No preview available
 /
     
Item 6C PresentationSpecific Use Permit for Temporary Construction Trailers Verizon Wireless ZA17-062 ZA17-062 Applicant: Griffin Harris, PLLC, on behalf of Verizon Wireless Request: Approval of a Specific Use Permit until December 31, 2019 for two temporary construction trailers at Verizon Wireless. Location: 500 West Dove Road Construction Trailer Location Plan North W. Dove Road Existing Construction Trailers 10 Wax Myrtles and 1 Bald Cypress need replacement Existing Construction Trailers Existing Trailer with Wrap Design and Construction Fencing City Council December 5, 2017; Approved (7-0) subject to the Staff Report dated November 38, 2017 and the Specific Use Permit Review Summary No. 2 dated September 15, 2017; and granting the following variance to the Zoning Ordinance that requires foundation landscape planting consisting of one (1) five-gallon shrub per four (4) linear feet around skirting (excluding entrances); noting that specifically approving a temporary specific use permit for a period that will expire March 31, 2018; instructing the applicant to return directly to City Council no later than March 6, 2018 to present a conceptual option or options, preferably options for permanent construction offices along with a proposed time period for construction. Proposed Construction Office Building Location Options (CC 3-6-18) North Proposed Building Location Option #1 (CC 3-6-18) Proposed Option # 1 Location at southeast corner of property (NW corner of W. Kirkwood Blvd. at W. Dove Road Approximately 3,800 sf construction office building with building material to match main complex building Proposed Building Location Option #2 (CC 3-6-18) Proposed Option # 2 Location east corner of property directly across from Dock #4 Approximately 3,800 sf construction office building with building material to match main complex building Proposed Building Location Option #2 (CC 3-6-18) Proposed Option # 3 Location north of main complex building between the current trailer locations Approximately 3,800 sf construction office building with building material to match main complex building Proposed W. Kirkwood Blvd. Landscape Plan Tyler St. Proposed Location Option #1 (CC 3-6-18) B. View west from W. Kirkwood Blvd. at W. Dove Road A. View north from W. Dove Road at W. Kirkwood Blvd. A B Proposed Location Option #2 (CC 3-6-18) B. View west from W. Kirkwood Blvd. north of Stockton Drive A. View southwest from W. Kirkwood Blvd.at Orchard Hill Drive A B Proposed Office Building Location Option #3 (CC 3-6-18) A. View west from W. Kirkwood Blvd.at Tyler Street B. View west from W. Kirkwood Blvd. west of Tyler Street A B Questions?