Item 6C Site Plan for Barger & Associates Office Building ZA17-065 1 ZA17-065 Applicant: Barger Equity Group, LLC Request: Approval of a site plan for the development of a single-story office building to be occupied by an Allstate Insurance Agency. Location: 440 N. Kimball Avenue Barger & Associates Allstate is requesting approval of a Site Plan for an approximately 3,025 square foot office building on property located at 440 N. Kimball Avenue. 2 3 4 Aerial View Trinity Partners Cambria Scooter’s Chicken Express The subject property is generally located on the west side of N. Kimball Avenue, approximately 375 feet north of the intersection of N. Kimball Avenue and the westbound SH114 Frontage Road. 5 Aerial View Trinity Partners Scooter’s Chicken Express The subject property is generally located on the west side of N. Kimball Avenue, approximately 375 feet north of the intersection of N. Kimball Avenue and the westbound SH114 Frontage Road. 6 Approved Concept Plan / Lot 4 Site Plan (ZA13-089) Existing Trinity Partners Building The proposed development is consistent with a previously approved concept plan under City case ZA13-089 which was approved November 5, 2013 along with a site plan for Trinity Partners Commercial Real Estate located on the adjacent lot to the north (Lot 4). Tree Preservation Ordinance No. 585, as amended, requires at least 70% minimum existing tree cover be preserved. There is a single 24” Oak tree shown in the future connecting driveway extending through Lot 3. The tree will remain until which time Lot 3 is constructed. 2. A reduction in the length of the required bufferyards to accommodate intersecting drives and parking lot landscape islands, as shown on the plan. 3. A minimum spacing of 250 feet is required along N. Kimball Avenue. An existing drive to the south is approximately 198.5 feet from the proposed drive. An existing drive approach to the north is approximately 120 feet from the proposed drive and does not currently serve an established use. 7 Proposed Site Plan – Lot 3 The purpose of this request is for approval of a site plan for development of a single-story office building to be occupied by an Allstate Insurance Agency. The proposed building is approximately 3,025 square feet in size. Twenty seven parking parking spaces provided/ 26 required. 8 Enlarged Proposed Site Plan – Lot 3 9 Colored Rendering Existing Trinity Partners Building This color rendering provides an example of what the proposed building materials and architecture style will look like. The building will look similar to the existing building to the north. The proposed building materials include smooth stone (redish/brown), saw cut stone, stucco and metal panel (Store front); the roof is proposed to be metal with a matte finish. Point out 4 inch metal bracket 10 East Building Elevation Here is a rendering of the east elevation. The proposed building materials include smooth stone, saw cut stone, stucco and metal; the roof is proposed to be metal with a matte finish. The I-1 zoning district requires buildings in the non-residential overlay (facades visible from Kimball) to be vertically articulated. The proposed building meets the required articulation. 11 West Building Elevation 12 South Building Elevation 13 North Building Elevation 14 Tree Preservation and Landscape Plan There is one existing tree (24” oak) located on the property that will need to be removed with the construction of the internal drive. A variance to tree preservation was granted with the previous approval of the concept plan under city case ZA13-089. 15 Requested Variances The applicant is requesting relief from the 8 foot opaque fencing required in the F1 bufferyard on the south property line. 16 Requested Variances The applicant is requesting a variance to the requirement that exposed structural support columns be constructed of, or clad in, masonry. The adjacent building does not include this metal structural element… 17 Planning & Zoning Commission October 19, 2017; Approved (6-0) as presented and subject to the Staff Report dated October 13, 2017 and the Revised Site Plan Review Summary No. 3, dated October 12, 2017; specifically granting the two variances in the staff report related to the columns and masonry material and the required fencing (along the southern property line as required in the 10’ F-1 Bufferyard). 18 Questions? 19 20 Bufferyard Plan A variance is requested regarding the required 8’ opaque fence 21