Loading...
Item 6C Revised Narrative 2-19-18REVISED NARRATIVE 2-19-18 Conceptual Plan showing proposed locations of construction office building(3,800 sf) Mill MR 5 Al t b v t f DOVE STREET tion#1 South Eastern most corner of Parce j Option #2 (Eastern portion of property, directly across from Dock #4) 3 #v; a p o fie'::•<<,... Option #3 (Northern section between the current trailer locations) r