCEPT ONE- AND TWO-FAMILY DWELLINGS AND MULTIPLE SINGLE-FAMILY DWELLINGS (TOWNHOUSES), AND INCLUDING THE NATIONAL ELECTRICAL CODE AS REFERENCED HEREIN, IN THE CITY OF SOUTHLAKE; PROVIDING FOR THE ADOPTION OF LOCAL AMENDMENTS THERETO; PROVIDING FOR RECORDING OF SUCH CODE AS A PUBLIC RECORD; PROVIDING THAT THIS ORDINANCE SHALL BE CUMULATIVE OF ALL ORDINANCES; PROVIDING FOR A PENALTY FOR VIOLATIONS HEREOF; PROVIDING A SEVERABILITY CLAUSE; PROVIDING A SAVINGS CLAUSE; PROVIDING FOR PUBLICATION IN PAMPHLET FORM; PROVIDING FOR PUBLICATION IN THE OFFICIAL NEWSPAPER; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Southlake is a home rule city acting under its charter adopted by the electorate pursuant to Article XI, Section 5 of the Texas Constitution and Chapter 9 of the Local Government Code; and WHEREAS, the City Council of the City of Southlake deems it necessary to adopt this ordinance providing minimum standards to safeguard the health, property, and welfare of the citizens of Southlake by regulating and controlling the use, occupancy, maintenance, repair, design, construction and quality of materials for buildings and structures within the City. WHEREAS, The ICC ELECTRICAL CODE is no longer published as a separate document but the electrical provisions are included in Appendix K, the National Electrical Code is being adopted as a part of this ordinance. WHEREAS, beginning in the spring of 2018, NCTCOG’s Regional Codes Coordinating Committee (RCCC) and its five advisory boards conducted open review meetings over a one-year period to review the 2018 editions of the International Codes and to develop regional amendments. Their review and recommendations were completed and endorsed by NCTCOG’s Executive Board on September 27, 2018. Now NCTCOG encourages jurisdictions in North Central Texas to adopt the 2018 International Building Code along with its respective regional amendments. 2 NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SOUTHLAKE, TEXAS: Section 1 Adoption That the International Building Code, 2018 Edition, published by the International Code Council, including the standards referenced therein, including Appendices A, C, F, G, H, I , J and K are hereby adopted as the Building Code of the City of Southlake regulating the erection, construction, enlargement, alteration, repair, moving, removal, demolition, conversion, occupancy, equipment, use, height, area and maintenance of all buildings or structures, except one- and two-family dwellings and multiple single family dwellings (townhouses), in the City of Southlake. A True and correct copy of this document is referenced in Exhibit "A." Section 2 Amendments That the 2018 International Building Code, as adopted herein, is hereby amended as provided in Exhibit "B" incorporated herein and attached hereto for all purposes of this ordinance. The City of Southlake, Texas may from time to time determine that additional local modifications to the Building Code are necessary and appropriate to meet the unique needs of the City of Southlake, Texas. To effectuate these local modifications, the City Council shall enact individual ordinances amending this Ordinance, fully setting forth the change to be made in the Building or Electrical Code. These amendments shall be consolidated as Exhibit "B" to this Ordinance. Section 3 Recording The material contained in Exhibits "A" and “B” to this ordinance shall not be included in the formal municipal codification of ordinances, but shall be maintained as a public record in the office of the City Secretary and/or the office of Building Inspections and will be available for public inspection and copying during regular business hours. Section 4 Cumulative Clause This ordinance shall be cumulative of all provisions of ordinances of the City of Southlake, Texas, except where the provisions of this ordinance are in direct conflict with the provisions of such ordinances, in which event the conflicting provisions of such ordinances are hereby repealed. This ordinance is intended to replace Ordinance 1142, as amended, the 2015 International Building Code. This ordinance is not intended to amend or replace the following: 1. Ordinance 480, as amended, the Zoning Ordinance. 2. Ordinance 483, as amended, the Subdivision Ordinance. 3. Ordinance 557, as amended, the Exterior Masonry Construction Requirements 4. Ordinance 568, as amended, the Contractor’s Licensing Ordinance 5. Ordinance 704-F, as amended, the Sign Ordinance 3 Section 5 Penalty Any person, firm or corporation who violates, disobeys, omits. neglects or refuses to comply with or who resists the enforcement of any of the provisions of this ordinance shall be fined not more than Two Thousand Dollars ($ 2,000.00) for any violation involving zoning, fire safety or public health and sanitation, including dumping or refuse, and shall be fined not more than five hundred dollars ($500) for any other violation of this ordinance. Each day that a violation is permitted to exist shall constitute a separate offense. Section 6 Severability It is hereby declared to be the intention of the City Council that the phrases, clauses, sentences, paragraphs, and sections of this ordinance are severable, and if any phrase, clause sentence, paragraph or section of this ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining phrases, claus es, sentences, paragraphs and sections of this ordinance, since the same would have been enacted by the City Council without the incorporation in this ordinance of any such unconstitutional phrase, clause, sentence, paragraph or section. Section 7 Saving Clause All rights and remedies of the City of Southlake are expressly saved as to any and all violations of the provisions of any ordinances affecting the regulation and control of the use, occupancy, maintenance, repair, design, construction and qualit y of materials for buildings and structures within the City which have accrued at the time of the effective date of this ordinance; and, as to such accrued violations and all pending litigation, both civil and criminal, whether pending in court or not, under such ordinances, same shall not be affected by this ordinance but may be prosecuted until final disposition by the courts. Section 8 Publication The City Secretary of the City of Southlake is hereby authorized to publish this ordinance in book or pamphlet form or on the internet for general distribution among the public, and the operative provisions of this ordinance as so published shall be admissible in evidence in all courts without further proof than the production thereof. The City Secretary of the City of Southlake is hereby directed to publish in the official newspaper of the City of Southlake or as authorized by law, the caption, penalty clause, publication clause and effective date of this ordinance one time within ten days after passage of this ordinance, as required by Section 3.13 of the Charter of the City of Southlake. Section 9 Effective Date This ordinance shall be in full force and effect from and after its passage and publication as required by law but not before May 1, 2019. 4 APPROVED ON FIRST READING THIS DAY OF , 2019. MAYOR ATTEST: CITY SECRETARY APPROVED ON SECOND READING THIS DAY OF , 2019. MAYOR ATTEST: CITY SECRETARY APPROVED AS TO FORM AND LEGALITY: _____________________________________ CITY ATTORNEY PUBLISHED: EFFECTIVE: 5 EXHIBIT A 2018 International Building Code Complete Edition Located in the Building Inspections Office 1400 Main St., Suite 250 City of Southlake, Texas 76092 6 EXHIBIT B Amendments to the 2018 International Building Code The following sections, paragraphs, and sentences of the 2018 International Building Code are hereby amended as follows: Standard type is text from the IBC. Underlined type is text inserted. Lined through type is deleted text from IBC. A double asterisk (**) at the beginning of a section identifies an amendment carried over from the 2015 edition of the code and a triple asterisk (***) identifies a new or revised amendment with the 2018 code. **Section 101.4; amend to read as follows: 101.4 Referenced codes. The other codes listed in Sections 101.4.1 through 101.4.8 and referenced elsewhere in this code, when specifically adopted, shall be considered part of the requirements of this code to the prescribed extent of each such reference. Whenever amendments have been adopted to the referenced codes and standards, each reference to said code and standard shall be considered to reference the amendments as well. Any reference to NFPA 70 or the Electrical Code shall mean the Electrical Code as adopted. (Reason: Legal wording to recognize locally adopted codes a nd amendments adopted with referenced codes. The former ICC Electrical Code is now Appendix K of this code but no longer called by that name.) **Section 101.4.8; add to read as follows: 101.4.8 Electrical. The provisions of the Electrical Code shall appl y to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and appurtenances thereto. (Reason: This was dropped when ICC no longer published the ICC Electrical Code, but the Electrical Code still should be referenced regardless of how it is adopted.) ** Section 103 and 103.1; amend to insert the Department Name: City of Southlake Building Inspections Department 103.1 Creation of enforcement agency. The Department of Building Safety [City of Southlake Building Inspections Department] is hereby created and the official in charge thereof shall be known as the building official. (Reason: Reminder to be sure ordinance reads the same as designated by the city.) **Section 105.1; amend to read as follows: 105.1 Required. Any owner or owner’s authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, to excavate or change the grade of any property, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit. For excavation or grading permits see appendix chapter J as adopted. (Reason: Consistent with previous edition amendment, to provide means to regulate grading affecting other properties.) **Section 105.2; Work exempt from permit; under sub-title entitled “Building” delete items 1, 2, 10 and 11 and re-number as follows: Building: 1. