Item 4H Memo Item 4H Page 1 of 2 M E M O R A N D U M (June 19, 2018) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Subject: Approve an Advanced Funding Agreement (AFA) with TxDOT for the replacement of the S. White Chapel Boulevard/Pleasant Run Bridge. Action Requested: Approve an Advanced Funding Agreement (AFA) with TxDOT for the replacement of the S. White Chapel Boulevard/Pleasant Run Bridge. Background Information: TxDOT contacted the Department of Public Works regarding the structural integrity of the S. White Chapel Bridge in 2012. Soil erosion at the base of the bridge supports was increasing and would ultimately jeopardize the structural integrity of the bridge. A locally funded repair project was undertaken to extend the service life of the off system bridge. TxDOT concurrently submitted a project to replace the off system bridge via the Federal Bridge Replacement program. The Program funds on and off system bridges in need of reconstruction based on the following allocation: Federal-80%, State-10%, Local Government-10%. TxDOT recently confirmed that the bridge has been selected to be replaced in FY19. As a result, TxDOT is requesting to formalize the agreement between the State and the local governing body via an Advanced Funding Agreement (AFA). The AFA commits Southlake to a cost share agreement in which Southlake would fund a portion of the design and construction. Financial Considerations: The total project direct cost is $1,118,985. The City’s cost share for design is $13,882.15 and $98,016.35 for construction. TxDOT is requested the design funds to be submitted with the signed AFA. Construction funds will not be required until FY19. Funding for the project design will be via residual funds in FY18 and SWUS funds via the CIP in FY19. Item 4H Page 2 of 2 Strategic Link: The award of this contract links to the City’s strategy map relative to the focus areas of Infrastructure. The specific corporate objectives that are met by this contract are F2 invest to provide and maintain high quality public assets. Citizen Input/ Board Review: N/A Legal Review: The City Attorney’s Office has reviewed the AFA. Alternatives: The City Council may approve or deny these expenditures. Supporting Documents: Attachment A: Advanced Funding Agreement Staff Recommendation: Approve an Advanced Funding Agreement (AFA) with TxDOT for the replacement of the S. White Chapel Boulevard/Pleasant Run Bridge. Staff Contact: Rob Cohen, Director of Public Works