Item 9DCITY OF SOUTH LADE MEMORANDUM (December 4, 2018) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Item 9D Subject: Ratify an emergency repair Construction Contract with GRod Construction, LLC to facilitate repairs to the North White Chapel culvert crossing at Kirkwood Branch in an amount not to exceed $580,000. Action Requested: Ratify an emergency repair Construction Contract with GRod Construction, LLC to facilitate repairs to the North White Chapel culvert crossing at Kirkwood Branch in an amount not to exceed $580,000. Background Information: The North White Chapel culvert crossing at Kirkwood Branch was recently damaged by a significant flood event in September. The road has remained closed since the event as the crossing has been declared unsafe for equipment or traffic by our structural consultant. Halff Associates, Inc. has provided professional design services, construction plans and specifications for the interim improvements to the crossing. The repair of this crossing is deemed an emergency requiring assistance from a third party engineering consultant and utility and paving contractor in order to re -open the road. The current closure is considered an emergency due to the impact on emergency response times to 300+ single family homes, multiple park facilities, a private school, a number of businesses, active residential construction sites as well as a cell tower site. Staff has consulted with the City Attorney and determined procuring these services falls under the Texas Local Government Code Chapter 252 Section 252.022 General Exemptions from Bidding for (a) a procurement necessary to preserve or protect the public health or safety of the municipality's residents; (b) a procurement necessary because of unforeseen damage to public machinery, equipment, or other property; and (c) a procurement for personal, professional, or planning services. Item 9D Halff engaged a number of qualified contractors and recommended GRod Construction as the most qualified, available contractor providing the best value to the City. Halff will also provide project coordination services with other interested agencies as well as the selected contractor to expedite the delivery of this project and reopening the road. Financial Considerations: The North White Chapel Road culvert crossing of Kirkwood Branch emergency repair will be funded from the current N. White Chapel, Kirkwood Branch Bridge project via the Storm Water Utility System Fund in the FY 2015 - 2019 Capital Improvement Program Budgets in the amounts of $1,675,000. Strategic Link: The North White Chapel Road culvert crossing of Kirkwood Branch emergency repair links to the City's strategy map relative to the focus areas of Safety and Security, Mobility and Infrastructure. The specific corporate objectives that are met by this repair project are to (Cl) Achieve the highest standards of safety & security, (C2) Provide travel convenience within City & region, (F1) Adhere to financial management principles & budget and (F2) Invest to provide & maintain high quality public assets. Citizen Input/ Board Review: The closure of North White Chapel is not only an inconvenience but significantly impacts emergency response times to this part of the City. Legal Review: The proposed construction contract is a standard North Central Texas Council of Government document utilized on all of our most recent Capital Improvement Program projects. Alternatives: The Council may ratify approval of the construction contract or decline. Supporting Documents: Partial Construction Contract Partial Plans for Drainage Improvements Halff Site Visit Report Emergency Repair Memo Staff Recommendation: Ratify an emergency repair Construction Contract with GRod Construction, LLC to facilitate repairs to the North White Chapel culvert crossing at Kirkwood Branch in an amount not to exceed $580,000. Staff Contact: Rob Cohen, Director of Public Works Kyle D. Hogue, P.E., Deputy Director/City Engineer THE CITY OF SOUTHLAKE, TEXAS <_IIY OI SOUTHLAI4CE CONTRACT DOCUMENTS AND SPECIFICATIONS North White Chapel Boulevard Improvements at Kirkwood Branch Prepared by: HalffAssociates, Inc. 4000 Fossil Creek Boulevard Fort Worth, TX 76137 TBPE Firm Registration Number F-312 MAYOR Laura Hill CITY COUNCIL PLACE 1: Shahid Shafi PLACE 2: Shawn McCaskill — Deputy Mayor Pro Tem PLACE 3: Chad Patton PLACE 4: Randy Williamson —Mayor Pro Tem PLACE 5: John Huffman PLACE 6: Christopher Archer CITY MANAGER Shanna Yelverton PUBLIC WORKS DIRECTOR Robert Cohen DEPUTY DIRECTOR OF PUBLIC WORKS/CITY ENGINEER Kyle Hogue PROPOSAL FORM FOR N WHITE CHAPEL BOULEVARD IMPRROVEMENTS AT KIRKWOOD BRANCH CITY OFSOUTHLAKE, TEXAS (THIS PROPOSAL FORM MUST NOT BE REMOVED FROM THE BIDDING DOCUMENTS. REVISED PROPOSAL FORMS ISSUED BY ADDENDA SHALL BE ATTACHED OR BOUND TO THE BIDDING DOCUMENTS.) Date 11/07/2018 TO: City of Southlake 1400 Main Street, # 270 Southlake, TX 76092 FROM: GRod Construction, LLC 889 E. Rock Island Avenue TX 76023 (Name and Address of Bidder) 1. The undersigned BIDDER proposes and agrees, if this Proposal is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Proposal Price and within the Times indicated in this Proposal and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER accepts all of the terms and conditions of the Advertisement for Proposals, Notice to Bidders, and Instructions to Bidders including without limitation those dealing with the disposition of Bid security. This Proposal will remain subject to acceptance for NINETY (90) days after the day of Proposal opening. BIDDER will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within ten (10) days after the date of OWNER's Notice of Award. 