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 120 s quare feet (11 m2). 7 2. Fences not over 7 feet (1829 mm) high. 3. 1. (Unchanged) 4. 2. (Unchanged) 5. 3. (Unchanged) 6. 4. Sidewalks and driveways…… {Text unchanged} …and are not part of an accessible route and not in the right-of-way. 7. 5. (Unchanged) 8. 6. (Unchanged) 9. 7. (Unchanged) 10. Shade cloth structures constructed for nursery or agricultural purposes, not including service systems. 11. Swings and other playground equipment accessory to detached on- and tow-family dwellings. 12. 8. (Unchanged) 13. 9. (Unchanged) (Reason: Items deleted are for one- and two-family dwellings regulated by the International Residential Code. Accessory structures, fences and shade cloth structures would require a permit for commercial properties to ensure compliance with local ordinance, egress, accessibility, flame spread of fabric, wind/snow design load, etc.). **Section 107.1; amend to read as follows: [A] 107.1 General. Submittal documents consisting of construction documents, statement of special inspections, geotechnical report and other data shall be submitted in two or more sets with each permit application. The construction documents shall be prepared by a registered design professional in addition to where required by laws of the State of Texas where required by the statutes of the jurisdiction in which the project is to be constructed, including, but not limited to, new construction, alterations and/or renovations. Architects and engineers shall be required on each project except where otherwise determined by the building official. Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional. Exceptions: 1. The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that review of construction documents is not necessary to obtain compliance with this code unless otherwise required by state law. 2. Free standing Group U occupancies. (Reason: To clarify design professional as architect and engineer. **Section 109; amend 109.4 and add 109.4.1 & 109.4.2 to read as follows: 109.4 Work commencing before permit issuance. Any person who commences work requiring a permit on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits shall be subject to a fee established by the applicable governing authority below that and shall be in addition to the required permit fees. 109.4.1 Investigation. Whenever work for which a permit is required by this code has been commenced without first obtaining a permit, a special investigation shall be made before a permit may be issued for such work. 109.4.2 Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is subsequently issued. The investigation fee shall be equal to the amount of the work completed up to the total permit fee as required by this code or the city fee schedule as applicable. The payment of such investigation fee shall not exempt the applicant from compliance with all other provisions of either this code or the technical codes nor from penalty prescribed by law. 8 (Reason: This fee is not a fine or penalty but is designed to compensate for time and to remove incentive to attempt to evade permits and code compliance. Text taken from former Uniform Administrative Code.) **Section 109; add Section 109.7, 109.8 to read as follows: 109.7 Unauthorized cover up fee. Any work concealed without first obtaining the required inspection in violation of Section 109 shall be assessed a fee as established by the city fee schedule. 109.8 Re-inspection Fee. A fee as established by city council resolution may be charged when: 1. Work called for inspection is incomplete; 2. Building address and/or permit card is not clearly posted; 3. City approved plans are not on the job site available to the inspector; 4. The building is locked or work otherwise not available for inspection when called; 5. Items noted for correction on initial inspection and not corrected upon re-inspection. 6. The original red tag has been removed from the job site and/or, 7. Violations exist on the property including failure to m aintain erosion control, trash control or tree protection. Any re-inspection fees assessed shall be paid before any more inspections are made on that job site. (Reason: These fees are not a fine or penalty but are designed to compensate for additional tim e necessary to obtain and verify code compliance. Language taken from former Uniform Administrative Code.) **Section 110.3.5; Lath, gypsum board and gypsum panel product inspection. Delete exception: Exception : Gypsum board and gypsum panel products that are not part of a fire resistance rated assembly or a shear assembly. (Reason: Lath or gypsum board inspections are not performed in this area.) **Section 111.1; add to read as follows: 111.1 Use and occupancy. A building or structure shall not be used or occupied, and a change in the existing use or occupancy classification, or occupant or owner, of a building or structure or portion thereof shall be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. Exception: Office occupancies, excluding medical care uses, which are not part of a mixed-use occupancy such as office/warehouse and there is no change in electric or gas meter accounts. (Reason: The IBC as written only requires a Certificate of Occupancy for new buildings, remodeled buildings, or buildings where the occupancy classification changes. Historically, Southlake has required that a Certificate of Occupancy be issued for a change in the business occupying the property even if the change was still within the same occupancy group. This amendment would e xempt simple tenant changes other than medical occupancies where there is no occupancy type change and there is no change in billing of metered utilities for electricity gas or water. Typical bills paid spaces rented for executive suites or mini warehouses would not require a certificate of occupancy.) **Section 202; amend definition to read as follows: AMBULATORY CARE FACILITY. Buildings or portions thereof used to provide medical, surgical, psychiatric, nursing or similar care on a less than 24-hour basis to individuals who are rendered incapable of self-preservation by the services provided. This group may include but not be limited to the following: - Dialysis centers - Procedures involving sedation - Sedation dentistry - Surgery centers 9 - Colonic centers - Psychiatric centers (Reason: To clarify the range of uses included in the definition. [Explanatory note related to Ambulatory Care Facilities: This group of uses includes medical or dental office s where persons are sedated for dental surgery or other services. Section 903.2.2 will now require such uses to be sprinklered if on other than the floor of exit discharge or if four or more persons are administered moderate sedation and/or general anesthesia on the level of exit discharge. Recommend (1.) jurisdictions document any pre- existing non-conforming conditions prior to issuing a new C of O for a change of tenant and, (2.) On any medical or dental office specify on C of O the maximum number of p ersons permitted to be administered general anesthesia. It is recommended that before a Certificate of Occupancy is issued, a letter of intended use from the business owner shall be included and a C of O documenting the maximum number of care recipients incapable of self preservation allowed.) **Section 202; add definition to read as follows: ASSISTED LIVING FACILITIES. A building or part thereof housing persons, on a 24-hour basis, who because of age, mental disability or other reasons, live in a supervised residential environment which provides personal care services. The occupants are capable of responding to an emergency situation without physical assistance from staff. (Reason: The code references Assisted Living facilities and definition was deleted. Corresponds with IFC 202. ) **Section 202; amend definition to read as follows: ATRIUM. An opening connecting two three or more stories… {Balance remains unchanged} (Reason: Accepted practice in the region based on legacy codes. Section 1019 permits unenclosed two story stairways under certain circumstances. Corresponds with IFC 202.) **Section 202; amend definition to read as follows: HIGH-RISE BUILDING. A building with an occupied floor located more than 75 55 