Item 4C[Type text] Item 4C Page 1 of 2 M E M O R A N D U M (May 15, 2018) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Subject: Award a construction contract for the N. Pearson 16-inch Waterline Improvements project to Four Star Excavating in an amount not to exceed $588,500. Action Requested: Award a construction contract for the N. Pearson 16 -inch W aterline Improvements project to Four Star Excavating in an amount not to exceed $588,500. Background: The N. Pearson 16-inch Waterline Improvements project consists of connecting a new 16-inch waterline and all its appurtenances to an existing 16-inch waterline downstream of the Pearson Road Pump Station and extending it approximately 3,000 linear feet along Harrell Drive to an existing 12-inch waterline in Johnson Road. These improvements will alleviate pressure issues associated with the current configuration and allow a more efficient transfer of water and water pressure. Nine (9) bids were received on Tuesday, April 24, 2018. The bids have been reviewed by Dunaway Associates, LP and City staff. The Dunaway Opinion of Probable Construction Cost was $571,313.00. Bid tabulation below: BIDDER BID AMOUNT Four Star Excavating $535,339 ANA Site Construction $546,870 Wildstone Construction, LLC $570,000 Willco Underground, LLC $599,990 Jackson Construction, LTD $618,310 Wilson Contracting $630,528 North Texas Contracting $634,540 RKM Utility Services $727,135 Blackrock Construction $789,385 Item 4C Page 2 of 2 Based on the City’s best value criteria , our staff recommends contract award amount for the base bid is $588,500. This award amount is within budget. All work associated with this project must be complete, by contract, in less than 150 working days once notice to proceed has been given. Financial Considerations: Funding for this contract has been allocated through the Capital Improvement Program within the FY 2014 budget and FY 2018 Water Impact Fee Fund. Strategic Link: This item relates to the City’s strategy map focus areas of Infrastructure. The specific corporate objective that is met by this project is to (F2) Invest to provide and maintain quality public assets. Citizen Input/ Board Review: N/A Legal Review: N/A Alternatives: The City Council may approve or deny the contract. Supporting Documents: Recommendation Letter Bid Tabulation Location Map Staff Recommendation: Award a construction contract for the N. Pearson 16 -inch W aterline Improvements project to Four Star Excavating in an amount not to exceed $588,500. Staff Contact: Rob Cohen, Director of Public Works Kyle Hogue, P.E., Deputy Director of Public Works/City Engineer Jim Flint, P.E., Civil Engineer Pr o j e c t N a m e : N. P e a r s o n R d 1 6 - i n c h W a t e r l i n e I m p r o v e m e n t s DA P r o j e c t N o . : 20 0 9 . 0 0 2 Ci t y P r o j e c t N o . : Bi d O p e n i n g D a t e : 24 - A p r - 1 8 Ta b u l a t e d B y : Jo s h W r i g h t , P E Un i t P r i c e Ex t e n s i o n Un i t P r i c e Extension Unit Price Extension WA T E R I M P R O V E M E N T S 00 1 16 " P V C W a t e r P i p e ( C - 9 0 5 ) LF 29 3 5 . 0 0 73 . 0 0 $ 21 4 , 2 5 5 . 