Loading...
Item 6G Narrative 12801 N. Central Expressway, Suite 1400, Dallas, TX 75243 hartgaugler.com May 21, 2018 Mr. Dennis Killough City of Southlake, Texas Planning and Development Services 1400 Main Street, Suite 310 Southlake, Texas 76092 Re: Carroll Independent School District Carroll Elementary School Campus – SUP for Portables HGA Project Number 217194 Dear Dennis: Carroll ISD desires to add to the Carroll Elementary School for additional classrooms to accommodate the school’s occupants. During construction (June 2018 – September 2019) affected classrooms will be shut down which creates a need for temporary classroom buildings to service the kids. The proposed t-buildings are 64’ X 24’ (1536 sqft). Access to the buildings will be via ramps and stairs. The buildings will meet TAS requirements. There will be a total of 3 temporary buildings on the site 1 relocation of an existing temporary building and 2 additional temporary classrooms will be added. Per the last submittal the temporary buildings have been updated to remain 30’ or more away from the existing building. Please contact me with any questions or comments you may have. Sincerely, Hart, Gaugler + Associates, Inc. John D. Blacker, P.E. Principal F:\2017\217194\Civil\Submittals\City Submittals\2018-04-02 Site Plan Submittal\217194 - Design SUP Narrative.doc