feet (22,860 mm) (16,764 mm) above the lowest level of fire department vehicle access. (Reason: To define high-rise, as it influences sprinkler requirement thresholds based on the firefighting capabilities of a jurisdiction. Corresponds with IFC 202.) **Section 202; amend definition to read as follows: REGISTERED DESIGN PROFESSIONAL. An individual who is registered or licensed to practice their respective profession as defined by the statutory requirements of the Texas Board of Architectural Examiners or the Texas Board of Professional Engineers, professionals are those that are regulated by the state or jurisdiction in which the project is to be constructed. (Reason: To clarify that registered design professionals are those who are regulated by the Texas Board of Architectural Examiners or the Texas Board of Professional Engineers.) **Section 202; amend definition to read as follows: REPAIR GARAGE. A building, structure or portion thereof used for servicing or repairing motor vehicles. This occupancy shall also include garages involved in minor repair, modification and servicing of motor vehicles for items such as lube changes, inspections, windshield repair or replacement, shocks, minor part replacement and other such minor repairs. (Reason: The code references aligns with IFC 202.) **Section 202; amend definition to read as follows: 10 SPECIAL INSPECTOR. A qualified person employed or retained by an approved agency who shall prove to the satisfaction of the registered design professional in responsible charge and approved by the Building Official as having the competence necessary to in spect a particular type of construction requiring special inspection. (Reason: The registered design professional in responsible charge should be included.) **Section 303.1.3; amend to read as follows: 303.1.3 Associated with Group E occupancies. A room or space used for assembly purposes that is associated with a Group E occupancy is not considered a separate occupancy. except when applying the assembly requirements of Chapter 10 and 11. (Reason: To clarify that egress and accessibility requirements are applicable for assembly areas, i.e. cafeteria, auditoriums, etc.) **Section 304.1; Business Group B add to read as follows: Fire stations Police stations with detention facilities for 5 or less (Reason: Consistent with regional practice dating back to the legacy codes.) **Section 307.1.1; High-Hazard Group H amend to read as follows: Exception: {previous exceptions unchanged} 4. Cleaning establishments… {Text unchanged} …with Section 707 or 1-hour horizontal assemblies constructed in accordance with Section 711 or both. See also IFC Chapter 21, Dry Cleaning Plant provisions. (Reason: To call attention to detailed requirements in the Fire Code.) **Section 403.1; High-Rise Building; amend to read as follows: Exception: {previous exceptions unchanged} 3. The open air portion of a building [remainder unchanged] (Reason: To clarify enclosed portions are not exempt.) **Section 403.3; Automatic sprinkler system; delete Exception 2. (Reason: To provide adequate fire protection to enclosed areas.) ***Section 403.3.2; amend to read as follows: [F] 403.3.2 Water supply to required fire pumps. In buildings that are more than 420 120 feet (36.5 m) in building height, required fire pumps shall be supplied by connections to no fewer than two water mai ns located in different streets. Separate supply piping shall be provided between each connection to the water main and the pumps. Each connection and the supply piping between the connection and the pumps shall be sized to supply the flow and pressure required for the pumps to operate. Exception: {No change to exception.} (Reason: The 2009 edition of the IFC added this requirement based on a need for redundancy of the water supply similar to the redundancy of the power supply to the fire pumps required for such tall 11 buildings, partially due to the fact that these buildings are rarely fully evacuated in a fire event. More commonly, the alarm activates on the floor of the event, the floor above and the floor below. Back -up power to the fire pump becomes critical for this reason. Certainly, the power is pointless if the water supply is impaired for any reason, so a similar requirement is provided here for redundant water supplies. The 2015 edition changes the requirement to only apply to very tall buildi ngs over 420 ft. This amendment modifies/lowers the requirement to 120 ft., based on this same height requirement for fire service access elevators. Again, the language from the 2009 and 2012 editions of the code applied to any high -rise building. This compromise at 120 ft. is based on the above technical justification of defend -in-place scenarios in fire incidents in such tall structures.) **Section 404.5; Smoke Control; delete Exception. (Reason: Consistent with amended atrium definition.) **Section 406.3.3.1; Carport separation; add to read as follows: A fire separation is not required between a Group R-2 and U carport provided that the carport is entirely open on all sides and that the distance between the two is at least 10 feet (3048 mm). (Reason: Simplifies the fire separation distance and eliminates the need to obtain opening information on existing buildings when adding carports in existing apartment complexes. Consistent with legacy codes in effect in region for years and no record of problems with car fires spreading to apartments as a result.) **Section 502.1; amend to read as follows: 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of ½ inch (12.7 mm). {Remainder of text unchanged} See Ordinance # 441 for specific addressing requirements. (Reason: Call attention to addressing ordinance. Also matches amendment to IFC 505.1) *** Table 506.2; delete sentence from table I. The maximum allowable area for a single-story non sprinklered Group U greenhouse is permitted to be 9000 square feet or the allowable area shall be permitted to comply with Table C102.1 of Appendix C. (Reason: To eliminate the need for Appendix C adoption and remain consistent with 6000 sq. ft. sprinklering provision.) **Section 506.3.1; add to read as follows: 506.3.1 Minimum percentage of perimeter. To qualify for an area factor increase based on frontage, a building shall have not less than 25 percent of its perimeter on a public way or open space. Such open space shall be either on the same lot or dedicated for public use and shall be accessed fr om a street or approved fire lane. In order to be considered as accessible, if not in direct contact with a street or fire lane, a minimum 10-foot wide pathway meeting fire department access from the street or approved fire lane shall be provided. (Reason: To define what is considered accessible. Consistent with regional amendment to IFC 504.1.) ***Section 602.1.1; add sentence to read as follows: 602.1.1 Minimum Requirements. [Existing Text to remain] Where a building contains more than one distinct type of construction, the building shall comply with the most restrictive area, height, and stories, for the lesser type of construction or be separated by fire walls. 12 (Reason: To create definite language that requires separation between dissimilar building types.) ***Section 708.4.2; change sentence to read as follows: 708.4.2 Fireblocks and draftstops in combustible construction. [Body of text unchanged] Exceptions: 1. Buildings equipped with an automatic sprinkler system installed throughout in accordance with Section 903.3.1.1, or in accordance with Section 903.3.1.2 provided that sprinkler protection is provided in the space between the top of the fire partition and the underside of the floor or roof sheathing, deck or slab above as required for system s complying with Section 903.3.1.1. Portions of buildings containing concealed spaces filled with noncombustible insulation as permitted for sprinkler omission shall not apply to this exception for draftstopping. [Remainder unchanged] Reason: (The most common exception used to eliminate the need for sprinklers in concealed spaces of combustible construction is to fill the space with noncombustible insulation. This exception was changed in 2010 to permit a 2-inch air gap at the top of the filled space. A space compliant with the permitted omission above would allow hot gas and smoke to spread unimpeded throughout a building not provided with draftstopping. For this reason, omission of sprinklers permitted in accordance with NFPA 13 referenced standard should not be permitted with IBC exception requiring draftstopping in combustible construction.) **Section 712.1.9; Two-story openings; amend to read as follows: 4. Is not open to a corridor in Group I and R H occupancies. (Reason: To be consistent with amended definition of an atrium.) ***Section 718.3; change sentence to read as follows: 718.3 Draftstopping in floors. [Body of text unchanged] Exceptions: Buildings equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1. and provided that in combustible construction, sprinkler protection is provided in the floor space. (Reason: To remain consistent with changes in 708.4.2 code.) ***Section 718.4; change sentence to read as follows: 718.4 Draftstopping in attics. [Body of text unchanged] Exceptions: Buildings equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 and provided that in combustible construction, sprinkler protection is provided in the attic space. (Reason: To remain consistent with changes in 708.4.2 code.) **Section 903.1.1; amend to read as follows: [F] 903.1.1 Alternative protection. Alternative automatic fire-extinguishing systems complying with Section 904 shall be permitted instead of in addition to automatic sprinkler protection where recognized by the applicable standard and, or as approved by the fire code official. (Reason: Such alternative systems do not provide the reliability of automatic sprinkler protection in general. An applicant could pursue an Alternate Method request to help mitigate the reliability issues with these alternative systems with the fire code official if so desired, or there may be circumstances in which the fire code official is acceptable to allowing an alternate system in li eu of sprinklers, such as kitchen hoods or paint booths. This also meets with local practices in the region.) 