3. In submitting this Proposal, BIDDER represents, as more fully set forth in the Agreement, that: (a) BIDDER has examined and carefully studied the Bidding Documents and the following Addenda receipt of all which is hereby acknowledged: (List Addenda by Addendum Number and Date) Addendum No. I dated Received Addendum No. 2 dated Received Addendum No. 3 dated Received (b) BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work. (c) BIDDER is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. (d) Bidder has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Contract Documents. Bidder accepts the determination set forth in the Contract Documents. Bidder acknowledges that such reports and drawings are not Contract Documents and may not be complete for Bidder's purposes. Bidder acknowledges that OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by Bidder and safety precautions and programs incident thereto. Bidder does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents. (e) Bidder is aware of the general nature of Work to be performed by OWNER and others at the site that relates to Work for which this Proposal is submitted as indicated in the Contract Documents. (f) Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations investigations, explorations, tests, studies and data with the Contract Documents. (g) Bidder has thoroughly reviewed the project and has submitted to the OWNER, at least 72 hours in advance of the date for opening bids, all questions regarding the meaning or intent of the contract documents and particularly all questions regarding issues which may affect the pricing or measurement and payment of the project. (h) To the extent permitted by applicable law, the OWNER reserves the right to reject any Bidder who has, within the last twelve months, made demands or claims against the City, or who is currently, or within the last twelve months, in litigation with the OWNER. ITEM SPEC CONTRACTITEM UNIT QTY UNIT COST TOTAL AMOUNT No. DESCRIPTION Mobilization, TxDOT twenty five thousand Dollars 1 500 no Cents LS 1 25,000.00 25,000.00 Per lump sum (complete and in pace). Construction Staking three thousand Dollars 2 NC no Cents LS 1 10S0G Per Lump Sum (complete 3,000.00 3000.00 and in place). Trench Excavation Protection 3 NCTCOG twenty five hundred Dollars 107 no Cents LS 1 2,500.00 2,500.00 Per Lump Sum (complete and in place). Joint Stormwater Pollution Prevention Plan 4 NCTCOG five thousand Dollars 201 no Cents LS 1 5,000.00 5,000.00 Per lump sum (complete and in pace). Erosion Control Matting NCTCOG fifteen Dollars 5 201 no Cents SY 600 Per squared yard (complete 15.00 9,000.00 and in place). 4 -inch Topsoil and Hydromulch Seeding 6 NCTCOG nineteen Dollars SY 600 202 no Cents Per square yard (complete 19.00 11,400.00 and in lace). ROW Preparation NCTCOG two thousand Dollars 7 203 no Cents STA 7 Per station (complete and in 2,000.00 14,000.0 lace). Remove Existing Asphalt Pavement 8 NCTCOG eight Dollars 203 no Cents SY 980 Per square yard (complete 8.00 7,840.00 and in place). Remove Existing Concrete Headwall 9 NCTCOG sixty five hundred Dollars LS 1 203 no Cents 6,500.00 6,500.00 Per lump sum (complete and in place). ITEM SPEC CONTRACT ITEM UNIT QTY UNIT COST TOTAL AMOUNT No. DESCRIPTION Tree Removal NCz thirty five hundred Dollars 10 3OG Cents Per lump sum (complete LS 1 3,500.00 3,500.00 and in place). Unclassified Roadway Excavation NCTCOG OG sevenyfive Dollars 11 no Cents CY 450 75.00 33,750.00 Per cubic yard (complete and in place). Reinforced Concrete Headwall Parallel Wings TxDO[ for 2 -72 -inch RCP 12 466 ixty thousand six hundred Dollars EA 2 no Cents 60,600.00 121,200.00 Per each (complete and in place). 8 -inch Reinforced Concrete Paving NCTCOG ninety five Dollars 13 303 Cents SY 880 Per square yard (complete 95.00 83,600.00 and in place). 8 -inch cement stabilized subgrade 14 NCTCOG twelve Dollars 301 no Cents SY 980 12.00 11,760.00 Per square yard (complete and in place). Cement for subgrade stabilization NCTCOG one hundred ninety seven Dollars 15 301 no Cents TON 12 Per ton (complete and in 197.00 2,364.00 lace). Rock Riprap one hundred sixty Dollars 16 NC$ 3OG no Cents SY 375 Per square yard (complete 160.00 60,000.00 and in place). 4 -inch Yellow Solid Striping 17 NCTCOG two Dollars 804 no Cents LF 720 2.00 1,440.00 Per linear foot (complete and in place). 