Item 8 - TIATraffic Impact Analysis
Kimball Avenue Office Development
Southlake, Texas
Trium Development
1431 Greenway Drive, Suite 800
Irving, TX 75038
972.358.6383
9 November 2018
General Office Development – Southlake – Trium Development
18-TX113158-1 Executive Summary 1
Executive Summary
Project Description
Kimball Avenue General Office Development is a proposed office complex in Southlake, Texas. The site
is located on the east side of Kimball Avenue, approximately 1,900 feet south of Southlake Boulevard
(FM 1709), at 495 South Kimball Avenue.
The development is proposed to consist of six buildings of 6,000 square feet each, for a total of 36,000-
square feet of general office space. Access to the property is proposed via a single driveway connecting
to Kimball Avenue, across from the George Dawson Middle School / Cleburne Eubanks Intermediate
School (School) one-way circular driveway exit.
This traffic impact study was conducted to determine if the proposed development could be
accommodated within the existing transportation infrastructure.
Trip Generation
The proposed new development is expected to generate 394 daily trips, with 52 entering trips and 8
exiting trips in the AM peak hour, and 7 entering and 36 exiting trips in the PM peak hour.
Traffic Impacts
Southlake Boulevard (FM 1709) & Kimball Avenue
Analysis shows that the intersection currently experiences LOS C overall in the AM peak hour and LOS D
overall in the PM peak hour.
For the Full Build 2020 scenario, LOS D is maintained overall in the AM peak hour and LOS E is
maintained overall in the PM peak hour. No improvements are recommended to this intersection due to
impacts from this development.
Kimball Avenue & Project Access
For Full Build 2020 conditions, levels of service E or better are maintained at the existing School access
with the addition of Kimball Avenue General Office traffic. LOS C is maintained on the proposed
project access. No improvements at the Project Access / School are recommended based on this
development.
General Office Development – Southlake – Trium Development
18-TX113158-1 Page 1
Table of Contents
I. Introduction ................................................................................................ 2
Figure 1 – Site Plan ......................................................................................... 3
Figure 2 – Vicinity Map .................................................................................... 4
II. Existing Conditions ..................................................................................... 5
A. Existing Roadway Conditions ....................................................................................... 5
B. Existing Intersection Geometry ................................................................................... 5
C. Traffic Volumes .......................................................................................................... 5
Figure 3 – Study Area Roadways and Intersections ............................................ 6
Figure 4 – Existing Traffic Volumes .................................................................. 7
III. Methodology .............................................................................................. 8
A. Base Assumptions ....................................................................................................... 8
B. Background Growth .................................................................................................... 8
C. Trip Generation .......................................................................................................... 8
D. Trip Distribution ......................................................................................................... 8
Figure 5 – Trip Distribution .............................................................................. 9
Figure 6 – Site Trips ...................................................................................... 10
Figure 7 – Full Build 2020 Volumes ................................................................. 11
IV. Turn Lane and Capacity Analysis .............................................................. 12
A. Turn Lane Analysis/Driveway Geometry ..................................................................... 12
B. Capacity Analysis ...................................................................................................... 12
1. Southlake Boulevard (FM 1709) & Kimball Avenue ...................................................... 13
2. Kimball Avenue & Project Access / School ................................................................. 15
V. Summary and Conclusion .......................................................................... 16
Appendix ...................................................................................................... 17
General Office Development – Southlake – Trium Development
18-TX113158-1 Page 2
I. Introduction
Kimball Avenue General Office Development is a proposed office complex in Southlake, Texas.
The site is located on the east side of Kimball Avenue, approximately 1,900 feet south of
Southlake Boulevard (FM 1709), at 495 South Kimball Avenue.
The development is proposed to consist of six buildings of 6,000 square feet each, for a total of
36,000-square feet of general office space. Access to the property is proposed via a single
driveway connecting to Kimball Avenue, across from the George Dawson Middle School / Cleburne
Eubanks Intermediate School (School) one-way circular driveway exit.
The City of Southlake requires a Traffic Impact Analysis (TIA) for developments where the number
of parking spaces exceeds 100 per driveway, or where 1,000 daily trips or more are generated.
This development will exceed 100 parking spaces for the single driveway.
This traffic impact study will determine if the proposed development can be accommodated
within the existing transportation infrastructure. Recommended improvements to maintain
operating conditions consistent with Texas Department of Transportation and City of Southlake
policies will be provided as necessary.
The study area included the following intersections:
• Southlake Boulevard (FM 1709) & Kimball Avenue
• Kimball Avenue & Project Access/School Exit
The study analyzed the following scenarios:
• 2018 Existing Conditions
• Full Build 2020 Conditions
The AM peak hour and PM peak hour were analyzed.
Figure 1 shows the most recent site plan. Figure 2 shows the project vicinity map.
Site Plan
Figure 1
Kimball Avenue Office Development - Southlake
Date: 7 November 2018
Project No: 18 -TX113158-1
Vicinity Map
Figure 2
Kimball Avenue Office Development - Southlake
NOT TO SCALENOT TO SCALE
Date: 7 November 2018
Project No: 18 -TX113158-1
Project Location
General Office Development – Southlake – Trium Development
18-TX113158-1 Page 5
II. Existing Conditions
A. EXISTING ROADWAY CONDITIONS
Table 2.1 presents a summary of the existing roadway conditions in the study area. Figure 3
shows the roadways in the study area.
Table 2.1 – Existing Roadways
Street Name Functional
Class Typical Section Posted
Speed AADT
Southlake Boulevard
(FM 1709)
Other
Principal
Arterial
Six-lane divided
with raised median 45 mph
43,856 west
and 34,232
east of
Kimball Ave.
Kimball Avenue Minor Arterial Four-lane divided
with raised median 35 mph N/A
B. EXISTING INTERSECTION GEOMETRY
Southlake Boulevard (FM 1709) & Kimball Avenue is a signalized intersection with
protected/permitted left-turn phasing for the eastbound and westbound approach left turns on
Southlake Avenue. These approaches also have three through lanes with separate right-turn
lanes. The northbound and southbound approaches have split phase timing. The northbound
approach has a separate left-turn lane with a through lane and a combination through/right-turn
lane. The southbound approach has a separate left-turn lane, two through-lanes and a separate
right-turn lane.
The Project Access is a proposed full-access driveway to the east of Kimball Avenue across from
the School circular driveway exit only approach . This is located approximately 1,900 feet south
of Southlake Boulevard (FM 1709). This intersection will be stop sign controlled on the new
access, as the School exit currently operates. A southbound left-turn lane currently exists at this
location for an existing residential property.
The geometric configuration of all intersections in the study area is shown in Figure 3.
C. TRAFFIC VOLUMES
Traffic data collection for the intersections of Southlake Boulevard (FM 1709) & Kimball Avenue,
and Kimball Avenue & Existing School Access was performed on October 11 and 18, 2018. Figure
4 displays existing traffic volumes. These volumes can be found in the Appendix.
The most recent Average Annual Daily Traffic (AADT) volumes were obtained from the TxDOT
website, Transportation Planning and Programming Division, 2016 Fort Worth District Traffic.
This map is included in the Appendix.
Study Area Roadways and Intersections
Figure 3
Kimball Avenue Office Development - Southlake
NOT TO SCALENOT TO SCALE
LEGEND
Lane
Geometry
Date: 7 November 2018
Project No: 18 -TX113158-1
Southlake Blvd (FM
1709) & Kimball Ave
Kimball Ave & Project
Access/School Exit
Existing Traffic Volumes
Figure 4
Kimball Avenue Office Development - Southlake
NOT TO SCALENOT TO SCALE
XX/XX
XX/XX
XX/XX
LEGEND
Turn
movement
AM/PM
peak
volumes
Date: 7 November 2018
Project No: 18 -TX113158-1
76/247
537/1543
85/134
329/194
1459/1098
295/117
19
8
/
2
5
5
25
0
/
3
4
5
10
0
/
1
2
4
39
0
/
4
5
4
28
3
/
3
3
8
15
9
/
1
5
6
76/247
537/1543
85/134
329/194
1459/1098
295/117
19
8
/
2
5
5
25
0
/
3
4
5
10
0
/
1
2
4
39
0
/
4
5
4
28
3
/
3
3
8
15
9
/
1
5
6
Southlake Blvd (FM
1709) & Kimball Ave
99/27
134/33
48
4
/
6
0
0
45
0
/
3
9
9
1/
0
99/27
134/33
48
4
/
6
0
0
45
0
/
3
9
9
1/
0
Kimball Ave & Project
Access/School Exit
General Office Development – Southlake – Trium Development
18-TX113158-1 Page 8
III. Methodology
A. BASE ASSUMPTIONS
Intersection capacity analysis was conducted using Synchro v 10.0 for stop-controlled and
signalized intersections. Trip generation was calculated using the 10th edition of the Institute of
Transportation Engineers (ITE) Trip Generation Manual.
B. BACKGROUND GROWTH
The average annual background growth rate is calcu lated using historical AADT volumes.
Calculations show that the background growth on Southlake Boulevard (FM 1709) west of Kimball
Avenue is 4.5% per year. These calculations can be found in the Appendix.
Existing volumes were increased by 4.5% per year to estimate background growth for Full Build
2020 conditions.
C. TRIP GENERATION
The development is proposed to consist of a 36,000-square-foot general office complex.
The ITE Trip Generation Manual, 10th Edition was used to estimate the projected trips by this
development. The ITE trip generation summary is included in the Appendix.
Table 3.2 contains the summary of the land uses and sizes used for trip generation estimates.
Table 3.2 - ITE Trip Generation
Average Weekday Driveway Volumes AM Peak
Hour
PM Peak
Hour
Land Use ITE
Code Size Daily
Trips Enter Exit Enter Exit
General Office Buildings 710 36.0 Th.Sq.Ft. GFA 394 52 8 7 36
D. TRIP DISTRIBUTION
Trips for this proposed development were assigned to the surround ing roadway network based
on existing traffic patterns and engineering judgment. The proposed trip distribution for this
project can be found in Figure 5, and the projected site trips are shown in Figure 6.
Full Build 2020 volumes are shown in Figure 7.
Trip Distribution
Figure 5
Kimball Avenue Office Development - Southlake
NOT TO SCALENOT TO SCALE
XX/XX
XX/XX
XX/XX
LEGEND
Turn
movement
AM/PM
peak
volumes
Date: 7 November 2018
Project No: 18 -TX113158-1
50
%
50
%
23
%
20%
Site Trips
Figure 6
Kimball Avenue Office Development - Southlake
NOT TO SCALENOT TO SCALE
XX/XX
XX/XX
XX/XX
LEGEND
Turn
movement
AM/PM
peak
volumes
Date: 7 November 2018
Project No: 18 -TX113158-1
4/1
10/1
2/
7
2/
8
0/
3
12
/
2
4/1
10/1
2/
7
2/
8
0/
3
12
/
2
Southlake Blvd (FM
1709) & Kimball Ave
26
/
3
26
/
4
26
/
3
26
/
4
Kimball Ave & Project
Access/School Exit
4/18
4/18
Full Build 2020 Volumes
Figure 7
Kimball Avenue Office Development - Southlake
NOT TO SCALENOT TO SCALE
XX/XX
XX/XX
XX/XX
LEGEND
Turn
movement
AM/PM
peak
volumes
Date: 7 November 2018
Project No: 18 -TX113158-1
83/270
586/1685
97/147
359/212
1593/1199
332/129
21
8
/
2
8
5
27
5
/
3
8
5
10
9
/
1
3
8
42
6
/
4
9
6
32
1
/
3
7
1
17
4
/
1
7
0
83/270
586/1685
97/147
359/212
1593/1199
332/129
21
8
/
2
8
5
27
5
/
3
8
5
10
9
/
1
3
8
42
6
/
4
9
6
32
1
/
3
7
1
17
4
/
1
7
0
Southlake Blvd (FM
1709) & Kimball Ave
99/27
134/33
52
9
/
6
5
5
26
/
3
49
1
/
4
3
6
26
/
3
99/27
134/33
52
9
/
6
5
5
26
/
3
49
1
/
4
3
6
26
/
3
Kimball Ave & Project
Access/School Exit
4/18
4/18
General Office Development – Southlake – Trium Development
18-TX113158-1 Page 12
IV. Turn Lane and Capacity Analysis
A. TURN LANE ANALYSIS/DRIVEWAY GEOMETRY
In order to determine if the proposed driveway configuration conforms to City of Southlake
requirements, the “Driveway Ordinance No. 634” was reviewed. This ordinance established City
of Southlake regulations for the location, spacing, and permit requirements for driveways,
including turn lane warrants and geometry, such as width, spacing, stacking and radius returns.
