Item 7 - ZA18-029 Narrative
12801 N. Central Expressway, Suite 1400, Dallas, TX 75243 hartgaugler.com
April 2, 2018
Mr. Dennis Killough
City of Southlake, Texas
Planning and Development Services
1400 Main Street, Suite 310
Southlake, Texas 76092
Re: Carroll Independent School District
Johnson Elementary School Campus
HGA Project Number 217329
Dear Dennis:
Carroll ISD desires to add to the existing elementary school building on the campus located south of
Continental Boulevard in Southlake, Texas.
Roadway/Access: The traffic pattern onsite will not be substantially affected by this development.
The fire lanes will be adjusted for the new building addition.
Water and Sanitary Sewer service: The building addition will be served from existing services. A
water line will be relocated for the new building addition.
Storm Sewer: No additional storm drain piping is expected.
Electric, Telephone, and Gas: Franchise utilities exist on-site.
Landscape: New plantings shall comply with applicable requirements of the City of Southlake
Landscape Ordinance. Based on the size of the expansion, we will be evaluating the existing
landscape to determine if it meets the Landscape Ordinance.
Additions and renovations of the existing facility consisting of the following:
· A new gym addition that will be utilized as an exercise space while also serving as a tornado
storm shelter
· Two new Kindergarten classrooms and four break-out spaces and additional storage
· (8) new 4 th grade classrooms with additional storage.
· Leveling existing auditorium floor
· Maker spaces will be added with a new cubby layout
· Exterior windows will be added to any classroom with no fenestration and skylights in 3
corridors
· Upgrades to the boys’ and girls’ restrooms not previously renovated in 2010 renovations.
· Flooring to be repaired/ replaced in the existing corridors, the replacement of ceiling grid &
tiles with mechanical repairs & replacement, roofing repairs and exterior waterproofing
upgrades will be carried out in specified areas not done in 2010 renovations.
Phasing:
Phase 1 – June 2018 – September 2018
- T-buildings
- Renovations and temp classrooms at Auditorium
- Geothermal well fields (possible)
- Earthwork for additions
Phase 2 –September 2018 - January 2019
- Gym Addition
12801 N. Central Expressway, Suite 1400, Dallas, TX 75243 hartgaugler.com
- Kinder and Storage additions
- Geothermal conversion (possible)
Phase 3 – January 2019 – September 2019
- Existing gym demo
- 4th grade Classroom additions
- Interior Renovations
- Exterior improvements
Operation of building: The school will continue its normal schedule and the areas affected by
construction will need temporary relocation. Temporary portable classroom buildings are proposed to
fulfill the need during construction.
Please contact me with any questions or comments you may have.
Sincerely,
Hart, Gaugler + Associates, Inc.
John D. Blacker, P.E.
Principal
F:\2017\217329\Civil\Submittals\City Submittals\2018-04-02 Site Plan Submittal\317329-Design Narrative.doc