Item 6D SPIN ReportUSOUTHLAKE
SPIN MEETING REPORT
SPIN Item Number: SPIN17-29
City Case Numbers: ZA17-071
Project Name: Zoning Change and Site Plan for DPS North and Site Plan for
North Park for a Wall Ball Court
SPIN Neighborhoods: SPIN #2
Meeting Date: September 26, 2017
Meeting Location: 1400 Main Street, Southlake, TX
City Council Chambers
Total Attendance: 5
Host: Sherry Berman, Community Engagement Committee
Applicants Presenting: Candice Edmondson, Deputy Director, Community Services
Department, phone: 817-748-8311, email:
cedmondson@ci.southlake.tx.us
City Staff Present: Patty Moos, Planner
Presentation begins: 6:00 pm Presentation ends: 6:07 pm
Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com and clicking
on "I Want to" and "View" "Video on Demand" — forums are listed under SPIN by meeting date.
FORUM SUMMARY:
Property Situation:
The proposed wall ball court will be located on the DPS North property and North Park. The
properties are located at 100 and 200 E. Dove Road, at the northeast intersection of E. Dove
Road and N. White Chapel Blvd.
Development Details:
The Southlake Lacrosse Association has made a request to the Community Services
Department to construct a wall ball court in North Park for lacrosse training. The Association
will be providing matching funds with the City of Southlake for the construction for the $85,000
facility.
The two court wall ball is proposed to be installed on the DPS North property north of the DPS
north parking lot and west of the North Park concession building. The wall ball court will have
two turf courts with a 16 ft. high CMU block wall and be detailed with Millsap sandstone stone
end caps matching the stone masonry on the concession building. Benches will be installed
adjacent to the wall ball court. The court will be lit by two light fixture poles. The existing trees on
the west property line will remain and two trees will be planted along the new sidewalk to the
wall ball court.
The timeline for the project:
October 5, 2017 Planning and Zoning Commission meeting
October 17, 2017 City Council meeting 1St Reading
November 2, 2017 City Council meeting
Construction to begin in Spring 2018.
Exhibits presented at SPIN:
Aerial view of proposed wall ball court:
Proposed Grading Plan:
MM
AW
M_ !WE
� I
\` w i�wLm�in
�% -
wrw
Proposed Site Plan:
carr_
NOR
WALLMiCDM
-JEW 96-
1-2
�"h7sv�
Tree Conservation Plan:
wR �
�R
QL i Nmnxn
v TM Kamm
Y l -* � souSNYwL�
a 6 V
w
Proposed Landscape Plan:
HIM
Wall Ball Court Elevations:
Rendering view west:
Lighting Detail:
Rendering view west:
Questions and Concerns:
There were no questions or concerns.
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official
meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and
the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are
strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council.
Southlake Connect Results for the September 26, 2017 SPIN Town Hall Forum
Detalkd Motincanon Analysis
SPIN! Town Hail Forum -September 26, 2017
13.1.11..
-
CO R ... I%
#.emp1 ]
Wo.RPwlPn le
2CS592d33PQ94$1+
651
891§:
NeE( Mlan
9ulndvd
280
254%
Type
❑
i
� a 1D -90i7 Attempted - e..drrmPa
5e8eom
aoxT.os-as
t59D
N 10010 t9O94V mtemoled - Mot Canfi—d
1 RI SP.1$
❑
37
81617-4 PA Attempted - Not Cone d
Bsiet TuM
s2 M 00 CDT
tBBB
16 10 3M Not 1etem00
COLT malleo
Nm DHrvereid - Nc Answer
301x1
� 145 71.32%7 Other
gsQYeFN!d
�
0
a
CA Thron V
ties
2273
29.FRk
0-6-
41x{51
18
M
��im.
'fDIC¢,'RV
Ce0 Rnulnlpx Mlle,xy PaM❑
lhlnl Yet Tell
VGCImN Fdess.ge Ooh
PnHnnee
Nol 13.1..x6❑ Lenlair P6tll Nm OeM1r.0 _ 9.02'k
Nol DHivercl
-
AmmPe ]
#.emp1 ]
ArtamPe d Atbmpr
Nm DHrveretl - Vaeemai Hung 19
651
891§:
D.Irv�ry (ardor Uryxluxhon ❑clean
5Pm
280
254%
pMwry W IPmds
❑
i
3
D
Uelr�
t59D
12:36'A
1 RI SP.1$
❑
37
0
2 Sxmd_ 513
Not Del—r.. Recipent Nung UP
tBBB
1l 13%
5. R„re,y En,al
Nm DHrvereid - Nc Answer
301x1
3271%
d Rirtvry lbhk
37
0
a
55e6orwa�P Email
fi Seconday GPBae
Dedrene9-lo 4'm[e1na4
2273
29.FRk
T HomePMrc
1
18
M
6. HmneAPpPe-2
Nal Delrve+d-Lme Bury
4e
QOYra
9 Bussx+� Phone
Nm Dd,xered - UN of Semce
3a3
1 d74c
10 — TTD Q-
2
12
19
D
D
D
01%
Mph- 1d Pd R 3
NVI Aflemp[etl2 0 l
Ntrr Ddi�.tvttl - CatA6ct ❑narudad6 143 1 3DM
ANe ,e aver Tme
Isk
Ik
AnmP1 Tlme @elWary Y1etl+ed
A.emp 1
AmmPe ]
#.emp1 ]
ArtamPe d Atbmpr
5 k.amq
6
Atumpl P
AMmpe 6
Tevll
2017.{9.25123599 Rmdry SMB
.f
E
❑
i
3
D
U
D
94
S:r _ SMS
❑
37
0
0
9
9
D
0
37
N -N Emad
25
51
37
0
a
0
0
0
119
ft-, Dmh1e
1
18
M
2d
a
0
D
0
79
fie -q E.M
0
D
2
12
19
D
D
D
30
.'+err�ld.ryP4aWly
1
2
1
7
0
D
0
12
Home P1'are
IMF
t
3
4
2
0
0
0
7877
MdY2 PIED614'
euamexsPMa
0
30[9
D
D
❑
0
1
3
9'
F
0
0
❑
D
D
0
1
7.03
TTVI MD.-
a
D
a
0
0
a
0 0
0
N17�,25{2MIN To1de
10987
111
TO
8T
m
0
a a
19862
417d9.25123711
%-q SMB
0
D
a
0
0
0
0 0
D
SecOmPaar SMS
0
9
0
0
0
0
0 0
0
Mmary F-1
0
D
a
0
0
a
0 0
a
Primary LlmW!
D
D
0
D
❑
❑
❑ 0
0
SCYmrsn E-1
0
0
0
0
0
0
0 0
0
SecOPWIXiFOWe
0
D
a
D
0
0
0 0
9
M1xne Plvne
❑
0
❑
o
a
1
5 0
2
Henle Plume k2
0
6
❑
D
D
0
1 D
1
B— P—
0
0
a
0
a
2
1 2
6
1'+Y �TfD It Nk
0
D
0
0
0
a
0 0
D
.1]-.. 1037It TMLLf
0
D
0
D
0
f2
0 2
1T