0 0 $ 79 . 0 0 $ 231,865.00 $ 71.00 $ 208,385.00 $ 00 2 12 " P V C W a t e r P i p e ( C - 9 0 0 ) LF 45 . 0 0 65 . 0 0 $ 2, 9 2 5 . 0 0 $ 77 . 0 0 $ 3,465.00 $ 52.00 $ 2,340.00 $ 00 3 8" P V C W a t e r P i p e ( C - 9 0 0 ) LF 25 . 0 0 53 . 0 0 $ 1, 3 2 5 . 0 0 $ 70 . 0 0 $ 1,750.00 $ 59.00 $ 1,475.00 $ 00 4 6" P V C W a t e r P i p e ( C - 9 0 0 ) LF 25 . 0 0 47 . 0 0 $ 1, 1 7 5 . 0 0 $ 60 . 0 0 $ 1,500.00 $ 55.00 $ 1,375.00 $ 00 5 Tr e n c h S a f e t y LF 30 0 5 . 0 0 1. 0 0 $ 3, 0 0 5 . 0 0 $ 1. 0 0 $ 3,005.00 $ 1.00 $ 3,005.00 $ 00 6 Du c t i l e I r o n W a t e r F i t t i n g s w / R e s t r a i n t TO N 4. 1 0 4, 4 0 0 . 0 0 $ 18 , 0 4 0 . 0 0 $ 5, 8 5 5 . 0 0 $ 24,005.50 $ 7,000.00 $ 28,700.00 $ 00 7 Co n n e c t i o n t o E x i s t i n g 1 6 " W a t e r M a i n EA 2. 0 0 7, 6 0 0 . 0 0 $ 15 , 2 0 0 . 0 0 $ 5, 5 0 0 . 0 0 $ 11,000.00 $ 7,400.00 $ 14,800.00 $ 00 8 Co n n e c t i o n t o E x i s t i n g 1 2 " H D P E W a t e r M a i n ( T a p p i n g S l e e v e ) EA 1. 0 0 8, 9 0 0 . 0 0 $ 8, 9 0 0 . 0 0 $ 8, 3 7 0 . 0 0 $ 8,370.00 $ 4,698.00 $ 4,698.00 $ 00 9 Re p a i r / R e p l a c e W a t e r S e r v i c e ( A s n e e d e d f o r c r o s s i n g 1 6 - i n c h ) EA 2. 0 0 2, 6 0 0 . 0 0 $ 5, 2 0 0 . 0 0 $ 2, 5 0 0 . 0 0 $ 5,000.00 $ 1,200.00 $ 2,400.00 $ 01 0 4" S e r v i c e T a p ( K I S D C o n n e c t i o n ) LF 15 . 0 0 14 5 . 0 0 $ 2, 1 7 5 . 0 0 $ 10 0 . 0 0 $ 1,500.00 $ 1,500.00 $ 22,500.00 $ 01 1 2" A i r R e l e a s e V a l v e A s s e m b l y EA 2. 0 0 1, 6 0 0 . 0 0 $ 3, 2 0 0 . 0 0 $ 3, 9 3 5 . 0 0 $ 7,870.00 $ 2,300.00 $ 4,600.00 $ 01 2 6" G a t e V a l v e EA 1. 0 0 1, 1 0 0 . 0 0 $ 1, 1 0 0 . 0 0 $ 2, 5 5 5 . 0 0 $ 2,555.00 $ 1,400.00 $ 1,400.00 $ 01 3 12 " G a t e V a l v e EA 1. 0 0 2, 3 0 0 . 0 0 $ 2, 3 0 0 . 0 0 $ 4, 8 0 0 . 0 0 $ 4,800.00 $ 1,500.00 $ 1,500.00 $ 01 4 16 " G a t e V a l v e EA 3. 0 0 10 , 1 0 0 . 0 0 $ 30 , 3 0 0 . 0 0 $ 13 , 8 0 5 . 0 0 $ 41,415.00 $ 7,000.00 $ 21,000.00 $ 01 5 6" B l o w - o f f V a l v e & A s s e m b l y w / 6 - i n c h D u c t i l e I r o n L i n e & P l u g EA 2. 0 0 7, 0 0 0 . 0 0 $ 14 , 0 0 0 . 0 0 $ 9, 0 3 0 . 0 0 $ 18,060.00 $ 8,300.00 $ 16,600.00 $ 01 6 Co n c r e t e C o l l a r f o r G a t e V a l v e s ( 1 2 - i n c h s i z e o r l e s s ) EA 2. 0 0 15 0 . 0 0 $ 30 0 . 0 0 $ 60 0 . 0 0 $ 1,200.00 $ 500.00 $ 1,000.00 $ 01 7 4" S D R - 2 6 P V C S e w e r P i p e ( 1 6 0 P S I ) LF 80 . 0 0 69 . 0 0 $ 5, 5 2 0 . 0 0 $ 40 . 0 0 $ 3,200.00 $ 49.00 $ 3,920.00 $ 01 8 6" S D R - 2 6 P V C S e w e r P i p e ( 1 6 0 P S I ) LF 20 . 0 0 73 . 0 0 $ 1, 4 6 0 . 0 0 $ 90 . 0 0 $ 1,800.00 $ 53.00 $ 1,060.00 $ 01 9 8" S D R - 2 6 P V C S e w e r P i p e ( 1 6 0 P S I ) LF 20 . 0 0 80 . 0 0 $ 1, 6 0 0 . 0 0 $ 90 . 0 0 $ 1,800.00 $ 57.00 $ 1,140.00 $ 02 0 Pe r m a n e n t A s p h a l t P a v e m e n t R e p a i r ( R e m o v e a n d R e p l a c e A s p h a l t w i t h 6 - i n c h H M A C t o t a l ; 2 " - T y p e D o v e r 4 " T y p e B ) SY 13 6 . 0 0 60 . 0 0 $ 8, 1 6 0 . 0 0 $ 95 . 0 0 $ 12,920.00 $ 135.00 $ 18,360.00 $ 02 1 CT S T r e n c h B a c k f i l l p e r C i t y S t a n d a r d D e t a i l u n d e r A s p h a l t P a v e m e n t TO N 24 4 . 