Loading...
Item 4C Memo - FINALCITY OF SOUTHLAKE MEMORANDUM (December 4, 2018) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Item 4C Subject: Authorize expenditures with Davidson Reconstruction, Inc. for various projects in City facilities in FY 2019 in an amount not to exceed $500,000 Action Requested: Authorize expenditures with Davidson Reconstruction, Inc. for various projects in City facilities in FY 2019 in an amount not to exceed $500,000. Background Information: The City of Southlake contracts with a construction firm to complete facility projects as needed. These projects are necessary to maintain City buildings and renovate work spaces. Typical projects include painting and remodeling of public spaces, construction of offices, repairs to the buildings and roofing systems, and striping of public parking spaces. In the FY 2019 adopted budget, City Council allocated funds to complete the space reconfiguration and relocation of multiple departments within Town Hall. This project includes remodeling Suite 210 to convert the space from the Community Services offices to the Human Resources Department. The project also includes remodeling Suites 420 & 430 to convert the space from the Library Administration offices to the new Finance & Technology Services Department. These renovations are necessary to align with the new organizational changes in order to best serve the City. FY 2019 Council approved projects also include the remodeling of the Town Hall 2nd and 3rd floor bathrooms in order to update the restroom facilities and be in compliance with the Americans with Disabilities Act (ADA) per the City's Accessology Report dated September 16, 2015. The painting of all public spaces within Town Hall will also be completed in order to give the hallways a fresh coat of paint. Page 1 of 3 Item 4C Financial Considerations: The City's purchasing policy for these construction services is met through The Interlocal Purchasing System (TIPS) government purchasing contract #170201. TIPS is a purchasing cooperative of the Texas Region 8 Education Service Center (ESC). All TIPS contracts are awarded by the ESC 8 seven -member Board of Directors, and each vendor has met strict Competitive Bidding Process guidelines established by the ESC 8 administration and the TIPS legal team. The City obtained three proposals for the remodeling of Town Hall Suites 210, 420 and 430 for the space reconfiguration project. Below is the tabulation of the three bids for your review. Davidson Reconstruction, Inc. was selected as the best value. Below are the budgeted amounts for each FY 2019 Facility Project. Facility Project BID TAB Town Hall Space Reconfiguration (2nd & 4t" Floor) $230,000 Town Hall Space $170,000 Town Hall Painting (1St 2nd 3rd & 4t" Public Spaces) Reconfiguration 2"d 5% Contingency $ 24,000 and 4r" Floor $500,000 Brown & Root Ware Brothers, LLC Davidson (Attachment A) (Attachment B) Reconstruction, Inc. Attachment C $ 278,824 $200,144 $170,400 Below are the budgeted amounts for each FY 2019 Facility Project. Facility Project Total Remodel Budget Town Hall Space Reconfiguration (2nd & 4t" Floor) $230,000 Town Hall Restroom Remodeling (2nd & 3rd Floor) $170,000 Town Hall Painting (1St 2nd 3rd & 4t" Public Spaces) $ 76,000 5% Contingency $ 24,000 Total $500,000 Funding for these projects has been approved in the Facility Maintenance Reserve Fund (011199-570200) and the TIF Operating Budget (105199-535000). Page 2 of 3 Item 4C Strategic Link: The item relates to the City's strategy map focus areas of Infrastructure and Performance Management & Service Delivery. It specifically relates to the City's Corporate Objectives of (F2) Invest to provide and maintain high quality public assets and (132) Collaborate with select partners to implement service solutions. Citizen Input/ Board Review: N/A Legal Review: None Alternatives: The City Council may approve or deny these expenditures. Supporting Documents: Attachment A: Brown & Root Proposal Attachment B: Ware Brothers, LLC Proposal Attachment C: Davidson Reconstruction, Inc. Proposal Attachment D: Town Hall Restroom Remodeling Proposal Attachment E: Town Hall Painting Proposal Staff Recommendation: Authorize expenditures with Davidson Reconstruction, Inc. for various projects in City facilities in FY 2019 in an amount not to exceed $500,000. Staff Contact: Rob Cohen, Director of Public Works Cristina McMurray, M.P.A, C.P.M, Deputy Director of Public Works Page 3 of 3 / 777�7� 415 E. Airport Freeway, Suite 281 <ttt 1111 Brown r Root Irving, 1. '15,11 1111 Brown & Root — Budget Proposal Kurt Ackermann City of Southlake 600 State Street #2010, Southlake, TX 76092 Suite 420/430 Finance Remodel Outline The intent of this proposal is to provide renovation services as detailed below. All work shall be in accordance with all OSHA standards, applicable federal, state and local codes and regulation and good construction practices. Brown & Root General Scope of Work • Per demo & floorplan provided by Kurt Ackermann • Demo walls per plan • Demo ceiling grid & the and lighting • Frame new walls to ceiling grid per plan, install new grid and tile • Install new millwork per plan • Demo doors per plan, provide new frames and re -use doors & hardware. • Patch drywall as needed • Prep and paint all walls and hard ceilings in space • Prep and paint doors & frames • Demo flooring and install vinyl plank flooring in copier room • Patch carpet with attic stock • Patch/install new base where needed • Adjust AC supply/return grills for new configuration. • Tap plumbing in adjacent restroom for supply/drain at new sink in copier room • Provide new sink and faucet • Relocate/add light switches for new floor plan • Reinstall exiting light fixtures, centered appropriately in new floor plan • Install existing can light over each cubical area • Provide and install an additional 4 EA 2x4 fixtures to match existing • Core floor at each cubical area. Provide power via poke through device