Item 10 - SPIN Report
SPIN MEETING REPORT
SPIN Item Number: SPIN2018-26
City Case Numbers: ZA18-0003
Project Name: North White Chapel Office Complex.
SPIN Neighborhoods: SPIN #3
Meeting Date: June 12, 2018
Meeting Location: 1400 Main Street, Southlake, TX
City Council Chambers
Total Attendance: 4
Host: Ben Siebach, Community Engagement Committee
Applicants Presenting: Skip Blake, Blake Architects
Brian Zvonecek; email: Brian@txie.com
City Staff Present: Patty Moos, Planner
Presentation begins: 6:15 pm Presentation ends: 6:25 pm
Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com and clicking
on “I Want to” and “View” “Video on Demand” – forums are listed under SPIN by meeting date.
FORUM SUMMARY:
Property Situation: Northwest corner of N. White Chapel Blvd. and W. SH 114
Details: Four-story, 52,000 sq. ft. general office building with a 23 space parking garage and
parking lots with general offices, no medical offices. There is driveway access off the west
bound SH114 access road and off N. White Chapel Blvd. An adjacent lot will be undeveloped as
it is owned by a separate owner and will have site access via the internal driveways. The
building will be faced with glass, stone and metal panel bands and will have outdoor balconies.
Here will be metal screens on the roof to screen the mechanical units. The building will be
owner occupied. There will be a detention area for the property and landscaping.
Presentation:
Questions and Concerns:
There are existing building to the west and a farm house to the north. Are the
existing buildings going to remain? The two buildings on the property and the
veterinarian to the west will remain.
What will be built on the corner of SH114 and N. White Cha pel Blvd.? The
property is owned by someone else and not part of this development. We will
provide driveway access to the adjacent property.
Is this general office only? Yes, no medical offices.
Do you know what that vacant lot will develop into? Not aware of how it will be
developed.
What is the profession of the owners? Land developers and project developers.
How much of the building will be occupied by the owner? They will occupy half of
the building.
Are the 3 floors over the parking garage offices? Yes. There are 14,000 sf on the
upper floors and 7,000 sf on the first floor.
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official
meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and
the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are
strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council.
Southlake Connect Results for the June 12, 2018 SPIN Town Hall Forum