0 0 51 . 0 0 $ 12 , 4 4 4 . 0 0 $ 65 . 0 0 $ 15,860.00 $ 93.00 $ 22,692.00 $ 02 2 Na t i v e T r e n c h M a t e r i a l H a u l - O f f f r o m B a c k f i l l Z o n e r e p l a c e d b y C T S B a c k f i l l CY 14 0 . 0 0 10 . 0 0 $ 1, 4 0 0 . 0 0 $ 20 . 0 0 $ 2,800.00 $ 12.00 $ 1,680.00 $ 02 3 4" T o p s o i l ( R e p a i r o f p a r k w a y s ) CY 47 5 . 0 0 30 . 0 0 $ 14 , 2 5 0 . 0 0 $ 40 . 0 0 $ 19,000.00 $ 53.00 $ 25,175.00 $ 02 4 So d G r a s s ( R e p a i r o f p a r k w a y s ) SY 43 0 5 . 0 0 11 . 0 0 $ 47 , 3 5 5 . 0 0 $ 3. 0 0 $ 12,915.00 $ 6.00 $ 25,830.00 $ 02 5 Pr o t e c t M a i l b o x EA 12 . 0 0 10 0 . 0 0 $ 1, 2 0 0 . 0 0 $ 22 0 . 0 0 $ 2,640.00 $ 140.00 $ 1,680.00 $ 02 6 22 " x 1 3 " R C P C u l v e r t LF 80 . 0 0 15 5 . 0 0 $ 12 , 4 0 0 . 0 0 $ 12 0 . 0 0 $ 9,600.00 $ 118.00 $ 9,440.00 $ 02 7 Cu l v e r t E n d S e c t i o n s EA 14 . 0 0 1, 6 0 0 . 0 0 $ 22 , 4 0 0 . 0 0 $ 50 0 . 0 0 $ 7,000.00 $ 2,100.00 $ 29,400.00 $ 02 8 Pr o j e c t S i g n s ( S u p p l y a n d P o s t o n s i t e a s d i r e c t e d b y t h e C i t y ) EA 2. 0 0 60 0 . 0 0 $ 1, 2 0 0 . 0 0 $ 1, 5 0 0 . 0 0 $ 3,000.00 $ 3,200.00 $ 6,400.00 $ 02 9 Pr i v a t e l y O w n e d I r r i g a t i o n L i n e s , S p r i n k l e r H e a d R e p a i r , L a n d s c a p i n g R e p l a c e m e n t a n d M i t i g a t i o n ( A s n e e d e d ) LS 1. 0 0 7, 5 0 0 . 0 0 $ 7, 5 0 0 . 0 0 $ 7, 5 0 0 . 0 0 $ 7,500.00 $ 7,500.00 $ 7,500.00 $ 03 0 SW P P P ≥ 1 a c r e E r o s i o n C o n t r o l M e a s u r e s LS 1. 0 0 6, 5 0 0 . 0 0 $ 6, 5 0 0 . 0 0 $ 6, 5 5 5 . 0 0 $ 6,555.00 $ 5,200.00 $ 5,200.00 $ 03 1 Tr a f f i c C o n t r o l LS 1. 0 0 3, 0 0 0 . 0 0 $ 3, 0 0 0 . 0 0 $ 8, 8 1 5 . 0 0 $ 8,815.00 $ 15,100.00 $ 15,100.00 $ Su b T o t a l 46 9 , 7 8 9 . 0 0 $ 482,765.50 $ 510,355.00 $ SI D E W A L K I M P R O V E M E N T S 00 1 5" C o n c r e t e S i d e w a l k SF 36 0 0 . 0 0 7. 0 0 $ 25 , 2 0 0 . 0 0 $ 4. 5 0 $ 16,200.00 $ 9.00 $ 32,400.00 $ 00 2 Si d e w a l k C u l v e r t EA 2. 0 0 4, 8 0 0 . 0 0 $ 9, 6 0 0 . 0 0 $ 2, 0 0 0 . 0 0 $ 4,000.00 $ 1,240.00 $ 2,480.00 $ 00 3 6" C o n c r e t e D r i v e w a y ( A s n e e d e d ) SF 16 0 0 . 0 0 9. 0 0 $ 14 , 4 0 0 . 0 0 $ 5. 7 5 $ 9,200.00 $ 10.00 $ 16,000.00 $ 00 4 6" C o n c r e t e I n t e g r a l C u r b LF 25 . 0 0 6. 0 0 $ 15 0 . 0 0 $ 20 . 0 0 $ 500.00 $ 13.00 $ 325.00 $ 00 5 6" C o n c r e t e C u r b & G u t t e r LF 80 . 0 0 30 . 0 0 $ 2, 4 0 0 . 0 0 $ 35 . 0 0 $ 2,800.00 $ 11.00 $ 880.00 $ 00 6 Co n c r e t e F l u m e R e p a i r LS 1. 0 0 1, 2 0 0 . 0 0 $ 1, 2 0 0 . 0 0 $ 4, 0 0 0 . 0 0 $ 4,000.00 $ 2,237.00 $ 2,237.00 $ 00 7 6" - 1 2 " T r e e R e m o v a l a n d D i s p o s a l EA 1. 0 0 60 0 . 0 0 $ 60 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 1,000.00 $ 823.00 $ 823.00 $ Su b T o t a l 53 , 5 5 0 . 0 0 $ 37,700.00 $ 55,145.00 $ MI S C E L L A N E O U S 00 1 01 7 0 . 0 1 0 0 M o b i l i z a t i o n LS 1. 0 0 12 , 0 0 0 . 0 0 $ 12 , 0 0 0 . 0 0 $ - $ 26,405.00 $ -$ 4,500.00 $ Su b T o t a l 12 , 0 0 0 . 0 0 $ 26,405.00 $ 4,500.00 $ *B o l d a n d i t a l i z c i z e d i n d i c a t e s t h e c o r r e c t e d a m o u n t s TO T A L 53 5 , 3 3 9 . 