4 -inch White Solid Striping NCTCOG two Dollars 18 804 no Cents LF 720 2.00 1,440.00 Per linear foot (complete and in lace). ITEM SPEC CONTRACT ITEM UNIT QTY UNIT COST TOTAL AMOUNT No. DESCRIPTION Aluminum Signs TxDOT T five hundred fifty Dollars 550.00 2,200.00 19 no Cents EA 4 Per each (complete and in lace). Install Small Road Sign Assembly TxDOT five hundred fifty Dollars 20 644 no Cents EA 3 550.00 1,650.00 Per each (complete and in lace). Install Metal Beam Guard Fence 21 TxDOT forty Dollars LF 710 540 no Cents 40.00 28,400.00 Per linear foot (complete and in lace). Install Metal Beam Long twenty TxDOT five hundreAollars 22 540 no Cents EA 2 2,500.00 5,000.00 Per each (complete and in place). Install Single Guardrail Terminal 23 TxDOT forty five hundred Dollars 544 no Cents EA 4 4,500.00 18,000.00 Per each (complete and in lace). MBGF Mow Strip two hundred sevety threeDollars 24 TxDOT no Cents CY 80 273.00 21,840.00 Per cubic yard (complete and in place). Install Delineator Assembly (D -SW) SZ 2 (BRF) GF1 TxDOT (B 25 658 f ty Dollars EA 12 50.00 600.00 noCents Per each (complete and in place). 6 -inch Rock Riprap Foundation 26 NCTCOG :)ne Hundred forty Dollars 803 no Cents CY 150 140.00 21,000.00 Per cubic yard (complete and in place). ITEM SPEC CONTRACT ITEM UNIT QTY UNIT COST TOTAL AMOUNT No. DESCRIPTION 72" CL III RCP Eight Hundred Dollars 27 TxDOT 464 no Cents LF 32 800.00 25,600.00 Per linear foot (complete and in place). BASE BID TOTAL: 527,584.00 Note: No direct or additional payment will be made for the non -pay items or any other item of work required for the completion of this project but which is not specifically itemized in the bid proposal. These items will be considered subsidiary to the contract, the cost of which shall be included in the unit price for the various construction pay items in the proposal. 4. Unit prices have been computed in accordance with the General Provisions. BIDDER acknowledges that, for unit price contracts, quantities are not guaranteed and final payment will be based on actual quantities determined as provided in the Contract Documents. 5. BIDDER agrees that the Work will be substantially completed and ready for final payment in accordance with the General Provisions and Special Provisions on or before the dates or within the number of calendar days indicated in the Constriction Agreement. BIDDER accepts the provisions of the Agreement as to incentives, disincentives, and liquidated damages in the event of failure to complete the Work within the times specified in the Construction Agreement. 6. The following documents are attached to and made a condition of this Bid: Communications concerning this Proposal shall be addressed to: The address of Bidder indicated below. 8. Terms used in this Proposal which are defined in the General Provisions or Instructions will have the meanings indicated in the General Provisions or Instructions. SUBMITTEDNo November 15 2018. Respectfully Submitted, ® °i°ueiM,NreaMwnk�oPmM�: p;v4uilkmmPWtgue;e=6 Pd CuuMkM1 Signed: Company: GRod Construction, LLC Address: 889 E. Rock Island Avenue Boyd, TX 76023 SEAL if Bidder is a Corporation Telephone: 682-302-3219 Fax: 682-302-3220 Submitted by: GRod Construction, LLC Doing Business As: an Individual, _a Partnership _a Corporation, _a Joint Venture X an LLC NORTH WHITE CHAPEL BOULEVARD IMPROVEMENTS AT KIRKWOOD BRANCH This CONSTRUCTION AGREEMENT is made and entered by and between , a Corporation (hereinafter referred to as "Contractor"), and the CITY OF SOUTHLAKE, TEXAS (hereinafter referred to as "City"), to be effective from and after the date hereinafter provided. For and in consideration of the covenants and agreements contained herein, and for the mutual benefits to be obtained hereby, the parties hereto agree as follows: 1 ► _._. 1 1 1/ ► The parties agree that the Contract Documents shall consist of the following: This written Construction Agreement; 2. The following listed and numbered addenda, if any; 3. The Specifications and the Project Drawings, if any; The Contractor's Proposal and Bid Schedule; 6. The Special Provisions; Technical Specifications; The City of Southlake's Standard Construction Details; The Standard Specifications for Public Works Construction (North Central Texas (NCTCOG) 2004, Fourth Edition), Divisions 200 through Division 6000; and the Standard Specifications for Public Works Construction (North Central Texas (NCTCOG) 2004, Fourth Edition), modified by any included Technical Specifications; and Division 100 as amended and supplemented by the Special Provisions (Division 100 Only) to said Standard Specifications, as amended (hereinafter referred to as "Southlake Standard Specifications"); 10. A Performance Bond in the sum of ONE HUNDRED PERCENT (100%) of the total contract price, which Bond shall be in a form acceptable to the City, shall guarantee that the faithful performance of the work shall be completed in accordance with the plans, specifications, and contract documents, REQUIRED; 11. A Payment Bond in the sum of ONE HUNDRED PERCENT (100%) of the total contract price, REQUIRED; 12. A Maintenance Bond in the sum of ONE HUNDRED PERCENT (100%) of the total contract price, which Bond shall be in a form acceptable to the City, and shall provide for repair or replacement of all defects due to faulty material and/or workmanship that appear within a period of two (2) years from the date of final acceptance by the City, REQUIRED. These Contract Documents form the Construction Agreement and are a part of this Construction Agreement as if fully set forth herein. The Contract Documents are complementary and what is called for by one shall be as binding as if called for by all. In the event of an inconsistency in any of the provisions of the Contract