PZ Item 11 - Landscape Replacement Letterverizon/
500 W Dove RD
Southlake, TX 76092
July 26, 2018
Patty Moos, RLA, Planner I
City of Southlake
1400 Main Street Suite 310
Southlake, Texas 76092
Re: Tree Replacement Schedule (Related to Case No. ZA18-023)
Verizon Wireless ("Applicant") received an extension of its SUP for temporary construction facility at the March 6, 2018
city council meeting (Case ZA17-062). In connection with that extension, the city has requested that the Applicant provide
a letter noting the proposed schedule for the required replacement trees along Kirkwood as part of the proposed revised site
plan application for a built -in-place staging facility (Case ZA18-023) to replace the temporary construction facility.
Applicant proposed to wait until the construction of the Kirkwood right-of-way (ROW) was complete, and then the irrigation
system would be repaired and the replacement trees would be planted in the same approximate areas as the dead trees, with
the replacement trees to be placed strategically to help provide screening of the Applicant's property from the Kirkwood
ROW. It is our understanding that the construction of Kirkwood is complete; Applicant anticipates that the irrigation system
will be repaired by August 31 2018 and the replacement trees will be planted sometime between September 24, 2018 and
October 31. 2018.
Please let me know if you need any additional information.
Sinceryk
V
David A. Newell
Operations Manager
DN/tr