0 0 $ 546,870.50 $ 570,000.00 $ "A s R e a d " T O T A L 53 4 , 6 3 9 . 0 0 $ 546,870.50 $ 570,000.00 $ 1 Fo u r S t a r E x c a v a t i n g 2 AN A S i t e C o n s t r u c t i o n 3 Un i t o f Me a s u r e Bi d Qu a n t i t y Bi d l i s t I t e m N o . D e s c r i p t i o n Wildstone Construction LLC Pa g e 1 Pr o j e c t N a m e : N. P e a r s o n R d 1 6 - i n c h W a t e r l i n e I m p r o v e m e n t s DA P r o j e c t N o . : 20 0 9 . 0 0 2 Ci t y P r o j e c t N o . : Bi d O p e n i n g D a t e : 24 - A p r - 1 8 Ta b u l a t e d B y : Jo s h W r i g h t , P E WA T E R I M P R O V E M E N T S 00 1 16 " P V C W a t e r P i p e ( C - 9 0 5 ) LF 29 3 5 . 0 0 00 2 12 " P V C W a t e r P i p e ( C - 9 0 0 ) LF 45 . 0 0 00 3 8" P V C W a t e r P i p e ( C - 9 0 0 ) LF 25 . 0 0 00 4 6" P V C W a t e r P i p e ( C - 9 0 0 ) LF 25 . 0 0 00 5 Tr e n c h S a f e t y LF 30 0 5 . 0 0 00 6 Du c t i l e I r o n W a t e r F i t t i n g s w / R e s t r a i n t TO N 4. 1 0 00 7 Co n n e c t i o n t o E x i s t i n g 1 6 " W a t e r M a i n EA 2. 0 0 00 8 Co n n e c t i o n t o E x i s t i n g 1 2 " H D P E W a t e r M a i n ( T a p p i n g S l e e v e ) EA 1. 0 0 00 9 Re p a i r / R e p l a c e W a t e r S e r v i c e ( A s n e e d e d f o r c r o s s i n g 1 6 - i n c h ) EA 2. 0 0 01 0 4" S e r v i c e T a p ( K I S D C o n n e c t i o n ) LF 15 . 0 0 01 1 2" A i r R e l e a s e V a l v e A s s e m b l y EA 2. 0 0 01 2 6" G a t e V a l v e EA 1. 0 0 01 3 12 " G a t e V a l v e EA 1. 0 0 01 4 16 " G a t e V a l v e EA 3. 0 0 01 5 6" B l o w - o f f V a l v e & A s s e m b l y w / 6 - i n c h D u c t i l e I r o n L i n e & P l u g EA 2. 0 0 01 6 Co n c r e t e C o l l a r f o r G a t e V a l v e s ( 1 2 - i n c h s i z e o r l e s s ) EA 2. 0 0 01 7 4" S D R - 2 6 P V C S e w e r P i p e ( 1 6 0 P S I ) LF 80 . 0 0 01 8 6" S D R - 2 6 P V C S e w e r P i p e ( 1 6 0 P S I ) LF 20 . 0 0 01 9 8" S D R - 2 6 P V C S e w e r P i p e ( 1 6 0 P S I ) LF 20 . 0 0 02 0 Pe r m a n e n t A s p h a l t P a v e m e n t R e p a i r ( R e m o v e a n d R e p l a c e A s p h a l t w i t h 6 - i n c h H M A C t o t a l ; 2 " - T y p e D o v e r 4 " T y p e B ) SY 13 6 . 0 0 02 1 CT S T r e n c h B a c k f i l l p e r C i t y S t a n d a r d D e t a i l u n d e r A s p h a l t P a v e m e n t TO N 24 4 . 0 0 02 2 Na t i v e T r e n c h M a t e r i a l H a u l - O f f f r o m B a c k f i l l Z o n e r e p l a c e d b y C T S B a c k f i l l CY 14 0 . 0 0 02 3 4" T o p s o i l ( R e p a i r o f p a r k w a y s ) CY 47 5 . 0 0 02 4 So d G r a s s ( R e p a i r o f p a r k w a y s ) SY 43 0 5 . 0 0 02 5 Pr o t e c t M a i l b o x EA 12 . 0 0 02 6 22 " x 1 3 " R C P C u l v e r t LF 80 . 0 0 02 7 Cu l v e r t E n d S e c t i o n s EA 14 . 0 0 02 8 Pr o j e c t S i g n s ( S u p p l y a n d P o s t o n s i t e a s d i r e c t e d b y t h e C i t y ) EA 2. 0 0 02 9 Pr i v a t e l y O w n e d I r r i g a t i o n L i n e s , S p r i n k l e r H e a d R e p a i r , L a n d s c a p i n g R e p l a c e m e n t a n d M i t i g a t i o n ( A s n e e d e d ) LS 1. 