Documents, the inconsistency shall be resolved per Item 105.1.1. Priority of Contract Documents, Standard Specifications for Public Works Construction (North Central Texas 2004, Fourth Edition), including City of Southlake amendments. BILVA701H . Contractor shall provide all labor, supervision, materials, and equipment necessary to perform all work required by the Contract Documents in connection with the North White Chapel Boulevard Improvements at Kirkwood Branch. III_ TIME OF COMMENCEMENTs TIME OF COMPLETION: LIQUIDATED DAMAGES Contractor shall commence work within ten (10) calendar days after receiving from the City a `Notice to Proceed' or work order. Contractor agrees and covenants that all work hereunder shall be complete within 45 Calendar Days, following `Notice to Proceed'. Time is of the Essence - All limitations of time set forth in this Agreement are material and time is of the essence of the Agreement. The parties acknowledge that adherence by Contractor to the completion schedule set forth herein is essential to this Agreement. It is agreed by the parties that the actual damages which might be sustained by the City by reason of the breach by Contractor of its promise to complete in accordance with the provisions hereof are uncertain and would be difficult of ascertainment; it is further agreed that the sum of $200.00 for each Calendar Day that completion is overdue would be reasonable and just compensation for such breach, and Contractor hereby promises to pay such sum as liquidated damages, and not as a penalty, in the event of such breach. The City shall pay the Contractor in current funds for the performance of the work, subject to additions and deductions by Change Orders or other quantity adjustments as provided in the Contract Documents. The contract sum shall be an amount of $ No interest or late charge payment shall ever be due. "o :___ :►1 ►' u ► Progress and final payments shall be paid to the Contractor in accordance with the CITY OF SOUTHLAKE Standard Specifications. The parties agree that the laws of the State of Texas shall apply to this Agreement, and that it is performable in TARRANT County, Texas. Exclusive venue shall lie in TARRANT County, Texas. Although this Agreement is drafted by the City, should any part be in dispute, the parties agree the Agreement shall not be construed more favorably for either Party. This Construction Agreement, including the Contract Documents listed in Paragraph I hereinabove, represents the entire and integrated agreement between City and the Contractor, and supersedes all prior negotiations, representations, or agreements, either written or oral. This Construction Agreement may be amended only by written instrument signed by both City and Contractor. This Construction Agreement is binding upon and shall inure to the benefit of the parties hereto and their respective successors and assigns. The effective date of this Construction Agreement will be the date of approval by the City Council of the City of Southlake, Texas (Council Meeting Date 2018). IN WITNESS WHEREOF, the parties have executed this Construction Agreement upon the year and date indicated beneath their signatures hereto. DATE: I a Zo I DATE: Contractor: BY: Title: caber &V-Intyof Southlake, Texas M Title: Sheet to be replace with original from Contractor STATE OF TEXAS ) COUNTY OF BEFORE ME, the undersigned authority, on this day appeared in person the within named person who stated that he/she is the MU4 ,1*hKof a (fid ('0n•O (b} , (Dn , a Q,C- -Eafpe en and is duly authorized in his/her capacity to execute the annexed and foregoing instrument for and in the name and behalf of said Corporation, and further stated and acknowledged that he/she has so signed, executed and delivered said foregoing instrument for the consideration, uses and purposes therein mentioned and set forth. GIVEN under my hand and seal of offi day of ✓eAb2r'-- , 2018. SUMMER D. JOHNSON Notary Public, State of Texas 15-2021 comm. Expires 12- Notary Public in and for the State %TF OF�:�' Notary ID 131382966 '��,��► of Texas ACKNOWLEDGMENT STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, the undersigned authority, on this day personally appeared , the of the CITY OF SOUTHLAKE, TEXAS, known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of the CITY OF SOUTHLAKE, TEXAS, for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN under my hand and seal of office this the day of , 2018. Notary Public in and for the State of Texas i w 0 2 m Q Z J U) Qa LJg 0– Z m w 'jrW Q wi0 j = a Y O � Y Zw Y J 0 0 �=D U O LL LL M J w Q Uiv Nam 0 2 aam MEN MEN MEN ••••••LE R•HEIN 11-20-2018 TBPE FIRM #F-312 Pm1 ect No.: Issued: Drawn By: Checked By: Scale: Sheet Title ROAD PLAN AND PROFILE 4 Sheet Number — Z 50' SGT 150' MBGF 50' LSS 205' MBGF 50' SGT 0 1s 30 45 so t N to HORZ. SCALE: 1 "=30 ' to ~ v CONTRACTOR N + VERT. SCALE 1"=5' (D N �° TO PROVIDE m w wt + M M STRIPING TO o o Lo 4 MATCH CONTRACTOR TO �p� s EXISTING ADUST MBGF 0 CONC. MOW 1 360 LF STRIP PER �pp� 4" WHITE EDGE LINE -- STANDARD FOR - INSTALL JANJD RR 1 V t SSMH_ �x oyE,_P ���� �, _/F-��� 2X12 4�DOUBLE AiT \E Ez ��, � STA 4+12 (LT & E H� �- YELLOW LINE RT)cvEr S P E E D 425 FT AT �� 1 \ ---`�``� / / / of / // FLOOD _--INSTALL RK �� LIMIT -- _---GUAGE - _ r- --- -------- _ ---- -- -260 SY 5' ___-`— - / - -- " WHITE E INE ' _ - M - - -- - MBGF MOW STRIP=- _--- - TS .SSMH A2-1 24X30 cuRVE2ornPu \ 0+00 0+20 +40 0+60 0+ 1+00 1+ 1+40 1+60 1+ �p 0 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 +80 4+00 4+20 4+40 4+60 4+80 5+00 5+20 5+40 5 0 6+00 20 / 6+40 +60 6+80 T+00 \ N WHITE CHAPEL RD 11' TYP. ' TSa—_---- ---- —5 �_ ..: --c 3'S TRAFFC _CONTRACTOR TO - _ 260 SY 5' CONC. RIPRA(P RARRicnoes a� / / / I /.I ADJUST MBGF MBGF MOW STRIP STA 0+00 TO STA 7+00 _ INSTALL / / / \ \ p AND CONC. MOW CONTRACTOR TO INSTALL o 0�1 STRIP PERSPEEDINSTALL INSTALL 20' HMAC TRANSITION 600 SY TEMPORARY 20' HMAC TRANSITION \ STANDARD FOR 2'- SURFACE COURSE EROSION CONTROL BLANKET 950 FT 2'- SURFACE COURSE 980 SY CONTRACTOR TO I ///1 I WATER VALVE TY B TOPSOIL AND SEED TY B REMOVE AND REPLACE I ' INSTALL BI-DIRECTIONAL SURFACE 4'- SURFACE COURSE RIGHT-OF-WAY 3 O 4'- SURFACE COURSE TY D EXISTING HMAC PER TYPICAL MOUNTED BARRIER REFLECTORS ON TY D NCTCOG 202.2, 202.4, 202.6 INSTALL PER SECTIONS NCTCOG 300 MBGF PER TxDOT DELINEATOR AND INSTALL PER A2-1 DETAIL ASPHALT OBJECT MARKER DETAILS DETAIL ASPHALT 24X30 0 + PAVEMENT o o N PAVEMENT m ,4 TERMINUS d v a o TERMINUS O W N r + e+.t N oo + + 50' SGT 205' MBGF rol 50' LSS 15O' MBGF ' 50' SGT v' NOTES: 1. PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE WITH TxDOT STANDARD SPECIFICATIONS AND THE MANUFACTURER RECOMMENDATIONS. 2. PAVEMENT MARKINGS INCLUDE PAINT STRIPING, THERMOPLASTIC STRIPING AND MARKINGS. 3. SIGNAGE SHALL BE INSTALLED IN ACCORDANCE WITH THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (TMUTCD), LATEST REVISION. 4. SIGNAGE INCLUDES REMOVING AND RE -INSTALLING EXISTING SIGNS TO THEIR PERMANENT LOCATION, REMOVING AND SALVAGING EXISTING SIGNS, INSTALLATION OF NEW SIGNS, TEMPORARY RELOCATION OF EXISTING SIGNS, AND REPLACEMENT OF EXISTING DAMAGED SIGNS. THE CITY OF SOUTHLAKE RESERVES THE SALVAGE RIGHTS ON SURPLUS/REPLACED SIGNAGE. 5. NEW STREET SIGNS MUST MEET THE FOLLOWING REQUIREMENTS: a. BE ON 9 -INCH ALUMINUM BLANKS, MINIMUM 0.080 INCHES THICK, NOT TO EXCEED 48 INCHES IN LENGTH. b. MOUNT SIGNS , WITH WIDE BRACKETS, ONTO 2-3/8 INCH GALVANIZED ROUND POLES, 12 - FOOT IN LENGTH. c. FOLLOW TEXAS MUTCD FOR OTHER SIGN REQUIREMENTS. 575 .......................................... .....----------------------------- .................................... ..........................:......................................................................:.....................................................................:...........................................................................................................................................:................................... .......................... .........:.....................................................................:.....................................................................:.....................................................................:................. ----- .------- .---- ...---- .... ..................................................................... ---- ....---- ....---- .-------- ....---- ....---- ....---- ....--- ....---- ....---- ....---- ....---- ...:---- .... ................................--..---.....---.....---.....---..... ---- ....---- ....---- ........... ---- ....---- ....... .. ...... ---------...---.....---.....---- 575 570 .... ......... .... ......... ..... ......... ....... ......... ....... ......... ........ ......... ........ ......... ......... ......... ........ ......... ...... ................................................ ........................................570 ---------------------------------------- --------------------'........................................................................................................................................;........................................................................... -PVISTA _ .. _ 3+78.01 ........................................... VL..L..V..=..- ........................................ ......-.-..-�.�.T._ ............. - ....................................... .............................:...........-...— "--................................... ..................................................................... .................................. iEX.= -1;811........................................................-----------.._.-------...-----...-----...---..•..---.....-----...-----...-----..........-----...-----...-----...---..i..----------------------------- ------------------------- 565 -.. _......_......_... _........................... _......_......_...... ......................._.. ............ ....._......_......_...... .._......K.._.37:00. ------------- ------------------- --------------------- --------------------- - — ------------ ------------------------- 565 560 `................................................................................................................................................ _ _ - --�-- ---- -- ---- -- ---- -- ---- -- ---- -- --- 560 .......................................... ......_......_......_......_..;..._......_..-- - - - - - - INSTALL - - -............................................_......_.........;...._------_------_------_----- 20' HMAC TRANSITION ---------------- _------_------_------_......