This driveway will be constructed across from the existing School circular driveway exit. It will
be designed and constructed to meet all of the geometric requirements of the 1995 ordinan ce.
The driveway is spaced approximately 250 ft. from the next closest access to the south. This
complies with the service driveway spacing requirement of 250 ft. for an arterial roadway, as
specified in Table One of the ordinance.
A deceleration right-turn lane will not be required based on the auxiliary lane requirements in
Section 5.4, which indicate in excess of 50 right-turn ingress vehicles occurring in the design hour
given the posted street speed limit of 35 mph. The maximum projected right-turn volume of 26
during the AM peak hour does not warrant an auxiliary lane.
B. CAPACITY ANALYSIS
The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term “level of
service” (LOS) to measure how traffic operates in intersections. There are currently six levels of
service ranging from A to F. Level of Service “A” represents the best conditions and Level of
Service “F” represents the worst. Synchro software was used to determine the level of service
for intersections in the study area. All worksheet reports from the analyses can be found in the
Appendix.
Table 4.1 shows the control delay per vehicle associated with LOS A through F for signalized
and unsignalized intersections.
Table 4.1 – Highway Capacity Manual Levels of Service and Control Delay
Signalized Intersection Unsignalized Intersection
Level of Service Control Delay per
Vehicle (sec)
Level of
Service
Control Delay per
Vehicle
(sec)
A 10 A 10
B 10 and 20 B 10 and 15
C 20 and 35 C 15 and 25
D 35 and 55 D 25 and 35
E 55 and 80 E 35 and 50
F 80 F 50
General Office Development – Southlake – Trium Development
18-TX113158-1 Page 13
1. SOUTHLAKE BOULEVARD (FM 1709) & KIMBALL AVENUE
2018 Existing Conditions
Table 4.2 shows the current LOS, control delay, and 95th percentile queue length for existing
2018 conditions.
Table 4.2 - Intersection LOS, Delay, and Queue by Movement - 2018 Existing
Intersection Approach Movement AM PM
LOS Delay Queue LOS Delay Queue
Southlake Boulevard
(FM 1709) & Kimball
Avenue
EB
LT C 25.5 281’ E 63.8 270’
TH C 32.7 516’ D 35.3 352’
RT B 15.2 190’ A 9.5 60’
WB
LT C 32.0 90’ C 30.1 110’
TH C 34.8 202’ D 47.7 565’
RT A 1.3 6’ B 17.3 154’
NB
LT E 62.7 270’ F 83.8 387’
TH D 47.6 203’ E 62.3 276’ RT
SB
LT E 55.3 209’ D 48.3 194’
TH D 48.5 170’ D 47.1 192’
RT B 12.3 117’ E 56.6 476’
OVERALL C (33.3) D (46.7)
Analysis shows that the intersection currently experiences LOS C overall in the AM peak hour and
LOS D overall in the PM peak hour. It should be noted that the eastbound left-turn AM volume of
329 and the northbound left-turn PM volume of 255 vehicles are approaching the level of turning
vehicles that may require an intersection improvement to provide double left-turn lanes. Based
on the projected yearly increase of 4.5%, this could occur within a short time frame.
General Office Development – Southlake – Trium Development
18-TX113158-1 Page 14
Full Build 2020 Conditions
Table 4.3 shows the expected LOS, control delay, and 95th percentile queue length for Full Build
2020 conditions.
Table 4.3 - Intersection LOS, Delay, and Queue by Movement – 2020 Full Build
Intersection Approach Movement AM PM
LOS Delay Queue LOS Delay Queue
Southlake Boulevard
(FM 1709) & Kimball
Avenue
EB
LT C 30.0 311’ F 83.7 313’
TH D 36.5 584’ D 38.0 392’
RT B 17.6 228’ B 10.9 69’
WB
LT D 37.5 107’ D 40.4 143’
TH D 37.9 221’ E 59.3 676’
RT A 2.2 12’ B 19.5 178’
NB
LT E 66.7 296’ F 99.5 453’
TH D 50.1 224’ E 69.8 338’ RT
SB
LT E 56.9 228’ D 48.9 211’
TH D 49.9 192’ D 48.0 210’
RT B 18.7 186’ E 74.6 580’
OVERALL D (36.8) E (55.4)
For the full-build scenario, the intersection experiences only minor increases in seconds of delay
and queue lengths from the addition of the development traffic. Background growth at the
projected level of 4.5% will have a much more significant impact on this intersection than traf fic
from this development. No improvements to the existing intersection are needed to
accommodate development traffic.
General Office Development – Southlake – Trium Development
18-TX113158-1 Page 15
2. KIMBALL AVENUE & PROJECT ACCESS / SCHOOL
Existing Conditions
Table 4.4 shows the current LOS, control delay, and 95th percentile queue length for existing
2018 conditions.
Table 4.4 - Intersection LOS, Delay, and Queue by Movement - 2018 Existing
Intersection Approach Movement AM PM
LOS Delay Queue LOS Delay Queue
Kimball Avenue &
Project Access / School
EB LT D 28.6 53’ C 22.1 10’
RT B 11.2 20’ B 10.7 5’
NB TH Free
SB LT A 8.6 0’ A 0.0 0’
TH Free
Full Build 2020 Conditions
Table 4.5 shows the expected LOS, control delay, and 95th percentile queue length for Full Build
2020 conditions.
Table 4.5 - Intersection LOS, Delay, and Queue by Movement - 2020 Full Build
Intersection Approach Movement AM PM
LOS Delay Queue LOS Delay Queue
Kimball Avenue &
Project Access / School
EB LT E 45.5 80’ C 21.6 10’
RT B 11.5 23’ A 9.9 5’
WB LT/RT C 22.6 15’ C 18.7 13’
NB TH Free
RT A 0.0 0’ A 0.0 0’
SB LT A 9.0 3’ A 9.1 0’
TH Free
For the full-build scenario, vehicles exiting the proposed development are expected to see LOS
C in both the AM and PM peak hours, with minimal queues.
General Office Development – Southlake – Trium Development
18-TX113158-1 Page 16
V. Summary and Conclusion
This study serves as an analysis of the traffic impacts from the proposed Kimball Avenue General
Office development in Southlake, Texas. This analysis examined current traffic volumes at the
study intersections and determined impacts from Full Build 2020 traffic conditions.
Based on this study, the proposed development traffic can be added to the roadway system with
good operational characteristics maintained at the existing School / Project unsignalized access.
Additionally, only minimal impacts to the Southlake Boulevard (FM 1709) & Kimball Avenue
intersection levels of service would be anticipated from the development traffic. No
improvements to Southlake Boulevard (FM 1709) or Kimball Avenue are recommended based on
this development.
Kimball Avenue at Southlake Boulevard (FM 1709) (Looking South)
General Office Development – Southlake – Trium Development
18-TX113158-1 Page 17
Appendix
Background Information
Traffic Volumes
Trip Generation
Trip Distribution
Capacity Analysis
Background Information
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
12343845359
118857
74020
106494
25353
31336
78859202843
18358
2048123707
24158
194727
118622
23492128444
144866
34232
140141
43856
38711
167856
75103108131
33412**
177533
83054
93599
141617
21200
21479
124519
27789
105167
107756 152901
145016
2376333708
32920
26840
126779
43225
25776
153404
22142
143762
30294
41449*
51989*
Bedford
Colleyville
Euless
Southlake
HighlandPark
UniversityPark
Arlington
Lewisville
Grapevine
Irving
Coppell
FlowerMound
Addison
Richardson
Plano
FortWorth GrandPrairie
Carrollton
Dallas
FarmersBranch
Hurst
,+B121
To l l
,+97
,+482
,+348 ST12
ST354
ST356
ST10
ST360
ST183
ST121
ST114
ST26
ST289
ST161
./75
./75
§¨¦35
§¨¦635
GrapevineLake
NorthLake
CollinCountyDentonCounty
DallasCountyTarrantCounty
1709
2499
3040
³Texas Department of TransportationTransportation Planning and Programming DivisionTraffic Analysis System Support Branch
PREPARED BY THE
IN COOPERATION WITH THEUnited States Department of Transportation Federal Highway Administration
Arterials &Collectors City!Town
State!.AADT Inset
US Local District
IH County County 0 1 20.5 Miles
2016 FORT WORTH DISTRICT TRAFFIC MAP
Sheet 13 of 31 Base Sheets
COPYRIGHT 2017 by the Texas Department of Transportation.All rights reserved.
NOTICE: This map has been prepared for internal use within the Texas Departmentof Transportation. Accuracy is limited to the validity of available data.
Publication Date: September 2017
Toll road traffic counts are shown for context purposes only and may not representOn System traffic.
*Traffic volumes set apart with an asterisk (*)include tolled mainlane traffic.**Traffic volumes set apart with a double asterisk(**) include non-tolled service road traffic.
Location Southlake
Year Count*Trend**
2018 N/A 47800
2018 N/A 47800
1,990 2020 N/A 51800
53.79%
7.65%
4.50%
6-Nov-18
Straight Line Growth Option *Axle-Adjusted
2020 Design Year Trend
TRANPLAN Forecasts/Trends
** Annual Trend Increase:
Trend Growth Rate (2016 to Design Year):
Printed:
Trend Annual Historic Growth Rate:
Traffic (ADT/AADT)
2018 Mid-Year Trend
Southlake Blvd (FM 1709)
Trend R-squared:
Highway:
2018 Opening Year Trend
Traffic Trends - V2.0
Southlake Blvd (FM 1709) -- West of Kimball Ave.County:
Station #:
0
0
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
2007 2012 2017 2022 2027 2032 2037
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
V
e
h
i
c
l
e
s
/
D
a
y
)
Year
Observed Count
Fitted Curve
https://library.municode.com/tx/southlake/codes/development_ord...
1 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
2 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
3 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
4 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
5 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
6 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
7 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
8 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
9 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
10 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
11 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
12 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
13 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
14 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
15 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
16 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
17 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
18 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
19 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
20 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
21 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
22 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
23 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
24 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
25 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
26 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
27 of 28 3/5/2018, 10:33 AM
https://library.municode.com/tx/southlake/codes/development_ord...