13 **Section 903.2; amend to read as follows: [F] 903.2 Where required. Approved automatic sprinkler systems in new buildings and structures shall be provided in the locations described in Sections 903.2.1 through 903.2.12. Automatic Sprinklers shall not be installed in elevator machine rooms, elevator machine spaces, and elevator hoistways, other than pits where such sprinklers would not necessitate shunt trip requirements under any circumstances . Storage shall not be allowed within the elevator machine room. Signage shall be provided at the entry doors to the elevator machine room indicating “ELEVATOR MACHINERY – NO STORAGE ALLOWED.” (Reason: Firefighter and public safety. This amendment eliminates the shunt trip requirement of the International Building Code Section 3006.5 for the purpose of elevator passenger and firefighter safety. This amendment is contingent on the Building Code amendment eliminating the Exceptions to Section 3006.4, such that passive fire barriers for these areas are maintained. This also meets with local practices in the region.) [F] **Section 903.2; Automatic Sprinkler Systems Where required; delete Exception. (Reason: The exception deletion is due to the fact that such telecom areas pose an undue fire risk to the structural integrity of the building. This also meets with local practices in the region.) **Section 903.2.9; add to read as follows: [F] 903.2.9.3 Self-service storage facility. An automatic sprinkler system shall be installed throughout all self-service storage facilities. (Reason: Fire departments are unable to inspect these commercial occupancies and are unaware of the contents being stored. Previous allowance to separate units by fire barriers is difficult to enforce maintenance after opening.) **Section 903.2.11; amend 903.2.11.3 and add 903.2.11.7, 903.2.11.8, and 903.2.11.9 to read as follows: 903.2.11.3 Buildings 55 35 feet or more in height. An automatic sprinkler system shall be installed throughout buildings that have one or more stories with an occupant load of 30 or more, other than penthouses in compliance with Section 1510 of the International Building Code , located 55 35 feet (16,764 10,668 mm) or more above the lowest level of fire department vehicle access, measured to the finished floor. Exceptions: 1. Open parking structures in compliance with Section 406.5 of the International Building Code, having no other occupancies above the subject garage. 2. Occupancies in Group F-2. 903.2.11.7 High-Piled Combustible Storage. For any building with a clear height exceeding 12 feet (4572 mm), see Chapter 32 of the IFC to determine if those provisions apply. 903.2.11.8 Spray Booths and Rooms. New and existing spray booths and spraying rooms shall be protected by an approved automatic fire-extinguishing system. 903.2.11.9 Buildings Over 6,000 Square Feet. An automatic sprinkler system shall be installed throughout all buildings over 6,000 sq. ft. For the purpose of this provision, fire walls shall not define separate buildings. For this section only, area measurement shall be based on outside dimensions of exterior walls, exclusive of vent shafts and courts, without deduction for corridors, stairways, closets, and the thickness of interior walls, columns or other features. The floor area of a building, or portion thereof, not provided with surrounding exterior walls shall be the usable area under the horizontal projection of the roof or floor above. For upper level attic type rooms, areas where the ceiling height is less than five feet (5’ 0”) shall not be considered. Unfinished space framed to permit future expansion of floor area shall be considered as part of the area. Joists designed to support floor loads shall be assumed to be for future area. Exceptions: 14 1. Open parking garages in compliance with IBC Section 406.3. 2. Building regulated under the International Residential Code as amended. (Reason: Reflects regional practices. Provides jurisdictions options as to their desired level of sprinkler protection based on multiple factors including firefighting philosophies/capabilities.) **Section 903.3.1.1.1; amend to read as follows: [F] 903.3.1.1.1 Exempt locations. When approved by the fire code official, automatic sprinklers shall not be required in the following rooms or areas where such ...{text unchanged}… because it is damp, of fire- resistance-rated construction or contains electrical equipment. 1. A room where the application of water, or flame and water, constitutes a serious life or fire hazard. 2. A room or space where sprinklers are considered undesirable because of the nature of the contents, when approved by the code official. 3. Generator and transformer rooms, under the direct control of a public utility, separated from the remainder of the building by walls and floor/ceiling or roof/ceiling assemblies having a fire - resistance rating of not less than 2 hours. 4. Rooms or areas that are of noncombustible construction with wholly nonco mbustible contents. 5. Fire service access Elevator machine rooms, and machinery spaces, and hoistways, other than pits where such sprinklers would not necessitate shunt trip requirements under any circumstances. 6. {Delete.} (Reason: Gives more direction to code official. Exception 4 deleted to provide protection where fire risks are poorly addressed. Amendment 903.2 addresses Exception 5. above relative to the elimination of sprinkler protection in these areas to avoid the shunt trip requirement.) ***Section 903.3.1.2.3; delete sections and replace as follows: [F] Section 903.3.1.2.3 Attached Garages and Attics. Sprinkler protection is required in attached garages, and in the following attic spaces: 1. [Remainder Unchanged] 2. [Remainder Unchanged] 3. Attic spaces of buildings that are two or more stories in height above grade plane or above the lowest level of fire department vehicle access. 4. Group R-4, Condition 2 occupancy attics not required by Item 1 or 3 to have sprinklers shall comply with one of the following: [Remainder Unchanged] (Reason: Attic protection is required due to issues with fire exposure via soffit vents, as well as firefighter safety. Several jurisdictions indicated experience with un-protected attic fires resulting in displacement of all building occupants. NFPA 13 provides for applicable attic sprinkler protection requirements, as well as exemptions to such, based on noncombustible construction, etc. Attached garages already require sprinklers via NFPA 13R – this amendment just re-emphasizes the requirement.) **Section 903.3.1.3; amend to read as follows: [F] 903.3.1.3 NFPA 13D sprinkler systems. Automatic sprinkler systems installed in one- and two-family dwellings; Group R-3; Group R-4 Condition 1 and townhouses shall be permitted to be installed throughout in accordance with NFPA 13D or in accordance with state law. (Reason: To allow the use of the Plumbing section of the IRC and recognize current state stipulations in this regard.) **Section 903.3.1.4; add to read as follows: [F] 903.3.1.4 Freeze protection. Freeze protection systems for automatic fire sprinkler systems shall be in accordance with the requirements of the applicable referenced NFPA standard and this section. 15 903.3.1.4.1 Attics. Only dry-pipe, preaction, or listed antifreeze automatic fire sprinkler systems shall be allowed to protect attic spaces. Exception: Wet-pipe fire sprinkler systems shall be allowed to protect non-ventilated attic spaces where: 1. The attic sprinklers are supplied by a separate floor control valve assembly to allow ease of draining the attic system without impairing sprinklers thro ughout the rest of the building, and 2. Adequate heat shall be provided for freeze protection as per the applicable referenced NFPA standard, and 3. The attic space is a part of the building’s thermal, or heat, envelope, such that insulation is provided at the roof deck, rather than at the ceiling level. 