_..................................................._......_........;....._......__...... ---- ....---- ............--- --.---- ------...;---- -. ---- ------ INSTALL 20' HMAC TRANSITION ...... .---- ------.------ ....---- 555 ................................... ........................................................................................................:.........................................................................................................................................:................................... ....................... . ..................... .............................;.........................................---.....---.....---.....--- 555 ................................................................................................................................................................................................................................................................................................................................................ J U ....................................:................................... ..................................:....... J ¢ w................................................550 --------------------------------- 550 _ }—� w . ............................:...................................................................... w .......... ...------------- ------------------------------. ............................................................................ i......................................................................i................................... w wa .... ........................ i.................................................................................................................................................................................-----------...-----...-----..---- w w ---m ---------------- ----------------------------------- ..................................................................................................................................................:............................... 0 U ....U........................:................................... ........ .... .............. ................. ...........................—............:.....................................................................:....p 0 U ............................................................................................................................. 545 o w-rn p w—N NZ� - 545 o�a>� tiwd OZNO ................................................................................................................................................................................. +JwO_Z ¢ ....................- +� JZ +� ZO¢. :................. wa- JZ ZU¢ +O� +¢ZJ JJ...............................................:..................................................................... -----------------...-- ............................................................................:........................................................................ w ...................:................................... ¢ ........ M— ....... M— ........... Vd ............:.....................................................................-.... II �d— ¢ ._......_......_......_............................._......_......_..;..._................................................................. ........................ ........................... ........¢z>dU .............¢ ............................................................ wN ¢o ---- UF¢ ....--- ....---- ....---- ....---- ....------- ----------------------------------- ..................................¢�UU ------------------------- ----------------------. ............................ ...........................................F HO¢ .......... �w nJw O -540 -ZWNW n?o --------- ------------------------`-------------------------- -------------------------- 540 .....................................o U .. � . . ........................ .................. ......................................................................................................................................................................... ..................................... tn...W.........TO ... .......... 0.;.0......... ... .........Q,. .a,........ k -G -"p ....... p.;,........ Lp �........ n n...n.........d.. ;. ........ N...a......... p<T. Q......... w... ........ ep:........N...N.........p............N...1,.1........ -0p.j.I.; T........dp...�......N NN.....�.. �......... .... ...........�... .........p..0........{�.. F ti W y,�............; �...... O Q... .------- (7 -- . ............................. • N N tq : p� N N N r (n (T N: N M rv� lfl Lrl tD I� t• : m O N <D v N: N O _ O ..................................... ... (O ro t` N lD ......... ... .......... . •. ......... ... ......... ...1 o In to Il'1 : ul V- ........ ... ........ .• .......... ... �......... �:� W M �....... N N O O ... ... ... .. �... -9... �... ._.7 ..... O _ n. (T m ()l : OT el pT tq {._ ...�,..u,......�,<�.....�,._ �... ...�.. .. .. ... ... ro ... dp ro tT : G� m m 6TOT ...tn... ... ..n.:.�......,n.. ......nn��.....m..�.. ... ... .. mtT O O ... ... ... ...w.so... ._n._ _. N _.�...,... N M n't : ul ... .. _,o..