at each. • Pull data wiring to poke through devices • Haul away all debris generated by our work • Work to be performed during normal business hours • Permitting costs included • P&P bonds cost included • National IPA R160402 contract to be utilized for work • Brown & Root Budget Cost: $150,600.00 • Alt #1: Supply new & replace all carpet in space, please add $17,815.00 General Notes • All work shall be in accordance with OSHA Standards, applicable federal, state, and local codes, regulations and good construction practices. • Includes all materials, equipment, and labor in bid to complete the scope of work. • Daily and final clean-up as well as protection of adjacent surfaces. Brown & Root Industrial Services, LLC Forged from the Past. Engineered for the Future. www.brownandroot.com Subject Page 2 of 2 • Approval of this proposal designates acceptance of the scope of work statement and line item estimate which has been used only to develop a mutually agreed price. The price is accepted as a lump sum fixed firm price and the incorporated scope of work becomes the controlling document taking precedence over line item estimate detail. Exclusions/Clarifications • Handling or removal of any hazardous material. • Hidden or unforeseen conditions. • Any repairs not specifically mentioned above. • Sprinkler relocation/repair • Fire alarm work • Data cable termination End of Scope Brown & Root Industrial Services, LLC Forged from the Past. Engineered for the Future. www.brownandroot.com A 415 E. Airport , Suite 28# /111' 1111 . �, Freeway. 1. f`1t 11'1 • ► oot i\t 1J/l Brown & Root — Budget Proposal Kurt Ackermann City of Southlake 600 State Street #2010, Southlake, TX 76092 Suite 210 Human Resources Remodel Outline The intent of this proposal is to provide renovation services as detailed below. All work shall be in accordance with all OSHA standards, applicable federal, state and local codes and regulation and good construction practices. Brown & Root General Scope of Work • Per drawing dated 6.19.18 • Close off transaction windows and demo millwork at transaction counter • Demo walls & frame new walls to ceiling grid per plan • Demo restroom tile and fixtures • Frame continuous header over openings to copy room and coffee room • Install blocking in wall of conference room for future television • Fur out wall in front of courtroom door • Install new millwork per plan including adjustable shelves in closet outside of conference room • Re -face existing millwork and install new countertops to match new • Demo doors per plan, provide new doors and hardware where needed. Match existing as closely as possible. • Demo & infill door to adjacent space. Match trim and finishes on the outside as closely as possible. • Patch drywall as needed • Prep and paint all walls and hard ceilings in space • Prep & paint doors and frames • Install vinyl plank flooring in coffee room • Patch carpet with attic stock • Patch/install new base where needed • Add 2'x'2 air returns in new offices • Restroom exhaust fan to remain • Rework plumbing in coffee room for new sink • Provide new sink and faucet • Relocate/add light switches for new floor plan • Center existing light fixtures in new offices • Add new outlets per plan • Add data rings per plan. Pull data wiring at new locations. • Haul away all debris generated by our work • Work to be performed during normal business hours • Permitting costs included • P&P bond s cost included • National IPA R160402 contract to be utilized for work • Brown & Root Budget Cost: $128,224.00 General Notes • All work shall be in accordance with OSHA Standards, applicable federal, state, and local codes, regulations Brown & Root Industrial Services, LLC Forged from the Past. Engineered for the Future. www.brownandroot.com Subject Page 2 of 2 and good construction practices. Includes all materials, equipment, and labor in bid to complete the scope of work. Daily and final clean-up as well as protection of adjacent surfaces. Approval of this proposal designates acceptance of the scope of work statement and line item estimate which has been used only to develop a mutually agreed price. The price is accepted as a lump sum fixed firm price and the incorporated scope of work becomes the controlling document taking precedence over line item estimate detail. Exclusions/Clarifications • Handling or removal of any hazardous material. • Hidden or unforeseen conditions. • Any repairs not specifically mentioned above. • Sprinkler relocation/repair • Fire alarm work • Data cable termination • Audio equipment demolition End of Scope Brown & Root Industrial Services, LLC Forged from the Past. Engineered for the Future. www.brownandroot.com Ware Brothers, LLC 10/11/2018 1001 W. Northwest Hwy Grapevine, Texas 76051 City of Southlake Remodel 2nd and 4th floor per preliminary plans Budget Quote based on preliminary plans 2nd Floor 4th Floor 1 Permit $ - $ - 2 Energy Comcheck / TAS Review $ 1,300.00 $ 2,000.00 3 Asbestos Survey $ 650.00 $ 1,500.00 4 Demo / Haul Off $ 4,000.00 $ 7,500.00 5 Const Clean $ 750.00 $ 1,500.00 6 Final Clean $ 750.00 $ 1,500.00 7 Int Framing/Drywall/Ceiling $ 3,850.00 $ 12,840.00 8 Int Door Units (labor only use existing units) $ 2,150.00 $ 850.00 9 Millwork $ 15,000.00 $ 8,000.00 10 Solid Counter Tops $ 7,780.00 $ 2,650.00 11 Tape/Bed/Paint $ 10,500.00 $ 15,800.00 12 Flooring Cpt LABOR ONLY $ 3,472.00 $ 9,550.00 13 Wood Flooring Labor and Material $ 1,800.00 $ 1,350.00 14 Cove Base $ 800.00 $ 400.00 15 Wood Paneling and Trim Work $ 2,500.00 $ - 16 Plumbing $ 3,000.00 $ 3,000.00 17 HVAC Relocate Duct and Vent off existing system $ 1,200.00 $ 6,800.00 18 Electrical $ 9,300.00 $ 14,273.00 19 Glass $ 472.00 $ - 20 Jobsite Supervision $ 2,000.00 $ 6,000.00 21 Overhead/Profit $ 14,255.00 $ 19,102.00 TOTAL $ 85,529.00 $ 114,615.00 TOTAL JOB EXCLUSIONS: Sales Tax Fire Sprinkler Work Fire Alarm Work Plans or Engineering Electronic hdwe $ 200,144.00 DRI CONSTRUCTION Davidson Reconstruction, Inc. Client: