Loading...
Item 4E SPIN Report r Medical and Wellness Overlay Designed and intended for the concentration of local to regional healthcare and related facilities �, �;•� . May include Medical/Wellness Specialty surgery J ]iWM Y� • • Pediatric care es ' Geriatric care (outpatient) • Research and development(including �,• xr hospital or university) • Health,beauty, wellness facilities Medical and Wellness Overlay -- Retail and Office limited to supporting function for primary medical and - wellness use • Medical and Wellness ' Overlay is intended to foster �€ collaboration and multiplication of benefits by ,A, IN locating medical uses near • �_._Y-,� - _�_. each other. =-_a- Envisioned to provide the greatest benefits when used in close proximity to existing facilities. Restaurant and Specialty Retail Overlay Intended for the awn.....: .: concentration of unique dining options not otherwise found in Southlake fir' ��,,. �_ • _` .�= • Purpose is to foster development of a dynamic, },•...: destination restaurant district Ahl Should feature mostly y independent,local "" v = restaurants offering a diverse and healthy cuisine in a sit-down format Restaurant and Specialty Retail Overlay May also include aspects of NNt culinary tourism or educational components up to and including schools offering training in culinary •� ' �� arts. The cluster may provide for incubation of new ' businesses and concepts which might otherwise struggle to operate in more traditional retail commercial spaces. Restaurant and Specialty Retail Overlay t Physical aspects of this districtmay include proximity to community a> r services,niche retail,and P frontage onto shared space_ r„ ratherthan streets,with LL shared parking. Areas located east of Carro -- : - Ave.may include retail operations that are boutique. or specialized in character such as specialty grocers r:- r ,�f r� sw�► home good stores,or boutique hotels that serve culinary or medical clu. MOBILITY RECOMMENDATIONS: M1 S.H. 114/Dove - ■ Design and implement portal plan _ `--� at S.H. 114 and Dove Street which •9 enhances the bridge structure and redesigns the bridge embankments. ■ Fund improvements through the ClR ■ Explore public private partnerships to AA improve the entry portal as development occurs. �' M2 Highway - Beautification ■ Coordinate with TXDoT and the City of Grapevineto make landscape improvements alongthis section of the corridor using recent regional projects such as the Chisolm Trail Parkway as a design example. ■ Develop a S.H. 114 Urban Design Plan. M3 Kirkwood Corridor Branding — - - - _ ■ Design and implement a plan to create a cohesive and unique urban _ design environment alongthe Kirkwood Blvd.Campus Office corridor development and also 1 buffers the impact to adjacent j residential properties I ■ Design should includethe landscapingof medians, installation of sidewalks,street lightingand wayfin.din,gsignage . QUESTIONS/CONCERNS: There were no questions or concerns raised. SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official meeting minutes; rather it serves to inform elected and appointed officials,City staff,and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Call Summary Report: Re >Delaka NoM—AreNsrsa SPIN T..Nall Forum-May 9,9017 Detailed Notificaton Analysis SPIN Town Half Forum-May 9,2017 Oetells Call Results Notlflta6an l0 2bd32302d3EE6417 NOAflwtlan Standard 7yaa t�0(0.00%)Attempted-Confirmed S-0- 2017-O&D31�147A1 IA6.39%I Attempted-Not Confirmed I�1263(7.55%1 Attempted-Not C....Md Start 71— 1249:48 COT r 667(3.99%)Not Attempted Confirmed.. No 14 0109S)01h, k.que call`r,—lino Yes D-1- 4 hr(s) Message VoiceRewt Call R.sulta(pn Delivery Ptlh) Taw %d Tata) F.— Volumall Message Only Pro aronc. D 3A0A 19 76% Delivery Order Org...ation Detaok Dd—a 1806 ad D.lhv M.Ihad. seM 3760 z2.49% 1.Pr'rrary SMS 2 Seca N5— Nd DelNered-Reci MHUNUp 2080 1250% 3.Pwiuy Email Nd Dd'Nered-WA—la 3323 19.37% 4.P—.,Mordle 5.Secondary Erol Not Od'rveretl-V'c ema9 'Up 499 2.09% A.Sec—,Mobile Attempted-Not Coniected 7.Home Phone R Home Phos* Nd Del'Nered-61 eked Phone Number 2 0.01% 0.Olalress Ph— Nd Oel'vered-Communrelim Error 1142 583% 10.TTY/TTD Device Nd D-1—d-U.Busy 117 0.70% NM Delivered-Invalid Number 2 001% Not Aft..pt.d Nd Delivered-Contact P-Nol Defined 39 0.23% Nd DeWered-Duplicak•Palh AM 375% Nd Attempaed-Ursubscnl i 14 ODs% Attempta D—r Tme tOk 10k Ok Hide Mia k IA-0 T.— Oeliv.ry IMhetl A.—,I Anempr2 Aeoempt3 Anemp14 Attempts Anempt8 A—p,7 Anempt9 Anempt9 -- 2017 9588 12 01 atal.2017-958812_`.5:01 Primary SMS 1306 D 0 0 0 0 0 a 0 1306 Secondary SMS 10 517 0 0 0 0 0 0 0 527 Primary Email 267 757 502 0 0 0 0 0 0 1546 Primary MMM 4 236 4% 371 D 0 0 0 0 1" Seco ,Entail 0 3 49 115 192 0 0 0 0 369 Secondary Moble 1 2 63 59 128 0 0 0 0 253 Home Phone 7M) 5 14 23 15 0 0 0 0 7738 Home Ph—Q 0 0 0 3 2 0 0 0 0 5 6usir.ss PMne 2805 3 12 32 23 0 0 0 0 2075 Tri I TTD Device 0 0 1 3 9 0 0 0 0 13 2017-OSL912 (115re Tdals 12131 1524 1p39 905 371 a 0 0 0 13792 2017-1 812:58:19 Primary SMS 0 0 0 0 0 0 0 0 0 n Secmaary SMS 0 0 0 0 0 0 0 0 0 0 Primary Email 0 0 D c 0 0 0 0 0 0 Primary MOGk 0 0 0 0 0 0 0 0 0 0 secondary Email 0 0 0 0 0 0 0 0 0 0 s—,,laT Wb 0 0 0 0 0 159 0 0 0 199 Hone Phmre 0 0 0 0 D 19 24 D 0 43 Home P—Q 0 0 D 0 0 1 7 2 0 10 6uslrass PW. 0 0 0 0 0 13 10 9 0 32 TTV ITTO Devbe 0 0 D 0 0 4 2 0 2 9 201]-Or..8A 1258.195re Tdals 0 0 0 0 0 19G 4311 2 252