903.3.1.4.2 Heat trace/insulation. Heat trace/insulation shall only be allowed where approved by the fire code official for small sections of large diameter water-filled pipe. (Reason: In the last few years, severe winters brought to light several issues with current practices for sprinklering attics, not the least of which was wet-pipe sprinklers in ventilated attics provided with space heaters, etc. for freeze protection of such piping. This practice is not acceptable for the protection of water-filled piping in a ventilated attic space as it does not provide a reliable means of maintaining the minimum 40 degrees required by NFPA, wastes energy, and presents a potential ignition source to the attic space. Listed antifreeze is specifically included because NFPA currently allows such even though there is no currently listed antifreeze at the time of developme nt of these amendments. The intent of this amendment is to help reduce the large number of freeze breaks that have occurred in the past with water - filled wet-pipe sprinkler systems in the future, most specifically in attic spaces.) **Section 903.3.5; Water supplies; add to read as follows: [F] Water supply as required for such systems shall be provided in conformance with the supply requirements of the respective standards; however, every water -based fire protection system shall be designed with a 10 psi safety factor. Reference Section 507.4 for additional design requirements. (Reason: To define uniform safety factor.) **Section 903.4; Sprinkler system supervision and alarms; add after the exceptions to read as follows: [F] Sprinkler and standpipe system water-flow detectors shall be provided for each floor tap to the sprinkler system and shall cause an alarm upon detection of water flow for more than 45 seconds. All control valves in the sprinkler and standpipe systems except for fire department hose connection valves shall be electrically supervised to initiate a supervisory signal at the central station upon tampering. (Reason: To avoid significant water losses. Consistent with amendment to IFC 905.9.) **Section 903.4.2; Alarms; add to read as follows: [F] The alarm device required on the exterior of the building shall be a weatherproof horn/strobe notification appliance with a minimum 75 candela strobe rating, installed as close as practicable to the fire department connection. (Reason: Fire department connections are not always located at the riser; this allows the fire department faster access.) **Section 905.1; add to read as follows: 905.1.1 905.1.1 Standpipe Testing. Building owners/managers must maintain and test standpipe systems as per NFPA 25 requirements. The following additional requirements shall be applied to the testing that is required every 5 years: 1. The piping between the Fire Department Connection (FDC) and the standpipe shall be backflushed when foreign material is present, and also hydrostatically tested for all FDC’s on any type of standpipe system. Hydrostatic testing shall also be conducted in accordance with NFPA 25 requirements for the different types of standpipe systems. 16 2. For any manual (dry or wet) standpipe system not having an automatic water supply capable of flowing water through the standpipe, the tester shall connect hose from a fire hydrant or portable pumping system (as approved by the fire code official) to each FDC, and flow water through the standpipe system to the roof outlet to verify that each inlet connection functions properly. Confirm that there are no open hose valves prior to introducing water into a dry standpipe. There is no required pressure criteria at the outlet. Verify that check valves function properly and that there are no closed control valves on the system. 3. Any pressure relief, reducing, or control valves shall be tested in accordance with the requirements of NFPA 25. All hose valves shall be exercised. 4. If the FDC is not already provided with approved caps, the contractor shall install such caps for all FDC’s as required by the fire code official. 5. Upon successful completion of standpipe test, place a blue tag (as per Texas Administrative Code, Fire Sprinkler Rules for Inspection, Test and Maintenance Service (ITM) Tag) at the bottom of each standpipe riser in the building. The tag shall be check -marked as “Fifth Year” for Type of ITM, and the note on the back of the tag shall read “5 Year Standpipe Test” at a minimum. 6. The procedures required by Texas Administrative Code Fire Sprinkler Rules with regard to Yellow Tags and Red Tags or any deficiencies noted during the testing, including the required notification of the local Authority Having Jurisdiction (fire code official) shall be followed. 7. Additionally, records of the testing shall be maintained by the owner and contractor, if applicable, as required by the State Rules mentioned above and NFPA 25. 8. Standpipe system tests where water will be flowed external to the building shall not be conducted during freezing conditions or during the day prior to expected night time freezing conditions. 9. Contact the fire code official for requests to remove existing fire hose from Class II and III standpipe systems where employees are not trained in the utilization of this firefighting equipment. All standpipe hose valves must remain in place and be provided with an approved cap and chain when approval is given to remove hose by the fire code official. (Reason: Increases the reliability of th e fire protection system and re-emphasizes the requirements of NFPA 25 relative to standpipe systems, as well as ensuring that FDC connections are similarly tested/maintained to ensure operation in an emergency incident. Corresponds to IFC 901.6.1.) **Section 905.2; amend to read as follows: [F] 905.2 Installation standard. Standpipe systems shall be installed in accordance with this section and NFPA 14. Fire department connections for standpipe systems shall be in accordance with Section 912 Manual dry standpipe systems shall be supervised with a minimum of 10 psig and a maximum of 40 psig air pressure with a high/low alarm. (Reason: To define manual dry standpipe supervision requirements. Helps ensure the integrity of the standpipe system via supervision, such that open hose valves will result in a supervisory low air alarm.) **Section 905.3; add to read as follows: [F] 905.3.9 Buildings exceeding 10,000 sq. ft. In buildings exceeding 10,000 square feet in area per story and where any portion of the building’s interior area is more than 200 feet (60960 mm) of travel, vertically and horizontally, from the nearest point of fire department vehicle access, Class I automatic wet or manual wet standpipes shall be provided. Exceptions: 1. Automatic dry and semi-automatic dry standpipes are allowed as provided for in NFPA 14. 2. R-2 occupancies of four stories or less in height having no interior corridors. (Reason: Allows for the rapid deployment of hose lines to the body of the fire.) 17 **Section 905.4; Location of Class I standpipe hose connections; amend to read as follows: [F] 1. In every required interior exit stairway, a hose connection shall be provided for each story above and below grade. Hose connections shall be located at an intermediate landing between stories, unless otherwise approved by the fire code official. 2. {No change.} 3. In every exit passageway, at the entrance from the exit passageway to other areas of a building. Exception: Where floor areas adjacent to an exit passageway are reachable from an interior exit stairway hose connection by a …No change to rest.} 4. {No change.} 5. Where the roof has a slope less than four units vertical in 12 units horizontal (33.3 -percent slope), each standpipe shall be provided with a two-way a hose connection shall be located to serve the roof or at the highest landing of an interior exit stairway with stair access to the roof provided in accordance with Section 1011.12. 6. {No change.} 7. When required by this Chapter, standpipe connections shall be placed adjacent to all required exits to the structure and at two hundred feet (200’) intervals along major corridors thereafter, or as otherwise approved by the fire code official. (Reason: Item 1, 3, and 5 amendments to remove ‘interior’ will help to clarify that such connections are required for all ‘exit’ stairways, to ensure firefighter capabilities are not diminished in these tall buildings, simply because the stair is on the exterior of the building. Item 5 reduces the amount of pressure requir ed to facilitate testing, and provides backup protection for fire fighter safety. Item 7 a llows for the rapid deployment of hose lines to the body of the fire.) **Section 905.9; Valve supervision; add after the exceptions to read as follows: [F] Sprinkler and standpipe system water-flow detectors shall be provided for each floor tap to the sprinkler system and shall cause an alarm upon detection of water flow for more than 45 seconds. All control valves in the sprinkler and standpipe systems except for f ire department hose connection valves shall be electrically supervised to initiate a supervisory signal at the central station upon tampering. (Reason: To avoid significant water losses. Consistent with amendment to IFC 903.4. **Section 907.1; add to read as follows: [F] 907.1.4 Design standards. Where a new fire alarm system is installed, the devices shall be addressable. Fire alarm systems utilizing more than 20 smoke detectors shall have analog initiating devices. (Reason: Provides for the ability of descriptive identification of alarms, and reduces need for panel replacement in the future. Updated wording to match the language of the new requirement at 907.5.2.3. Change of terminology allows for reference back to definitions of NFPA 72) **Section 907.2.1; amend to read as follows: [F] 907.2.1 Group A. A manual fire alarm system that activates the occupant notification system in accordance with Section 907.5 shall be installed in Group A occupancies where the having an occupant load due to the assembly occupancy is of 300 or more persons or more than 100 persons above or below the lowest level of exit discharge. Group A occupancies not separated from one another in accordance with Section 707.3. 