Item 6B PresentationZA17-063
Lonesome Dove Baptist ChurchSite Plan
1
APPLICANT: Eiler Construction and Adams Engineering
OWNER: Lonesome Dove Baptist Church
REQUEST: Approval of a Site Plan for Lonesome Dove Baptist Church to install 12 additional
paved parking spaces on the church property.
LOCATION: 2380 Lonesome Dove Road
ZA17-063
The applicants, Eiler Construction and Adams Engineering, are requesting approval for a site plan for Lonesome Dove Baptist Church to install 12 additional paved parking spaces on the
church property. The church is located at 2380 Lonesome Dove Road.
2
The future land use plan designation is public/semi-public.
3
The current zoning is CS Community Service District.
4
This aerial shows the location of the church on Lonesome Dove Road north of E. Dove Road.
5
APPROVED Site PLAN (ZA99-009)
This is the approved site plan for the property under planning case ZA99-009.
6
Aerial with Proposed Parking Spaces
The aerial plan shows the existing buildings on the 5.2 acre church property.This is the proposed site plan for 12 paved parking spaces. Ten parking spaces are located along the north
driveway and tow spaces are located along the east driveway.
7
Proposed site Plan (ZA17-063)
North
Site Plan Location
This slide shows the detailed location of the parking spaces on the church site with landscaping and a decomposed granite path near the northeast parking space. Currently, the church
has 72 parking spaces and is seeking to add 12 more paved parking spaces to help with overflow parking for the church.
8
View west to one parking space on the east parking lot
Site Photographs
View west to one proposed parking space on east parking lot
A
B
A
B
These are photographs of the east parking lot with the two proposed parking spaces.
9
View west to ten proposed
parking spaces north of church
Site Photographs
View southwest to ten proposed
parking spaces north of church
C
C
D
D
These photographs show the 10 proposed parking spaces along the north driveway.
10
Planning and Zoning Commission
September 21, 2017; Approved (5-0) subject to the Staff Report dated September 19, 2017 and further subject to the Site Plan Review Summary No. 2 dated September 15, 2017.
11
Questions?
12