Southlake 2nd Floor STE 210 Property: 1400 Main St Southlake, TX 76092 Operator: DEREKDAV Estimator: Derek Davidson Type of Estimate: Remodel Date Entered: 7/11/2018 Date Assigned: 7/11/2018 Date Est. Completed: 8/1/2018 Date Job Completed: Price List: TYDF8X_JAN17 Labor Efficiency: Restoration/Service/Remodel Estimate: SL 2ND FLOOR STE210 This estimate is based on TIPS / TAPS contract # 170201 DRI CONSTRUCTION Main Level Davidson Reconstruction, Inc. SL -2ND -FLOOR STE210 DESCRIPTION QTY UNIT PRICE TOTAL 1. General Demolition - Remove restroom and restroom walls, 1.00 EA @ 15,000.00 = 15,000.00 conference room wall, doors to be framed in per drawing 2. Plumbing Rough In - Cap off restroom and and run a new drain and 1.00 EA @ 3,000.00 = 3,000.00 supply line for coffee bar sink 3. Framing - 2 doors to the court room, conference room wall and 1.00 EA @ 12,000.00 = 12,000.00 storage room, 4 walls for new offices and close in door to utility billing - Close in reception windows 4. Electrical - Per drawing rough in 1.00 EA @ 6,000.00 = 6,000.00 5. Heat, Vent, & Air Conditioning - relocate registers where necessary 1.00 EA @ 1,500.00 = 1,500.00 6. 1/2" drywall - hung - new walls and repair where necessary 1.00 EA @ 10,000.00 = 10,000.00 7. Cabinetry - coffee bar 1.00 EA @ 2,500.00 = 2,500.00 8. Closet shelving in storage closet 1.00 EA @ 1,000.00 = 1,000.00 9. Finish trim and Cove molding at new walls - Replace judges paneling 1.00 EA @ 2,500.00 = 2,500.00 outside Court lobby 10. Rough cleaning -construction 1.00 EA @ 1,000.00 = 1,000.00 11. Paint Interior/Stain - 1 color walls - 1 color on cabinets 1.00 EA @ 6,000.00 = 6,000.00 12. Countertop - Granite - Galaxy Black at coffee bar 1.00 EA @ 3,000.00 = 3,000.00 13. Electrical - Final - Per Drawings - Add electrical and network to the 1.00 EA @ 2,000.00 = 2,000.00 conference room (217) wall with the door for a TV mid -wall 14. Plumbing - install Sink and faucet - ice maker line 1.00 EA @ 1,000.00 = 1,000.00 15. Doors and Finish Hardware / door stops - per drawing 1.00 EA @ 2,200.00 = 2,200.00 16. Light Fixtures - add where necessary for coffee bar and relocate per 1.00 EA @ 1,000.00 = 1,000.00 drawings 17. Plumbing Fixtures - sinks / faucets 1.00 EA @ 500.00 = 500.00 18. Flooring - vinyl plank in coffee area and patch carpet squares where 1.00 EA @ 3,000.00 = 3,000.00 necessary 19. During Construction and Final cleaning 1.00 EA @ 1,000.00 = 1,000.00 20. Sprinkler system - relocate 2 heads 1.00 EA @ 1,200.00 = 1,200.00 21. Dumpster load - or haul off debris 2.00 EA @ 600.00 = 1,200.00 22. Suspended ceiling grid - Detach and rework where necessary 1.00 EA @ 3,000.00 = 3,000.00 SL -2ND -FLOOR STE210 8/1/2018 Page: 2 DRI CONSTRUCTION Line Item Total Davidson Reconstruction, Inc. Replacement Cost Value Net Claim Derek Davidson Summary 79,600.00 $79,600.00 $79,600.00 SL-2ND—FLOOR STE210 8/1/2018 Page: 3 DRI CONSTRUCTION Davidson Reconstruction, Inc. Client: Southlake 4th Floor - Finance Property: 1400 Main St Southlake, TX 76092 Operator: DEREKDAV Estimator: Derek Davidson Type of Estimate: Remodel Date Entered: 7/11/2018 Date Assigned: 7/11/2018 Date Est. Completed: 8/1/2018 Date Job Completed: Price List: TYDF8X_JAN17 Labor Efficiency: Restoration/Service/Remodel Estimate: SL FINANCE STE420 This estimate is based on TIPS / TAPS contract # 170201 DRI CONSTRUCTION Main Level Davidson Reconstruction, Inc. SL_FINANCE_STE420 DESCRIPTION QTY UNIT PRICE TOTAL 1. General Demolition - Remove walls and doors per drawing 1.00 EA @ 20,000.00 = 20,000.00 2. Plumbing Rough In - Run a new drain and supply line for coffee bar 1.00 EA @ 3,000.00 = 3,000.00 sink 3. Framing - frame in new wall at entry, 2 offices, and copier room 1.00 EA @ 12,000.00 = 12,000.00 4. Electrical - Per drawing rough in 1.00 EA @ 6,000.00 = 6,000.00 5. Heat, Vent, & Air Conditioning - relocate registers where necessary 1.00 EA @ 1,500.00 = 1,500.00 6. 1/2" drywall - hung - new walls and repair where necessary 1.00 EA @ 10,000.00 = 10,000.00 7. Cabinetry - coffee bar 1.00 EA @ 2,500.00 = 2,500.00 8. Finish trim and Cove molding at new walls 1.00 EA @ 2,500.00 = 2,500.00 9. Rough cleaning - construction 1.00 EA @ 1,000.00 = 1,000.00 10. Paint Interior/Stain - 1 color walls - 1 color on cabinets - paint 1.00 EA @ 6,000.00 = 6,000.00 accent walls where requested 11. Countertop - Granite - Galaxy Black at coffee bar 1.00 EA @ 3,000.00 = 3,000.00 12. Electrical - Final - Per Drawings 1.00 EA @ 2,000.00 = 2,000.00 13. Plumbing - install Sink and faucet - ice maker line 1.00 EA @ 1,000.00 = 1,000.00 14. Doors and Finish Hardware / door stops - per drawing 1.00 EA @ 2,200.00 = 2,200.00 15. Light Fixtures - add where necessary for coffee bar and relocate per 1.00 EA @ 1,000.00 = 1,000.00 drawings 16. Plumbing Fixtures - sinks / faucets 1.00 EA @ 500.00 = 500.00 17. Flooring - vinyl plank in coffee area and patch carpet squares where 1.00 EA @ 5,000.00 = 5,000.00 necessary 18. Final cleaning 1.00 EA @ 1,000.00 = 1,000.00 19. Sprinkler system - relocate 2 heads 1.00 EA @ 1,200.00 = 1,200.00 20. Suspended ceiling grid - Detach and rework where necessary 1.00 EA @ 4,000.00 = 4,000.00 21. Dumpster load - or haul off debris 4.00 EA @ 600.00 = 2,400.00 SL_FINANCE_STE420 8/1/2018 Page:2 DRI CONSTRUCTION Line Item Total Davidson Reconstruction, Inc. Replacement Cost Value Net Claim Derek Davidson Summary 87,800.00 $87,800.00 $87,800.00 SL_FINANCE_STE420 8/1/2018 Page:3 DRI CONSTRUCTION DRI CONSTRUCTION Client: Southlake Town Hall Utility Billing Door Property: 1400 Main St Southlake , TX 76096 Operator: DEREKDAV Estimator: Derek Davidson Business E-mail Type of Estimate: Other Date Entered: 4/9/2018 Date Assigned: 4/9/2018 Date Est. Completed: 4/9/2018 Date Job Completed: Price List: TXDF8X_MAY16 Labor Efficiency: Restoration/Service/Remodel Estimate: SL UTIL BILLING DOOR This estimate is based on TIPS / TAPS contract # 170201 (817)733-0730 derekdavidson77 @gmail. com DRI CONSTRUCTION DRI CONSTRUCTION