Loading...
Item 7 NarrativeNarrative (8-6-18) The City is requesting a Specific Use Permit for the installation of two electric vehicle charging stations. With the opening of Champions Club at The Marq Southlake coming in late 2018, both stations will be located in close proximity to the entry doors of the facility. With the specified ChargePoint CT4000 charging stations they are able to be utilized with all brands, including Tesla, due to their level two SAE J1772 plugs. These charging stations are currently installed in both parking garages within Southlake Town Square. One station is being requested to be installed in coordination for the opening of the facility while there is no immediately plans for the future staged installation. With substantial completion of the facility due by October 26, 2018 installation will begin immediately after approval. Due to the nature of the construction site, pictures of the actual locations are unavailable at this time. However, pictures from the parking garages along with the site plan is included with the application.