� ......�n-�- tD l0 ......... ............................. - - 535 d W (D � w 1.° Ln LO : LrT In _ m - to Ln lit Ln lfl LFA In In L(', lit : In to LIl to Ifl L(1 I.f) Lrl lfl Lll lfltn Lt]Ln In Ltt . Ln to _� t(1 Ln:. U"1 Lr� In . L(1 to Ln 535 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 0 2 m Q Z J U) Qa LJg 0– Z m w 'jrW Q wi0 j = a Y O � Y Zw Y J 0 0 �=D U O LL LL M J w Q Uiv Nam 0 2 aam MEN MEN MEN ••••••LE R•HEIN 11-20-2018 TBPE FIRM #F-312 Pm1 ect No.: Issued: Drawn By: Checked By: Scale: Sheet Title ROAD PLAN AND PROFILE 4 Sheet Number r) >H= 00az LLJ JwaQ d Z m F w rJw0a Lu>0~ _ Y O n z I_LI Q 0J =D O +: •••LEVI R•HEIN 11-20-2018 TBPE FIRM #F-312 Project No.: Issued: Drawn By: Checked By: Scale: Sheet Title CULVERT PLAN AND PROFILE 5 Sheet Number �� INSTALL 50 FT OR ROCK �U CHECK DAM PER TxDOT h Z INSTALL 185 SY ROCK RIPRAP CEP, DETAIL EC(2)-16 TYPE 3 (36" , TALL, WOVEN WIRE MESH) 0 5 10 15 20 EX PP CAUTION!!! X Of/E HORZ. SCALE: 1"=10' VERT. SCALE: 1"=2.5' — EX TEL UNDERGROUND FIBER OPTIC �- L� CONTRACTOR TO REMOVE AND 60,P� 'I REPLACE EXISTING HEADWALL 0 APPLICABLE STANDARDS 1� O� TxDOT CH -PW -S (MOD) TxDOT 466 CAUTIONIII ��_) J UNDERGROUND STA 3+19.56 LT TELEPHONE 20 - EXISTING TREE TO BE REMOVED CONTRACTOR TO INSTALL TEMPORARY OF HEADWALL HEADWALL ,!\ STA 3+82.56 14.50 LT EROSION CONTROL BLANKET TOPSOIL AND SEED RIGHT-OF-WAY D BACK OF HEADWALL NCTCOG 202.2, 202.4, 202.6 39 Ir �� ED MCI SION MBGF MOW STRIP T �i - a" ON �aDwA= �. Ex �� L 4 U� 4• X II CA TIONIII I I I I CAUTIONIII WATER a l a l SANITARY MBGF 2+40 2+60 2+80 3+00 +2 LINES 3+401 I - I 3+60 SEWER 3+80 4+QQ 4+20 4+40 4+60 4.80 2+20 _ N WHITE CHAPEL RD I I I I EX 24 iY EX 2410' — EX 241Y I I I Z4_ 14 I I I i wy 3.5' 6' F,— 26' MBGF MOW STRIP' 39' �ASIGN T&T -- STA 3+17.57 14.50 RT - V - -- STA 3+80.57 14.50 RT BACK OF HEADWALL - - - - BACK OF HEADWALL 20 r{I / ;'�,I CONTRACTOR TO PERFORM RESOTOREHEXISTINGRI AND D/S OF CULVERT CROSSING CONTRACTOR TO REMOVE AND 6 REPLACE EXISTING HEADWALL APPLICABLE STANDARDS TxDOT CH -PW -S (MOD) TxDOT 466 63 INSTALL 190 SY ROCK RIPRAP INSTALL 70 FT OR ROCK CHECK DAM PER TxDOT DETAIL EC(2)-16 TYPE 3 (36' TALL, WOVEN WIRE MESH) ::�' NOTE: ALL WORK SHALL CONFORM TO THE GEOTECHNICAL ENGINEERING STUDY PREPARED BY ALPHA TESTING, NOVEMBER 15,2018. ----- - - .._ - ---- -- -.. ..........................,.......................',. .... .... .... .... ... .... ..., ..... N ........ WHITE .... .. ... .. .... .... ._ _.. .. .... .... .... .- CHAPEL -... BLVD CONTRACTOR TO REMOVE AND ......... ........ ...... .................... ...... ........ ........ ---- - - - ... PAVING PER TYPICAL SECTION 3...' REPLACE EXISTING MBGF APPLICABLE STANDARDS _.. _... _..... ------------ - -.. .............. ... .... .......... TA STANDARDS, 560560 --. _... _.. CAUTIONIII.. .... GF(D3�) 14 .. .. r ... ... ... ..... .. .... UNDERGROUND 2/ GF(31)LS-17 FIBER OPTIC TYP GF(31)MS-17 - - - --.. _... '', _...._ _.. ....83 ECFV.- 557.73 - ..... .... = .... ... ... ... ......... ........ ... ...... .. ... ....... ....... /.., ...'',- -----+ .__-- .___.. ...__.. ........ .... ..i. A5O CY UNCLASSIFIED ,...... ....J,... ..... .. EXCAVATION ... ...... .... ... ... ......... ....... ....... ...... .. ... ....... ._.......... ..... EMBANKMENT -FREE DRAIN GRANULAR - -- -.. _. MATERIAL.... [ I .. I ... .... .... .... .... .. .... VE & RELAY .. _. _.. ... ... ... I - _ 72 RCP 8 LF .. ... ._ 555 - { - REMOVE & RELAY.... MO .. --- - _._._. ? .. _ _.I, .... 555 2 RCP. a LF -- I '. CONTRACTOR TO REMOVE AND ---. _... _...... .....................!.... . ......... ......... ..................................... ...J... ......... ........ .. REP LACE EXISTING HEADWALL ........ ................................................ ...... ........ ........ ------------ --- ___ __ .. _.._.. .I. ......... 1 APPLICABLE STANDARDS. SLOPE BACK EXCAVATION 2 MAX TxDOT CH PW -S (MOD)..._ --------------------p - -.._ _.. TEMPORARY SHORING AS REQUIRED j I f NCTCOG 707 1 MIN ... ... ... ... .. . ... - - -- ... .. .. ... ... ... ... ............................... .... .... CONTRACTOR TOO CK RIPRAP - - .. ... '', ... ... ... ELEV.= 549 73... I I EXIRCP ? DRYSRIPRAP 550 KIRKWOOD TO 1. .I.. ... 550 BRANCH REMAIN ......'.- ...._---- ._-----........... . . .......... :....... .... - - - ......... ......... ........ ........ ...... .................... ...... ........ ............ .. ..-..-... ..-.... ...... ......... ........ ......... ............ ... ......... ........ ........ ........................................................ ........ ..... - r - -- _ . EX.27'SS W/ 48' CASING _ EX. 12' WL .... .... ---.: - - .... .... ....................., - EX. FO OF CASING - -ELEV. UNKNOWN ',- ... ..... .. .. .... .... _. .... ... UNKNOW N _ .87 ELEV. - 547 ... .... .... .. 545 --' --- .... .... ... ........................ELEV. ,... ..... _... 545 EX. FO .__._.J......._.__._....i.........___ ........... ..... -- - _... ._.._.. _..... ......... .... EX. 24' WL W/ ; ...... .................... ...... ........ ........ ---- --------- ------ - ------ _..... _� ......... ......... ......... ......... .......... 36° CASING _... _..... _ _.. _. _... _..... _..:'. TOP OF CASING ....... ....... ELEV.