SL_UTIL BILLING_DOOR Main Level DESCRIPTION QTY 1. Frame in door opening for new door 1.00 EA 2. Drywall at new framing - install moulding to match existing as close as possible 1.00 EA 3. Interior door and frame - half light - includes door knob 1.00 EA 4. Paint the door, door frame, new wall, and moulding 1.00 EA Grand Total Derek Davidson $3,000.00 SL_UTIL_BILLING_DOOR 4/9/2018 Page:2 DRI CONSTRUCTION Davidson Reconstruction, Inc. Client: Southlake Town Hall Restroom - 2nd Floor Property: 1400 Main St Southlake, TX 76092 Operator: DEREKDAV Estimator: Derek Davidson Business E-mail Type of Estimate: Other Date Entered: 12/4/2018 Date Assigned: 12/4/2018 Date Est. Completed: 12/4/2018 Date Job Completed: Estimate: SL TH RESTR2 12418 This estimate is based on TIPS/TAPS contract # 170201 THIS ESTIMATE INCLUDES THE FEES FOR TIPS/TAPS PROJECTS (817)733-0730 derekdavidson77 @gmail. com DRI CONSTRUCTION Davidson Reconstruction, Inc. SL_TH_RESTR2_12418 2nd Floor Mens DESCRIPTION Height: 8' QTY UNIT PRICE TOTAL 1. General Demolition - Remove Partitions, Countertops, Tile, Drywall 1.00 EA @ 6,000.00 = 6,000.00 on Walls, and Accessories. 2. 5/8" drywall - hung, taped, ready for tile 482.67 SF @ 3.00 = 1,448.01 3. Tile covering - up to 3.00 SF material allowance 709.00 SF @ 10.00 = 7,090.00 4. Paint the ceiling 226.33 SF @ 3.00 = 678.99 5. Recessed light fixture - trim only 5.00 EA @ 56.68 = 283.40 6. Prime & paint register and speakers 4.00 EA @ 50.00 = 200.00 7. Paint door 1.00 EA @ 150.00 = 150.00 8. Toilet partition - stainless steel - oversized/handicap 1.00 EA @ 1,600.00 = 1,600.00 9. Toilet partition - stainless steel 2.00 EA @ 1,400.00 = 2,800.00 10. Urinal partition -stainless steel 1.00 EA @ 450.00 = 450.00 11. R&R Sink faucet - satin nickel - standard 3.00 EA @ 200.65 = 601.95 12. Detach & Reset Handicap grab bar and accessories 1.00 EA @ 500.00 = 500.00 13. Cleaning (post construction clean up) 1.00 EA @ 250.00 = 250.00 14. On -Site Evaluation and/or Supervisor/Admin - per hour 80.00 HR @ 44.04 = 3,523.20 Womens DESCRIPTION Height: 8' QTY UNIT PRICE TOTAL 15. General Demolition - Remove Partitions, Countertops, Tile, Drywall 1.00 EA @ 6,000.00 = 6,000.00 on Walls, and Accessories. 16. 5/8" drywall - hung, taped, ready for tile 496.00 SF @ 3.00 = 1,488.00 17. Tile covering - up to 3.00 SF material allowance 734.00 SF @ 10.00 = 7,340.00 18. Paint the ceiling 238.00 SF @ 3.00 = 714.00 19. Recessed light fixture - trim only 5.00 EA @ 56.68 = 283.40 20. Prime & paint register and speakers 4.00 EA @ 50.00 = 200.00 21. Paint door 1.00 EA @ 150.00 = 150.00 22. Toilet partition - stainless steel - oversized/handicap 1.00 EA @ 1,600.00 = 1,600.00 23. Toilet partition - stainless steel 3.00 EA @ 1,400.00 = 4,200.00 24. R&R Sink faucet - satin nickel - standard 4.00 EA @ 200.65 = 802.60 25. Cleaning (post construction clean up) 1.00 EA @ 250.00 = 250.00 26. Detach & Reset Handicap grab bar and accessories 1.00 EA @ 500.00 = 500.00 27. On -Site Evaluation and/or Supervisor/Admin - per hour 80.00 HR @ 44.04 = 3,523.20 SL_TH RESTR2_12418 11/26/2018 Page: 2 DRI CONSTRUCTION Davidson Reconstruction, Inc. Grand Total Areas: 978.67 SF Walls 464.33 SF Floor 0.00 SF Long Wall 464.33 Floor Area 1,149.00 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 464.33 SF Ceiling 51.59 SY Flooring 0.00 SF Short Wall 506.00 Total Area 127.67 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length 1,443.00 SF Walls and Ceiling 122.33 LF Floor Perimeter 122.33 LF Ceil. Perimeter 978.67 Interior Wall Area 0.00 Total Perimeter Length SL_TH RESTR2_12418 11/26/2018 Page: 3 DRI CONSTRUCTION Line Item Total Overhead Profit Davidson Reconstruction, Inc. Replacement Cost Value Net Claim Derek Davidson Summary 52,626.75 5,262.67 5,262.67 $63,152.09 $63,152.09 SL_TH RESTR2_12418 11/26/2018 Page: 4 DRI CONSTRUCTION Davidson Reconstruction, Inc. Client: Southlake Town Hall Restroom - 3rd floor Property: 1400 Main St Southlake, TX 76092 Operator: DEREKDAV Estimator: Derek Davidson Business E-mail Type of Estimate: Other Date Entered: 12/4/2018 Date Assigned: 12/4/2018 Date Est. Completed: 12/4/2018 Date Job Completed: Estimate: SL TH RESTR3 12418 This estimate is based on TIPS/TAPS contract # 170201 THIS ESTIMATE INCLUDES THE FEES FOR TIPS/TAPS PROJECTS (817)733-0730 derekdavidson77 @gmail. com DRI CONSTRUCTION Davidson Reconstruction, Inc. SL TH RESTR3 12418 3rd Floor Mens DESCRIPTION Height: 8' QTY UNIT PRICE TOTAL 1. General Demolition - Remove Partitions, Countertops, Tile, Drywall 1.00 EA @ 6,000.00 = 6,000.00 on Walls, and Accessories. 2. 5/8" drywall - hung, taped, ready for tile 482.67 SF @ 3.00 = 1,448.01 3. Tile covering - up to 3.00 SF material allowance 709.00 SF @ 10.00 = 7,090.00 4. Paint the ceiling 226.33 SF @ 3.00 = 678.99 5. Recessed light fixture - trim only 5.00 EA @ 56.68 = 283.40 6. Prime & paint register and speakers 4.00 EA @ 50.00 = 200.00 7. Paint door 1.00 EA @ 150.00 = 150.00 8. Toilet partition - stainless steel - oversized/handicap 1.00 EA @ 1,600.00 = 1,600.00 9. Toilet partition - stainless steel 2.00 EA @ 1,400.00 = 2,800.00 10. Urinal partition -stainless steel 1.00 EA @ 450.00 = 450.00 11. R&R Sink faucet - satin nickel - standard 3.00 EA @ 200.65 = 601.95 12. Detach & Reset Handicap grab bar and accessories 1.00 EA @ 500.00 = 500.00 13. Cleaning (post construction clean up) 1.00 EA @ 250.00 = 250.00 14. On -Site Evaluation and/or Supervisor/Admin - per hour 80.00 HR @ 44.04 = 3,523.20 Womens DESCRIPTION Height: 8' QTY UNIT PRICE TOTAL 15. General Demolition - Remove Partitions, Countertops, Tile, Drywall 1.00 EA @ 6,000.00 = 6,000.00 on Walls, and Accessories. 16. 