Loading...
Item 4D Plat Revision for Lots 12R1 and 12R2, A. H. Chivers No. 299 Addition ZA17-056 Case number ZA17-056 is a Plat Revision for Lots 12R1 and 12R2, A. H. Chivers No. 299 Addition 1 Owner/ Applicant: PST Holdings, LLC Request: Approval of a Plat Revision for Lots 12R1 and 12R2, A. H. Chivers No. 299 Addition to divide the existing Lot 12, A. H. Chivers No. 299 Addition into two lots that conform to the approved Zoning Change and Site Plan for Kirkwood Crossing Location: 1200 N. Carroll Ave. ZA17-056 The request is for approval of a Plat Revision for Lots 12R1 and 12R2, A. H. Chivers No. 299 Addition to divide the existing Lot 12, A. H. Chivers No. 299 Addition into two lots that conform to the approved Zoning Change and Site Plan for Kirkwood Crossing. The property is located at 1200 N. Carroll Ave. 2 The future land use designation is mixed use. 3 The current zoning on the property is S-P-1 Detailed Site Plan District. 4 Aerial View This is an aerial view of the property located at the northwest corner of N. Carroll Ave. and E. Highland St., which is to be the future alignment of Kirkwood Blvd. 5 Approved Site Plan for Kirkwood Crossing A Zoning Change and Site Plan for Kirkwood Crossing from “AG” Agricultural District to “S-P-1” Detailed Site Plan District to develop two one-story office buildings on approximately 0.89 acres was approved by City Council on November 18, 2014. The approved lot line between the two buildings is shown as the yellow dashed line. The first phase, which consists of a general office building with approximately 3,200 square feet of floor area on the northern lot, is currently under construction. The second phase will consist of an approximately 3,802 square foot medical office building on the southern lot. The site was not served by City sewer when the development was originally approved, so the property was platted as one lot until such time that City sewer is extended to the property. The northern lot was to be served by a septic system until City sewer is available. City sewer is currently under construction to serve both of the proposed lots and it should be completed by September 2017, so the construction of the septic system is not needed. The plat can be recorded once City sewer is available to both lots. 6 Plat Revision The proposed plat revision conforms to the approved S-P-1 zoning and site plan. A review comment has been included to add the corner clip on the front building line for a possible future roundabout as it was shown on the approved Site Plan. 7 Approved Tree Preservation Plan There have been no changes to the tree conservation plan since it was approved with the S-P-1 zoning in 2014. 8 August 3, 2017; Approved (7-0) subject to the staff report dated July 28, 2017 and Plat Review Summary No. 2, dated July 28, 2017, noting the Chairman’s comments that he would appreciate the applicant being present at the City Council meeting. P & Z Action The Planning and Zoning Commission recommended approval (7-0) subject to the staff report dated July 28, 2017 and Plat Review Summary No. 2, dated July 28, 2017, noting the Chairman’s comments that he would appreciate the applicant being present at the City Council meeting. 9 Questions? 10