10 of the International Building Code shall be considered as a single occupancy for the purposes of applying this section. Portions of Group E occupancies occupied for assembly purposes shall be provided with a fire alarm system as required for the Group E occupancy. Exception: {No change.} Activation of fire alarm notification appliances shall: 1. Cause illumination of the means of egress with light of not less than 1 foot-candle (11 lux) at the walking surface level, and 2. Stop any conflicting or confusing sounds and visual distractions. 18 (Reason: Increases the requirement to be consistent with Group B requirement. Also addresses issue found in Group A occupancies of reduced lighting levels and other A/V equipment that distracts from fire alarm notification devices or reduces ability of fire alarm system to notify occupants of the emergency condition.) **Section 907.2.3; amend to read as follows: [F] 907.2.3 Group E. A manual fire alarm system that initiates the occupant notification signal utilizing an emergency voice/alarm communication syst em meeting the requirements of Section 907.5.2.2 and installed in accordance with Section 907.6 shall be installed in Group E educational occupancies. When automatic sprinkler systems or smoke detectors are installed, such systems or detectors shall be connected to the building fire alarm system. An approved smoke detection system shall be installed in Group E day care occupancies. Unless separated by a minimum of 100' open space, all buildings, whether portable buildings or the main building, will be considered one building for alarm occupant load consideration and interconnection of alarm systems. Exceptions: 1. {No change.} 1.1. Residential In-Home day care with not more than 12 children may use interconnected single station detectors in all habitable rooms. (For care of more than five children 2 1/2 or less years of age, see Section 907.2.6.) {No change to remainder of exceptions.} (Reason: To distinguish educational from day care occupancy minimum protection requirements. Further, to define threshold at which portable buildings are considered a separate building for the purposes of alarm systems. Exceptions provide consistency with State law concerning such occupancies.) **Section 907.2.12; High-rise buildings; amend to read as follows: Exception: {previous exceptions unchanged} [F] 3. Open air portions of buildings with an occupancy in Group A-5 in accordance with Section 303.1 of the International Building Code; however, this exception does not apply to accessory uses including but not limited to sky boxes, restaurants and similarly enclosed areas. (Reason: To indicate that enclosed areas within open air seating type occupancies are not exempted from automatic fire alarm system requirements.) **Section 907.4.2; add to read as follows: [F] 907.4.2.7 Type. Manual alarm initiating devices shall be an approved double action type. (Reason: Helps to reduce false alarms.) **Section 907.6.1; add to read as follows: [F] 907.6.1.1 Wiring Installation. All fire alarm systems shall be installed in such a manner that a failure of any single initiating device or single open in an initiating circuit conductor will not interfere with the normal operation of other such devices. All signaling line circuits (SLC) shall be installed in such a way that a single open will not interfere with the operation of any addressable devices (Class A). Outgoing and return SLC conductors shall be installed in accordance with NFPA 72 requirements for Class A circuits and shall have a minimum of four feet separation horizontal and one foot vertical between supply and return circuit conductors. The initiating device circuit (IDC) from a signaling line circuit interface device may be wired Class B, provided the distance from the interface device to the initiating device is t en feet or less. (Reason: To provide uniformity in system specifications and guidance to design engineers. Improves reliability of fire alarm devices and systems.) **Section 907.6.3; Initiation device identification; delete all four Exceptions. 19 (Reason: To assist responding personnel in locating the emergency event for all fire alarm systems.) **Section 907.6.6; Monitoring; add sentence at end of paragraph to read as follows: [F] See 907.6.3 for the required information transmitted to the supervising station. (Reason: To assist responding personnel in locating the emergency event for all fire alarm systems. This was moved from 907.6.5.3 in the 2012 IFC and reworded to match new code language and sections.) **Section 909.22; add to read as follows: [F] 909.22 Stairway or ramp pressurization alternative. Where the building is equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 and the stair pressurization alternative is chosen for compliance with Building Code requirements for a smokeproof enclosure, interior exit stairways or ramps shall be pressurized to a minimum of 0.10 inches of water (25 Pa) and a maximum of 0.35 inches of water (87 Pa) in the shaft relative to the building measured with all interior exit stairway and ramp doors closed under maximum anticipated conditions of stack effect and wind effect. Such systems shall comply with Section 909, including the installation of a separate fire -fighter’s smoke control panel as per Section 909.16, and a Smoke Control Permit shall be required from the Fire Department as per Section 105.7. [F] 909.22.1 Ventilating equipment. The activation of ventilating equipment for the stair or ramp pressurization system shall be by smoke detectors installed at each floor le vel at an approved location at the entrance to the smokeproof enclosure. When the closing device for the stairway or ramp shaft and vestibule doors is activated by smoke detection or power failure, mechanical equipment shall activate and operate at the required performance levels. Smoke detectors shall be installed in accordance with Section 907.3. [F] 909.22.1.1 Ventilation systems. Smokeproof enclosure ventilation systems shall be independent of other building ventilation systems. The equipment, control wiring, power wiring and ductwork shall comply with one of the following: 1. Equipment, control wiring, power wiring and ductwork shall be located exterior to the building and directly connected to the smokeproof enclosure or connected to the smokeproof enclosure by ductwork enclosed by not less than 2-hour fire barriers constructed in accordance with Section 707 of the Building Code or horizontal assemblies constructed in accordance with Section 711 of the Building Code, or both. 2. Equipment, control wiring, power wiring and ductwork shall be located within the smokeproof enclosure with intake or exhaust directly from and to the outside or through ductwork enclosed by not less than 2-hour barriers constructed in accordance with Section 707 of the Building Code or horizontal assemblies constructed in accordance with Section 711 of the Building Code, or both. 3. Equipment, control wiring, power wiring and ductwork shall be located within the building if separated from the remainder of the building, including other mechanical equipment, by not less than 2-hour fire barriers constructed in accordance with Section 707 of the Building Code or horizontal assemblies constructed in accordance with Section 711 of the Building Code, or both. Exceptions: 1. Control wiring and power wiring utilizing a 2-hour rated cable or cable system. 2. Where encased with not less than 2 inches (51 mm) of concrete. 3. Control wiring and power wiring protected by a listed electrical circuit protective systems with a fire-resistance rating of not less than 2 hours. [F] 909.22.1.2 Standby power. Mechanical vestibule and stairway and ramp shaft ventilation systems and automatic fire detection systems shall be provided with standby power in accordance with Section 2702 of the Building Code. [F] 909.22.1.3 Acceptance and testing. Before the mechanical equipment is approved, the system shall be tested in the presence of the fire code official to confirm that the system is operating in compliance with these requirements. 