28 of 28 3/5/2018, 10:33 AM
Traffic Volumes
Location:GPS N = 32.9410, W = 97.1165
date Day
Weather Peak AM
Counter
Left Thru Right Left Thru Right Left Thru Right Left Thru Right
7:00 33 47 42 6 71 16 25 24 6 31 335 22 658
7:15 47 57 93 8 84 13 14 48 12 95 424 19 914
7:30 45 70 106 13 93 21 28 42 11 114 367 27 937
7:45 38 70 117 30 151 13 36 60 22 92 345 75 1049
8:00 41 80 91 21 112 26 65 65 30 85 337 109 1062
8:15 40 71 68 16 148 17 56 58 30 85 408 53 1050
8:30 40 62 114 18 126 20 41 67 18 67 369 58 1000
8:45 40 49 101 9 167 18 48 38 22 48 325 18 883
Left Thru Right Left Thru Right Left Thru Right Left Thru Right
7:00 33 47 40 4 70 16 17 19 6 30 334 22 638
7:15 47 57 92 8 84 13 13 46 12 94 422 19 907
7:30 45 70 105 13 92 20 28 41 11 114 367 26 932
7:45 38 68 117 30 148 13 36 60 22 92 342 74 1040
8:00 39 78 87 21 105 26 65 62 30 82 329 108 1032
8:15 37 70 66 15 140 15 54 56 29 83 401 48 1014
8:30 35 61 108 18 119 19 40 63 18 66 355 57 959
8:45 39 47 98 9 155 18 47 35 21 48 317 17 851
Left Thru Right Left Thru Right Left Thru Right Left Thru Right
7:00 0 0 2 2 1 0 8 5 0 1 1 0 20
7:15 0 0 1 0 0 0 1 2 0 1 2 0 7
7:30 0 0 1 0 1 1 0 1 0 0 0 1 5
7:45 0 2 0 0 3 0 0 0 0 0 3 1 9
8:00 2 2 4 0 7 0 0 3 0 3 8 1 30
8:15 3 1 2 1 8 2 2 2 1 2 7 5 36
8:30 5 1 6 0 7 1 1 4 0 1 14 1 41
8:45 1 2 3 0 12 0 1 3 1 0 8 1 32
Left Thru Right Left Thru Right Left Thru Right Left Thru Right
Vehicle
Total 159 283 390 85 537 76 198 250 100 329 1459 295 3962
Pk 15 min 38 70 117 30 151 13 36 60 22 92 345 75 1049
PHF 0.94
Left Thru Right Left Thru Right Left Thru Right Left Thru Right
Car 149 277 378 84 512 73 195 241 99 323 1427 287 4045
Truck 10 6 12 1 25 3 3 9 1 6 32 8 116
HV %age 6%2%3%1%5%4%2%4%1%2%2%3%
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
Pedestrians
Total
Ben Israelson
Total
Peak Hour Vehicle Summary
7:45 to
8:45
Southbound Westbound Northbound Eastbound
Intersection Peak Hour
Westbound Northbound Eastbound Total
7:45 to
8:45
Southbound Westbound Northbound Eastbound
Interval
starts
Southbound Westbound Northbound Eastbound
Turn Count Summary
10/11/2018 Thursday
Total vehicle traffic
Fair, 53
Southlake Blvd & Kimball Ave
EAST Leg NORTH Leg WEST Leg SOUTH Leg
Total
Car traffic
Interval
starts
Southbound Westbound Northbound Eastbound Total
Total
Truck traffic
Interval
starts
Southbound
GR
A
M
T
r
a
f
f
i
c
N
T
X
I
n
c
.
11
2
0
W
.
L
o
v
e
r
s
L
a
n
e
Ar
l
i
n
g
t
o
n
,
T
e
x
a
s
,
U
n
i
t
e
d
S
t
a
t
e
s
7
6
0
1
3
81
7
.
2
6
5
.
8
9
6
8
j
o
h
n
@
g
r
a
m
n
t
x
.
c
o
m
Count Name: KIMBALL AVE @ SOUTHLAKE BLVD Site Code:Start Date: 10/18/2018 Page No: 1
Tu
r
n
i
n
g
M
o
v
e
m
e
n
t
D
a
t
a
St
a
r
t
T
i
m
e
KI
M
B
A
L
L
A
V
E
SO
U
T
H
L
A
K
E
B
L
V
D
KI
M
B
A
L
L
A
V
E
SOUTHLAKE BLVD
So
u
t
h
b
o
u
n
d
We
s
t
b
o
u
n
d
No
r
t
h
b
o
u
n
d
Eastbound
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Left Thru Right U-Turn Peds App.Total Int. Total
2:
0
0
P
M
25
47
75
0
0
14
7
19
29
1
53
4
1
36
7
51
46
30
0
0
12
7
50 269 35 5 0 359 1000
2:
1
5
P
M
37
50
94
0
0
18
1
24
27
0
63
3
4
36
0
54
70
27
1
0
15
2
62 239 38 3 0 342 1035
2:
3
0
P
M
39
37
87
0
0
16
3
39
28
8
54
1
0
38
2
43
75
21
0
0
13
9
62 225 37 0 0 324 1008
2:
4
5
P
M
28
51
80
0
0
15
9
18
28
3
47
1
0
34
9
36
52
24
0
0
11
2
69 234 32 0 0 335 955
Ho
u
r
l
y
T
o
t
a
l
12
9
18
5
33
6
0
0
65
0
10
0
11
3
2
21
7
9
5
14
5
8
18
4
24
3
10
2
1
0
53
0
243 967 142 8 0 1360 3998
3:
0
0
P
M
27
44
89
1
0
16
1
28
25
8
48
3
1
33
7
32
64
28
0
0
12
4
54 195 45 0 0 294 916
3:
1
5
P
M
41
53
96
0
1
19
0
39
27
8
43
0
0
36
0
49
49
22
1
0
12
1
61 236 41 1 0 339 1010
3:
3
0
P
M
36
77
92
0
0
20
5
24
27
3
72
2
0
37
1
38
72
19
1
0
13
0
69 211 53 0 0 333 1039
3:
4
5
P
M
40
82
97
0
0
21
9
26
28
8
48
0
0
36
2
55
90
30
0
0
17
5
61 234 43 0 0 338 1094
Ho
u
r
l
y
T
o
t
a
l
14
4
25
6
37
4
1
1
77
5
11
7
10
9
7
21
1
5
1
14
3
0
17
4
27
5
99
2
0
55
0
245 876 182 1 0 1304 4059
4:
0
0
P
M
45
58
11
7
0
0
22
0
25
28
1
63
0
0
36
9
74
90
23
0
0
18
7
51 238 17 0 0 306 1082
4:
1
5
P
M
40
56
10
8
0
0
20
4
28
35
1
56
2
0
43
7
51
58
17
0
0
12
6
37 256 29 1 0 323 1090
4:
3
0
P
M
34
64
12
6
0
0
22
4
23
32
2
63
0
0
40
8
69
74
24
2
0
16
9
53 270 52 1 0 376 1177
4:
4
5
P
M
35
82
12
2
0
0
23
9
28
39
3
57
0
1
47
8
59
73
33
1
0
16
6
46 292 50 1 0 389 1272
Ho
u
r
l
y
T
o
t
a
l
15
4
26
0
47
3
0
0
88
7
10
4
13
4
7
23
9
2
1
16
9
2
25
3
29
5
97
3
0
64
8
187 1056 148 3 0 1394 4621
5:
0
0
P
M
32
87
12
1
0
0
24
0
41
41
0
57
0
0
50
8
74
98
37
1
0
21
0
45 258 23 0 0 326 1284
5:
1
5
P
M
41
85
10
8
0
0
23
4
29
36
3
68
1
0
46
1
62
87
30
1
0
18
0
60 288 27 0 0 375 1250
5:
3
0
P
M
48
84
10
3
0
0
23
5
35
37
7
65
0
0
47
7
56
87
24
1
1
16
8
42 260 17 0 0 319 1199
5:
4
5
P
M
39
69
13
1
0
0
23
9
38
30
5
67
1
0
41
1
62
88
29
1
0
18
0
46 209 32 3 0 290 1120
Ho
u
r
l
y
T
o
t
a
l
16
0
32
5
46
3
0
0
94
8
14
3
14
5
5
25
7
2
0
18
5
7
25
4
36
0
12
0
4
1
73
8
193 1015 99 3 0 1310 4853
Gr
a
n
d
T
o
t
a
l
58
7
10
2
6
16
4
6
1
1
32
6
0
46
4
50
3
1
92
4
18
7
64
3
7
86
5
11
7
3
41
8
10
1
24
6
6
868 3914 571 15 0 5368 17531
Ap
p
r
o
a
c
h
%
18
.
0
31
.
5
50
.
5
0.
0
-
-
7.
2
78
.
2
14
.
4
0.
3
-
-
35
.
1
47
.
6
17
.
0
0.
4
-
-
16.2 72.9 10.6 0.3 ---
To
t
a
l
%
3.
3
5.
9
9.
4
0.
0
-
18
.
6
2.
6
28
.
7
5.
3
0.
1
-
36
.
7
4.
9
6.
7
2.
4
0.
1
-
14
.
1
5.0 22.3 3.3 0.1 -30.6 -
Li
g
h
t
s
57
5
99
7
16
2
8
1
-
32
0
1
46
1
50
0
7
91
9
18
-
64
0
5
84
9
11
4
1
41
5
10
-
24
1
5
863 3854 550 15 -5282 17303
%
L
i
g
h
t
s
98
.
0
97
.
2
98
.
9
10
0
.
0
-
98
.
2
99
.
4
99
.
5
99
.
5
10
0
.
0
-
99
.
5
98
.
2
97
.
3
99
.
3
10
0
.
0
-
97
.
9
99.4 98.5 96.3 100.0 -98.4 98.7
Me
d
i
u
m
s
10
26
15
0
-
51
3
22
2
0
-
27
15
32
2
0
-
49
5 56 20 0 -81 208
%
M
e
d
i
u
m
s
1.
7
2.
5
0.
9
0.
0
-
1.
6
0.
6
0.
4
0.
2
0.
0
-
0.
4
1.
7
2.
7
0.
5
0.
0
-
2.
0
0.6 1.4 3.5 0.0 -1.5 1.2
Ar
t
i
c
u
l
a
t
e
d
T
r
u
c
k
s
2
3
3
0
-
8
0
2
3
0
-
5
1
0
1
0
-
2
0 4 1 0 -5 20
%
A
r
t
i
c
u
l
a
t
e
d
Tr
u
c
k
s
0.
3
0.
3
0.
2
0.
0
-
0.
2
0.
0
0.
0
0.
3
0.
0
-
0.
1
0.
1
0.
0
0.
2
0.
0
-
0.
1
0.0 0.1 0.2 0.0 -0.1 0.1
Bi
c
y
c
l
e
s
o
n
Cr
o
s
s
w
a
l
k
-
-
-
-
1
-
-
-
-
-
0
-
-
-
-
-
1
-
----0 --
%
B
i
c
y
c
l
e
s
o
n
Cr
o
s
s
w
a
l
k
-
-
-
-
10
0
.
0
-
-
-
-
-
0.
0
-
-
-
-
-
10
0
.
0
-
-------
Pe
d
e
s
t
r
i
a
n
s
-
-
-
-
0
-
-
-
-
-
7
-
-
-
-
-
0
-
----0 --
%
P
e
d
e
s
t
r
i
a
n
s
-
-
-
-
0.
0
-
-
-
-
-
10
0
.
0
-
-
-
-
-
0.
0
-
-------
GR
A
M
T
r
a
f
f
i
c
N
T
X
I
n
c
.
11
2
0
W
.
L
o
v
e
r
s
L
a
n
e
Ar
l
i
n
g
t
o
n
,
T
e
x
a
s
,
U
n
i
t
e
d
S
t
a
t
e
s
7
6
0
1
3
81
7
.
2
6
5
.
8
9
6
8
j
o
h
n
@
g
r
a
m
n
t
x
.
c
o
m
Count Name: KIMBALL AVE @ SOUTHLAKE BLVD Site Code:Start Date: 10/18/2018 Page No: 2
10
/
1
8
/
2
0
1
8
2
:
0
0
P
M
En
d
i
n
g
A
t
10
/
1
8
/
2
0
1
8
6
:
0
0
P
M
Li
g
h
t
s
Me
d
i
u
m
s
Ar
t
i
c
u
l
a
t
e
d
T
r
u
c
k
s
Bi
c
y
c
l
e
s
o
n
C
r
o
s
s
w
a
l
k
Pe
d
e
s
t
r
i
a
n
s
KI
M
B
A
L
L
A
V
E
[
N
]
Ou
t
In
To
t
a
l
29
2
4
32
0
1
61
2
5
39
51
90
3
8
11
0
0
0
0
0
0
29
6
6
32
6
0
62
2
6
16
2
8
99
7
57
5
1
0
15
26
10
0
0
3
3
2
0
0
0
0
0
0
1
0
0
0
0
0
16
4
6
10
2
6
58
7
1
1
R
T
L
U
P
4937
0
0
7
68
4862
Out
6437
0
0
5
27
6405
In
11374
0
0
12
95
11267
Total
SOUTHLAKE BLVD [E]
R
924
0
0
3
2
919
T
5031
0
0
2
22
5007
L
464
0
0
0
3
461
U
18
0
0
0
0
18
P
7
7
0
0
0
0
20
1
8
24
1
5
44
3
3
49
49
98
4
2
6
0
0
0
0
0
0
20
7
1
24
6
6
45
3
7
Ou
t
In
To
t
a
l
KI
M
B
A
L
L
A
V
E
[
S
]
U
L
T
R
P
10
84
9
11
4
1
41
5
0
0
15
32
2
0
0
1
0
1
0
0
0
0
0
1
0
0
0
0
0
10
86
5
11
7
3
41
8
1
S
O
U
T
H
L
A
K
E
B
L
V
D
[
W
]
T
o
t
a
l
1
2
7
8
1
1
3
3
1
1
0
0
1
2
9
2
5
I
n
5
2
8
2
8
1
5
0
0
5
3
6
8
O
u
t
7
4
9
9
5
2
6
0
0
7
5
5
7
1
5
0
0
0
0
1
5
U
8
6
3
5
0
0
0
8
6
8
L
3
8
5
4
5
6
4
0
0
3
9
1
4
T
5
5
0
2
0
1
0
0
5
7
1
R
0
0
0
0
0
0
P
Tu
r
n
i
n
g
M
o
v
e
m
e
n
t
D
a
t
a
P
l
o
t
GR
A
M
T
r
a
f
f
i
c
N
T
X
I
n
c
.