0 0 03 0 SW P P P ≥ 1 a c r e E r o s i o n C o n t r o l M e a s u r e s LS 1. 0 0 03 1 Tr a f f i c C o n t r o l LS 1. 0 0 Su b T o t a l SI D E W A L K I M P R O V E M E N T S 00 1 5" C o n c r e t e S i d e w a l k SF 36 0 0 . 0 0 00 2 Si d e w a l k C u l v e r t EA 2. 0 0 00 3 6" C o n c r e t e D r i v e w a y ( A s n e e d e d ) SF 16 0 0 . 0 0 00 4 6" C o n c r e t e I n t e g r a l C u r b LF 25 . 0 0 00 5 6" C o n c r e t e C u r b & G u t t e r LF 80 . 0 0 00 6 Co n c r e t e F l u m e R e p a i r LS 1. 0 0 00 7 6" - 1 2 " T r e e R e m o v a l a n d D i s p o s a l EA 1. 0 0 Su b T o t a l MI S C E L L A N E O U S 00 1 01 7 0 . 0 1 0 0 M o b i l i z a t i o n LS 1. 0 0 Su b T o t a l *B o l d a n d i t a l i z c i z e d i n d i c a t e s t h e c o r r e c t e d a m o u n t s TO T A L "A s R e a d " T O T A L Un i t o f Me a s u r e Bi d Qu a n t i t y Bi d l i s t I t e m N o . D e s c r i p t i o n Un i t P r i c e Ex t e n s i o n Un i t P r i c e Extension Unit Price Extension 90 . 0 0 $ 26 4 , 1 5 0 . 0 0 $ 78 . 0 0 $ 228,930.00 $ 102.08 $ 299,604.80 $ 50 . 0 0 $ 2, 2 5 0 . 0 0 $ 88 . 0 0 $ 3,960.00 $ 148.53 $ 6,683.85 $ 40 . 0 0 $ 1, 0 0 0 . 0 0 $ 72 . 0 0 $ 1,800.00 $ 136.42 $ 3,410.50 $ 30 . 0 0 $ 75 0 . 0 0 $ 54 . 0 0 $ 1,350.00 $ 130.93 $ 3,273.25 $ 1. 0 0 $ 3, 0 0 5 . 0 0 $ 1. 0 0 $ 3,005.00 $ 1.00 $ 3,005.00 $ 8, 5 0 0 . 0 0 $ 34 , 8 5 0 . 0 0 $ 5, 1 0 0 . 0 0 $ 20,910.00 $ 6,935.61 $ 28,436.00 $ 5, 0 0 0 . 0 0 $ 10 , 0 0 0 . 0 0 $ 4, 5 0 0 . 0 0 $ 9,000.00 $ 4,496.00 $ 8,992.00 $ 8, 0 0 0 . 0 0 $ 8, 0 0 0 . 0 0 $ 10 , 0 0 0 . 0 0 $ 10,000.00 $ 6,146.00 $ 6,146.00 $ 1, 0 0 0 . 0 0 $ 2, 0 0 0 . 0 0 $ 1, 6 0 0 . 0 0 $ 3,200.00 $ 2,400.00 $ 4,800.00 $ 10 0 . 0 0 $ 1, 5 0 0 . 0 0 $ 27 0 . 0 0 $ 4,050.00 $ 175.33 $ 2,629.95 $ 2, 0 0 0 . 0 0 $ 4, 0 0 0 . 0 0 $ 3, 1 0 0 . 0 0 $ 6,200.00 $ 2,267.50 $ 4,535.00 $ 3, 0 0 0 . 0 0 $ 3, 0 0 0 . 0 0 $ 1, 1 0 0 . 0 0 $ 1,100.00 $ 1,126.00 $ 1,126.00 $ 5, 0 0 0 . 0 0 $ 5, 0 0 0 . 0 0 $ 2, 5 0 0 . 0 0 $ 2,500.00 $ 2,788.00 $ 2,788.00 $ 8, 0 0 0 . 0 0 $ 24 , 0 0 0 . 0 0 $ 14 , 0 0 0 . 0 0 $ 42,000.00 $ 11,025.00 $ 33,075.00 $ 7, 0 0 0 . 0 0 $ 14 , 0 0 0 . 0 0 $ 11 , 7 0 0 . 0 0 $ 23,400.00 $ 9,349.80 $ 18,699.60 $ 1, 5 0 0 . 0 0 $ 3, 0 0 0 . 0 0 $ 12 0 . 0 0 $ 240.00 $ 125.00 $ 250.00 $ 50 . 0 0 $ 4, 0 0 0 . 0 0 $ 60 . 0 0 $ 4,800.00 $ 64.00 $ 5,120.00 $ 60 . 0 0 $ 1, 2 0 0 . 0 0 $ 62 . 0 0 $ 1,240.00 $ 64.75 $ 1,295.00 $ 70 . 0 0 $ 1, 4 0 0 . 0 0 $ 72 . 0 0 $ 1,440.00 $ 75.00 $ 1,500.00 $ 45 . 0 0 $ 6, 1 2 0 . 0 0 $ 95 . 0 0 $ 12,920.00 $ 80.33 $ 10,924.88 $ 60 . 0 0 $ 14 , 6 4 0 . 0 0 $ 14 0 . 0 0 $ 34,160.00 $ 75.00 $ 18,300.00 $ 5. 0 0 $ 70 0 . 0 0 $ 16 . 0 0 $ 2,240.00 $ 15.00 $ 2,100.00 $ 30 . 0 0 $ 14 , 2 5 0 . 0 0 $ 54 . 0 0 $ 25,650.00 $ 44.00 $ 20,900.00 $ 5. 0 0 $ 21 , 5 2 5 . 0 0 $ 7. 0 0 $ 30,135.00 $ 6.85 $ 29,489.25 $ 50 0 . 0 0 $ 6, 0 0 0 . 0 0 $ 80 0 . 0 0 $ 9,600.00 $ 65.00 $ 780.00 $ 55 . 0 0 $ 4, 4 0 0 . 0 0 $ 16 0 . 0 0 $ 12,800.00 $ 85.00 $ 6,800.00 $ 1, 5 0 0 . 0 0 $ 21 , 0 0 0 . 0 0 $ 2, 1 0 0 . 0 0 $ 29,400.00 $ 950.00 $ 13,300.00 $ 1, 0 0 0 . 0 0 $ 2, 0 0 0 . 0 0 $ 45 0 . 