5/8" drywall - hung, taped, ready for tile 496.00 SF @ 3.00 = 1,488.00 17. Tile covering - up to 3.00 SF material allowance 734.00 SF @ 10.00 = 7,340.00 18. Paint the ceiling 238.00 SF @ 3.00 = 714.00 19. Recessed light fixture - trim only 5.00 EA @ 56.68 = 283.40 20. Prime & paint register and speakers 4.00 EA @ 50.00 = 200.00 21. Paint door 1.00 EA @ 150.00 = 150.00 22. Toilet partition - stainless steel - oversized/handicap 1.00 EA @ 1,600.00 = 1,600.00 23. Toilet partition - stainless steel 3.00 EA @ 1,400.00 = 4,200.00 24. R&R Sink faucet - satin nickel - standard 4.00 EA @ 200.65 = 802.60 25. Cleaning (post construction clean up) 1.00 EA @ 250.00 = 250.00 26. Detach & Reset Handicap grab bar and accessories 1.00 EA @ 500.00 = 500.00 27. On -Site Evaluation and/or Supervisor/Admin - per hour 80.00 HR @ 44.04 = 3,523.20 SL_TH RESTR3_12418 11/26/2018 Page: 2 DRI CONSTRUCTION Davidson Reconstruction, Inc. Grand Total Areas: 978.67 SF Walls 464.33 SF Floor 0.00 SF Long Wall 464.33 Floor Area 1,149.00 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 464.33 SF Ceiling 51.59 SY Flooring 0.00 SF Short Wall 506.00 Total Area 127.67 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length 1,443.00 SF Walls and Ceiling 122.33 LF Floor Perimeter 122.33 LF Ceil. Perimeter 978.67 Interior Wall Area 0.00 Total Perimeter Length SL_TH RESTR3_12418 11/26/2018 Page: 3 DRI CONSTRUCTION Line Item Total Overhead Profit Davidson Reconstruction, Inc. Replacement Cost Value Net Claim Derek Davidson Summary 52,626.75 5,262.67 5,262.67 $63,152.09 $63,152.09 SL_TH RESTR3_12418 11/26/2018 Page: 4 DRI CONSTRUCTION Davidson Reconstruction, Inc. Client: Southlake Town Hall Restroom - Executive Property: 1400 Main St Southlake, TX 76092 Operator: DEREKDAV Estimator: Derek Davidson Business E-mail Type of Estimate: Other Date Entered: 12/4/2018 Date Assigned: 12/4/2018 Date Est. Completed: 12/4/2018 Date Job Completed: Estimate: SL TH RR EXEC 12418 This estimate is based on TIPS/TAPS contract # 170201 THIS ESTIMATE INCLUDES THE FEES FOR TIPS/TAPS PROJECTS (817)733-0730 derekdavidson77 @gmail. com DRI CONSTRUCTION Davidson Reconstruction, Inc. SL_TH_RR_EXEC_12418 Executive restroom Executive Height: 8' DESCRIPTION QTY UNIT PRICE TOTAL 1. General Demolition - Remove Partitions, Countertops, Tile, Drywall 1.00 EA @ 2,000.00 = 2,000.00 on Walls, and Accessories. 2. 5/8" drywall - hung, taped, ready for tile 216.00 SF @ 3.00 = 648.00 3. Tile covering - up to 3.00 SF material allowance 260.00 SF @ 10.00 = 2,600.00 4. Paint the ceiling 44.00 SF @ 3.00 = 132.00 5. Prime & paint register and speakers 1.00 EA @ 50.00 = 50.00 6. Paint door 1.00 EA @ 150.00 = 150.00 7. R&R Light bar - 250.00 Allowance 1.00 EA @ 422.02 = 422.02 8. R&R Outlet or switch cover - stainless 2.00 EA @ 15.50 = 31.00 9. R&R Sink - single - stainless - standard 1.00 EA @ 249.93 = 249.93 10. R&R Sink - wall mount 1.00 EA @ 564.44 = 564.44 11. R&R Toilet - standard 1.00 EA @ 819.26 = 819.26 12. R&R Toilet seat - standard 1.00 EA @ 100.25 = 100.25 13. R&R Toilet auto flush - standard 1.00 EA @ 644.86 = 644.86 14. R&R Soap dispenser - wall mounted - stainless - we will provide 1.00 EA @ 93.32 = 93.32 selection 15. R&R Paper towel dispenser - stainless - standard 1.00 EA @ 336.55 = 336.55 16. Detach & Reset Toilet paper holder 1.00 EA @ 40.00 = 40.00 17. Detach & Reset Handicap grab bar 2.00 EA @ 30.00 = 60.00 18. Detach & Reset Door stop - wall or floor mounted 1.00 EA @ 15.00 = 15.00 19. Cleaning (post construction clean up) 1.00 EA @ 150.00 = 150.00 20. R&R Mirror 1.00 EA @ 250.22 = 250.22 21. (Install) Diaper change station - plastic 1.00 EA @ 149.03 = 149.03 22. On -Site Evaluation and/or Supervisor/Admin - per hour 32.00 HR @ 44.04 = 1,409.28 Grand Total Areas: 216.00 SF Walls 44.00 SF Floor 0.00 SF Long Wall 44.00 Floor Area 267.00 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 44.00 SF Ceiling 4.89 SY Flooring 0.00 SF Short Wall 53.44 Total Area 29.67 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length 260.00 SF Walls and Ceiling 27.00 LF Floor Perimeter 27.00 LF Ceil. Perimeter 216.00 Interior Wall Area 0.00 Total Perimeter Length SL_TH RR EXEC_12418 11/26/2018 Page: 2 DRI CONSTRUCTION Line Item Total Overhead Profit Davidson Reconstruction, Inc. Replacement Cost Value Net Claim Derek Davidson Summary 10,915.16 1,091.52 1,091.52 $13,098.20 $13,098.20 SL_TH RR EXEC_12418 11/26/2018 Page: 3 DAVIDSO Rcrt• Remodel • R ­i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED Client: Southlake Town Hall Property: 1400 Main St Southlake, TX 76092 Operator: DAVIDSON Estimator: Derek Davidson Business: 621 Silver Creek Rd Azle, TX 76020 Type of Estimate: Other Date Entered: 4/18/2018 Date Assigned: 4/18/2018 Date Est. Completed: 4/25/2018 Date Job Completed: Price List: TXDF8X_MAR18 Labor Efficiency: Restoration/Service/Remodel Estimate: TOWN HALL 1ST FLOOR This estimate is based on TIPS / TAPS contract # 170201 Business: (817) 477-7233 E-mail: derekdavidson77@gmail. com DAVIDSO Rcrt• Remodel • R -i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED TOWN -HALL -1ST -FLOOR 1st floor Vestibule 100 Height: 9'8" DESCRIPTION QTY 1. Paint the walls and ceiling 1,030.50 SF 2. Paint baseboard w/cap &/or shoe 79.50 LF 3. Paint chair rail 79.50 LF 4. Paint crown molding 79.50 LF 5. Paint door slab only - (per side) 2.00 EA 6. Paint door or window trim & jamb - (per side) 5.00 EA 7. Mask and prep for paint - tape only 318.00 LF 8. Mask and cover light fixture or accessory 20.00 EA Stairway Height: 9' 8" DESCRIPTION QTY 9. Paint the walls and ceiling 1,131.03 SF 10. Paint baseboard w/cap &/or shoe 32.00 LF 11. Paint chair rail 85.71 LF 12. Paint door slab only - (per side) 4.00 EA 13. Paint door or window trim & jamb - (per side) 2.00 EA 14. Mask and prep for paint - tape only 342.83 LF 15. Mask and cover light fixture or accessory 11.00 EA 16. Paint stair skirt/apron 171.42 LF 17. Paint newel 10.00 EA Elevator Lobby 102 Height: 9' 8" DESCRIPTION QTY 18. Paint the walls 547.78 SF 19. Paint baseboard w/cap &/or shoe 56.67 LF 20. Paint chair rail 56.67 LF 21. Paint crown molding 56.67 LF 22. Paint door slab only - (per side) 4.00 EA 23. Paint door or window trim & jamb - (per side) 4.00 EA 24. Mask and prep for paint - tape only 226.67 LF 25. Mask and cover light