11
2
0
W
.
L
o
v
e
r
s
L
a
n
e
Ar
l
i
n
g
t
o
n
,
T
e
x
a
s
,
U
n
i
t
e
d
S
t
a
t
e
s
7
6
0
1
3
81
7
.
2
6
5
.
8
9
6
8
j
o
h
n
@
g
r
a
m
n
t
x
.
c
o
m
Count Name: KIMBALL AVE @ SOUTHLAKE BLVD Site Code:Start Date: 10/18/2018 Page No: 3
Tu
r
n
i
n
g
M
o
v
e
m
e
n
t
P
e
a
k
H
o
u
r
D
a
t
a
(
4
:
4
5
P
M
)
St
a
r
t
T
i
m
e
KI
M
B
A
L
L
A
V
E
SO
U
T
H
L
A
K
E
B
L
V
D
KI
M
B
A
L
L
A
V
E
SOUTHLAKE BLVD
So
u
t
h
b
o
u
n
d
We
s
t
b
o
u
n
d
No
r
t
h
b
o
u
n
d
Eastbound
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Left Thru Right U-Turn Peds App.Total Int. Total
4:
4
5
P
M
35
82
12
2
0
0
23
9
28
39
3
57
0
1
47
8
59
73
33
1
0
16
6
46 292 50 1 0 389 1272
5:
0
0
P
M
32
87
12
1
0
0
24
0
41
41
0
57
0
0
50
8
74
98
37
1
0
21
0
45 258 23 0 0 326 1284
5:
1
5
P
M
41
85
10
8
0
0
23
4
29
36
3
68
1
0
46
1
62
87
30
1
0
18
0
60 288 27 0 0 375 1250
5:
3
0
P
M
48
84
10
3
0
0
23
5
35
37
7
65
0
0
47
7
56
87
24
1
1
16
8
42 260 17 0 0 319 1199
To
t
a
l
15
6
33
8
45
4
0
0
94
8
13
3
15
4
3
24
7
1
1
19
2
4
25
1
34
5
12
4
4
1
72
4
193 1098 117 1 0 1409 5005
Ap
p
r
o
a
c
h
%
16
.
5
35
.
7
47
.
9
0.
0
-
-
6.
9
80
.
2
12
.
8
0.
1
-
-
34
.
7
47
.
7
17
.
1
0.
6
-
-
13.7 77.9 8.3 0.1 ---
To
t
a
l
%
3.
1
6.
8
9.
1
0.
0
-
18
.
9
2.
7
30
.
8
4.
9
0.
0
-
38
.
4
5.
0
6.
9
2.
5
0.
1
-
14
.
5
3.9 21.9 2.3 0.0 -28.2 -
PH
F
0.
8
1
3
0.
9
7
1
0.
9
3
0
0.
0
0
0
-
0.
9
8
8
0.
8
1
1
0.
9
4
1
0.
9
0
8
0.
2
5
0
-
0.
9
4
7
0.
8
4
8
0.
8
8
0
0.
8
3
8
1.
0
0
0
-
0.
8
6
2
0.804 0.940 0.585 0.250 -0.906 0.974
Li
g
h
t
s
15
3
33
1
44
8
0
-
93
2
13
3
15
3
4
24
6
1
-
19
1
4
24
8
34
2
12
3
4
-
71
7
192 1085 114 1 -1392 4955
%
L
i
g
h
t
s
98
.
1
97
.
9
98
.
7
-
-
98
.
3
10
0
.
0
99
.
4
99
.
6
10
0
.
0
-
99
.
5
98
.
8
99
.
1
99
.
2
10
0
.
0
-
99
.
0
99.5 98.8 97.4 100.0 -98.8 99.0
Me
d
i
u
m
s
2
5
5
0
-
12
0
7
1
0
-
8
2
3
1
0
-
6
1 12 3 0 -16 42
%
M
e
d
i
u
m
s
1.
3
1.
5
1.
1
-
-
1.
3
0.
0
0.
5
0.
4
0.
0
-
0.
4
0.
8
0.
9
0.
8
0.
0
-
0.
8
0.5 1.1 2.6 0.0 -1.1 0.8
Ar
t
i
c
u
l
a
t
e
d
T
r
u
c
k
s
1
2
1
0
-
4
0
2
0
0
-
2
1
0
0
0
-
1
0 1 0 0 -1 8
%
A
r
t
i
c
u
l
a
t
e
d
Tr
u
c
k
s
0.
6
0.
6
0.
2
-
-
0.
4
0.
0
0.
1
0.
0
0.
0
-
0.
1
0.
4
0.
0
0.
0
0.
0
-
0.
1
0.0 0.1 0.0 0.0 -0.1 0.2
Bi
c
y
c
l
e
s
o
n
Cr
o
s
s
w
a
l
k
-
-
-
-
0
-
-
-
-
-
0
-
-
-
-
-
1
-
----0 --
%
B
i
c
y
c
l
e
s
o
n
Cr
o
s
s
w
a
l
k
-
-
-
-
-
-
-
-
-
-
0.
0
-
-
-
-
-
10
0
.
0
-
-------
Pe
d
e
s
t
r
i
a
n
s
-
-
-
-
0
-
-
-
-
-
1
-
-
-
-
-
0
-
----0 --
%
P
e
d
e
s
t
r
i
a
n
s
-
-
-
-
-
-
-
-
-
-
10
0
.
0
-
-
-
-
-
0.
0
-
-------
GR
A
M
T
r
a
f
f
i
c
N
T
X
I
n
c
.
11
2
0
W
.
L
o
v
e
r
s
L
a
n
e
Ar
l
i
n
g
t
o
n
,
T
e
x
a
s
,
U
n
i
t
e
d
S
t
a
t
e
s
7
6
0
1
3
81
7
.
2
6
5
.
8
9
6
8
j
o
h
n
@
g
r
a
m
n
t
x
.
c
o
m
Count Name: KIMBALL AVE @ SOUTHLAKE BLVD Site Code:Start Date: 10/18/2018 Page No: 4
Pe
a
k
H
o
u
r
D
a
t
a
10
/
1
8
/
2
0
1
8
4
:
4
5
P
M
En
d
i
n
g
A
t
10
/
1
8
/
2
0
1
8
5
:
4
5
P
M
Li
g
h
t
s
Me
d
i
u
m
s
Ar
t
i
c
u
l
a
t
e
d
T
r
u
c
k
s
Bi
c
y
c
l
e
s
o
n
C
r
o
s
s
w
a
l
k
Pe
d
e
s
t
r
i
a
n
s
KI
M
B
A
L
L
A
V
E
[
N
]
Ou
t
In
To
t
a
l
78
0
93
2
17
1
2
5
12
17
0
4
4
0
0
0
0
0
0
78
5
94
8
17
3
3
44
8
33
1
15
3
0
0
5
5
2
0
0
1
2
1
0
0
0
0
0
0
0
0
0
0
0
0
45
4
33
8
15
6
0
0
R
T
L
U
P
1379
0
0
2
15
1362
Out
1924
0
0
2
8
1914
In
3303
0
0
4
23
3276
Total
SOUTHLAKE BLVD [E]
R
247
0
0
0
1
246
T
1543
0
0
2
7
1534
L
133
0
0
0
0
133
U
1
0
0
0
0
1
P
1
1
0
0
0
0
58
2
71
7
12
9
9
8
6
14
2
1
3
0
0
0
0
0
0
59
2
72
4
13
1
6
Ou
t
In
To
t
a
l
KI
M
B
A
L
L
A
V
E
[
S
]
U
L
T
R
P
4
24
8
34
2
12
3
0
0
2
3
1
0
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
4
25
1
34
5
12
4
1
S
O
U
T
H
L
A
K
E
B
L
V
D
[
W
]
T
o
t
a
l
3
6
2
3
3
0
5
0
0
3
6
5
8
I
n
1
3
9
2
1
6
1
0
0
1
4
0
9
O
u
t
2
2
3
1
1
4
4
0
0
2
2
4
9
1
0
0
0
0
1
U
1
9
2
1
0
0
0
1
9
3
L
1
0
8
5
1
2
1
0
0
1
0
9
8
T
1
1
4
3
0
0
0
1
1
7
R
0
0
0
0
0
0
P
Tu
r
n
i
n
g
M
o
v
e
m
e
n
t
P
e
a
k
H
o
u
r
D
a
t
a
P
l
o
t
(
4
:
4
5
P
M
)
GR
A
M
T
r
a
f
f
i
c
N
T
X
I
n
c
.
11
2
0
W
.
L
o
v
e
r
s
L
a
n
e
Ar
l
i
n
g
t
o
n
,
T
e
x
a
s
,
U
n
i
t
e
d
S
t
a
t
e
s
7
6
0
1
3
81
7
.
2
6
5
.
8
9
6
8
j
o
h
n
@
g
r
a
m
n
t
x
.
c
o
m
Count Name: KIMBALL AVE @ SCHOOL EXIT Site Code:Start Date: 10/18/2018 Page No: 1
Tu
r
n
i
n
g
M
o
v
e
m
e
n
t
D
a
t
a
St
a
r
t
T
i
m
e
KI
M
B
A
L
L
A
V
E
We
s
t
b
o
u
n
d
S
t
.
