Item 4E - Memo FINAL[Type text] Item 4E Page 1 of 3 M E M O R A N D U M (November 6, 2018) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Subject: Authorize expenditures with Wildstone Construction LLC. for Emergency Water and Wastewater Utility Infrastructure repairs in an amount not to exceed $100,000 Action Requested: Authorize expenditures with Wildstone Construction LLC. for Emergency Water and Wastewater Utility Infrastructure repairs in an amount not to exceed $100,000. Background Information: The City of Southlake requires the assistance of a third party utility contractor to complete large scale emergency repairs of critical Water and Wastewater infrastructure as the need arises. Smaller scale emergency repairs are performed in-house by Public Works Water Division and Wastewater Division personnel. Public Works utility personnel are able to make repairs on water and wastewater pipes that are less than 16 inches in diameter and at a depth of less than 12 feet. Emergency repairs of leaks and breaks on the 20-inch, 30-inch, 36-inch, and 42-inch diameter water transmission mains are generally at a depth greater than 12 feet and require larger excavation equipment which the City does not own; extensive safety shoring boxes; large cranes; and the fabrication of large segments of custom pipe. Financial Considerations: Expenditures for emergency repairs to the City’s Water and Wastewater utility infrastructure is exempt from bidding under the Texas Local Government Code Chapter 252 Sec tion 252.022 General Exemptions: (a)(2) “a procurement necessary to preserve or protect the public health or safety of the municipality’s residents.” Funding for Water and Wastewater utility infrastructure repairs and system maintenance is budgeted in the FY 2019 Public Works Operating Budget. Item 4E In FY 2018, the City spent $46,880 on emergency utility repairs with Wildstone, and in FY 2019 to date, $43,050 has been encumbered for emergency repairs. The table below itemizes the emergency repairs to date. FY 2019 Emergency Repairs To Date Cost (*est.) Emergency repair of exposed sewer main @ the creek crossing @ Longford Dr. $ 18,050 Emergency repair of 30-inch water transmission main leak @ N. Pearson Lane and Southlake Blvd.(FM1709) $ 25,000* Total-to-date $ 43,050 The Alta Vista 30-inch/36-inch and the Caylor 42-inch water transmission mains are shared by the cities of Southlake and Keller. Per the Interlocal Agreements between the two cities, maintenance and repairs of the Alta Vista supply line is shared 50/50, and maintenance of the Caylor supply line is shared 75/25. Because the City of Southlake holds the majority interest, Southlake takes the lead on any emergency repairs of these water transmission lines and then invoices the City of Keller for reimbursement of their cost share. Strategic Link: This item relates to the City’s strategy map focus areas of Safety & Security and Infrastructure. It specifically relates to the City’s Corporate Objectives of (C1) Achieve the highest standards of safety & security, and (F2) Invest to provide & maintain high quality public assets. Citizen Input/ Board Review: N/A Legal Review: N/A Alternatives: The City Council may approve or deny this contract. Supporting Documents: Attachment A: Memo - Emergency Repair of Sewer Main Creek Crossing at Longford Dr. Item 4E Attachment B: Quote - Wildstone Construction, LLC 800 Longford Dr. Staff Recommendation: Authorize expenditures with Wildstone Construction LLC. for Emergency Water and Wastewater Utility Infrastructure repairs in an amount not to exceed $100,000. Staff Contact: Rob Cohen, Director of Public Works Cristina McMurray, M.P.A, C.P.M, Deputy Director of Public Works Wildstone Construction, LLC 12850 Hwy 287 Fort Worth, Texas 76052 Phone: 817-847-8660 Fax: 817-847-8019 Quote To:Date:09/19/2018 Phone:Attn:Jack Thompson Fax: Project: Item No.Quantity Unit Description Unit Price Extension 1 1 EA $1,500.00 $1,500.00 2 40 LF $30.00 $1,200.00 3 2 EA $2,000.00 $4,000.00 4 40 LF $150.00 $6,000.00 5 50 CY $90.00 $4,500.00 6 10 CY $85.00 $850.00 TOTAL QUOTE:$18,050.00 City of Southlake 1950 E. Continental Blvd Southlake, Texas 76092 - - Mobilize Remove Concrete Cap on 8" San Sew Concrete Pier & Pier Cap 14" or 16" Split Casing CTS Creek Bottom Rock Rip End of CTS 800 Longford Drive 731 Longford Drive Page 1 of 1