20 (Reason: To assist with enforcement of such as a smoke control system, as per Section 909.6.3, especially since a permit is now specifically required for such systems in the Fire Code. Also ensures that a firefighter’s override panel is provided as per 909.16 for such systems. The above amendment copies the applicable requirements for such systems from Section 909.20 of the Building Code into the Fire Code. Although the published code did copy the elevator pressurization requirements into the Fire Code, it did not copy over the stair pressurization requirements.) **Section 910.2; Smoke and Heat Removal Where required; amend to read as follows: Exceptions: {previous exceptions unchanged} [F] 2. Only manual smoke and heat removal shall not be required in areas of buildings equipped with early suppression fast-response (ESFR) sprinklers. Automatic smoke and heat removal is prohibited. 3. Only manual smoke and heat removal shall not be required in areas of buildings equipped with control mode special application sprinklers with a response time index of 50(m*S)1/2 or less that are listed to control a fire in stored commodities with 12 or fewer sprinklers. Automatic smoke and heat removal is prohibited. (Reason: Allows the fire department to control the smoke and heat during and after a fire event, while still prohibiting such systems from being automatically activated, which is a potential detriment to the particular sprinkler systems indicated.) **Section 910.2; add to read as follows: [F] 910.2.3 Group H. Buildings and portions thereof used as a Group H occupancy as follows: 1. In occupancies classified as Group H-2 or H-3, any of which are more than 15,000 square feet (1394 m2) in single floor area. Exception: Buildings of noncombustible construction containing only noncombustible materials. 2. In areas of buildings in Group H used for storing Class 2, 3, and 4 liquid and solid oxidizers, Class 1 and unclassified detonable organic peroxides, Class 3 and 4 unstable (reactive) materials, or Class 2 or 3 water-reactive materials as required for a high-hazard commodity classification. Exception: Buildings of noncombustible construction containing only noncombustible materials. (Reason: Maintains a fire protection device utilized in such occupancies where it is sometim es necessary to allow chemicals to burn out, rather than extinguish.) **Section 910.3; add to read as follows: [F] 910.3.4 Vent operation. Smoke and heat vents shall be capable of being operated by approved automatic and manual means. Automatic operation of smoke and heat vents shall conform to the provisions of Sections 910.3.2.1 through 910.3.2.3. [F] 910.3.4.1 Sprinklered buildings. Where installed in buildings equipped with an approved automatic sprinkler system, smoke and heat vents shall be designed to operate automatically. The automatic operating mechanism of the smoke and heat vents shall operate at a temperature rating at least 100 degrees F (approximately 38 degrees Celsius) greater than the temperature rating of the sprinklers installed. Exception: Manual only system per 910.2 [F] 910.3.4.2 Nonsprinklered buildings. Where installed in buildings not equipped with an approved automatic sprinkler system, smoke and heat vents shall operate automatically by actuation of a heat-responsive device rated at between 100°F (56°C) and 220°F (122°C) above ambient. 21 Exception: Listed gravity-operated drop out vents. (Reason: Amendment continues to keep applicable wording from prior to the 2012 edition of th e IFC. Specifically, automatic activation criteria is no longer specifically required in the published code. Specifying a temperature range at which smoke and heat vents should activate in sprinklered buildings helps to ensure that the sprinkler system has an opportunity to activate and control the fire prior to vent operation.) **Section 910.4.3.1; amend to read as follows: [F] 910.4.3.1 Makeup air. Makeup air openings shall be provided within 6 feet (1829 mm) of the floor level. Operation of makeup air openings shall be manual or automatic. The minimum gross area of makeup air inlets shall be 8 square feet per 1,000 cubic feet per minute (0.74 m2 per 0.4719 m3/s) of smoke exhaust. (Reason: Makeup air has been required to be automatic for several years now in this region when mechanical smoke exhaust systems are proposed. This allows such systems to be activated from the smoke control panel by first respond ers without having to physically go around the exterior of the building opening doors manually. Such requires a significant number of first responders on scene to conduct this operation and significantly delays activation and/or capability of the smoke ex haust system.) **Section 910.4.4; amend to read as follows: [F] 910.4.4 Activation. The mechanical smoke removal system shall be activated by manual controls only automatically by the automatic sprinkler system or by an approved fire detection system. I ndividual manual controls shall also be provided. Exception: Manual only systems per Section 910.2. (Reason: The provision of a manual only mechanical smoke removal system does not provide equivalency with automatic smoke and heat vents. This amendmen t clarifies that the primary intent is for automatic systems, unless exceptions are provided as in 910.2 – consistent with the charging statements of the section.) **Section 912.2; add to read as follows: [F] 912.2.3 Hydrant distance. An approved fire hydrant shall be located within 100 feet of the fire department connection as the fire hose lays along an unobstructed path. (Reason: To accommodate limited hose lengths, improve response times where the FDC is needed to achieve fire control, and improve ease of locating a fire hydrant in those situations also. Also, consistent with NFPA 14 criteria.) **Section 913.2.1; Protection of fire pump rooms; add second paragraph and exception to read as follows: [F] When located on the ground level at an exterior wall, the fire pump room shall be provided with an exterior fire department access door that is not less than 3 ft. in width and 6 ft. – 8 in. in height, regardless of any interior doors that are provided. A key box shall be provided at this door, as required by Section 506.1. 3. Exception: When it is necessary to locate the fire pump room on other levels or not at an exterior wall, the corridor leading to the fire pump room access from the exterior of the building shall be provided with equivalent fire resistance as that required for the pump room, or as approved by the fire code official. Access keys shall be provided in the key box as required by Section 506.1. (Reason: This requirement allows fire fighters safer access to the fire pump room. The requirement allows access without being required to enter the building and locate the fire pump room interior access door during a fire event. The exception recognizes that this will not always be a feasible design scenario for some buildings, and as such, provides an acceptable alternative to protect the pathway to the fire pump room.) **Section 1006.2.2.7; add to read as follows: 22 1006.2.2.7 Electrical Rooms. For electrical rooms, special exiting requirements may apply. Reference the electrical code as adopted. (Reason: Cross reference necessary for coordination with the NEC which has exiting requirements as well.) **Section 1009.1; Accessible means of egress required; add to read as follows: Exceptions: {previous exceptions unchanged} 3. Buildings regulated under State Law and built in accordance with State registered plans, including any variances or waivers granted by the State, shall be deemed to be in compliance with the requirements of Section 1009. (Reason: To accommodate buildings regulated under Texas State Law and to be consistent with amendments to Chapter 11.) **Section 1010.1.9.5; Bolt Locks; amend to read as follows: Exceptions: {previous exceptions unchanged} 3. Where a pair of doors serves an occupant load of less than 50 persons in a Group B, F, M or S occupancy. {Remainder unchanged} 4. Where a pair of doors serves a Group A, B, F, M or S occupancy {Remainder unchanged} (Reason: Application to M occupancies reflects regional practice; No. 4 expanded to Group A due to it being a similar scenario to other uses; No. 4 was regional practice.) **Section 1015.8; Window Openings. Amend to read as follows: 1. Operable windows where the top of the sill of the opening is located more than 75 feet (22,860 mm) 55 feet (16,764 mm) above the finished grade or other surface below and that are provided with window fall prevention devices that comply with ASTM F 2006. (Reason: In Option B jurisdictions, change "75 feet" to "55 feet".) **Section 1020.1; Construction; add to read as follows: Exceptions: {previous exceptions unchanged} 6. In group B occupancies, corridor walls and ceilings need not be of fire-resistive construction within a single tenant space when the space is equipped with approved automatic smoke-detection within the corridor. The actuation of any detector shall activate self-annunciating alarms audible in all areas within the corridor. Smoke detectors shall be connected to an approved automatic fire alarm system where such system is provided. (Reason: Revise the 2012 published NCTCOG amendment to this section to now read closer to that of the City of Dallas 2012 amendment.) **Section 1028.1: Exit Discharge. Amend Exception to read as follows: Exception: 1. Not more than 50 percent… 23 1.1. Discharge of interior