KI
M
B
A
L
L
A
V
E
SCHOOL EXIT
So
u
t
h
b
o
u
n
d
We
s
t
b
o
u
n
d
No
r
t
h
b
o
u
n
d
Eastbound
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Left Thru Right U-Turn Peds App.Total Int. Total
7:
0
0
A
M
0
60
0
0
0
60
0
0
0
0
0
0
0
60
0
0
0
60
4 0 8 0 0 12 132
7:
1
5
A
M
0
69
0
0
0
69
0
0
0
0
0
0
0
44
0
0
0
44
0 0 1 0 0 1 114
7:
3
0
A
M
0
75
0
0
0
75
0
0
0
0
0
0
0
85
0
0
0
85
8 0 2 0 0 10 170
7:
4
5
A
M
0
10
6
0
0
0
10
6
0
0
0
0
0
0
0
13
4
0
0
0
13
4
16 0 27 0 0 43 283
Ho
u
r
l
y
T
o
t
a
l
0
31
0
0
0
0
31
0
0
0
0
0
0
0
0
32
3
0
0
0
32
3
28 0 38 0 0 66 699
8:
0
0
A
M
0
14
2
0
0
0
14
2
0
0
0
0
0
0
0
11
9
0
0
0
11
9
36 0 50 0 0 86 347
8:
1
5
A
M
1
10
2
0
0
0
10
3
0
0
0
0
0
0
0
13
1
0
0
0
13
1
23 0 32 0 0 55 289
8:
3
0
A
M
0
10
0
0
0
0
10
0
0
0
0
0
0
0
0
10
0
0
0
0
10
0
24 0 25 0 0 49 249
8:
4
5
A
M
0
60
0
0
0
60
0
0
0
0
0
0
0
94
0
0
0
94
8 0 6 0 0 14 168
Ho
u
r
l
y
T
o
t
a
l
1
40
4
0
0
0
40
5
0
0
0
0
0
0
0
44
4
0
0
0
44
4
91 0 113 0 0 204 1053
9:
0
0
A
M
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0 0 0 0 0 0
**
*
B
R
E
A
K
*
*
*
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-------
Ho
u
r
l
y
T
o
t
a
l
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0 0 0 0 0 0
2:
0
0
P
M
0
77
0
0
0
77
0
0
0
0
0
0
0
80
0
0
0
80
4 0 3 0 0 7 164
2:
1
5
P
M
0
93
0
0
0
93
0
0
0
0
0
0
0
89
0
0
0
89
4 0 2 0 33 6 188
2:
3
0
P
M
0
81
0
0
0
81
0
0
0
0
0
0
0
74
0
0
0
74
5 0 2 0 0 7 162
2:
4
5
P
M
0
78
0
0
0
78
0
0
0
0
0
0
0
84
0
0
0
84
10 0 9 0 0 19 181
Ho
u
r
l
y
T
o
t
a
l
0
32
9
0
0
0
32
9
0
0
0
0
0
0
0
32
7
0
0
0
32
7
23 0 16 0 33 39 695
3:
0
0
P
M
0
75
0
1
0
76
0
0
0
0
0
0
0
97
0
0
0
97
5 0 6 0 39 11 184
3:
1
5
P
M
0
92
0
0
0
92
0
0
0
0
0
0
0
93
0
1
0
94
5 0 2 0 38 7 193
3:
3
0
P
M
0
84
0
0
0
84
0
0
0
0
0
0
0
11
8
0
0
0
11
8
9 0 6 0 0 15 217
3:
4
5
P
M
0
15
9
0
0
0
15
9
0
0
0
0
0
0
0
11
8
0
1
0
11
9
24 0 28 0 0 52 330
Ho
u
r
l
y
T
o
t
a
l
0
41
0
0
1
0
41
1
0
0
0
0
0
0
0
42
6
0
2
0
42
8
43 0 42 0 77 85 924
4:
0
0
P
M
0
75
0
0
0
75
0
0
0
0
0
0
0
11
9
0
0
0
11
9
10 0 10 0 0 20 214
4:
1
5
P
M
0
85
0
0
0
85
0
0
0
0
0
0
0
12
5
0
0
0
12
5
8 0 8 0 0 16 226
4:
3
0
P
M
0
80
0
1
0
81
0
0
0
0
0
0
0
14
1
0
1
0
14
2
13 0 9 0 0 22 245
4:
4
5
P
M
0
12
1
0
0
0
12
1
0
0
0
0
0
0
0
14
4
0
0
0
14
4
9 0 13 0 0 22 287
Ho
u
r
l
y
T
o
t
a
l
0
36
1
0
1
0
36
2
0
0
0
0
0
0
0
52
9
0
1
0
53
0
40 0 40 0 0 80 972
5:
0
0
P
M
0
10
6
0
0
0
10
6
0
0
0
0
0
0
0
17
7
0
0
0
17
7
5 0 7 0 2 12 295
5:
1
5
P
M
0
92
0
1
0
93
0
0
0
0
0
0
0
13
8
0
1
0
13
9
0 0 4 0 0 4 236
5:
3
0
P
M
0
78
0
1
0
79
0
0
0
0
0
0
0
13
1
0
0
0
13
1
3 0 1 0 0 4 214
5:
4
5
P
M
0
99
0
0
0
99
0
0
0
0
0
0
0
11
5
0
0
0
11
5
0 0 2 0 0 2 216
Ho
u
r
l
y
T
o
t
a
l
0
37
5
0
2
0
37
7
0
0
0
0
0
0
0
56
1
0
1
0
56
2
8 0 14 0 2 22 961
6:
0
0
P
M
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0 0 0 0 0 0
Gr
a
n
d
T
o
t
a
l
1
21
8
9
0
4
0
21
9
4
0
0
0
0
0
0
0
26
1
0
0
4
0
26
1
4
233 0 263 0 112 496 5304
Ap
p
r
o
a
c
h
%
0.
0
99
.
8
0.
0
0.
2
-
-
0.
0
0.
0
0.
0
0.
0
-
-
0.
0
99
.
8
0.
0
0.
2
-
-
47.0 0.0 53.0 0.0 ---
To
t
a
l
%
0.
0
41
.
3
0.
0
0.
1
-
41
.
4
0.
0
0.
0
0.
0
0.
0
-
0.
0
0.
0
49
.
2
0.
0
0.
1
-
49
.
3
4.4 0.0 5.0 0.0 -9.4 -
Li
g
h
t
s
1
21
3
3
0
4
-
21
3
8
0
0
0
0
-
0
0
25
3
7
0
4
-
25
4
1
228 0 249 0 -477 5156
%
L
i
g
h
t
s
10
0
.
0
97
.
4
-
10
0
.
0
-
97
.
4
-
-
-
-
-
-
-
97
.
2
-
10
0
.
0
-
97
.
2
97.9 -94.7 --96.2 97.2
Me
d
i
u
m
s
0
53
0
0
-
53
0
0
0
0
-
0
0
70
0
0
-
70
5 0 14 0 -19 142
%
M
e
d
i
u
m
s
0.
0
2.
4
-
0.
0
-
2.
4
-
-
-
-
-
-
-
2.
7
-
0.
0
-
2.
7
2.1 -5.3 --3.8 2.7
Ar
t
i
c
u
l
a
t
e
d
T
r
u
c
k
s
0
3
0
0
-
3
0
0
0
0
-
0
0
3
0
0
-
3
0 0 0 0 -0 6
%
A
r
t
i
c
u
l
a
t
e
d
Tr
u
c
k
s
0.
0
0.
1
-
0.
0
-
0.
1
-
-
-
-
-
-
-
0.
1
-
0.
0
-
0.
1
0.0 -0.0 --0.0 0.1
Bi
c
y
c
l
e
s
o
n
Cr
o
s
s
w
a
l
k
-
-
-
-
0
-
-
-
-
-
0
-
-
-
-
-
0
-
----2 --
%
B
i
c
y
c
l
e
s
o
n
Cr
o
s
s
w
a
l
k
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
----1.8 --
Pe
d
e
s
t
r
i
a
n
s
-
-
-
-
0
-
-
-
-
-
0
-
-
-
-
-
0
-
----110 --
%
P
e
d
e
s
t
r
i
a
n
s
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
----98.2 --
GR
A
M
T
r
a
f
f
i
c
N
T
X
I
n
c
.
11
2
0
W
.
L
o
v
e
r
s
L
a
n
e
Ar
l
i
n
g
t
o
n
,
T
e
x
a
s
,
U
n
i
t
e
d
S
t
a
t
e
s
7
6
0
1
3
81
7
.
2
6
5
.
8
9
6
8
j
o
h
n
@
g
r
a
m
n
t
x
.
c
o
m
Count Name: KIMBALL AVE @ SCHOOL EXIT Site Code:Start Date: 10/18/2018 Page No: 3
10
/
1
8
/
2
0
1
8
7
:
0
0
A
M
En
d
i
n
g
A
t
10
/
1
8
/
2
0
1
8
6
:
1
5
P
M
Li
g
h
t
s
Me
d
i
u
m
s
Ar
t
i
c
u
l
a
t
e
d
T
r
u
c
k
s
Bi
c
y
c
l
e
s
o
n
C
r
o
s
s
w
a
l
k
Pe
d
e
s
t
r
i
a
n
s
KI
M
B
A
L
L
A
V
E
[
N
]
Ou
t
In
To
t
a
l
27
6
9
21
3
8
49
0
7
75
53
12
8
3
3
6
0
0
0
0
0
0
28
4
7
21
9
4
50
4
1
0
21
3
3
1
4
0
0
53
0
0
0
0
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
21
8
9
1
4
0
R
T
L
U
P
1
0
0
0
0
1
Out
0
0
0
0
0
0
In
1
0
0
0
0
1
Total
Westbound St. [E]
R
0
0
0
0
0
0
T
0
0
0
0
0
0
L
0
0
0
0
0
0
U
0
0
0
0
0
0
P
0
0
0
0
0
0
23
8
6
25
4
1
49
2
7
67
70
13
7
3
3
6
0
0
0
0
0
0
24
5
6
26
1
4
50
7
0
Ou
t
In
To
t
a
l
KI
M
B
A
L
L
A
V
E
[
S
]
U
L
T
R
P
4
0
25
3
7
0
0
0
0
70
0
0
0
0
3
0
0
0
0
0
0
0
0
0
0
0
0
4
0
26
1
0
0
0
S
C
H
O
O
L
E
X
I
T
[
W
]
T
o
t
a
l
4
7
7
1
9
0
0
0
4
9
6
I
n
4
7
7
1
9
0
0
0
4
9
6
O
u
t
0
0
0
0
0
0
0
0
0
0
0
0
U
2
2
8
5
0
0
0
2
3
3
L
0
0
0
0
0
0
T
2
4
9
1
4
0
0
0
2
6
3
R
0
0
0
2
1
1
0
1
1
2
P
Tu
r
n
i
n
g
M
o
v
e
m
e
n
t
D
a
t
a
P
l
o
t
GR
A
M
T
r
a
f
f
i
c
N
T
X
I
n
c
.
11
2
0
W
.
L
o
v
e
r
s
L
a
n
e
Ar
l
i
n
g
t
o
n
,
T
e
x
a
s
,
U
n
i
t
e
d
S
t
a
t
e
s
7
6
0
1
3
81
7
.
2
6
5
.
8
9
6
8
j
o
h
n
@
g
r
a
m
n
t
x
.
c
o
m
Count Name: KIMBALL AVE @ SCHOOL EXIT Site Code:Start Date: 10/18/2018 Page No: 4
Tu
r
n
i
n
g
M
o
v
e
m
e
n
t
P
e
a
k
H
o
u
r
D
a
t
a
(
7
:
4
5
A
M
)
St
a
r
t
T
i
m
e
KI
M
B
A
L
L
A
V
E
We
s
t
b
o
u
n
d
S
t
.
KI
M
B
A
L
L
A
V
E
SCHOOL EXIT
So
u
t
h
b
o
u
n
d
We
s
t
b
o
u
n
d
No
r
t
h
b
o
u
n
d
Eastbound
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Left Thru Right U-Turn Peds App.Total Int. Total
7:
4
5
A
M
0
10
6
0
0
0
10
6
0
0
0
0
0
0
0
13
4
0
0
0
13
4
16 0 27 0 0 43 283
8:
0
0
A
M
0
14
2
0
0
0
14
2
0
0
0
0
0
0
0
11
9
0
0
0
11
9
36 0 50 0 0 86 347
8:
1
5
A
M
1
10
2
0
0
0
10
3
0
0
0
0
0
0
0
13
1
0
0
0
13
1
23 0 32 0 0 55 289
8:
3
0
A
M
0
10
0
0
0
0
10
0
0
0
0
0
0
0
0
10
0
0
0
0
10
0
24 0 25 0 0 49 249
To
t
a
l
1
45
0
0
0
0
45
1
0
0
0
0
0
0
0
48
4
0
0
0
48
4
99 0 134 0 0 233 1168
Ap
p
r
o
a
c
h
%
0.
2
99
.
8
0.
0
0.
0
-
-
0.
0
0.
0
0.
0
0.
0
-
-
0.
0
10
0
.
0
0.
0
0.
0
-
-
42.5 0.0 57.5 0.0 ---
To
t
a
l
%
0.
1
38
.
5
0.
0
0.
0
-
38
.
6
0.
0
0.
0
0.
0
0.
0
-
0.
0
0.
0
41
.
4
0.
0
0.
0
-
41
.
4
8.5 0.0 11.5 0.0 -19.9 -
PH
F
0.
2
5
0
0.
7
9
2
0.
0
0
0
0.
0
0
0
-
0.
7
9
4
0.
0
0
0
0.
0
0
0
0.
0
0
0
0.
0
0
0
-
0.
0
0
0
0.
0
0
0
0.
9
0
3
0.
0
0
0
0.
0
0
0
-
0.
9
0
3
0.688 0.000 0.670 0.000 -0.677 0.841
Li
g
h
t
s
1
44
3
0
0
-
44
4
0
0
0
0
-
0
0
47
8
0
0
-
47
8
99 0 133 0 -232 1154
%
L
i
g
h
t
s
10
0
.
0
98
.
4
-
-
-
98
.
4
-
-
-
-
-
-
-
98
.
8
-
-
-
98
.
8
100.0 -99.3 --99.6 98.8
Me
d
i
u
m
s
0
7
0
0
-
7
0
0
0
0
-
0
0
6
0
0
-
6
0 0 1 0 -1 14
%
M
e
d
i
u
m
s
0.
0
1.
6
-
-
-
1.
6
-
-
-
-
-
-
-
1.
2
-
-
-
1.
