Loading...
Item 6C PresentationSpecific Use Permit for Temporary Construction Trailers Verizon Wireless ZA17-062 ZA17-062 Applicant: Griffin Harris, PLLC, on behalf of Verizon Wireless Request: Approval of a Specific Use Permit until December 31, 2019 for two temporary construction trailers at Verizon Wireless. Location: 500 West Dove Road Future Land Use Land Use:Mixed Use Verizon 'siaa-earFbod Future Land Use 1UU-VearFlood Plain ns ity Res' ntuxl Corps of Engineers Property - Public ParklOpen Space i id ial Public/Semi-Public ^ Low Density Residential Medium Density Residential Office Commercial P - Retail Commercial - Mixed Use RuNic.Send-Fu61ic - Town Center Regional Retail 1 m e I n - Industrial if)[)- Flood lain I IN fU D my Res entia.l va � - m6ensF Residential WM— Q0ensdy Res ident �A Dens Res id ntial 100-Y F 1Lin Off 0 Com dal J Zoning Current Zoning: V@rizon NR-P11O Zoning Districts: f 0 AG - Cl `V ® RE - C2 _ 1 0 SF1A - C3 7 I , o� y (� FMSF2 - NR-PL1D SF30 - HC 0 SF20A 0 B1 1 _ SPI SF20B 0 B2 — + -- ��r� \,, R-PLJ D 0 11 MF1 0 12 0MF2 0SP1 } . -P D J ® MH 0 SP2 i F R-PU C} y ti - 11II1,,,i f4��4f���TTT:.TTiiii��Illl 0 CS KJ DT i Jr 01 TZD 1 3 392.5 ffi5 1.250 — F.et L•5 � , 57Z .: . WA I 0.1 h: w` Construction Trailer Location Plan North W. Dove Road Existing Construction Trailers 10 Wax Myrtles and 1 Bald Cypress need replacement Existing Construction Trailers Existing Trailer with Wrap Design and Construction Fencing City Council December 5, 2017; Approved (7-0) subject to the Staff Report dated November 38, 2017 and the Specific Use Permit Review Summary No. 2 dated September 15, 2017; and granting the following variance to the Zoning Ordinance that requires foundation landscape planting consisting of one (1) five-gallon shrub per four (4) linear feet around skirting (excluding entrances); noting that specifically approving a temporary specific use permit for a period that will expire March 31, 2018; instructing the applicant to return directly to City Council no later than March 6, 2018 to present a conceptual option or options, preferably options for permanent construction offices along with a proposed time period for construction. Proposed Construction Office Building Location Options (CC 3-6-18) North Proposed Building Location Option #1 (CC 3-6-18) Proposed Option # 1 Location at southeast corner of property (NW corner of W. Kirkwood Blvd. at W. Dove Road Approximately 3,800 sf construction office building with building material to match main complex building Proposed Building Location Option #2 (CC 3-6-18) Proposed Option # 2 Location east corner of property directly across from Dock #4 Approximately 3,800 sf construction office building with building material to match main complex building Proposed Building Location Option #2 (CC 3-6-18) Proposed Option # 3 Location north of main complex building between the current trailer locations Approximately 3,800 sf construction office building with building material to match main complex building Proposed W. Kirkwood Blvd. Landscape Plan Tyler St. Proposed Location Option #1 (CC 3-6-18) B. View west from W. Kirkwood Blvd. at W. Dove Road A. View north from W. Dove Road at W. Kirkwood Blvd. A B Proposed Location Option #2 (CC 3-6-18) B. View west from W. Kirkwood Blvd. north of Stockton Drive A. View southwest from W. Kirkwood Blvd.at Orchard Hill Drive A B Proposed Office Building Location Option #3 (CC 3-6-18) A. View west from W. Kirkwood Blvd.at Tyler Street B. View west from W. Kirkwood Blvd. west of Tyler Street A B Questions?