Loading...
Item 6B SPIN Report IDSOUTHLAKE SPIN MEETING REPORT SPIN Item Number: SPIN2017-17 Project Name: Mughlai SPIN Neighborhood: SPIN #8 Meeting Date: July 25, 2017 Meeting Location: 1400 Main Street, Southlake, TX City Council Chambers Total Attendance: Approximately 56 Host: Ben Siebach, Community Engagement Committee Applicant Presenting: Drew Hayes City Staff Present: Jerod Potts, Assistant to the Director— Planning and Development Services, Lauren LaNeave—Assistant to the City Manager Attached to the end of this report are the Southlake Connect Results for the July 25, 2017 SPIN Town Hall Forum Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com and clicking on "Learn More" under Video On Demand; forums are listed under SPIN by meeting date. FORUM SUMMARY: Property Situation: • 3311 E. SH 114 Development Details: • Proposed awning addition that would go over an existing patio • There would be some additional small awnings • The applicant noted there would be no change to any current zoning, use, or area —just an update to the elevations • No change to the current parking or landscaping • The awning will cover an existing patio (approximately 520 square feet), plus adjacent windows • Material of the awning is compliant with current fire code (NFPA 701) • Sprinkler heads will be added per direction of the Fire Marshal to the exterior area • Screens above the railing where you can see in will be approximately 75% transparent, so you can see into and out of the awning, with a small border around those openings • A small ridge portion of the awning projects out with the same projection of the ridge line of the roof, paralleling the existing architecture • Requesting a variance to not wrap the existing steel tubes (columns) that will support the awning in masonry Exhibits presented at SPIN: Mug ]' Awn 1 nAdd ition 3311 E. HWY 114 Southlake, Texas CASE NO: ZA-17-055 1 I ughlai Awning Addition - Location VI INITY MAP U-G H WI 1 LW3HIAI M ughlai Awning Addition — Existing Proposed b Existing Proposed Mughlai Awning Addition — Project Data • No Change to Cu rre nt Zo ni ng, Use, orArea • Flo Change to Current Parking or Landscaping • Covers existing patio (Approx, 5 0sf), plus adjacent windows • Material is compliant with Fire Code (NFPA 70 1) • S prinkler Heads as directed by Fire Marshall • 75 Transparent/ 5 Opaque Panel (Above Railing) �4 i �•3 l � ::s Similar Enclosure EIELLWErH oil , :jr— — + 10"Z pal =� Similar Enclosures Mu hlai Awning Addition — Elevations ��+� EAST ELEYJ,TKY{ h . . C�45EN8.2A•i7-G53 — - - — ------ ---- �Tw �raw � meLerunaw QUESTIONS / CONCERNS: • Is there anything here about wind load? o Patio covering being done by qualified contractor— it will be engineered as well. The City will check engineering as part of the building inspection SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives.The report is neither verbatim nor official meeting minutes;rather it serves to inform elected and appointed officials,City staff,and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Southlake Connect Results for the July 25, 2017 SPIN Town Hall Forum s Ar Fridgeu J x" .a � Dasnboad niv.n. Nau6cauons conurn s.lunos ac« Re aDeimled NPliflcanon AnaNsrsa SPIN Ta Hall Forum-July 26,2o170 Detailed Notification Analysis SPIN Town Hall Forum-July 26,2017 Details cad N.ewls N.bo.4m.ID 2202425597835416 Nee6aade. Seandara NP �0 W.00%1 A[temPled-ConFrmed Stan Dai. 21117-07-2410226(93.85A3 Attempled-Nal Confirmed M 552(5.07%)Attempted-N.(Connected Smn Tlm. 13.39A1 COT M 22(0.20%)Not Attempled Confilmauon No 9fi(0.88%)Other R.9 u.and Call Thrmdins Ves Duraion 4 hRs) D190.tlP.iad9 M.ssa9. yp[e?l GII R.aJb(gr 0.lYr.ry Pall Teal %MTtel Format Preference Me—ow Attempted-Not Confirmed GO—-ToW .el 2781 le 16% DelMery nrtler Or❑ani7ffiion De A Sent 216 1.08% Oell. Me ds Delivered 1491 1360% E.Primary S 2 SecondaSMry SMS NplDeliveretl-Vpiremail Hung Up T42 6.01% 3.Primary Email No[Deliveretl-NO Ansvrer 4063 3].47% d.Primary Mobile 5.Secondary EmailN­11111111­ec66­1 p 8.Secondary Mablle 7.H.o PPore a.Horne PPore#2 Npl Delivered-Out of 5ernce 222 2.04% 9.01151—Phone Npl Delivered-Invalitl Number 234 2.15% ED.m r TTD Device Nol Delivered I—Busy 96 0.66% Nm Delivered-Duplicate Palh 22 0.20% Not Dellv.r.d-Do—eam Dommunic—Enor 1 0.01% N Delivemd-DwMmtream Ten .,Enor 1 0D1% N.Delivemd-cod 'Uresaifa 94 388% Attempts[Wer Time 38k IIOk Sk ok HHe dela Ls An.mpa Tine Delivery Me— Attempll Atr 02 anemp13 -P1 anempr. ­p"' Anempl7 Anempt# TomN I 2017.07-24 13 44 14 Primary SMS 72 0 0 0 f. 0 f. 0 72 Secondary SMS 0 31 C 0 C. 0 0 0 31 Primary Email 13 41 31 P C P 0 0 91 Primary Mobile 1 14 2D 21 0 0 9 0 56 Sec do Email D 0 I 1❑ 11 D d 0 22 SecondarylV hl 1 1 1 ❑ 7 D D 0 10 Ham.Phone 7672 1 3 1 2 0 0 0 7679 Home Phone#2 0 0 0 I 0 0 0 0 I Business Phone 2901 0 0 2 0 0 0 0 2803 1Tr l rrD Derice o B B o 0 0 0 o B 2111]-0]-2413:M:14 lbT 6 10086 &1 56 3S 211 ❑ 0 0 10685 201]-07-]413'.96:16 P—SMS ❑ ❑ ❑ ❑ ❑ ❑ D 0 ❑ -d_SM9 D ❑ ❑ D D 9 0 0 ❑ Primary Email 0 D D 0 0 D 0 0 0 Primary IV— 0 0 0 0 0 0 0 0 0 5econdary Email 0 0 0 0 0 0 0 0 0 Secondary Mobile 0 0 0 0 0 6 0 0 8 Home Phone 0 0 0 0 0 1 1 0 2 Fbme Phone 42 0 ❑ ❑ 0 0 0 0 0 0 Bu.iress PPece 0 ❑ ❑ 0 ❑ ❑ ❑ 1 1 TTV ITrD Device o ❑ ❑ D D ❑ D o 0 Pma iemn Muse 02017 Eyerbddge,Inc 7 0 0 50-2011 M2&0817 us1mgr02 _