2
0.0 -0.7 --0.4 1.2
Ar
t
i
c
u
l
a
t
e
d
T
r
u
c
k
s
0
0
0
0
-
0
0
0
0
0
-
0
0
0
0
0
-
0
0 0 0 0 -0 0
%
A
r
t
i
c
u
l
a
t
e
d
Tr
u
c
k
s
0.
0
0.
0
-
-
-
0.
0
-
-
-
-
-
-
-
0.
0
-
-
-
0.
0
0.0 -0.0 --0.0 0.0
Bi
c
y
c
l
e
s
o
n
Cr
o
s
s
w
a
l
k
-
-
-
-
0
-
-
-
-
-
0
-
-
-
-
-
0
-
----0 --
%
B
i
c
y
c
l
e
s
o
n
Cr
o
s
s
w
a
l
k
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-------
Pe
d
e
s
t
r
i
a
n
s
-
-
-
-
0
-
-
-
-
-
0
-
-
-
-
-
0
-
----0 --
%
P
e
d
e
s
t
r
i
a
n
s
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-------
GR
A
M
T
r
a
f
f
i
c
N
T
X
I
n
c
.
11
2
0
W
.
L
o
v
e
r
s
L
a
n
e
Ar
l
i
n
g
t
o
n
,
T
e
x
a
s
,
U
n
i
t
e
d
S
t
a
t
e
s
7
6
0
1
3
81
7
.
2
6
5
.
8
9
6
8
j
o
h
n
@
g
r
a
m
n
t
x
.
c
o
m
Count Name: KIMBALL AVE @ SCHOOL EXIT Site Code:Start Date: 10/18/2018 Page No: 5
Pe
a
k
H
o
u
r
D
a
t
a
10
/
1
8
/
2
0
1
8
7
:
4
5
A
M
En
d
i
n
g
A
t
10
/
1
8
/
2
0
1
8
8
:
4
5
A
M
Li
g
h
t
s
Me
d
i
u
m
s
Ar
t
i
c
u
l
a
t
e
d
T
r
u
c
k
s
Bi
c
y
c
l
e
s
o
n
C
r
o
s
s
w
a
l
k
Pe
d
e
s
t
r
i
a
n
s
KI
M
B
A
L
L
A
V
E
[
N
]
Ou
t
In
To
t
a
l
57
7
44
4
10
2
1
6
7
13
0
0
0
0
0
0
0
0
0
58
3
45
1
10
3
4
0
44
3
1
0
0
0
7
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
45
0
1
0
0
R
T
L
U
P
1
0
0
0
0
1
Out
0
0
0
0
0
0
In
1
0
0
0
0
1
Total
Westbound St. [E]
R
0
0
0
0
0
0
T
0
0
0
0
0
0
L
0
0
0
0
0
0
U
0
0
0
0
0
0
P
0
0
0
0
0
0
57
6
47
8
10
5
4
8
6
14
0
0
0
0
0
0
0
0
0
58
4
48
4
10
6
8
Ou
t
In
To
t
a
l
KI
M
B
A
L
L
A
V
E
[
S
]
U
L
T
R
P
0
0
47
8
0
0
0
0
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
48
4
0
0
S
C
H
O
O
L
E
X
I
T
[
W
]
T
o
t
a
l
2
3
2
1
0
0
0
2
3
3
I
n
2
3
2
1
0
0
0
2
3
3
O
u
t
0
0
0
0
0
0
0
0
0
0
0
0
U
9
9
0
0
0
0
9
9
L
0
0
0
0
0
0
T
1
3
3
1
0
0
0
1
3
4
R
0
0
0
0
0
0
P
Tu
r
n
i
n
g
M
o
v
e
m
e
n
t
P
e
a
k
H
o
u
r
D
a
t
a
P
l
o
t
(
7
:
4
5
A
M
)
GR
A
M
T
r
a
f
f
i
c
N
T
X
I
n
c
.
11
2
0
W
.
L
o
v
e
r
s
L
a
n
e
Ar
l
i
n
g
t
o
n
,
T
e
x
a
s
,
U
n
i
t
e
d
S
t
a
t
e
s
7
6
0
1
3
81
7
.
2
6
5
.
8
9
6
8
j
o
h
n
@
g
r
a
m
n
t
x
.
c
o
m
Count Name: KIMBALL AVE @ SCHOOL EXIT Site Code:Start Date: 10/18/2018 Page No: 6
Tu
r
n
i
n
g
M
o
v
e
m
e
n
t
P
e
a
k
H
o
u
r
D
a
t
a
(
4
:
3
0
P
M
)
St
a
r
t
T
i
m
e
KI
M
B
A
L
L
A
V
E
We
s
t
b
o
u
n
d
S
t
.
KI
M
B
A
L
L
A
V
E
SCHOOL EXIT
So
u
t
h
b
o
u
n
d
We
s
t
b
o
u
n
d
No
r
t
h
b
o
u
n
d
Eastbound
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Le
f
t
Th
r
u
Ri
g
h
t
U-
T
u
r
n
Pe
d
s
Ap
p
.
To
t
a
l
Left Thru Right U-Turn Peds App.Total Int. Total
4:
3
0
P
M
0
80
0
1
0
81
0
0
0
0
0
0
0
14
1
0
1
0
14
2
13 0 9 0 0 22 245
4:
4
5
P
M
0
12
1
0
0
0
12
1
0
0
0
0
0
0
0
14
4
0
0
0
14
4
9 0 13 0 0 22 287
5:
0
0
P
M
0
10
6
0
0
0
10
6
0
0
0
0
0
0
0
17
7
0
0
0
17
7
5 0 7 0 2 12 295
5:
1
5
P
M
0
92
0
1
0
93
0
0
0
0
0
0
0
13
8
0
1
0
13
9
0 0 4 0 0 4 236
To
t
a
l
0
39
9
0
2
0
40
1
0
0
0
0
0
0
0
60
0
0
2
0
60
2
27 0 33 0 2 60 1063
Ap
p
r
o
a
c
h
%
0.
0
99
.
5
0.
0
0.
5
-
-
0.
0
0.
0
0.
0
0.
0
-
-
0.
0
99
.
7
0.
0
0.
3
-
-
45.0 0.0 55.0 0.0 ---
To
t
a
l
%
0.
0
37
.
5
0.
0
0.
2
-
37
.
7
0.
0
0.
0
0.
0
0.
0
-
0.
0
0.
0
56
.
4
0.
0
0.
2
-
56
.
6
2.5 0.0 3.1 0.0 -5.6 -
PH
F
0.
0
0
0
0.
8
2
4
0.
0
0
0
0.
5
0
0
-
0.
8
2
9
0.
0
0
0
0.
0
0
0
0.
0
0
0
0.
0
0
0
-
0.
0
0
0
0.
0
0
0
0.
8
4
7
0.
0
0
0
0.
5
0
0
-
0.
8
5
0
0.519 0.000 0.635 0.000 -0.682 0.901
Li
g
h
t
s
0
38
6
0
2
-
38
8
0
0
0
0
-
0
0
59
1
0
2
-
59
3
27 0 33 0 -60 1041
%
L
i
g
h
t
s
-
96
.
7
-
10
0
.
0
-
96
.
8
-
-
-
-
-
-
-
98
.
5
-
10
0
.
0
-
98
.
5
100.0 -100.0 --100.0 97.9
Me
d
i
u
m
s
0
12
0
0
-
12
0
0
0
0
-
0
0
8
0
0
-
8
0 0 0 0 -0 20
%
M
e
d
i
u
m
s
-
3.
0
-
0.
0
-
3.
0
-
-
-
-
-
-
-
1.
3
-
0.
0
-
1.
3
0.0 -0.0 --0.0 1.9
Ar
t
i
c
u
l
a
t
e
d
T
r
u
c
k
s
0
1
0
0
-
1
0
0
0
0
-
0
0
1
0
0
-
1
0 0 0 0 -0 2
%
A
r
t
i
c
u
l
a
t
e
d
Tr
u
c
k
s
-
0.
3
-
0.
0
-
0.
2
-
-
-
-
-
-
-
0.
2
-
0.
0
-
0.
2
0.0 -0.0 --0.0 0.2
Bi
c
y
c
l
e
s
o
n
Cr
o
s
s
w
a
l
k
-
-
-
-
0
-
-
-
-
-
0
-
-
-
-
-
0
-
----2 --
%
B
i
c
y
c
l
e
s
o
n
Cr
o
s
s
w
a
l
k
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
----100.0 --
Pe
d
e
s
t
r
i
a
n
s
-
-
-
-
0
-
-
-
-
-
0
-
-
-
-
-
0
-
----0 --
%
P
e
d
e
s
t
r
i
a
n
s
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
----0.0 --
GR
A
M
T
r
a
f
f
i
c
N
T
X
I
n
c
.
11
2
0
W
.
L
o
v
e
r
s
L
a
n
e
Ar
l
i
n
g
t
o
n
,
T
e
x
a
s
,
U
n
i
t
e
d
S
t
a
t
e
s
7
6
0
1
3
81
7
.
2
6
5
.
8
9
6
8
j
o
h
n
@
g
r
a
m
n
t
x
.