0 0 $ 900.00 $ 1,100.00 $ 2,200.00 $ 7, 5 0 0 . 0 0 $ 7, 5 0 0 . 0 0 $ 7, 5 0 0 . 0 0 $ 7,500.00 $ 7,500.00 $ 7,500.00 $ 25 , 0 0 0 . 0 0 $ 25 , 0 0 0 . 0 0 $ 10 , 0 0 0 . 0 0 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10 , 0 0 0 . 0 0 $ 10 , 0 0 0 . 0 0 $ 11 , 0 0 0 . 0 0 $ 11,000.00 $ 8,670.00 $ 8,670.00 $ 52 0 , 2 4 0 . 0 0 $ 555,430.00 $ 566,334.08 $ 7. 0 0 $ 25 , 2 0 0 . 0 0 $ 7. 0 0 $ 25,200.00 $ 0.38 $ 1,368.00 $ 1, 5 0 0 . 0 0 $ 3, 0 0 0 . 0 0 $ 5, 9 0 0 . 0 0 $ 11,800.00 $ 8,050.00 $ 16,100.00 $ 10 . 0 0 $ 16 , 0 0 0 . 0 0 $ 12 . 0 0 $ 19,200.00 $ 10.06 $ 16,096.00 $ 50 . 0 0 $ 1, 2 5 0 . 0 0 $ 4. 0 0 $ 100.00 $ 34.50 $ 862.50 $ 50 . 0 0 $ 4, 0 0 0 . 0 0 $ 51 . 0 0 $ 4,080.00 $ 46.00 $ 3,680.00 $ 2, 5 0 0 . 0 0 $ 2, 5 0 0 . 0 0 $ 1, 6 0 0 . 0 0 $ 1,600.00 $ 6,900.00 $ 6,900.00 $ 2, 8 0 0 . 0 0 $ 2, 8 0 0 . 0 0 $ 90 0 . 0 0 $ 900.00 $ 1,200.00 $ 1,200.00 $ 54 , 7 5 0 . 0 0 $ 62,880.00 $ 46,206.50 $ 25 , 0 0 0 . 0 0 $ 25 , 0 0 0 . 0 0 $ - $ -$ 17,987.40 $ 17,987.40 $ 25 , 0 0 0 . 0 0 $ -$ 17,987.40 $ 59 9 , 9 9 0 . 0 0 $ 618,310.00 $ 630,527.98 $ 59 9 , 9 9 0 . 0 0 $ 618,310.00 $ 630,510.76 $ 5 4 Wi l l c o U n d e r g r o u n d L L C 6 Wilson Contracting Ja c k s o n C o n s t r u c t i o n , L t d Pa g e 2 Pr o j e c t N a m e : N. P e a r s o n R d 1 6 - i n c h W a t e r l i n e I m p r o v e m e n t s DA P r o j e c t N o . : 20 0 9 . 0 0 2 Ci t y P r o j e c t N o . : Bi d O p e n i n g D a t e : 24 - A p r - 1 8 Ta b u l a t e d B y : Jo s h W r i g h t , P E WA T E R I M P R O V E M E N T S 00 1 16 " P V C W a t e r P i p e ( C - 9 0 5 ) LF 29 3 5 . 0 0 00 2 12 " P V C W a t e r P i p e ( C - 9 0 0 ) LF 45 . 0 0 00 3 8" P V C W a t e r P i p e ( C - 9 0 0 ) LF 25 . 0 0 00 4 6" P V C W a t e r P i p e ( C - 9 0 0 ) LF 25 . 0 0 00 5 Tr e n c h S a f e t y LF 30 0 5 . 0 0 00 6 Du c t i l e I r o n W a t e r F i t t i n g s w / R e s t r a i n t TO N 4. 1 0 00 7 Co n n e c t i o n t o E x i s t i n g 1 6 " W a t e r M a i n EA 2. 0 0 00 8 Co n n e c t i o n t o E x i s t i n g 1 2 " H D P E W a t e r M a i n ( T a p p i n g S l e e v e ) EA 1. 0 0 00 9 Re p a i r / R e p l a c e W a t e r S e r v i c e ( A s n e e d e d f o r c r o s s i n g 1 6 - i n c h ) EA 2. 0 0 01 0 4" S e r v i c e T a p ( K I S D C o n n e c t i o n ) LF 15 . 0 0 01 1 2" A i r R e l e a s e V a l v e A s s e m b l y EA 2. 0 0 01 2 6" G a t e V a l v e EA 1. 0 0 01 3 12 " G a t e V a l v e EA 1. 0 0 01 4 16 " G a t e V a l v e EA 3. 0 0 01 5 6" B l o w - o f f V a l v e & A s s e m b l y w / 6 - i n c h D u c t i l e I r o n L i n e & P l u g EA 2. 0 0 01 6 Co n c r e t e C o l l a r f o r G a t e V a l v e s ( 1 2 - i n c h s i z e o r l e s s ) EA 2. 0 0 01 7 4" S D R - 2 6 P V C S e w e r P i p e ( 1 6 0 P S I ) LF 80 . 0 0 01 8 6" S D R - 2 6 P V C S e w e r P i p e ( 1 6 0 P S I ) LF 20 . 0 0 01 9 8" S D R - 2 6 P V C S e w e r P i p e ( 1 6 0 P S I ) LF 20 . 0 0 02 0 Pe r m a n e n t A s p h a l t P a v e m e n t R e p a i r ( R e m o v e a n d R e p l a c e A s p h a l t w i t h 6 - i n c h H M A C t o t a l ; 2 " - T y p e D o v e r 4 " T y p e B ) SY 13 6 . 