fixture or accessory 10.00 EA TOWN HALL_1ST FLOOR 4/25/2018 Page:2 DAVIDSO Rcrt• Remodel • R -i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED Lobby 103 Height: 9' 8" DESCRIPTION QTY 26. Paint the walls and ceiling 955.53 SF 27. Paint baseboard w/cap &/or shoe 73.17 LF 28. Paint chair rail 73.17 LF 29. Paint crown molding 73.17 LF 30. Paint door slab only - (per side) 2.00 EA 31. Paint door or window trim & jamb - (per side) 6.00 EA 32. Mask and prep for paint - tape only 292.67 LF 33. Mask and cover light fixture or accessory 14.00 EA Lobby offset 1 -103 Height: 9' 8" DESCRIPTION QTY 34. Paint the walls 254.56 SF 35. Paint baseboard w/cap &/or shoe 26.33 LF 36. Paint chair rail 26.33 LF 37. Paint crown molding 26.33 LF 38. Paint door slab only - (per side) 3.00 EA 39. Paint door or window trim & jamb - (per side) 2.00 EA 40. Mask and prep for paint - tape only 105.33 LF 41. Mask and cover light fixture or accessory 3.00 EA Alcove 144 Height: 9' 8" DESCRIPTION QTY 42. Paint the walls 277.11 SF 43. Paint baseboard w/cap &/or shoe 28.67 LF 44. Paint door slab only - (per side) 2.00 EA 45. Paint door or window trim & jamb - (per side) 1.00 EA 46. Mask and prep for paint - tape only 114.67 LF Waiting Area 139 Height: 9' 8" DESCRIPTION QTY 47. Paint part of the walls - touch up 565.50 SF 48. Paint baseboard w/cap &/or shoe 117.00 LF 49. Paint countertop edge and renail 63.00 LF 50. Paint door slab only - (per side) 1.00 EA 51. Paint door or window trim & jamb - (per side) 1.00 EA 52. Mask and prep for paint - tape only 468.00 LF 53. Mask and cover light fixture or accessory 3.00 EA TOWN HALL_1ST FLOOR 4/25/2018 Page: 3 DAVIDSO Rcrt• Remodel • R -i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED Lobby Offset 2 - 103 Height: 8' 9" DESCRIPTION QTY 54. Paint the walls 253.75 SF 55. Paint baseboard w/cap &/or shoe 29.00 LF 56. Paint chair rail 29.00 LF 57. Paint crown molding 29.00 LF 58. Paint door slab only - (per side) 2.00 EA 59. Paint door or window trim & jamb - (per side) 3.00 EA 60. Mask and prep for paint - tape only 116.00 LF 61. Mask and cover light fixture 1.00 EA Corridor 108 Height: 8' 9" DESCRIPTION QTY 62. Paint the walls 303.33 SF 63. Paint door slab only - (per side) 3.00 EA 64. Paint door or window trim & jamb - (per side) 2.00 EA 65. Mask and prep for paint - tape only 138.67 LF 66. Mask and cover light fixture or accessory 3.00 EA Circulation 110 Height: 8' 9" DESCRIPTION QTY 67. Paint the walls 450.63 SF 68. Paint baseboard w/cap &/or shoe 51.50 LF 69. Paint door slab only - (per side) 2.00 EA 70. Paint door or window trim & jamb - (per side) 1.00 EA 71. Mask and prep for paint - tape only 206.00 LF 72. Mask and cover light fixture or accessory 3.00 EA Dealer Tax 109 Height: 8' 9" DESCRIPTION QTY 73. Paint the walls 392.29 SF 74. Paint baseboard w/cap &/or shoe 44.83 LF 75. Paint countertop edge and decorative apron 25.00 LF 76. Paint door slab only - (per side) 1.00 EA 77. Paint door or window trim & jamb - (per side) 1.00 EA 78. Mask and prep for paint - tape only 179.33 LF 79. Mask and cover light fixture or accessory 2.00 EA TOWN HALL_1ST FLOOR 4/25/2018 Page:4 DAVIDSO Rcrt• Remodel • R -i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED Property tax 111 Height: 8' 9" DESCRIPTION QTY 80. Paint the walls 667.92 SF 81. Paint baseboard w/cap &/or shoe 76.33 LF 82. Paint countertop edge and decorative apron 17.00 LF 83. Mask and prep for paint - tape only 305.33 LF 84. Mask and cover light fixture or accessory 1.00 EA Tax waiting area 112 Height: 91811 DESCRIPTION QTY 85. Paint part of the walls 547.78 SF 86. Paint baseboard w/cap &/or shoe 113.33 LF 87. Paint countertop edge and decorative apron 113.33 LF 88. Paint reception opening jamb 11.00 EA 89. Mask and prep for paint - tape only 453.34 LF 90. Mask and cover light fixture or accessory 3.00 EA Corridor 122 Height: 8' 9" DESCRIPTION QTY 91. Paint the walls 1,006.22 SF 92. Paint door slab only - (per side) 6.00 EA 93. Paint door or window trim & jamb - (per side) 6.00 EA 94. Mask and prep for paint - tape only 459.98 LF 95. Mask and cover light fixture or accessory 4.00 EA Corridor 134 Height: 8' 9" DESCRIPTION QTY 96. Paint the walls 1,023.68 SF 97. Paint door slab only - (per side) 2.00 EA 98. Paint door or window trim & jamb - (per side) 2.00 EA 99. Mask and prep for paint - tape only 467.97 LF 100. Mask and cover light fixture or accessory 4.00 EA Corridor 133 Height: 8' 9" DESCRIPTION QTY 101. Paint the walls 762.74 SF TOWN HALL_1ST FLOOR 4/25/2018 Page: 5 DAVIDSON DAVIDSON RECONSTRUCTION INCORPORATED 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 CONTINUED - Corridor 133 DESCRIPTION QTY 102. Paint door slab only - (per side) 7.00 EA 103. Paint door or window trim & jamb - (per side) 6.00 EA 104. Mask and prep for paint - tape only 348.68 LF 105. Mask and cover light fixture or accessory 14.00 EA Mail room 125 Height: 8' 9" DESCRIPTION QTY 106. Paint the walls 904.17 SF 107. Paint door slab only - (per side) 4.00 EA 108. Paint door or window trim & jamb - (per side) 3.00 EA 109. Mask and prep for paint - tape only 413.33 LF 110. Mask and cover light fixture or accessory 4.00 EA Recieving 127 Height: 8' 9" DESCRIPTION QTY 111. Paint the walls 348.54 SF 112. Paint door slab only - (per side) 2.00 EA 113. Paint door or window trim & jamb -(per side) 2.00 EA 114. Mask and prep for paint - tape only 159.33 LF 115. Mask and cover light fixture or accessory 1.00 EA Miscellaneous DESCRIPTION QTY 116. On -Site Evaluation and/or Supervisor/Admin - per hour 40.00 HR 117. General clean - up 8.00 HR Grand Total $31,219.22 Derek Davidson TOWN HALL_1ST FLOOR 4/25/2018 Page: 6 DAVIDSON DAVIDSON RECONSTRUCTION INCORPORATED 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 Grand Total Areas: 11,723.57 SF Walls 4,795.05 SF Floor 0.00 SF Long Wall 4,795.05 Floor Area 8,579.41 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 4,795.05 SF Ceiling 532.78 SY Flooring 0.00 SF Short Wall 5,150.25 Total Area 