c
o
m
Count Name: KIMBALL AVE @ SCHOOL EXIT Site Code:Start Date: 10/18/2018 Page No: 7
Pe
a
k
H
o
u
r
D
a
t
a
10
/
1
8
/
2
0
1
8
4
:
3
0
P
M
En
d
i
n
g
A
t
10
/
1
8
/
2
0
1
8
5
:
3
0
P
M
Li
g
h
t
s
Me
d
i
u
m
s
Ar
t
i
c
u
l
a
t
e
d
T
r
u
c
k
s
Bi
c
y
c
l
e
s
o
n
C
r
o
s
s
w
a
l
k
Pe
d
e
s
t
r
i
a
n
s
KI
M
B
A
L
L
A
V
E
[
N
]
Ou
t
In
To
t
a
l
62
0
38
8
10
0
8
8
12
20
1
1
2
0
0
0
0
0
0
62
9
40
1
10
3
0
0
38
6
0
2
0
0
12
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
39
9
0
2
0
R
T
L
U
P
0
0
0
0
0
0
Out
0
0
0
0
0
0
In
0
0
0
0
0
0
Total
Westbound St. [E]
R
0
0
0
0
0
0
T
0
0
0
0
0
0
L
0
0
0
0
0
0
U
0
0
0
0
0
0
P
0
0
0
0
0
0
42
1
59
3
10
1
4
12
8
20
1
1
2
0
0
0
0
0
0
43
4
60
2
10
3
6
Ou
t
In
To
t
a
l
KI
M
B
A
L
L
A
V
E
[
S
]
U
L
T
R
P
2
0
59
1
0
0
0
0
8
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
2
0
60
0
0
0
S
C
H
O
O
L
E
X
I
T
[
W
]
T
o
t
a
l
6
0
0
0
0
0
6
0
I
n
6
0
0
0
0
0
6
0
O
u
t
0
0
0
0
0
0
0
0
0
0
0
0
U
2
7
0
0
0
0
2
7
L
0
0
0
0
0
0
T
3
3
0
0
0
0
3
3
R
0
0
0
2
0
2
P
Tu
r
n
i
n
g
M
o
v
e
m
e
n
t
P
e
a
k
H
o
u
r
D
a
t
a
P
l
o
t
(
4
:
3
0
P
M
)
Trip Generation
Project Name:Kimball Avenue Office Southlake
No:
Date:11/7/2018
City:Southlake
State/Province:Texas
Zip/Postal Code:
Country:
Client Name:495 S. Kimball, LLC
Analyst's Name:Wright
Edition:ITE-TGM 10th Edition
Land Use Size
Entry Exit Entry Exit Entry Exit
710 - General Office Building (General
Urban/Suburban) 36 1000 Sq. Ft. GFA 197 197 52 8 7 36
Reduction 0 0 0 0 0 0
Internal 0 0 0 0 0 0
Pass-by 0 0 0 0 0 0
Non-pass-by 197 197 52 8 7 36
Total 197 197 52 8 7 36
Total Reduction 0 0 0 0 0 0
Total Internal 0 0 0 0 0 0
Total Pass-by 0 0 0 0 0 0
Total Non-pass-by 197 197 52 8 7 36
Project Information
Weekday
Weekday, AM Peak
Hour
Weekday, PM Peak
Hour
Trip Distribution
Traffic Increase Kimball Office
Southlake, TX
Future extended linear growth = 4.50% per year
Southlake - Kimball Existing Site Trips 2020
AM PM SAT AM PM SAT AM PM SAT AM PM SAT
LT 329 194 0 359 212 0 359 212 0
EB TH 1459 1098 0 1593 1199 0 1593 1199 0 EB
RT 295 117 0 322 128 0 10 1 332 129 0
LT 85 134 0 93 146 0 4 1 97 147 0
WB TH 537 1543 0 586 1685 0 586 1685 0 WB
RT 76 247 0 83 270 0 83 270 0
LT 198 255 0 216 278 0 2 7 218 285 0
NB TH 250 345 0 273 377 0 2 8 275 385 0 NB
RT 100 124 0 109 135 0 0 3 109 138 0
LT 159 156 0 174 170 0 174 170 0
SB TH 283 338 0 309 369 0 12 2 321 371 0 SB
RT 390 454 0 426 496 0 426 496 0
Kimball Ave - Project Access Site Trips 2020
AM PM SAT AM PM SAT AM PM SAT AM PM SAT
LT 99 27 0 99 27 0 99 27 0
EB TH 0 0 0 0 0 0 0 0 0 EB
RT 134 33 0 134 33 0 134 33 0
LT 0 0 0 0 0 0 4 18 4 18 0
WB TH 0 0 0 0 0 0 0 0 0 WB
RT 0 0 0 0 0 0 4 18 4 18 0
LT 0 0 0 0 0 0 0 0 0
NB TH 484 600 0 529 655 0 529 655 0 NB
RT 0 0 0 0 0 0 26 3 26 3 0
LT 0 0 0 0 0 0 26 3 26 3 0
SB TH 450 399 0 491 436 0 491 436 0 SB
RT 0 0 0 0 0 0 0 0 0
Total Trips 2020
Total Trips 20202020
2020
Capacity Analysis
Southlake Boulevard (FM 1709) & Kimball Avenue
Lanes, Volumes, Timings 2018 Existing AM Peak
1: Kimball Ave & Southlake Blvd (FM 1709)11/05/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 329 1459 295 85 537 76 198 250 100 159 283 390
Future Volume (vph) 329 1459 295 85 537 76 198 250 100 159 283 390
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 300 140 350 170 180 0 145 727
Storage Lanes 1 1 1 1 1 0 1 1
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 0.95 0.95 1.00 0.95 1.00
Frt 0.850 0.850 0.957 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 5085 1568 1787 4940 1553 1770 3349 0 1703 3539 1568
Flt Permitted 0.320 0.107 0.950 0.950
Satd. Flow (perm) 596 5085 1568 201 4940 1553 1770 3349 0 1703 3539 1568
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 153 132 37 396
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1070 1045 1938 781
Travel Time (s) 24.3 23.8 44.0 17.8
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 2% 2% 3% 1% 5% 4% 2% 4% 1% 6% 2% 3%
Adj. Flow (vph) 350 1552 314 90 571 81 211 266 106 169 301 415
Shared Lane Traffic (%)
Lane Group Flow (vph) 350 1552 314 90 571 81 211 372 0 169 301 415
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 12 12 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Turn Type pm+pt NA Perm pm+pt NA Perm Split NA Split NA Perm
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases 2 2 6 6 4
Detector Phase 5 2 2 1 6 6 8 8 4 4 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 10.0 20.0 20.0 10.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0
Total Split (s) 33.0 59.0 59.0 14.0 40.0 40.0 31.0 31.0 36.0 36.0 36.0
Total Split (%) 23.6% 42.1% 42.1% 10.0% 28.6% 28.6% 22.1% 22.1% 25.7% 25.7% 25.7%
Maximum Green (s) 28.0 54.0 54.0 9.0 35.0 35.0 26.0 26.0 31.0 31.0 31.0
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None None None Min Min Min Min Min
Lanes, Volumes, Timings 2018 Existing AM Peak
1: Kimball Ave & Southlake Blvd (FM 1709)11/05/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 2
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Act Effct Green (s) 63.0 49.8 49.8 45.5 37.5 37.5 20.0 20.0 20.4 20.4 20.4
Actuated g/C Ratio 0.53 0.42 0.42 0.38 0.32 0.32 0.17 0.17 0.17 0.17 0.17
v/c Ratio 0.68 0.73 0.42 0.49 0.37 0.14 0.71 0.63 0.58 0.50 0.70
Control Delay 25.5 32.7 15.2 32.0 34.8 1.3 62.7 47.6 55.3 48.5 12.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 25.5 32.7 15.2 32.0 34.8 1.3 62.7 47.6 55.3 48.5 12.3
LOS C C B C C A E D E D B
Approach Delay 29.1 30.8 53.1 32.8
Approach LOS C C D C
Queue Length 50th (ft) 152 361 81 33 123 0 161 132 127 116 13
Queue Length 95th (ft) 281 516 190 90 202 6 270 203 209 170 117
Internal Link Dist (ft) 990 965 1858 701
Turn Bay Length (ft) 300 140 350 170 180 145 727
Base Capacity (vph) 601 2384 816 203 1625 599 399 784 458 952 711
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.58 0.65 0.38 0.44 0.35 0.14 0.53 0.47 0.37 0.32 0.58
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 118.8
Natural Cycle: 80
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.73
Intersection Signal Delay: 33.3 Intersection LOS: C
Intersection Capacity Utilization 68.5% ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 1: Kimball Ave & Southlake Blvd (FM 1709)
Lanes, Volumes, Timings 2018 Existing PM Peak
1: Kimball Ave & Southlake Blvd (FM 1709)11/05/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 194 1098 117 134 1543 247 255 345 124 156 338 454
Future Volume (vph) 194 1098 117 134 1543 247 255 345 124 156 338 454
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 300 140 350 170 180 0 145 727
Storage Lanes 1 1 1 1 1 0 1 1
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 0.95 0.95 1.00 0.95 1.00
Frt 0.850 0.850 0.960 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1787 5136 1568 1805 5136 1599 1787 3431 0 1787 3539 1599
Flt Permitted 0.077 0.158 0.950 0.950
Satd. Flow (perm) 145 5136 1568 300 5136 1599 1787 3431 0 1787 3539 1599
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 94 135 31 185
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1070 1045 1938 781
Travel Time (s) 24.3 23.8 44.0 17.8
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles (%) 1% 1% 3% 0% 1% 1% 1% 1% 1% 1% 2% 1%
Adj. Flow (vph) 200 1132 121 138 1591 255 263 356 128 161 348 468
Shared Lane Traffic (%)
Lane Group Flow (vph) 200 1132 121 138 1591 255 263 484 0 161 348 468
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 12 12 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Turn Type pm+pt NA Perm pm+pt NA Perm Split NA Split NA Perm
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases 2 2 6 6 4
Detector Phase 5 2 2 1 6 6 8 8 4 4 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 10.0 20.0 20.0 10.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0
Total Split (s) 19.0 57.0 57.0 16.0 54.0 54.0 29.0 29.0 38.0 38.0 38.0
Total Split (%) 13.6% 40.7% 40.7% 11.4% 38.6% 38.6% 20.7% 20.7% 27.1% 27.1% 27.1%
Maximum Green (s) 14.0 52.0 52.0 11.0 49.0 49.0 24.0 24.0 33.0 33.0 33.0
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None None None Min Min Min Min Min
Lanes, Volumes, Timings 2018 Existing PM Peak
1: Kimball Ave & Southlake Blvd (FM 1709)11/05/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 2
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Act Effct Green (s) 65.7 52.0 52.0 58.3 48.3 48.3 22.9 22.9 30.8 30.8 30.8
Actuated g/C Ratio 0.48 0.38 0.38 0.43 0.36 0.36 0.17 0.17 0.23 0.23 0.23
v/c Ratio 0.85 0.58 0.18 0.57 0.87 0.39 0.87 0.80 0.40 0.43 0.93
Control Delay 63.8 35.3 9.5 30.1 47.7 17.3 83.8 62.3 48.3 47.1 56.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 63.8 35.3 9.5 30.1 47.7 17.3 83.8 62.3 48.3 47.1 56.6
LOS E D A C D B F E D D E
Approach Delay 37.0 42.5 69.9 51.8
Approach LOS D D E D
Queue Length 50th (ft) 129 302 16 68 498 78 236 211 124 142 270
Queue Length 95th (ft) #270 352 60 110 565 154 #387 276 194 192 #476
Internal Link Dist (ft) 990 965 1858 701
Turn Bay Length (ft) 300 140 350 170 180 145 727
Base Capacity (vph) 240 1982 663 253 1860 665 317 634 436 863 530
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.83 0.57 0.18 0.55 0.86 0.38 0.83 0.76 0.37 0.40 0.88
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 135.8
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.93
Intersection Signal Delay: 46.7 Intersection LOS: D
Intersection Capacity Utilization 84.6% ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: Kimball Ave & Southlake Blvd (FM 1709)
Lanes, Volumes, Timings 2020 Full Build AM Peak
1: Kimball Ave & Southlake Blvd (FM 1709)11/07/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 359 1593 332 97 586 83 218 275 109 174 321 426
Future Volume (vph) 359 1593 332 97 586 83 218 275 109 174 321 426
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 300 140 350 170 180 0 145 727
Storage Lanes 1 1 1 1 1 0 1 1
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 0.95 0.95 1.00 0.95 1.00
Frt 0.850 0.850 0.957 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 5085 1568 1787 4940 1553 1770 3349 0 1703 3539 1568
Flt Permitted 0.283 0.110 0.950 0.950
Satd. Flow (perm) 527 5085 1568 207 4940 1553 1770 3349 0 1703 3539 1568
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 157 132 37 380
Link Speed (mph) 45 45 35 35
Link Distance (ft) 1070 1045 1938 781
Travel Time (s) 16.2 15.8 37.8 15.2
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 2% 2% 3% 1% 5% 4% 2% 4% 1% 6% 2% 3%
Adj. Flow (vph) 382 1695 353 103 623 88 232 293 116 185 341 453
Shared Lane Traffic (%)
Lane Group Flow (vph) 382 1695 353 103 623 88 232 409 0 185 341 453
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 12 12 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Turn Type pm+pt NA Perm pm+pt NA Perm Split NA Split NA Perm
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases 2 2 6 6 4
Detector Phase 5 2 2 1 6 6 8 8 4 4 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 10.0 20.0 20.0 10.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0
Total Split (s) 33.0 59.0 59.0 14.0 40.0 40.0 31.0 31.0 36.0 36.0 36.0