0 0 02 1 CT S T r e n c h B a c k f i l l p e r C i t y S t a n d a r d D e t a i l u n d e r A s p h a l t P a v e m e n t TO N 24 4 . 0 0 02 2 Na t i v e T r e n c h M a t e r i a l H a u l - O f f f r o m B a c k f i l l Z o n e r e p l a c e d b y C T S B a c k f i l l CY 14 0 . 0 0 02 3 4" T o p s o i l ( R e p a i r o f p a r k w a y s ) CY 47 5 . 0 0 02 4 So d G r a s s ( R e p a i r o f p a r k w a y s ) SY 43 0 5 . 0 0 02 5 Pr o t e c t M a i l b o x EA 12 . 0 0 02 6 22 " x 1 3 " R C P C u l v e r t LF 80 . 0 0 02 7 Cu l v e r t E n d S e c t i o n s EA 14 . 0 0 02 8 Pr o j e c t S i g n s ( S u p p l y a n d P o s t o n s i t e a s d i r e c t e d b y t h e C i t y ) EA 2. 0 0 02 9 Pr i v a t e l y O w n e d I r r i g a t i o n L i n e s , S p r i n k l e r H e a d R e p a i r , L a n d s c a p i n g R e p l a c e m e n t a n d M i t i g a t i o n ( A s n e e d e d ) LS 1. 0 0 03 0 SW P P P ≥ 1 a c r e E r o s i o n C o n t r o l M e a s u r e s LS 1. 0 0 03 1 Tr a f f i c C o n t r o l LS 1. 0 0 Su b T o t a l SI D E W A L K I M P R O V E M E N T S 00 1 5" C o n c r e t e S i d e w a l k SF 36 0 0 . 0 0 00 2 Si d e w a l k C u l v e r t EA 2. 0 0 00 3 6" C o n c r e t e D r i v e w a y ( A s n e e d e d ) SF 16 0 0 . 0 0 00 4 6" C o n c r e t e I n t e g r a l C u r b LF 25 . 0 0 00 5 6" C o n c r e t e C u r b & G u t t e r LF 80 . 0 0 00 6 Co n c r e t e F l u m e R e p a i r LS 1. 0 0 00 7 6" - 1 2 " T r e e R e m o v a l a n d D i s p o s a l EA 1. 0 0 Su b T o t a l MI S C E L L A N E O U S 00 1 01 7 0 . 0 1 0 0 M o b i l i z a t i o n LS 1. 0 0 Su b T o t a l *B o l d a n d i t a l i z c i z e d i n d i c a t e s t h e c o r r e c t e d a m o u n t s TO T A L "A s R e a d " T O T A L Un i t o f Me a s u r e Bi d Qu a n t i t y Bi d l i s t I t e m N o . D e s c r i p t i o n Un i t P r i c e Ex t e n s i o n Un i t P r i c e Extension Unit Price Extension Unit Price Extension 10 7 . 0 0 $ 31 4 , 0 4 5 . 0 0 $ 12 5 . 0 0 $ 366,875.00 $ 120.00 $ 352,200.00 $ 90.00 $ 264,150.00 $ 10 0 . 0 0 $ 4, 5 0 0 . 0 0 $ 11 5 . 0 0 $ 5,175.00 $ 110.00 $ 4,950.00 $ 65.00 $ 2,925.00 $ 95 . 0 0 $ 2, 3 7 5 . 0 0 $ 90 . 0 0 $ 2,250.00 $ 100.00 $ 2,500.00 $ 80.00 $ 2,000.00 $ 90 . 0 0 $ 2, 2 5 0 . 0 0 $ 10 0 . 0 0 $ 2,500.00 $ 100.00 $ 2,500.00 $ 81.00 $ 2,025.00 $ 1. 0 0 $ 3, 0 0 5 . 0 0 $ 7. 0 0 $ 21,035.00 $ 3.00 $ 9,015.00 $ 1.50 $ 4,507.50 $ 2, 0 0 0 . 0 0 $ 8, 2 0 0 . 0 0 $ 2, 5 0 0 . 0 0 $ 10,250.00 $ 9,650.00 $ 39,565.00 $ 7,000.00 $ 28,700.00 $ 6, 0 0 0 . 0 0 $ 12 , 0 0 0 . 0 0 $ 7, 5 0 0 . 0 0 $ 15,000.00 $ 5,475.00 $ 10,950.00 $ 3,500.00 $ 7,000.00 $ 4, 0 0 0 . 0 0 $ 4, 0 0 0 . 0 0 $ 8, 5 0 0 . 0 0 $ 8,500.00 $ 8,500.00 $ 8,500.00 $ 3,500.00 $ 3,500.00 $ 1, 0 0 0 . 0 0 $ 2, 0 0 0 . 0 0 $ 2, 5 0 0 . 0 0 $ 5,000.00 $ 2,500.00 $ 5,000.00 $ 1,000.00 $ 2,000.00 $ 20 0 . 0 0 $ 3, 0 0 0 . 0 0 $ 75 0 . 0 0 $ 11,250.00 $ 175.00 $ 2,625.00 $ 50.00 $ 750.00 $ 5, 0 0 0 . 0 0 $ 10 , 0 0 0 . 0 0 $ 2, 5 0 0 . 0 0 $ 5,000.00 $ 4,000.00 $ 8,000.00 $ 9,000.00 $ 18,000.00 $ 1, 0 0 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 1, 2 5 0 . 0 0 $ 1,250.00 $ 1,305.00 $ 1,305.00 $ 9,000.00 $ 9,000.00 $ 3, 0 0 0 . 0 0 $ 3, 0 0 0 . 