842.16 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length 16,518.62 SF Walls and Ceiling 1,279.04 LF Floor Perimeter 1,279.04 LF Ceil. Perimeter 11,723.57 Interior Wall Area 0.00 Total Perimeter Length TOWN HALL_1ST FLOOR 4/25/2018 Page: 7 DAVIDSO Rcrt• Remodel • R ­i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED Client: Southlake Town Hall Property: 1400 Main St Southlake, TX 76092 Operator: DAVIDSON Estimator: Derek Davidson Business: 621 Silver Creek Rd Azle, TX 76020 Type of Estimate: Other Date Entered: 4/18/2018 Date Assigned: 4/18/2018 Date Est. Completed: 4/25/2018 Date Job Completed: Price List: TXDF8X_MAR18 Labor Efficiency: Restoration/Service/Remodel Estimate: TOWN—HALL-2ND—FLOOR This estimate is based on TIPS / TAPS contract # 170201 Business: (817) 477-7233 E-mail: derekdavidson77@gmail. com DAVIDSO Rcrt• Remodel • R -i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED TOWN -HALL -2ND -FLOOR 2nd floor Stairway Height: 9'8" DESCRIPTION QTY 1. Paint the walls 751.18 SF 2. Paint baseboard w/cap &/or shoe 20.00 LF 3. Paint chair rail 77.71 LF 4. Paint door slab only - (per side) 2.00 EA 5. Paint door or window trim & jamb - (per side) 4.00 EA 6. Mask and prep for paint - tape only 310.83 LF 7. Mask and cover light fixture or accessory 15.00 EA 8. Paint stair skirt/apron 155.42 LF 9. Paint newel 12.00 EA Elevator Lobby Height: 9' 8" DESCRIPTION QTY 10. Paint the walls and judges paneling 547.78 SF 11. Paint baseboard w/cap &/or shoe 56.67 LF 12. Paint chair rail 56.67 LF 13. Paint crown molding 56.67 LF 14. Paint door slab only - (per side) 4.00 EA 15. Paint door or window trim & jamb - (per side) 4.00 EA 16. Mask and prep for paint - tape only 226.67 LF 17. Mask and cover light fixture or accessory 11.00 EA Lobby Height: 9' 8" DESCRIPTION QTY 18. Paint baseboard w/cap &/or shoe 200.00 LF 19. Paint base of column 24.00 EA 20. Paint door slab only - (per side) 4.00 EA 21. Paint door or window trim & jamb - (per side) 15.00 EA 22. Mask and prep for paint - tape only 800.00 LF 23. Mask and cover light fixture or accessory 1.00 EA S E Offset Height: 9' 8" TOWN -HALL -2ND -FLOOR 4/25/2018 Page: 2 DAVIDSO Rcrt• Remodel • R -i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED DESCRIPTION QTY 24. Paint the walls 773.33 SF 25. Paint baseboard w/cap &/or shoe 80.00 LF 26. Paint chair rail 80.00 LF 27. Paint crown molding 80.00 LF 28. Paint door slab only - (per side) 7.00 EA 29. Paint door or window trim & jamb - (per side) 7.00 EA 30. Mask and prep for paint - tape only 320.00 LF 31. Mask and cover light fixture or accessory 6.00 EA N E Offset Height: 9' 8" DESCRIPTION QTY 32. Paint the walls 447.89 SF 33. Paint baseboard w/cap &/or shoe 46.33 LF 34. Paint chair rail 46.33 LF 35. Paint crown molding 46.33 LF 36. Paint door slab only - (per side) 2.00 EA 37. Paint door or window trim & jamb - (per side) 6.00 EA 38. Mask and prep for paint - tape only 185.33 LF 39. Mask and cover light fixture or accessory 8.00 EA N W Offset Height: 9' 8" DESCRIPTION QTY 40. Paint the walls 270.67 SF 41. Paint baseboard w/cap &/or shoe 28.00 LF 42. Paint chair rail 28.00 LF 43. Paint crown molding 28.00 LF 44. Paint door slab only - (per side) 2.00 EA 45. Paint door or window trim & jamb - (per side) 3.00 EA 46. Mask and prep for paint - tape only 112.00 LF 47. Mask and cover light fixture or accessory 5.00 EA S W Offset Height: 9' 8" DESCRIPTION QTY 48. Paint the walls 290.00 SF 49. Paint baseboard w/cap &/or shoe 30.00 LF 50. Paint chair rail 30.00 LF 51. Paint crown molding 30.00 LF 52. Paint door slab only - (per side) 1.00 EA TOWN -HALL -2ND -FLOOR 4/25/2018 Page: 3 DAVIDSO Rcrt• Remodel • R -i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED CONTINUED - S W Offset DESCRIPTION QTY 53. Paint door or window trim & jamb - (per side) 3.00 EA 54. Mask and prep for paint - tape only 120.00 LF 55. Mask and cover light fixture or accessory 6.00 EA North Entry Foyer Height: 9' 8" DESCRIPTION QTY 56. Paint the walls and judge paneling 831.33 SF 57. Paint baseboard w/cap &/or shoe 86.00 LF 58. Paint chair rail 86.00 LF 59. Paint crown molding 86.00 LF 60. Paint door slab only - (per side) 7.00 EA 61. Paint door or window trim & jamb - (per side) 8.00 EA 62. Mask and prep for paint - tape only 344.00 LF 63. Mask and cover light fixture or accessory 14.00 EA Community Services Height: 9' 8" DESCRIPTION QTY 64. Paint the walls and judge paneling 773.33 SF 65. Paint baseboard w/cap &/or shoe 80.00 LF 66. Paint chair rail 80.00 LF 67. Paint crown molding 80.00 LF 68. Paint door slab only - (per side) 5.00 EA 69. Paint door or window trim & jamb - (per side) 11.00 EA 70. Mask and prep for paint - tape only 320.00 LF 71. Mask and cover light fixture or accessory 20.00 EA Utility Billing Height: 918" DESCRIPTION QTY 72. Paint the walls 73. Paint baseboard w/cap &/or shoe 74. Paint chair rail 75. Paint door slab only - (per side) 76. Paint door or window trim & jamb - (per side) 77. Mask and prep for paint - tape only 78. Mask and cover light fixture or accessory TOWN -HALL -2ND -FLOOR 428.56 SF 44.33 LF 44.33 LF 2.00 EA 6.00 EA 177.33 LF 5.00 EA 4/25/2018 Page:4 DAVIDSON DAVIDSON RECONSTRUCTION INCORPORATED 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 City Secretary Height: 9' 8" DESCRIPTION QTY 79. Paint the walls 219.11 SF 80. Paint door slab only - (per side) 3.00 EA 81. Paint door or window trim & jamb -(per side) 3.00 EA 82. Mask and prep for paint - tape only 90.67 LF 83. Mask and cover light fixture or accessory 1.00 EA Miscellaneous DESCRIPTION QTY 84. On -Site Evaluation and/or Supervisor/Admin - per hour 40.00 HR 85. Entry Doors - refinish 2.00 EA 86. General clean - up 10.00 HR Grand Total $24,057.16 Derek Davidson Grand Total Areas: 7,266.52 SF Walls 4,218.35 SF Floor 0.00 SF Long Wall 4,218.35 Floor Area 6,222.67 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 4,218.35 SF Ceiling 468.71 SY Flooring 0.00 SF Short Wall 4,441.98 Total Area 583.38 