= 545.00 1+00 1+50 2+00 v 2+50 3+00 r) >H= 00az LLJ JwaQ d Z m F w rJw0a Lu>0~ _ Y O n z I_LI Q 0J =D O +: •••LEVI R•HEIN 11-20-2018 TBPE FIRM #F-312 Project No.: Issued: Drawn By: Checked By: Scale: Sheet Title CULVERT PLAN AND PROFILE 5 Sheet Number MEN HALFFp October 24, 2018 P35201.001 Kyle Hogue City Engineer/Public Works Deputy Director 1400 Main Street Southlake, Texas 76092 Subject: North White Chapel Road at Kirkwood Branch Culvert Dear Mr. Hogue, At your request, I visited the site of the above referenced project on September 25, 2018. The purpose of this visit was to observe the structural condition of the culvert after it had become overtopped after a heavy rainfall. Our evaluation of the culvert is limited to visual observations only. No "As -built" drawings, geotechnical information or previous inspection reports have been made available for our review. Furthermore, we have not undertaken any materials testing or conducted any exploratory excavations. The rain event of September 22, 2018 inundated the culvert crossing requiring a family to be rescued from the structure when their vehicle became stranded after attempting to drive through the flood waters. At the time of my visit, North White Chapel Road was barricaded to prevent traffic from crossing the culvert. During this site visit I observed the following: • The asphalt pavement had delaminated from the underlying flex base subgrade. • One of the metal beam guard rail posts had dislodged from its foundation and was carried downstream approximately 20 feet. • Scour and erosion were evident along the stream embankment and at the shoulder between the roadway and headwalls. • Both the upstream and downstream headwalls have rotated outward. The most pressing concern is the low elevation of the roadway above Kirkwood Branch. Without significant upgrades to either elevate the roadway profile or expand the capacity of the culvert opening, White Chapel Road will continue to be overtopped during similar rain events. A secondary but still significant concern is the rotation of the headwalls. The rotation is most likely due to surface water from the roadway draining toward the headwalls, infiltrating behind the walls and saturating the backfill materials. These saturated soils increase the lateral driving pressures behind the walls leading to rotation and/or translation. The headwall rotation will become progressively worse if no measures are undertaken to prevent further water infiltration. Temporary measures to reduce the rate of further rotation would include capping the open surface area at the shoulder to inhibit water infiltration and strengthening the walls to withstand HALFF ASSOCIATES, INC. 4000 FOSSIL CREEK BOULEVARD TEL (817) 847-1422 WWW.HALFF.COM FORT WORTH, TX 76137-2720 FAX (817) 232-9784 p;; HALFF Kyle Hogue City of Southlake October 24, 2018 Page 2 the increased lateral pressures. Possible strengthening alternatives would include the installation of soil anchors behind the walls or buttresses in front of the walls. Replacement of the headwalls is also a possibility however this will not address the primary cause of the flooding and should only be considered temporary until a permanent solution is constructed. If the City chooses not to undergo any temporary or permanent measures to address the inundation problems at this site, the headwalls will eventually fail and will no longer be capable of retaining the soils beneath the roadway exposing them to the stream flow. Given the turbulent flows, the soils will eventually erode and the roadway will be undermined. Until either permanent or temporary repairs are undertaken, we do not recommend reopening the culvert to traffic or construction equipment. If you should have any questions or require any further assistance with this matter, please contact me at your earliest convenience. Sincerely, HALFF ASSOCIATES, INC.AV AW *: : *� ••••••••••••••••••••••�••• Paul J. Rielly, P.E. Vice President % •••••••••••••••••••••••••• • 10-24-2018 ©CITY OF SOUTHLAKE MEMORANDUM To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works ` y Date: October 11, 2018 Subject: Emergency Repair of N. White Chapel Culvert Crossing at Kirkwood Branch This memo shall certify that the repair of the N. White Chapel Culvert Crossing at Kirkwood Branch is deemed an emergency repair requiring assistance from a third party engineering consultant and utility and paving contractor in order to re -open the road. The current closure is considered an emergency due to the impact on emergency response times (2+ minutes) to the following: • 300+ single family homes • Bob Jones Park (soccer, baseball, dog park, trail heads, nature center, etc.) • The Clariden School • Marshall Creek Ranch • Showtime Farms • Active Residential Construction • Cell Tower Site • Private Chemical Facility For the aforementioned reasons, procuring these construction services falls under the Texas Local Government Code Chapter 252 Section 252.022 General Exemptions from Bidding: • a procurement necessary to preserve or protect the public health or safety of the municipality's residents; • a procurement necessary because of unforeseen damage to public machinery, equipment, or other property; • a procurement for personal, professional, or planning services; Cc: Attach to Munis Requisition along with LGC Ch. 252 Page 1 of 1