0 0 $ 3, 0 0 0 . 0 0 $ 3,000.00 $ 2,700.00 $ 2,700.00 $ 2,900.00 $ 2,900.00 $ 8, 0 0 0 . 0 0 $ 24 , 0 0 0 . 0 0 $ 8, 0 0 0 . 0 0 $ 24,000.00 $ 7,200.00 $ 21,600.00 $ 7,500.00 $ 22,500.00 $ 9, 0 0 0 . 0 0 $ 18 , 0 0 0 . 0 0 $ 25 , 0 0 0 . 0 0 $ 50,000.00 $ 21,610.00 $ 43,220.00 $ 6,000.00 $ 12,000.00 $ 25 0 . 0 0 $ 50 0 . 0 0 $ 50 0 . 0 0 $ 1,000.00 $ 500.00 $ 1,000.00 $ 250.00 $ 500.00 $ 15 0 . 0 0 $ 12 , 0 0 0 . 0 0 $ 25 . 0 0 $ 2,000.00 $ 103.00 $ 8,240.00 $ 80.00 $ 6,400.00 $ 16 0 . 0 0 $ 3, 2 0 0 . 0 0 $ 27 . 0 0 $ 540.00 $ 104.00 $ 2,080.00 $ 100.00 $ 2,000.00 $ 17 0 . 0 0 $ 3, 4 0 0 . 0 0 $ 32 . 0 0 $ 640.00 $ 105.00 $ 2,100.00 $ 100.00 $ 2,000.00 $ 11 5 . 0 0 $ 15 , 6 4 0 . 0 0 $ 75 . 0 0 $ 10,200.00 $ 90.00 $ 12,240.00 $ 75.00 $ 10,200.00 $ 50 . 0 0 $ 12 , 2 0 0 . 0 0 $ 60 . 0 0 $ 14,640.00 $ 50.00 $ 12,200.00 $ 35.00 $ 8,540.00 $ 15 . 0 0 $ 2, 1 0 0 . 0 0 $ 12 . 0 0 $ 1,680.00 $ 140.00 $ 19,600.00 $ 14.00 $ 1,960.00 $ 2. 0 0 $ 95 0 . 0 0 $ 60 . 0 0 $ 28,500.00 $ 25.00 $ 11,875.00 $ 30.00 $ 14,250.00 $ 5. 0 0 $ 21 , 5 2 5 . 0 0 $ 6. 0 0 $ 25,830.00 $ 4.00 $ 17,220.00 $ 5.00 $ 21,525.00 $ 50 . 0 0 $ 60 0 . 0 0 $ 75 . 0 0 $ 900.00 $ 1,000.00 $ 12,000.00 $ 250.00 $ 3,000.00 $ 25 0 . 0 0 $ 20 , 0 0 0 . 0 0 $ 17 0 . 0 0 $ 13,600.00 $ 350.00 $ 28,000.00 $ 100.00 $ 8,000.00 $ 1, 5 0 0 . 0 0 $ 21 , 0 0 0 . 0 0 $ 83 0 . 0 0 $ 11,620.00 $ 1,250.00 $ 17,500.00 $ 1,050.00 $ 14,700.00 $ 50 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 50 0 . 0 0 $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 1,500.00 $ 3,000.00 $ 7, 5 0 0 . 0 0 $ 7, 5 0 0 . 0 0 $ 7, 5 0 0 . 0 0 $ 7,500.00 $ 7,500.00 $ 7,500.00 $ 7,500.00 $ 7,500.00 $ 8, 0 0 0 . 0 0 $ 8, 0 0 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 1,000.00 $ 5,000.00 $ 5,000.00 $ 7,500.00 $ 7,500.00 $ 5, 0 0 0 . 0 0 $ 5, 0 0 0 . 0 0 $ 7, 5 0 0 . 0 0 $ 7,500.00 $ 6,000.00 $ 6,000.00 $ 3,500.00 $ 3,500.00 $ 54 5 , 9 9 0 . 0 0 $ 659,235.00 $ 679,185.00 $ 496,532.50 $ -$ 8. 0 0 $ 28 , 8 0 0 . 0 0 $ 6. 0 0 $ 21,600.00 $ 10.00 $ 36,000.00 $ 5.50 $ 19,800.00 $ 4, 0 0 0 . 0 0 $ 8, 0 0 0 . 0 0 $ 1, 5 5 0 . 0 0 $ 3,100.00 $ 2,000.00 $ 4,000.00 $ 5,500.00 $ 11,000.00 $ 10 . 0 0 $ 16 , 0 0 0 . 0 0 $ 8. 0 0 $ 12,800.00 $ 12.00 $ 19,200.00 $ 7.00 $ 11,200.00 $ 10 . 0 0 $ 25 0 . 0 0 $ 10 . 0 0 $ 250.00 $ 100.00 $ 2,500.00 $ 15.00 $ 375.00 $ 65 . 0 0 $ 5, 2 0 0 . 0 0 $ 35 . 0 0 $ 2,800.00 $ 100.00 $ 8,000.00 $ 45.00 $ 3,600.00 $ 1, 0 0 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 1, 3 5 0 . 0 0 $ 1,350.00 $ 2,000.00 $ 2,000.00 $ 1,100.00 $ 1,100.00 $ 75 0 . 0 0 $ 75 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 1,000.00 $ 1,500.00 $ 1,500.00 $ 500.00 $ 500.00 $ 60 , 0 0 0 . 0 0 $ 42,900.00 $ 73,200.00 $ 47,575.00 $ 28 , 5 5 0 . 0 0 $ 28 , 5 5 0 . 0 0 $ 25 , 0 0 0 . 0 0 $ 25,000.00 $ 37,000.00 $ 37,000.00 $ $27,205.38 27,205.38 $ 28 , 5 5 0 . 0 0 $ 25,000.00 $ 37,000.00 $ 27,205.38 $ 63 4 , 5 4 0 . 0 0 $ 727,135.00 $ 789,385.00 $ 571,312.88 $ 63 4 , 5 4 0 . 0 0 $ 722,135.00 $ 789,385.00 $ Engineers Estimate8 RK M U t i l i t y S e r v i c e s 9 7 Blackrock Construction No r t h T e x a s C o n t r a c t i n g Pa g e 3