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length 11,484.87 SF Walls and Ceiling 751.71 LF Floor Perimeter 751.71 LF Ceil. Perimeter 7,266.52 Interior Wall Area 0.00 Total Perimeter Length TOWN -HALL -2ND -FLOOR 4/25/2018 Page: 5 DAVIDSO Rcrt• Remodel • R ­i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED Client: Southlake Town Hall Property: 1400 Main St Southlake, TX 76092 Operator: DAVIDSON Estimator: Derek Davidson Business: 621 Silver Creek Rd Azle, TX 76020 Type of Estimate: Other Date Entered: 4/18/2018 Date Assigned: 4/18/2018 Date Est. Completed: 4/25/2018 Date Job Completed: Price List: TXDF8X_MAR18 Labor Efficiency: Restoration/Service/Remodel Estimate: TOWN—HALL-3RD—FLOOR This estimate is based on TIPS / TAPS contract # 170201 Business: (817) 477-7233 E-mail: derekdavidson77@gmail. com DAVIDSO Rcrt• Remodel • R -i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED TOWN -HALL -3RD -FLOOR 3rd floor Stairway Height: 9'8" DESCRIPTION QTY 1. Paint part of the walls - under chair rail 375.59 SF 2. Paint chair rail 77.71 LF 3. Paint door slab only - (per side) 2.00 EA 4. Paint door or window trim & jamb - (per side) 5.00 EA 5. Mask and prep for paint - tape only 310.83 LF 6. Mask and cover light fixture or accessory 12.00 EA 7. Paint stair skirt/apron 155.42 LF 8. Paint newel 10.00 EA Elevator Lobby Height: 9' 8" DESCRIPTION QTY 9. Paint the walls 547.78 SF 10. Paint baseboard w/cap &/or shoe 56.67 LF 11. Paint chair rail 56.67 LF 12. Paint crown molding 56.67 LF 13. Paint door slab only - (per side) 4.00 EA 14. Paint door or window trim & jamb - (per side) 4.00 EA 15. Mask and prep for paint - tape only 226.67 LF 16. Mask and cover light fixture or accessory 10.00 EA Lobby DESCRIPTION Height: 9' 8" QTY 17. Paint part of the walls - under chair rail 966.67 SF 18. Paint baseboard w/cap &/or shoe 200.00 LF 19. Paint base of column 24.00 EA 20. Paint chair rail 200.00 LF 21. Paint door slab only - (per side) 15.00 EA 22. Paint door or window trim & jamb - (per side) 18.00 EA 23. Mask and prep for paint - tape only 800.00 LF Breakroom Hallway Height: 9' 8" TOWN -HALL -3RD -FLOOR 4/25/2018 Page: 2 DaviDs .N DAVIDSON RECONSTRUCTION INCORPORATED Rcrtomian Remodel Rrnovasion 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DESCRIPTION QTY 24. Paint the walls 892.56 SF 25. Paint door slab only - (per side) 4.00 EA 26. Paint door or window trim & jamb - (per side) 5.00 EA 27. Mask and prep for paint - tape only 369.33 LF 28. Mask and cover light fixture or accessory 8.00 EA Training rooms Height: 9' 8" DESCRIPTION QTY 29. Paint part of the walls - under chair rail 908.67 SF 30. Paint chair rail 188.00 LF 31. Paint door slab only - (per side) 8.00 EA 32. Paint door or window trim & jamb - (per side) 4.00 EA 33. Mask and prep for paint - tape only 752.00 LF Public Works Alcove Height: 9' 8" DESCRIPTION QTY 34. Paint the walls 773.33 SF 35. Paint door slab only - (per side) 2.00 EA 36. Paint door or window trim & jamb - (per side) 1.00 EA 37. Mask and prep for paint - tape only 320.00 LF 38. Mask and cover light fixture or accessory 1.00 EA Miscellaneous DESCRIPTION QTY 39. On-Site Evaluation and/or Supervisor/Admin - per hour 20.00 HR 40. General clean -up 8.00 HR Grand Total $14,709.71 Derek Davidson TOWN -HALL -3RD -FLOOR 4/25/2018 Page: 3 DAVIDSON DAVIDSON RECONSTRUCTION INCORPORATED 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 Grand Total Areas: 6,715.52 SF Walls 5,483.02 SF Floor 0.00 SF Long Wall 5,483.02 Floor Area 5,680.45 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 5,483.02 SF Ceiling 609.22 SY Flooring 0.00 SF Short Wall 3,353.69 Total Area 532.54 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length 12,198.54 SF Walls and Ceiling 694.71 LF Floor Perimeter 694.71 LF Ceil. Perimeter 6,715.52 Interior Wall Area 0.00 Total Perimeter Length TOWN -HALL -3RD -FLOOR 4/25/2018 Page: 4 DAVIDSO Rcrt• Remodel • R ­i. 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED Client: Southlake Town Hall Property: 1400 Main St Southlake, TX 76092 Operator: DAVIDSON Estimator: Derek Davidson Business: 621 Silver Creek Rd Azle, TX 76020 Type of Estimate: Other Date Entered: 4/18/2018 Date Assigned: 4/18/2018 Date Est. Completed: 4/25/2018 Date Job Completed: Price List: TXDF8X_MAR18 Labor Efficiency: Restoration/Service/Remodel Estimate: TOWN—HALL-4TH—FLOOR This estimate is based on TIPS / TAPS contract # 170201 Business: (817) 477-7233 E-mail: derekdavidson77@gmail. com DAVIDSO Rcrtom�ian Remodel Rrnovasion 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 DAVIDSON RECONSTRUCTION INCORPORATED TOWN—HALL-4TH—FLOOR 4th floor Stairway Height: 9'8" DESCRIPTION QTY 1. Paint part of the walls - under chair rail and furr downs 375.59 SF 2. Paint baseboard w/cap &/or shoe 20.00 LF 3. Paint chair rail 77.71 LF 4. Paint door slab only - (per side) 2.00 EA 5. Paint door or window trim & jamb - (per side) 4.00 EA 6. Mask and prep for paint - tape only 310.83 LF 7. Mask and cover light fixture or accessory 1.00 EA 8. Paint stair skirt/apron 155.42 LF 9. Paint newel 6.00 EA Miscellaneous DESCRIPTION QTY 10. On -Site Evaluation and/or Supervisor/Admin - per hour 20.00 HR 11. General clean - up 4.00 HR 12. Paint door slab only - (per side) 5.00 EA 13. Paint door or window trim & jamb - (per side) 5.00 EA 14. Drywall Repair - touch up paint in hallway 1.00 EA Grand Total $4,283.89 Derek Davidson TOWN—HALL-4TH—FLOOR 4/25/2018 Page: 2 DAVIDSON DAVIDSON RECONSTRUCTION INCORPORATED 817-477-7233 WWW.A2VIASOIIICCOfI5N1C(IOII.CO111 Grand Total Areas: 1,298.96 SF Walls 519.18 SF Floor 0.00 SF Long Wall 519.18 Floor Area 1,326.67 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 519.18 SF Ceiling 57.69 SY Flooring 0.00 SF Short Wall 562.42 Total Area 124.38 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length 1,818.15 SF Walls and Ceiling 134.38 LF Floor Perimeter 134.38 LF Ceil. Perimeter 1,298.96 Interior Wall Area 0.00 Total Perimeter Length TOWN HALL 4TH FLOOR 4/25/2018 Page: 3