exit stairways and ramps shall be provided with a fee and unobstructed path of travel to an exterior exit door and such exit is readily visible in direct line of sight and identifiable from the point of termination of the enclosure. (Reason: Clarification.) **Section 1029.1.1.1; Delete section: Spaces under grandstands and bleachers. (Reason: Unenforceable.) **Section 1101.1; Scope; add to read as follows: Exception: Components of projects regulated by and registered with the Architectural Barriers Division of the Texas Department of Licensing and Regulation shall be deemed to be in compliance with the requirements of this chapter. (Reason: To accommodate buildings regulated under state law. Further clarified in 2015 to mean components that are specifically addressed by TDLR shall be exempt.) **Table 1505.1; delete footnote c and amend footnote b to read as follows: b. Non-classified roof coverings shall be permitted on buildings of U occupancies having not more than 120 sq. ft. of protected roof area. When exceeding 120 sq. ft. of protected roof area, buildings of U occupancies may use non-rated non-combustible roof coverings. c. [delete] (Reason: Conforms to regional practice affording increased fire protection.) **Section 1505.7; Delete section: Special purpose roofs. (Reason: Conforms to regional practice.) **Section 1511.1; Reroofing; add to read as follows: 1511.1 General. Materials and methods of applications used for recovering or replacing an existing roof covering shall comply with the requirements of Chapter 15. All individual replacement shingles or shakes shall be in compliance with the rating required by Table 1505.1. {Exception unchanged} (Reason: Relocated the text to more appropriate place. Previously was footnote “b” to Table 1505.1) **Section 2901.1; add to read as follows: [P] 2901.1 Scope. {existing text to remain} The provisions of this Chapter are meant to work in coordination with the provisions of Chapter 4 of the International Plumbing Code. Should any conflicts arise between the two chapters, the Building Official shall determine which provision applies. (Reason: Gives discretion to Code Official in case of code conflict.) **Section 2902.1; Minimum number of fixtures; add a second paragraph to read as follows: In other than E Occupancies, the minimum number of fixtures in Table 2902.1 may be lowered, if requested in writing, by the applicant stating reasons for a reduced number and approved by the Building Official. (Reason: To allow flexibility for designer to consider specific occupancy needs.) **Table 2902.1; add footnote f to read as follows: g. Drinking fountains are not required in M Occupancies with an occupant load of 100 or less, B Occupancies with an occupant load of 25 or less, and for dining and/or drink ing establishments. 24 (Reason: Adjustment meets the needs of specific occupancy types.) **Section 2902.1.4; add to read as follows: 2902.1.4 Additional fixtures for food preparation facilities. In addition to the fixtures required in this Chapter, all food service facilities shall be provided with additional fixtures set out in this section. 2902.1.4.1 Hand washing lavatory. At least one hand washing lavatory shall be provided for use by employees that is accessible from food preparation, food dispens ing and ware washing areas. Additional hand washing lavatories may be required based on convenience of use by employees. 2902.1.4.2 Service sink. In new or remodeled food service establishments, at least one service sink or one floor sink shall be provided so that it is conveniently located for the cleaning of mops or similar wet floor cleaning tool and for the disposal of mop water and similar liquid waste. The location of the service sink(s) and/or mop sink(s) shall be approved by the Tarrant County health department. (Reason: Coordinates Health law requirements with code language for consistent regional practice.) ***Section 3001.2 Emergency Elevator Communication Systems for the deaf, hard of hearing and speech impaired; delete this section. (Reason: Per Elevator manufacturers input, they were not consulted prior to code approval and technology of elevator provisions as submitted are not currently available to provide this feature.) **Section 3002.1; Hoistway Enclosure Protection; add to read as follows: Exceptions: 1. Elevators wholely located within atriums complying with Section 404 shall not require hoistway enclosure protection. 2. Elevators in open or enclosed parking garages that serve only the parking garage, a nd complying with Sections 406.5 and 406.6, respectively, shall not require hoistway enclosure protection. (Reason: Provides specific Code recognition that elevators within atriums and within parking garages do not require hoistway enclosure protection.) **Section 3005.4; Machine rooms, control rooms, machinery spaces and control spaces; delete and revise text as follows: Elevator machine rooms, control rooms, control spaces and machinery spaces outside of but attached to a hoistway that have openings into the hoistway shall be enclosed with fire barriers constructed in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both. Elevator machine rooms, control rooms, control spaces and machinery spaces shal l be enclosed with fire barriers constructed in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both. (Remainder unchanged) (Reason: This amendment eliminates code language so as to be consistent with the regional goal to require passive enclosures of these areas unless a hoistway enclosure is not required by other Code provisions. See companion change to eliminate fire sprinklers thereby eliminating shunt trip.) ***Section 3005.4 Machine rooms, control rooms, machinery spaces and control spaces; Delete exceptions and add two new exceptions to Section 3005.4 as follows: Exceptions: 1. Elevator machine rooms, control rooms, machinery spaces and control spaces completely located within atriums shall not require enclosure protection. 25 2. Elevator machine rooms, control rooms, machinery spaces and control spaces in open or enclosed parking garages that serve only the parking garage, shall not require enclosure protection. (Reason: This amendment eliminates the Exceptions to Section 3005.4 such that passive enclosures for these areas are to be provided and maintained. The fire rating of these enclosures is permitted to be omitted by the above added exceptions where allowed by other provisions of the code such as in atriums and parking structures. See companion change to eliminate fire sprinklers to eliminate the need for shunt trip system.) **Section 3005.7; add to read as follows: 3005.7 Fire Protection in Machine rooms, control rooms, machinery spaces and control spaces. 3005.7.1 Automatic sprinkler system. The building shall be equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1, except as otherwise permitted by Section 903.3.1.1.1 and as prohibited by Section 3005.7.2.1. 3005.7.2.1 Prohibited locations. Automatic sprinklers shall not be installed in machine rooms, elevator machinery spaces, control rooms, control spaces and elevator hoist-ways. 3005.7.2.2 Sprinkler system monitoring. The sprinkler system shall have a sprinkler control valve supervisory switch and water-flow initiating device provided for each floor that is monitored by the building’s fire alarm system. 3005.7.3 Water protection. An approved method to prevent water from infiltrating into the hoistway enclosure from the operation of the automatic sprinkler system outside the elevator lobby shall be provided. 3005.7.4 Shunt trip. Means for elevator shutdown in accordance with Section 3005.5 shall not be installed. (Reason: Firefighter and public safety. This amendment eliminates the shunt trip requirement of the International Building Code Section 3005.5 for the purpose of elevator passenger and firefighter safety. The new section above is intended to be identical to Sections 3007.2, 3007.3, and 3007.4 for Fire Service Access Elevators and Sections 3008.2, 3008.3 and 3008.4 for Occupant Evacuation Elevators.) **Section 3005.8; add to read as follows: 3005.8 Storage. Storage shall not be allowed within the elevator machine room, control room, machinery spaces and or control spaces. Provide approved signage at each entry to the above listed locations stating: "No Storage Allowed”. (Reason: Reinforces the need to maintain space clean and free of combustibles. See companion change to eliminate fire sprinklers therein, to always require an enclosure - with IBC 3005.4 exceptions deleted - resulting in the limited need for a shunt trip system.) **Section 3006.2; Hoistway opening protection required; amend to read as follows: 5. The building is a high rise and the elevator hoistway is more than 75 feet (22,860 mm) 55 feet (16,764 mm) in height. The height of the hoistway shall be measured from the lowest floor at or above grade to the highest floors served by the hoistway. (Reason: 2015 IBC text does not address hoistways that are > 75' in height that are both below grade and above grade but not located above the high rise classification nor does the IBC address hoistways wholely located above grade such as those that serve above sky lobbies.) End