Total Split (%) 23.6% 42.1% 42.1% 10.0% 28.6% 28.6% 22.1% 22.1% 25.7% 25.7% 25.7%
Maximum Green (s) 28.0 54.0 54.0 9.0 35.0 35.0 26.0 26.0 31.0 31.0 31.0
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None None None Min Min Min Min Min
Lanes, Volumes, Timings 2020 Full Build AM Peak
1: Kimball Ave & Southlake Blvd (FM 1709)11/07/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 2
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Act Effct Green (s) 63.9 50.5 50.5 44.6 36.3 36.3 21.1 21.1 21.8 21.8 21.8
Actuated g/C Ratio 0.52 0.41 0.41 0.36 0.30 0.30 0.17 0.17 0.18 0.18 0.18
v/c Ratio 0.76 0.81 0.48 0.57 0.42 0.16 0.76 0.67 0.61 0.54 0.77
Control Delay 30.0 36.5 17.6 37.5 37.9 2.2 66.7 50.1 56.9 49.9 18.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 30.0 36.5 17.6 37.5 37.9 2.2 66.7 50.1 56.9 49.9 18.7
LOS C D B D D A E D E D B
Approach Delay 32.7 34.0 56.1 36.8
Approach LOS C C E D
Queue Length 50th (ft) 185 444 112 42 150 0 185 153 144 137 53
Queue Length 95th (ft) 311 584 228 #107 221 12 296 224 228 192 186
Internal Link Dist (ft) 990 965 1858 701
Turn Bay Length (ft) 300 140 350 170 180 145 727
Base Capacity (vph) 567 2304 796 196 1530 572 386 759 443 920 689
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.67 0.74 0.44 0.53 0.41 0.15 0.60 0.54 0.42 0.37 0.66
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 122.2
Natural Cycle: 80
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.81
Intersection Signal Delay: 36.8 Intersection LOS: D
Intersection Capacity Utilization 73.8% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: Kimball Ave & Southlake Blvd (FM 1709)
Lanes, Volumes, Timings 2020 Full Build PM Peak
1: Kimball Ave & Southlake Blvd (FM 1709)11/07/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 212 1199 129 147 1685 270 285 385 138 170 371 496
Future Volume (vph) 212 1199 129 147 1685 270 285 385 138 170 371 496
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 300 140 350 170 180 0 145 727
Storage Lanes 1 1 1 1 1 0 1 1
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 0.95 0.95 1.00 0.95 1.00
Frt 0.850 0.850 0.960 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1787 5136 1568 1805 5136 1599 1787 3431 0 1787 3539 1599
Flt Permitted 0.076 0.123 0.950 0.950
Satd. Flow (perm) 143 5136 1568 234 5136 1599 1787 3431 0 1787 3539 1599
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 94 135 31 176
Link Speed (mph) 45 45 35 35
Link Distance (ft) 1070 1045 1938 781
Travel Time (s) 16.2 15.8 37.8 15.2
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles (%) 1% 1% 3% 0% 1% 1% 1% 1% 1% 1% 2% 1%
Adj. Flow (vph) 219 1236 133 152 1737 278 294 397 142 175 382 511
Shared Lane Traffic (%)
Lane Group Flow (vph) 219 1236 133 152 1737 278 294 539 0 175 382 511
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 12 12 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Turn Type pm+pt NA Perm pm+pt NA Perm Split NA Split NA Perm
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases 2 2 6 6 4
Detector Phase 5 2 2 1 6 6 8 8 4 4 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 10.0 20.0 20.0 10.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0
Total Split (s) 19.0 57.0 57.0 16.0 54.0 54.0 29.0 29.0 38.0 38.0 38.0
Total Split (%) 13.6% 40.7% 40.7% 11.4% 38.6% 38.6% 20.7% 20.7% 27.1% 27.1% 27.1%
Maximum Green (s) 14.0 52.0 52.0 11.0 49.0 49.0 24.0 24.0 33.0 33.0 33.0
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None None None Min Min Min Min Min
Lanes, Volumes, Timings 2020 Full Build PM Peak
1: Kimball Ave & Southlake Blvd (FM 1709)11/07/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 2
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Act Effct Green (s) 66.4 52.5 52.5 59.5 49.0 49.0 24.0 24.0 33.0 33.0 33.0
Actuated g/C Ratio 0.47 0.38 0.38 0.42 0.35 0.35 0.17 0.17 0.24 0.24 0.24
v/c Ratio 0.94 0.64 0.21 0.70 0.97 0.43 0.96 0.88 0.42 0.46 1.00
Control Delay 83.7 38.0 10.9 40.4 59.3 19.5 99.5 69.8 48.9 48.0 74.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 83.7 38.0 10.9 40.4 59.3 19.5 99.5 69.8 48.9 48.0 74.6
LOS F D B D E B F E D D E
Approach Delay 42.0 52.9 80.3 60.9
Approach LOS D D F E
Queue Length 50th (ft) 149 339 23 76 568 96 269 241 136 157 335
Queue Length 95th (ft) #313 392 69 #143 #676 178 #453 #338 211 210 #580
Internal Link Dist (ft) 990 965 1858 701
Turn Bay Length (ft) 300 140 350 170 180 145 727
Base Capacity (vph) 232 1925 646 223 1797 647 306 613 421 834 511
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.94 0.64 0.21 0.68 0.97 0.43 0.96 0.88 0.42 0.46 1.00
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 140
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 1.00
Intersection Signal Delay: 55.4 Intersection LOS: E
Intersection Capacity Utilization 91.6% ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: Kimball Ave & Southlake Blvd (FM 1709)
Kimball Avenue & Project Access / School
HCM 2010 TWSC 2018 Existing AM Peak
6: Kimball Ave & School Exit 11/05/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 3.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 99 0 134 0 0 0 0 484 0 1 450 0
Future Vol, veh/h 99 0 134 0 0 0 0 484 0 1 450 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 0 - 0 - - - - - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 84 84 84 84 84 84 84 84 84 84 84 84
Heavy Vehicles, % 0 0 0 0 0 0 0 1 0 0 2 0
Mvmt Flow 118 0 160 0 0 0 0 576 0 1 536 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 826 - 268 846 1114 288 - 0 0 576 0 0
Stage 1 538 - - 576 576 - - - - - - -
Stage 2 288 - - 270 538 - - - - - - -
Critical Hdwy 7.5 - 6.9 7.5 6.5 6.9 - - - 4.1 - -
Critical Hdwy Stg 1 6.5 - - 6.5 5.5 - - - - - - -
Critical Hdwy Stg 2 6.5 - - 6.5 5.5 - - - - - - -
Follow-up Hdwy 3.5 - 3.3 3.5 4 3.3 - - - 2.2 - -
Pot Cap-1 Maneuver 268 0 736 259 210 715 0 - - 1007 - 0
Stage 1 500 0 - 475 505 - 0 - - - - 0
Stage 2 701 0 - 718 526 - 0 - - - - 0
Platoon blocked, % - - -
Mov Cap-1 Maneuver 268 - 736 203 210 715 - - - 1007 - -
Mov Cap-2 Maneuver 268 - - 203 210 - - - - - - -
Stage 1 500 - - 475 505 - - - - - - -
Stage 2 701 - - 562 525 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 18.6 0 0 0
HCM LOS C A
Minor Lane/Major Mvmt NBT NBR EBLn1 EBLn2WBLn1 SBL SBT
Capacity (veh/h) - - 268 736 - 1007 -
HCM Lane V/C Ratio - - 0.44 0.217 - 0.001 -
HCM Control Delay (s) - - 28.6 11.2 0 8.6 -
HCM Lane LOS - - D B A A -
HCM 95th %tile Q(veh) - - 2.1 0.8 - 0 -
HCM 2010 TWSC 2018 Existing PM Peak
6: Kimball Ave & School Exit 11/05/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 0.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 27 0 33 0 0 0 0 399 0 0 600 0
Future Vol, veh/h 27 0 33 0 0 0 0 399 0 0 600 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 0 - 0 - - - - - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 0 0 0 0 0 0 0 2 0 0 3 0
Mvmt Flow 30 0 37 0 0 0 0 443 0 0 667 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 889 - 334 777 1110 222 - 0 0 443 0 0
Stage 1 667 - - 443 443 - - - - - - -
Stage 2 222 - - 334 667 - - - - - - -
Critical Hdwy 7.5 - 6.9 7.5 6.5 6.9 - - - 4.1 - -
Critical Hdwy Stg 1 6.5 - - 6.5 5.5 - - - - - - -
Critical Hdwy Stg 2 6.5 - - 6.5 5.5 - - - - - - -
Follow-up Hdwy 3.5 - 3.3 3.5 4 3.3 - - - 2.2 - -
Pot Cap-1 Maneuver 241 0 668 290 211 788 0 - - 1128 - 0
Stage 1 419 0 - 569 579 - 0 - - - - 0
Stage 2 766 0 - 659 460 - 0 - - - - 0
Platoon blocked, % - - -
Mov Cap-1 Maneuver 241 - 668 274 211 788 - - - 1128 - -
Mov Cap-2 Maneuver 241 - - 274 211 - - - - - - -
Stage 1 419 - - 569 579 - - - - - - -
Stage 2 766 - - 623 460 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 15.8 0 0 0
HCM LOS C A
Minor Lane/Major Mvmt NBT NBR EBLn1 EBLn2WBLn1 SBL SBT
Capacity (veh/h) - - 241 668 - 1128 -
HCM Lane V/C Ratio - - 0.124 0.055 - - -
HCM Control Delay (s) - - 22.1 10.7 0 0 -
HCM Lane LOS - - C B A A -
HCM 95th %tile Q(veh) - - 0.4 0.2 - 0 -
HCM 2010 TWSC 2020 Full Build AM Peak
6: Kimball Ave & School Exit 11/07/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 5.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 99 0 134 18 0 18 0 529 26 26 491 0
Future Vol, veh/h 99 0 134 18 0 18 0 529 26 26 491 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 0 - 0 - - - - - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 84 84 84 84 84 84 84 84 84 84 84 84
Heavy Vehicles, % 0 0 0 0 0 0 0 1 0 0 2 0
Mvmt Flow 118 0 160 21 0 21 0 630 31 31 585 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 962 - 293 1001 1293 331 - 0 0 661 0 0
Stage 1 647 - - 646 646 - - - - - - -
Stage 2 315 - - 355 647 - - - - - - -
Critical Hdwy 7.5 - 6.9 7.5 6.5 6.9 - - - 4.1 - -
Critical Hdwy Stg 1 6.5 - - 6.5 5.5 - - - - - - -
Critical Hdwy Stg 2 6.5 - - 6.5 5.5 - - - - - - -
Follow-up Hdwy 3.5 - 3.3 3.5 4 3.3 - - - 2.2 - -
Pot Cap-1 Maneuver 213 0 709 200 164 671 0 - - 937 - 0
Stage 1 431 0 - 431 470 - 0 - - - - 0
Stage 2 676 0 - 641 470 - 0 - - - - 0
Platoon blocked, % - - -
Mov Cap-1 Maneuver 201 - 709 151 159 671 - - - 937 - -
Mov Cap-2 Maneuver 201 - - 151 159 - - - - - - -
Stage 1 431 - - 431 470 - - - - - - -
Stage 2 654 - - 480 454 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 25.9 22.6 0 0.5
HCM LOS D C
Minor Lane/Major Mvmt NBT NBR EBLn1 EBLn2WBLn1 SBL SBT
Capacity (veh/h) - - 201 709 247 937 -
HCM Lane V/C Ratio - - 0.586 0.225 0.174 0.033 -
HCM Control Delay (s) - - 45.5 11.5 22.6 9 -
HCM Lane LOS - - E B C A -
HCM 95th %tile Q(veh) - - 3.2 0.9 0.6 0.1 -
HCM 2010 TWSC 2020 Full Build PM Peak
6: Kimball Ave & School Exit 11/07/2018
Southlake Kimball Office Development 11/05/2018 Synchro 10 Report
Page 1
Intersection
Int Delay, s/veh 1.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 27 0 33 18 0 18 0 655 3 3 436 0
Future Vol, veh/h 27 0 33 18 0 18 0 655 3 3 436 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 0 - 0 - - - - - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 0 0 0 0 0 0 0 2 0 0 3 0
Mvmt Flow 30 0 37 20 0 20 0 728 3 3 484 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 854 - 242 978 1220 366 - 0 0 731 0 0
Stage 1 490 - - 730 730 - - - - - - -
Stage 2 364 - - 248 490 - - - - - - -
Critical Hdwy 7.5 - 6.9 7.5 6.5 6.9 - - - 4.1 - -
Critical Hdwy Stg 1 6.5 - - 6.5 5.5 - - - - - - -
Critical Hdwy Stg 2 6.5 - - 6.5 5.5 - - - - - - -
Follow-up Hdwy 3.5 - 3.3 3.5 4 3.3 - - - 2.2 - -
Pot Cap-1 Maneuver 256 0 765 208 182 637 0 - - 883 - 0
Stage 1 534 0 - 384 431 - 0 - - - - 0
Stage 2 633 0 - 740 552 - 0 - - - - 0
Platoon blocked, % - - -
Mov Cap-1 Maneuver 247 - 765 198 181 637 - - - 883 - -
Mov Cap-2 Maneuver 247 - - 198 181 - - - - - - -
Stage 1 534 - - 384 431 - - - - - - -
Stage 2 613 - - 702 550 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 15.2 18.7 0 0.1
HCM LOS C C
Minor Lane/Major Mvmt NBT NBR EBLn1 EBLn2WBLn1 SBL SBT
Capacity (veh/h) - - 247 765 302 883 -
HCM Lane V/C Ratio - - 0.121 0.048 0.132 0.004 -
HCM Control Delay (s) - - 21.6 9.9 18.7 9.1 -
HCM Lane LOS - - C A C A -
HCM 95th %tile Q(veh) - - 0.4 0.2 0.5 0 -